CN207004172U - A kind of provisional guard rail of construction engineering quality detection - Google Patents
A kind of provisional guard rail of construction engineering quality detection Download PDFInfo
- Publication number
- CN207004172U CN207004172U CN201720827414.0U CN201720827414U CN207004172U CN 207004172 U CN207004172 U CN 207004172U CN 201720827414 U CN201720827414 U CN 201720827414U CN 207004172 U CN207004172 U CN 207004172U
- Authority
- CN
- China
- Prior art keywords
- guard rail
- supported rod
- rod erecting
- bar
- buffer zone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of provisional guard rail of construction engineering quality detection, including the first supported rod erecting, flexible firm leg, warning reflection bar, support bar, telescopic mast, firm pin and chute, the top side of first supported rod erecting is provided with the first fixed seat, the outer wrap of first supported rod erecting has warning reflection bar, and the lateral wall of first supported rod erecting is provided with chute.The utility model is scientific and reasonable for structure, it is safe and convenient to use, the structure of guard rail is optimized, make guard rail that there is the feature for being easily installed and dismantling, reduce the time that staff installs guard rail, there is provided inserting hook and connected slot, more convenient staff splices the length of guard rail, there is provided flexible firm leg and support bar, staff is facilitated to adjust the length of support bar, so as to make guard rail more firm, the design is not only easy to use, it is time saving and energy saving, and be more convenient for staff's installation and dismounting guard rail.
Description
Technical field
The provisional guard rail technical field of construction engineering quality detection is the utility model is related to, is specially a kind of building work
The provisional guard rail of journey quality testing.
Background technology
Guard rail is divided into, hillside guard rail, gardens guard rail, stadium guard rail, residential block guard rail and construction safety
Column etc., guard rail play the guardrail of protected working person works, and general guard rail is internally provided with steel wire, embodies guard rail
Compactedness, make guard rail firmer, preferably protect the personal safety of staff, needed when construction engineering quality detects
Use guard rail.
But construction engineering quality detection in the market is not only complicated with provisional guard rail, and function list
One, prior art is the steadiness of increase guard rail, is typically fixedly connected using welding manner, and is welded to connect and is not easy to move
It is dynamic, it has not been convenient to carry, make troubles to staff's installation and removal, so as to reduce the practical value of guard rail, do not set
Put inserting hook and connected slot, it has not been convenient to splice the length of guard rail, be not provided with flexible firm leg and support bar, it is impossible to make protection
Column is more firm, it is impossible to improves the safety index of guard rail.
Utility model content
The utility model provides a kind of construction engineering quality detection provisional guard rail, can effectively solve above-mentioned background
Steadiness of the prior art for increase guard rail is proposed in technology, is typically fixedly connected using welding manner, and is welded to connect not
It is easy to remove, it has not been convenient to carry, made troubles to staff's installation and removal, so as to reduce the practical value of guard rail,
It is not provided with inserting hook and connected slot, it has not been convenient to splice the length of guard rail, be not provided with flexible firm leg and support bar, it is impossible to
Make guard rail more firm, it is impossible to the problem of improving the safety index of guard rail.
To achieve the above object, the utility model provides following technical scheme:A kind of construction engineering quality detection is with temporarily
Property guard rail, including the first supported rod erecting, the first fixed seat, the first buffer zone, top band, the second buffer zone, Intermediate Gray, second
Supported rod erecting, connected slot, handle, hinge, bottom bar, flexible firm leg, the second fixed seat, inserting hook, sliding block, warning reflection bar,
Support bar, telescopic mast, firm pin and chute, the top side of first supported rod erecting are provided with the first fixed seat, and first
Supported rod erecting bottom side is provided with the second fixed seat, and the outer wrap of first supported rod erecting has warning reflection bar, and
The bottom of one supported rod erecting is provided with bottom bar, and the lateral wall of first supported rod erecting is provided with chute, and the first supported rod erecting
Outside be provided with sliding block, one end of first fixed seat is provided with top band, and the first fixed seat side is close to top band
Lower position be provided with the first buffer zone, one end of first buffer zone is provided with the second buffer zone, and described first is anti-
Protecting band one end is provided with Intermediate Gray close to the middle position of the first supported rod erecting, and one end of the sliding block is provided with inserting hook, institute
The second supported rod erecting is stated above one end of bottom bar, and the side of the second supported rod erecting is provided with connected slot, the company
Patch and handle is provided with below groove, the lateral wall of the bottom bar is provided with hinge, and the preceding surface of bottom bar is provided with and stretched surely
Gu leg, the support bar is arranged on the rear side of the first supported rod erecting, and the lower end insertion of support bar is provided with telescopic mast, described to stretch
The lower end of contracting post is provided with firm pin.
