CN207260525U - A kind of heavy construction roof paints device - Google Patents

A kind of heavy construction roof paints device Download PDF

Info

Publication number
CN207260525U
CN207260525U CN201721135176.3U CN201721135176U CN207260525U CN 207260525 U CN207260525 U CN 207260525U CN 201721135176 U CN201721135176 U CN 201721135176U CN 207260525 U CN207260525 U CN 207260525U
Authority
CN
China
Prior art keywords
fixedly connected
conveying pipeline
telescopic rod
fixed
coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721135176.3U
Other languages
Chinese (zh)
Inventor
谢开容
李小婷
汪礼刚
薛为湖
冯苏干
董立好
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu crown Asia Construction Engineering Co., Ltd.
Original Assignee
Jiangsu Guanya Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Guanya Decoration Engineering Co Ltd filed Critical Jiangsu Guanya Decoration Engineering Co Ltd
Priority to CN201721135176.3U priority Critical patent/CN207260525U/en
Application granted granted Critical
Publication of CN207260525U publication Critical patent/CN207260525U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of heavy construction roof to paint device, sleeve upper end socket telescopic rod, and two casing of left and right centre is hinged fastening spring, and reinforcing rib is fixedly connected with the middle part of telescopic rod, and the rotation connection of telescopic rod top, which is painted, to be taken turns;Telescopic rod upper end is fixedly connected with movable conveying pipeline, and movable conveying pipeline lower end seals the fixed conveying pipeline that is slidably connected, nozzle is fixedly connected with the top of movable conveying pipeline;Fixed conveying pipeline lower end is fixedly connected with corrugated flexible hose, and passage lower end sets and is interconnected between mateiral pump, passage and corrugated flexible hose and fixed conveying pipeline.The device is adjusted by telescopic rod and casing to be painted the length of wheel and paints scope controlling, and by fastening spring it is carried out it is spacing, avoid paint take turns stress after can not be abutted with upper metope.Apparatus structure design is rationally applicable in, and greatly improves the rendering efficiency of building roof, and rendering scope is adjustable, flexibility chamber.

