CN207259935U - A kind of simple supported-to-continuous girder bridge built a bridge at once system - Google Patents

A kind of simple supported-to-continuous girder bridge built a bridge at once system Download PDF

Info

Publication number
CN207259935U
CN207259935U CN201720935102.1U CN201720935102U CN207259935U CN 207259935 U CN207259935 U CN 207259935U CN 201720935102 U CN201720935102 U CN 201720935102U CN 207259935 U CN207259935 U CN 207259935U
Authority
CN
China
Prior art keywords
temporary support
bridge
common
conversion
precast beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720935102.1U
Other languages
Chinese (zh)
Inventor
王磊
韩之江
吴佳佳
刘志华
赵雷
汪永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201720935102.1U priority Critical patent/CN207259935U/en
Application granted granted Critical
Publication of CN207259935U publication Critical patent/CN207259935U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of simple supported-to-continuous girder bridge built a bridge at once system, including:Precast beam, bent cap, common temporary support, conversion temporary support, permanent bearing, Cast-in-Situ Segment and hogging moment prestressing tendon.Permanent bearing, common and conversion temporary support are installed on bent cap;Precast beam is installed on common, conversion temporary support;After cast-in-place section concrete reaches design strength between precast beam, tensioning hogging moment prestressing tendon;After releasing common, conversion temporary support successively, precast beam is supported on permanent bearing, completes Program for structural Transformation.Built a bridge at once system described in the utility model finally reaches structural internal force state once to fall frame bridge completion state, and system stress is clear and definite, structure is safe and reliable, and whole process is easy to operate, and construction is quick.

Description

A kind of simple supported-to-continuous girder bridge built a bridge at once system
Technical field
The utility model belongs to bridge structure technical field of construction, it particularly relates to arrive a kind of simple support-continuous girder Bridge built a bridge at once system.
Background technology
Simply supported-to-continuous system beam bridge is easy for construction quick by precast assembly.Limited by work progress, a phase dead load Under effect, span centre maximal bending moment and the simply supported beam of same across footpath are almost equal, also fail to improve into structure after bridge by system transform The internal force status of system, simply in structure " bridge floor is continuous ", for Heavy Traffic load, " bridge floor is continuous " in structure It is difficult to ensure that structural system has enough safety stocks.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of simple supported-to-continuous girder bridge built a bridge at once system, It is applicable to improve simply supported-to-continuous system beam bridge Internal force of bridge under completion stage state.
A kind of simple supported-to-continuous girder bridge built a bridge at once system, including:Bent cap (1), permanent bearing (2), common interim branch Seat (3), conversion temporary support (4), precast beam (5), sagging moment prestressing tendon (6), Cast-in-Situ Segment (7) and hogging moment prestressing tendon (8);
Permanent bearing (2), common temporary support (3) and conversion temporary support (4) are provided with the bent cap (1);It is described Precast beam (5) is installed on common temporary support (3) and conversion temporary support (4);The interior tensioning of the precast beam (5) has sagging moment Prestressing tendon (6);The Cast-in-Situ Segment (7) is located between precast beam (5) and tensioning has hogging moment prestressing tendon (8).
Preferably, after the completion of hogging moment prestressing tendon (8) tensioning, common temporary support (3) is detachable.
Preferably, after the common temporary support (3) is removed, conversion temporary support (4) is detachable, after dismounting, in advance Beam (5) processed is supported on permanent bearing (2).
Preferably, the common temporary support of thickness ratio (3) of the conversion temporary support (4) is big;The common temporary support (3) thickness is consistent with permanent bearing (2).
Preferably, the common temporary support (3) and conversion temporary support (4) are the prefabricated bearings of meltability sulphur-bonded mortar.
Compared with prior art, built a bridge at once system described in the utility model finally makes structural internal force state reach once Fall frame bridge completion state, system stress is clear and definite, structure is safe and reliable, and whole process is easy to operate, and construction is quick.
Brief description of the drawings
Fig. 1 is precast beam scheme of installation.
Fig. 2 is Cast-in-Situ Segment concreting schematic diagram.
Fig. 3 is to release common temporary support schematic diagram.
Fig. 4 is to release conversion temporary support schematic diagram.
Fig. 5 is conversion temporary support and permanent bearing relative position schematic diagram.
Fig. 6 is the final Internal force of bridge under completion stage figure of structural system.
Description of reference numerals:
The permanent bearing of 1- bent caps, 2-, the common temporary supports of 3-, 4- conversions temporary support, 5- precast beams, 6- sagging moments in advance should Power beam, 7- Cast-in-Situ Segments, 8- hogging moment prestressing tendons.
Embodiment
To make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings to this reality It is described in detail with a kind of simple supported-to-continuous girder bridge built a bridge at once system of new offer.
A kind of simple supported-to-continuous girder bridge built a bridge at once system, including:Bent cap 1, permanent bearing 2, common temporary support 3, Change temporary support 4, precast beam 5, sagging moment prestressing tendon 6, Cast-in-Situ Segment 7 and hogging moment prestressing tendon 8.
Installed on bent cap 1 permanent bearing 2, common 3 and conversion 4 temporary supports;Common 3 can with conversion 4 temporary supports use Fusibleness sulphur-bonded mortar is prefabricated to be formed;It is big to change the common temporary support 3 of 4 thickness ratio of temporary support;Common 3 thickness of temporary support with forever Long bearing (2) is consistent;Conversion 4 thickness of temporary support is calculated by designing.
Precast beam 5 is installed on common 3 and 4 temporary supports of conversion;Tensioning has sagging moment prestressing tendon 6 in precast beam 5.In advance 57 casting concretes of Cast-in-Situ Segment of beam processed, after 7 concrete of Cast-in-Situ Segment reaches design strength, tensioning hogging moment prestressing tendon 8.It is negative curved After the completion of 6 tensioning of square prestressing tendon, common temporary support 3 is released.After common temporary support 3 releases, conversion temporary support is released 4.Change temporary support 4 release after, precast beam 5 is supported on permanent bearing 2, final structure system internal force status reach once into Bridge like state.
When in use, can carry out in accordance with the following steps:
(1) permanent bearing, common temporary support and conversion temporary support are installed on bent cap, temporary support is by meltability sulphur Sulphur mortar is prefabricated to be formed.
(2) precast beam is installed on common temporary support and conversion temporary support, sees Fig. 1, Fig. 5.
(3) cast-in-place section concrete between precast beam is poured.
(4) after cast-in-place section concrete reaches design strength, tensioning hogging moment prestressing tendon, is shown in Fig. 2.
(5) after the completion of the tensioning of hogging moment prestressing tendon, common temporary support is released, sees Fig. 3.
(6) after common temporary support releases, conversion temporary support is released successively, and precast beam is finally supported in permanent bearing On, see Fig. 4.
Compared with prior art, built a bridge at once system described in the utility model finally makes structural internal force state reach once Fall frame bridge completion state, system stress is clear and definite, structure is safe and reliable, and whole process is easy to operate, and construction is quick.
It is understood that embodiment of above is merely to illustrate that the principle of the utility model and uses exemplary Embodiment, but the utility model is not limited thereto.For those skilled in the art, this is not being departed from In the case of the spirit and essence of utility model, various changes and modifications can be made therein, these variations and modifications are also considered as this reality With new protection domain.