Preferably, first supported rod erecting is rotatablely connected with support bar by rotation seat.
Preferably, first buffer zone, top band, the second buffer zone are fixedly connected with Intermediate Gray by clip.
Preferably, the hinge is provided with three altogether, and three hinges are pressed in the two side of bottom bar respectively.
Preferably, first supported rod erecting is slidably connected with inserting hook by sliding block.
Compared with prior art, the beneficial effects of the utility model:The utility model is scientific and reasonable for structure, side safe to use
Just, the structure of guard rail is optimized, makes guard rail that there is the feature for being easily installed and dismantling, reduce staff's peace
Bottom bar is divided into four sections by the time of assembly and disassembly guard rail, the design, and four sections of bottom bars are connected by hinge, when not in use, will
Bottom bar is folded and can packed up, and is solved steadiness of the prior art for increase guard rail, is typically fixedly connected using welding manner,
And it is welded to connect and is not easy to move, it has not been convenient to carries, the problem of being made troubles to staff's installation and removal, there is provided inserting hook
And connected slot, the length that staff splices guard rail is more convenient, improves the practical value of guard rail, there is provided flexible firm
Leg and support bar, and support bar one end is provided with telescopic mast, facilitates staff to adjust the length of support bar, so as to make to prevent
Guardrail is more firm, improves the safety index of guard rail, the design is not only simple in structure, easy to use, time saving and energy saving, Er Qiegeng
It is easy to staff's installation and dismounting guard rail.
Brief description of the drawings
Accompanying drawing is used for providing further understanding to of the present utility model, and a part for constitution instruction, with this practicality
New embodiment is used to explain the utility model together, does not form to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is side view of the present utility model;
Label in figure:1st, the first supported rod erecting;2nd, the first fixed seat;3rd, the first buffer zone;4th, top band;5th, the second protection
Band;6th, Intermediate Gray;7th, the second supported rod erecting;8th, connected slot;9th, handle;10th, hinge;11st, bottom bar;12nd, stretch firm leg;
13rd, the second fixed seat;14th, inserting hook;15th, sliding block;16th, warning reflection bar;17th, support bar;18th, telescopic mast;19th, pin is consolidated;20、
Chute.
Embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent
Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
Embodiment:As shown in Figure 1-2, the utility model provides a kind of technical scheme, and a kind of construction engineering quality detection is used
Provisional guard rail, including the first supported rod erecting 1, the first fixed seat 2, the first buffer zone 3, top band 4, the second buffer zone 5, in
Between band 6, the second supported rod erecting 7, connected slot 8, handle 9, hinge 10, bottom bar 11, flexible firm leg 12, the second fixed seat 13,
Inserting hook 14, sliding block 15, warning reflection bar 16, support bar 17, telescopic mast 18, firm pin 19 and chute 20, the first supported rod erecting 1
Top side is provided with the first fixed seat 2, and the bottom side of the first supported rod erecting 1 is provided with the second fixed seat 13, the first support
The outer wrap of vertical rod 1 has warning reflection bar 16, and the bottom of the first supported rod erecting 1 is provided with bottom bar 11, the first supported rod erecting 1
Lateral wall be provided with chute 20, and the outside of the first supported rod erecting 1 is provided with sliding block 15, and one end of the first fixed seat 2 is set
There is top band 4, and the side of the first fixed seat 2 is provided with the first buffer zone 3, the first protection close to the lower position of top band 4
3 one end is provided with the second buffer zone 5, the one end of the first buffer zone 3 is provided with close to the middle position of the first supported rod erecting 1
Intermediate Gray 6, one end of sliding block 15 are provided with inserting hook 14, and the second supported rod erecting 7 is arranged on above one end of bottom bar 11, and second
The side of support vertical rod 7 is provided with connected slot 8, and the lower section of connected slot 8 is provided with handle 9, and the lateral wall of bottom bar 11 is provided with
Hinge 10, and the preceding surface of bottom bar 11 is provided with flexible firm leg 12, support bar 17 is arranged on the rear side of the first supported rod erecting 1,
And the lower end insertion of support bar 17 is provided with telescopic mast 18, the lower end of telescopic mast 18 is provided with firm pin 19.