Description

A kind of heavy construction roof paints device
Technical field
A kind of Architectural Equipment is the utility model is related to, is specifically that a kind of heavy construction roof paints device.
Background technology
With the fast development of construction industry, the building decoration with building supporting also makes rapid progress, is painting at this stage therewith Do not grow with each passing hour still there are many conventional methods in wall field.
Still have many work inconvenience, such as the rendering work of roofing roof, existing room at present in building decoration field Work is painted at the top of face to generally require manually to complete by fork ladder, and easily causes fork ladder to collapse work when artificial paint The security risk of injury to personnel, and when painting roof, staff needs to come back for a long time mostly, easily makes one to produce tired Labor, coating can drop on the plasterer person or ground during rendering, and the rubbish spot cleaning to the later stage brings pole Big puzzlement.
Utility model content
The purpose of this utility model is to provide a kind of heavy construction roof to paint device, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical solution:
A kind of heavy construction roof paints device, including device body;Described device body is mainly by coating chamber, activity Conveying pipeline, fastening spring, hydraulic cylinder and rendering wheel are formed, and described device body upper part is hinged casing, and sleeve upper end socket is flexible Bar, hinged fastening spring among two casing of left and right, sleeve surface set multiple pin holes, grafting fixed pin in pin hole;It is described flexible Wheel is painted in the rotation connection of bar top, and telescopic rod upper end is fixedly connected with movable conveying pipeline, and movable conveying pipeline lower end sealing is slidably connected Fixed conveying pipeline, and fixed conveying pipeline fixed connecting sleeve;The fixed conveying pipeline lower end is fixedly connected with corrugated flexible hose, and ripple is soft Pipe the other end is fixedly connected with passage, passage fixed connection apparatus body upper end, and passage lower end sets mateiral pump;It is described Mateiral pump lower end sets coating chamber, and material sucking port, and material sucking port connection mateiral pump are fixedly connected with the middle part of coating chamber;Under the material sucking port End sets interval feed table, and interval feed table lower end is fixedly connected with driving shaft, driving shaft lower end rotation connection driving motor;It is described Device body both upper ends thereof is respectively fixedly connected with coating reclaiming chamber, and horizontal puddler is rotatablely connected in coating reclaiming chamber;The master Sprocket wheel is fixedly connected with the middle part of moving axis, horizontal puddler lower end is also fixedly connected with sprocket wheel, is connected between sprocket wheel by chain.
As further program of the utility model:Nozzle is fixedly connected with the top of the activity conveying pipeline.
As the utility model further scheme:The interval feed table end is fixedly connected with longitudinal rabble.
As the utility model further scheme:Coating chamber's left part lower end is fixedly connected with tapping hole.
As the utility model further scheme:The coating reclaiming chamber lower part is fixedly connected with return duct upper end, returns Flow tube lower end is fixedly connected with coating chamber.
Compared with prior art, the beneficial effects of the utility model are:The device is adjusted by telescopic rod and casing and painted The length of wheel and then control and paint scope, and by fastening spring it is carried out it is spacing, avoid paint take turns after stress can not with it is upper Metope abuts.Apparatus structure design is rationally applicable in, and greatly improves the rendering efficiency of building roof, and rendering scope is adjustable, Flexibility chamber.
Brief description of the drawings
Fig. 1 is the structure diagram that heavy construction roof paints device.
Fig. 2 is the structure diagram that heavy construction roof paints device middle sleeve and telescopic rod.
Fig. 3 is that heavy construction roof paints the top view of movable conveying pipeline and fixed conveying pipeline in device.
Fig. 4 is the structure diagram that heavy construction roof paints interval feed table in device.
In figure:1- device bodies;2- coating chamber;3- casings;4- telescopic rods;5- activity conveying pipelines;6- fixes conveying pipeline;7- Fastening spring;8- coating reclaiming chambers;9- horizontal puddlers;10- return ducts;11- mateiral pumps;12- material sucking ports;13- charging apertures; 14- interval feed tables;15- chains;16- sprocket wheels;17- longitudinal directions rabble;18- tapping holes;19- drives motor;20- driving shafts; 21- hydraulic cylinders;22- shifting rollers;23- motor bases;24- fluid communicating pipes;25- corrugated flexible hoses;26- pin holes;27- is fixed Pin;28- reinforcing ribs;29- paints wheel;30- nozzles.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1~4, in the utility model embodiment, a kind of heavy construction roof paints device, including device body 1;Described device body 1 is mainly made of coating chamber 2, movable conveying pipeline 5, fastening spring 7, hydraulic cylinder 21 and rendering wheel 29; 1 upper articulation casing 3 of described device body, 3 upper end of casing socket telescopic rod 4,3 surface of casing sets multiple pin holes 26, pin hole Grafting fixed pin 27 in 26, the hinged fastening spring 7 in the centre of two casing of left and right 3, telescopic rod 4 can move up and down change inside casing 3 Change length and then adjust and paint scope, fixed casing 3 and telescopic rod 4 by fixed pin 27 and being used cooperatively for pin hole 26;Institute State the middle part of telescopic rod 4 and be fixedly connected with reinforcing rib 28, wheel 29 is painted in the rotation connection of 4 top of telescopic rod, and reinforcing rib 28 reinforces front and rear two The bonding strength of telescopic