In order to play the purpose of the first support post 1 of support and the second support post 7, in the present embodiment, it is preferred that first
Supported rod erecting 1 is rotatablely connected with support bar 17 by rotation seat.
In order that guard rail more fastens, the effect of high protection is played, in the present embodiment, it is preferred that the first buffer zone 3,
Top band 4, the second buffer zone 5 are fixedly connected with Intermediate Gray 6 by clip.
In order that bottom bar 11 has folding feature, facilitate staff to carry and operate, in the present embodiment, it is preferred that
Hinge 10 is provided with three altogether, and three hinges 10 are pressed in the two side of bottom bar 11 respectively.
In order to play a part of splicing guard rail, increase the length of guard rail, in the present embodiment, it is preferred that the first support
Vertical rod 1 is slidably connected with inserting hook 14 by sliding block 15.
Operation principle and process for using of the present utility model:Protected including the first supported rod erecting 1, the first fixed seat 2, first
Band 3, the second buffer zone 5, the second supported rod erecting 7, bottom bar 11, flexible firm leg 12, the second fixed seat 13 and support bar 17, first
The top side of supported rod erecting 1 is provided with the first fixed seat 2, and the bottom side of the first supported rod erecting 1 is provided with the second fixed seat
13, playing a part of the first buffer zone 3 of connection and the second buffer zone 5, the outer wrap of the first supported rod erecting 1 has warning reflection bar
16, play a part of warning, and the bottom of the first supported rod erecting 1 is provided with bottom bar 11, one end of sliding block 15 is provided with inserting hook 14,
Second supported rod erecting 7 is arranged on above one end of bottom bar 11, and the side of the second supported rod erecting 7 is provided with connected slot 8, and bottom
The preceding surface of bar 11 is provided with flexible firm leg 12, and support bar 17 is arranged on the rear side of the first supported rod erecting 1, to the knot of guard rail
Structure is optimized, and guard rail is had the feature for being easily installed and dismantling, and reduces the time that staff installs guard rail,
The design divides bottom bar 11 for four sections, and four sections of bottom bars 11 are connected by hinge 10, and when not in use, bottom bar 11, which is folded, to be received
Rise, solve steadiness of the prior art for increase guard rail, be typically fixedly connected using welding manner, and be welded to connect inconvenience
In movement, it has not been convenient to carry, the problem of being made troubles to staff's installation and removal, there is provided inserting hook 14 and connected slot 8,
More convenient staff splices the length of guard rail, improves the practical value of guard rail, and there is provided flexible firm leg 12 and support
Bar 17, and the one end of support bar 17 is provided with telescopic mast 18, the lower end of telescopic mast 18 is provided with firm pin 19, facilitates staff to adjust
The length of support bar 17 is saved, so as to make guard rail more firm, improves the safety index of guard rail, the design not only structure
Simply, it is easy to use, it is time saving and energy saving, and be more convenient for staff's installation and dismounting guard rail.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, is not limited to this reality
With new, although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it can still be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered
Row equivalent substitution.All any modification, equivalent substitution and improvements within the spirit and principles of the utility model, made etc., all should
Within the scope of protection of the utility model.
Claims (5)
1. a kind of provisional guard rail of construction engineering quality detection, including the first supported rod erecting (1), the first fixed seat (2), the
One buffer zone (3), top band (4), the second buffer zone (5), Intermediate Gray (6), the second supported rod erecting (7), connected slot (8),
Hand (9), hinge (10), bottom bar (11), flexible firm leg (12), the second fixed seat (13), inserting hook (14), sliding block (15), warning
Reflecting strips (16), support bar (17), telescopic mast (18), firm pin (19) and chute (20), it is characterised in that:First support
The top side of vertical rod (1) is provided with the first fixed seat (2), and the first supported rod erecting (1) bottom side is provided with the second fixation
Seat (13), the outer wrap of first supported rod erecting (1) have warning reflection bar (16), and the bottom of the first supported rod erecting (1)
It is provided with bottom bar (11), the lateral wall of first supported rod erecting (1) is provided with chute (20), and the first supported rod erecting (1)
Outside is provided with sliding block (15), and one end of first fixed seat (2) is provided with top band (4), and the first fixed seat (2) side
Lower position close to top band (4) is provided with the first buffer zone (3), and one end of first buffer zone (3) is provided with the
Two buffer zones (5), described first buffer zone (3) one end are provided with Intermediate Gray close to the middle position of the first supported rod erecting (1)
(6), one end of the sliding block (15) is provided with inserting hook (14), and second supported rod erecting (7) is arranged on one end of bottom bar (11)
Top, and the side of the second supported rod erecting (7) is provided with connected slot (8), and handle is provided with below the connected slot (8)
(9), the lateral wall of the bottom bar (11) is provided with hinge (10), and the preceding surface of bottom bar (11) is provided with flexible firm leg
(12), the support bar (17) is arranged on the rear side of the first supported rod erecting (1), and the lower end insertion of support bar (17) is provided with and stretched
Contracting post (18), the lower end of the telescopic mast (18) are provided with firm pin (19).