rod 4 is held, wheel 29 is painted and rolls work;4 upper end of telescopic rod is fixedly connected with movable conveying pipeline 5, activity 5 lower end of conveying pipeline seals the fixed conveying pipeline 6 that is slidably connected, and 6 fixed connecting sleeve 3 of fixed conveying pipeline, the movable top of conveying pipeline 5 It is fixedly connected with nozzle 30, activity conveying pipeline 5 follows elongation and shortening during adjustable telescopic rod 4;6 lower end of fixed conveying pipeline is fixed Corrugated flexible hose 25 is connected, 25 the other end of corrugated flexible hose is fixedly connected with passage, 1 upper end of passage fixed connection apparatus body, Passage lower end sets and is interconnected between mateiral pump 11, passage and corrugated flexible hose 25 and fixed conveying pipeline 6;The mateiral pump 11 lower ends set coating chamber 2, and 2 upper end of coating chamber is fixedly connected with sunpender, sunpender upper end fixed connection apparatus body 1, in coating chamber 2 Portion is fixedly connected with material sucking port 12, and material sucking port 12 connects mateiral pump 11, and the coating that the work of mateiral pump 11 is twitched in coating chamber 2 enters In passage and then enter in corrugated flexible hose 25 and fixed conveying pipeline 6 and movable conveying pipeline 5.
12 lower end of material sucking port sets interval feed table 14, and 14 lower end of interval feed table is fixedly connected with driving shaft 20, main 20 bearing of moving axis rotation connection coating chamber, 2 bottom, and 14 end of interval feed table is fixedly connected with longitudinal rabble 17, driving shaft 20 Lower end rotation connection driving motor 19, interval feed table 14 is in Symmetrical Circular Arc shape, and 12 lower end of suction hole is also Symmetrical Circular Arc shape, The driving work of motor 19, which is beaten, drives interval feed table 14 to rotate, so that suction under 12 lower reaction of suction hole of Symmetrical Circular Arc shape 12 intermittent communication coating chamber 2 of hole, control coating interval is sucked in passage, and the interval feed table 14 rotated drives longitudinal stirring Bar 17 rotates stirring coating;The 2 left part lower end of coating chamber is fixedly connected with tapping hole 18, the rotation connection control of 18 upper end of tapping hole Valve, 2 right end top of coating chamber are fixedly connected with charging aperture 18, can be toward injection coating in coating chamber 2 by charging aperture 18.
1 both upper ends thereof of described device body is respectively fixedly connected with coating reclaiming chamber 8, and rotation connection is horizontal in coating reclaiming chamber 8 To rabble 9, and 9 upper and lower end parts of horizontal puddler distinguish rotary connecting device body 1, and 8 lower part of coating reclaiming chamber is fixedly connected 10 upper end of return duct, 10 lower end of return duct are fixedly connected with coating chamber 2, paint on wheel 29 coating dripped and fall into coating reclaiming chamber 8 It is interior to be recycled to again in coating chamber 2 from return duct 10 after the stirring of horizontal puddler 9;The 20 middle part fixing connection chain of driving shaft Wheel 16,9 lower end of horizontal puddler is also fixedly connected with sprocket wheel 16, is connected between sprocket wheel 16 by chain 15, and driving motor 19 rotates Sprocket wheel 16 and the lower drive horizontal puddler 9 of the effect of chain 15 rotate stirring.
19 lower end of the driving motor is fixedly connected with motor base 23,23 bolt fixed connection apparatus body 1 of motor base Lower end, and 1 both sides lower part of device body is respectively fixedly connected with hydraulic cylinder 21,21 lower end of hydraulic cylinder is rotatablely connected shifting roller 22, 21 upper end of hydraulic cylinder is fixedly connected with fluid communicating pipe 24, the height of 21 adjustable apparatus body 1 of hydraulic cylinder, left and right ends hydraulic cylinder 21 by keeping 1 left and right ends of cylinder internal pressure strongly consistent device body to raise simultaneously or reduce fluid communicating pipe 24.
The operation principle of the utility model is:The device is rotated by driving the work of motor 19 to drive driving shaft 20 to rotate 20 one side drive sprocket 16 of driving shaft rotate drive interval feed table 14 on one side and rotate, interval feed table 14 is in Symmetrical Circular Arc Shape, so that 12 intermittent communication coating chamber 2 of suction hole, control coating interval are inhaled under 12 lower reaction of suction hole of Symmetrical Circular Arc shape Enter in passage, wherein interval feed table 14 also drive longitudinal rabble 17 rotate the coating in coating chamber 2 is stirred it is anti- Only condense, sprocket wheel 16, which rotates, drives chain 15 to rotate, and drives the horizontal puddler 9 of left and right ends is synchronous to turn under the effect of chain 15 Dynamic, the coating dripped on rendering wheel 29 falls into coating reclaiming chamber 8 and is recycled again from return duct 10 after the stirring of horizontal puddler 9 The effect of realizing paint collection recycling in coating chamber 2, avoids coating from being dropped in ground not easy to clean, and saves painting Material, mateiral pump 11 is constantly pumped into coating and is sprayed onto through fixed conveying pipeline 6 and movable conveying pipeline 5 on rendering wheel 29, and 1 liang of device body Side lower part is respectively fixedly connected with hydraulic cylinder 21, the height of 21 adjustable apparatus body 1 of hydraulic cylinder, and left and right ends hydraulic cylinder 21 passes through Fluid communicating pipe 24 keeps cylinder internal pressure strongly consistent to cause 1 left and right ends of device body to raise simultaneously or reduce.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The scope of type is indicated by the appended claims rather than the foregoing description, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical solution, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (5)

1. a kind of heavy construction roof paints device, including device body(1);Described device body(1)Mainly by coating chamber (2), movable conveying pipeline(5), fastening spring(7), hydraulic cylinder(21)Taken turns with painting(29)Form, it is characterised in that described device Body(1)Upper articulation casing(3), casing(3)Upper end is socketed telescopic rod(4), two casing of left and right(3)The hinged fastening spring in centre (7), casing(3)Surface sets multiple pin holes(26), pin hole(26)Interior grafting fixed pin(27);The telescopic rod(4)Top turns Wheel is painted in dynamic connection(29), telescopic rod(4)Upper end is fixedly connected with movable conveying pipeline(5), movable conveying pipeline(5)Lower end sealing is slided The fixed conveying pipeline of connection(6), and fixed conveying pipeline(6)Fixed connecting sleeve(3);The fixed conveying pipeline(6)Lower end, which is fixed, to be connected Connect corrugated flexible hose(25), corrugated flexible hose(25)The other end is fixedly connected with passage, passage fixed connection apparatus body(1)On End, passage lower end set mateiral pump(11);The mateiral pump(11)Lower end sets coating chamber(2), coating chamber(2)Middle part is fixed Connect material sucking port(12), and material sucking port(12)Connect mateiral pump(11);The material sucking port(12)Lower end sets interval feed table (14), interval feed table(14)Lower end is fixedly connected with driving shaft(20), driving shaft(20)Lower end rotation connection driving motor(19); Described device body(1)Both upper ends thereof is respectively fixedly connected with coating reclaiming chamber(8), coating reclaiming chamber(8)Interior rotation connection is laterally Rabble(9);The driving shaft(20)Middle part is fixedly connected with sprocket wheel(16), horizontal puddler(9)Lower end is also fixedly connected with sprocket wheel (16), sprocket wheel(16)Between pass through chain(15)Connection.
2. a kind of heavy construction roof according to claim 1 paints device, it is characterised in that the activity conveying pipeline (5)Top is fixedly connected with nozzle(30).
3. a kind of heavy construction roof according to claim 1 paints device, it is characterised in that the interval feed table (14)End is fixedly connected with longitudinal rabble(17).
4. a kind of heavy construction roof according to claim 1 paints device, it is characterised in that the coating chamber(2)It is left Subordinate end is fixedly connected with tapping hole(18).
5. a kind of heavy construction roof according to claim 1 paints device, it is characterised in that the coating reclaiming chamber (8)Lower part is fixedly connected with return duct(10)Upper end, return duct(10)Lower end is fixedly connected with coating chamber(2).
CN201721135176.3U 2017-09-06 2017-09-06 A kind of heavy construction roof paints device Expired - Fee Related CN207260525U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721135176.3U CN207260525U (en) 2017-09-06 2017-09-06 A kind of heavy construction roof paints device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721135176.3U CN207260525U (en) 2017-09-06 2017-09-06 A kind of heavy construction roof paints device