A kind of 2. provisional guard rail of construction engineering quality detection according to claim 1, it is characterised in that:Described
One supported rod erecting (1) is rotatablely connected with support bar (17) by rotation seat.
A kind of 3. provisional guard rail of construction engineering quality detection according to claim 1, it is characterised in that:Described
One buffer zone (3), top band (4), the second buffer zone (5) are fixedly connected with Intermediate Gray (6) by clip.
A kind of 4. provisional guard rail of construction engineering quality detection according to claim 1, it is characterised in that:The conjunction
Page (10) is provided with three altogether, and three hinges (10) are pressed in the two side of bottom bar (11) respectively.
A kind of 5. provisional guard rail of construction engineering quality detection according to claim 1, it is characterised in that:Described
One supported rod erecting (1) is slidably connected with inserting hook (14) by sliding block (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720827414.0U CN207004172U (en) | 2017-07-10 | 2017-07-10 | A kind of provisional guard rail of construction engineering quality detection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720827414.0U CN207004172U (en) | 2017-07-10 | 2017-07-10 | A kind of provisional guard rail of construction engineering quality detection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207004172U true CN207004172U (en) | 2018-02-13 |
Family
ID=61452715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720827414.0U Expired - Fee Related CN207004172U (en) | 2017-07-10 | 2017-07-10 | A kind of provisional guard rail of construction engineering quality detection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207004172U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108534620A (en) * | 2018-06-14 | 2018-09-14 | 贵州大学 | A kind of mine blasting protective fence convenient for splicing |
-
2017
- 2017-07-10 CN CN201720827414.0U patent/CN207004172U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108534620A (en) * | 2018-06-14 | 2018-09-14 | 贵州大学 | A kind of mine blasting protective fence convenient for splicing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207406115U (en) | A kind of construction guardrail | |
CN203096993U (en) | Synergetic energy-consumption buckling-restrained bracing member with major earthquake protective function | |
CN208518302U (en) | A kind of low latitude operation civil engineering bracket with overall shrinkage function | |
CN208501565U (en) | A kind of telescopic insulating ground pile | |
CN205399182U (en) | Antidumping single -column mound bridge | |
CN207004172U (en) | A kind of provisional guard rail of construction engineering quality detection | |
CN204645053U (en) | A kind of the building foundation pit construction stage use have enough to meet the need drawing dustproof net support | |
CN103236656B (en) | Column suspension type crossing structure and operating method thereof | |
CN207228661U (en) | A kind of construction site protective fence | |
CN108843124A (en) | A kind of construction site guardrail | |
CN207260616U (en) | A kind of sleet canopy of packaged type for above foundation pit | |
CN207920225U (en) | A kind of stainless steel guard rail being easily installed | |
CN208168301U (en) | A kind of stable type construction slipper bracket | |
CN205445450U (en) | Foldable safe cat ladder | |
CN209620654U (en) | A kind of assembling type buildings building site hoistway protective net | |
CN209040680U (en) | A kind of protective fence for building easy to remove | |
CN109853930A (en) | Double mast formulas combine lifting platform | |
CN207158734U (en) | A kind of attached basket of movable folding type | |
CN203022408U (en) | Anchor cable pull rope structure for stabilizing wire pole | |
CN206844811U (en) | A kind of portable guardrail | |
CN206815241U (en) | A kind of anticollision barrier of highway | |
CN204967120U (en) | Wire exhibition of pulling is put special steel pipe and is strideed across frame | |
CN206942105U (en) | A kind of scaffold of folding easy to remove | |
CN202323789U (en) | Roadbed wind-sand-proof facility capable of automatically adjusting wind-sand-resisting direction in gobi gale region | |
CN206328729U (en) | A kind of crossing bridge crash bearer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180213 Termination date: 20190710 |