Publications (1)

Publication Number Publication Date
CN207260525U true CN207260525U (en) 2018-04-20

Family

ID=61923791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721135176.3U Expired - Fee Related CN207260525U (en) 2017-09-06 2017-09-06 A kind of heavy construction roof paints device

Country Status (1)

Country Link
CN (1) CN207260525U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629800A (en) * 2019-01-17 2019-04-16 郭淑梅 A kind of multifunctional coating painting device
CN110924641A (en) * 2019-12-13 2020-03-27 陈小虎 Building wall whitewashing machine
CN111456383A (en) * 2020-04-13 2020-07-28 陈本英 Large-range wall plastering device for building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629800A (en) * 2019-01-17 2019-04-16 郭淑梅 A kind of multifunctional coating painting device
CN109629800B (en) * 2019-01-17 2020-07-28 江西龙正科技发展有限公司 Multifunctional coating whitewashes device
CN110924641A (en) * 2019-12-13 2020-03-27 陈小虎 Building wall whitewashing machine
CN111456383A (en) * 2020-04-13 2020-07-28 陈本英 Large-range wall plastering device for building

Similar Documents

Publication Publication Date Title
CN207260525U (en) A kind of heavy construction roof paints device
CN106111408A (en) A kind of engineering oil pipe surface paint spraying device
CN207245110U (en) A kind of building wall brushing vehicle
CN107630547A (en) A kind of wall plastering device with liquid self-feeding function
CN107685053A (en) A kind of robot for being convenient to clean pipeline
CN207794559U (en) A kind of construction wall surface spraying device facilitating angular adjustment
CN107414649A (en) A kind of metal tube rust-cleaning integrating machine
CN109914211A (en) Rifle is efficiently studied for a second time courses one has flunked in a kind of portable building asphalt road highway maintenance crack
CN207686239U (en) A kind of architectural engineering protection type wall surface spraying device
CN108086653A (en) A kind of mobile model wall surface spraying device of architectural decoration
CN205057820U (en) Steel pipe internal and external surface sand blasting unit
CN107401273A (en) A kind of heavy construction roof paints device
CN208574809U (en) A kind of spray equipment of architecture engineering material
CN207812960U (en) A kind of mobile model wall surface spraying device of architectural decoration
CN110586365A (en) Intelligent spraying equipment of multifunctional building material
CN108252495A (en) A kind of wall plaster machine people
CN208925050U (en) A kind of planting fruit trees flusher
CN110314796A (en) A kind of scaffold semi-finished product entirety appearance spray equipment
CN206308974U (en) A kind of indoor many paint wall body spray equipments
CN207553533U (en) A kind of rendering device suitable for corridor metope
CN206917224U (en) A kind of novel and multifunctional automation wall brush
CN206303861U (en) One kind hangs pull-type glass curtain wall clean robot
CN205476355U (en) Automatic machine of applying paint with a brush of outer wall
CN108487592A (en) A kind of finishing putty spray equipment convenient for cleaning
CN107476541B (en) A kind of intelligent painting instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 210000 Dongping Town Industrial Zone, Lishui District, Nanjing, Jiangsu

Patentee after: Jiangsu crown Asia Construction Engineering Co., Ltd.

Address before: 210005 21 floor, Dongyu building, 18 Zheng Hong street, Qinhuai District, Nanjing, Jiangsu.

Patentee before: Jiangsu crown Decoration Engineering Co., Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180420

Termination date: 20200906