Claims (5)

  1. A kind of 1. simple supported-to-continuous girder bridge built a bridge at once system, it is characterised in that including:It is bent cap (1), permanent bearing (2), general Logical temporary support (3), conversion temporary support (4), precast beam (5), sagging moment prestressing tendon (6), Cast-in-Situ Segment (7) and hogging moment are pre- Stress beam (8);
    Permanent bearing (2), common temporary support (3) and conversion temporary support (4) are provided with the bent cap (1);It is described prefabricated Beam (5) is installed on common temporary support (3) and conversion temporary support (4);The interior tensioning of the precast beam (5) has sagging moment in advance should Power beam (6);The Cast-in-Situ Segment (7) is located between precast beam (5) and tensioning has hogging moment prestressing tendon (8).
  2. 2. simple supported-to-continuous girder bridge built a bridge at once system according to claim 1, it is characterised in that the hogging moment is pre- After the completion of stress beam (8) tensioning, common temporary support (3) is detachable.
  3. 3. simple supported-to-continuous girder bridge built a bridge at once system according to claim 2, it is characterised in that described common interim After bearing (3) is removed, conversion temporary support (4) is detachable, and after dismounting, precast beam (5) is supported on permanent bearing (2).
  4. 4. simple supported-to-continuous girder bridge built a bridge at once system according to claim 3, it is characterised in that the conversion is interim The common temporary support of thickness ratio (3) of bearing (4) is big;Common temporary support (3) thickness is consistent with permanent bearing (2).
  5. 5. simple supported-to-continuous girder bridge built a bridge at once system according to claim 4, it is characterised in that described common interim Bearing (3) and conversion temporary support (4) are the prefabricated bearings of meltability sulphur-bonded mortar.
CN201720935102.1U 2017-07-28 2017-07-28 A kind of simple supported-to-continuous girder bridge built a bridge at once system Expired - Fee Related CN207259935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720935102.1U CN207259935U (en) 2017-07-28 2017-07-28 A kind of simple supported-to-continuous girder bridge built a bridge at once system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720935102.1U CN207259935U (en) 2017-07-28 2017-07-28 A kind of simple supported-to-continuous girder bridge built a bridge at once system

Publications (1)

Publication Number Publication Date
CN207259935U true CN207259935U (en) 2018-04-20

Family

ID=61927461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720935102.1U Expired - Fee Related CN207259935U (en) 2017-07-28 2017-07-28 A kind of simple supported-to-continuous girder bridge built a bridge at once system

Country Status (1)

Country Link
CN (1) CN207259935U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344322A (en) * 2019-08-09 2019-10-18 河南省交通规划设计研究院股份有限公司 A kind of temporary support and the method using support progress bridge conversion

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344322A (en) * 2019-08-09 2019-10-18 河南省交通规划设计研究院股份有限公司 A kind of temporary support and the method using support progress bridge conversion
CN110344322B (en) * 2019-08-09 2024-02-06 河南省交通规划设计研究院股份有限公司 Temporary support and method for converting bridge structural system by adopting same

Similar Documents

Publication Publication Date Title
CN102296525B (en) Support system mixed combined beam cable-stayed bridge and construction method thereof
CN207143733U (en) A kind of simple-supported thencontinuous bridge system converting system
CN102021889A (en) Bridge erection method
CN104153284A (en) Partial filling type steel box concrete continuous composite girder bridge and construction method thereof
CN105133486A (en) Corrugated steel web few-main-beam structure
CN106894346A (en) A kind of the continuous beam bridge construction method
CN207259935U (en) A kind of simple supported-to-continuous girder bridge built a bridge at once system
CN108589914B (en) Self-resetting frame structure and construction method
CN206736708U (en) A kind of FRP pipes and half prefabricated half cast-in-place regeneration concrete prestressing force overlapping bridge pier
CN206220321U (en) A kind of SC systems stiffness hollow core laminated slab
CN110004816B (en) Corrugated steel web prestress UHPC combined box girder and construction method thereof
CN208830171U (en) Bridge cast-in-situ box-beam deck-type bearing frame system
CN207160414U (en) A kind of precast beam structure
CN202170474U (en) Support system mixing type combined beam cable-stayed bridge
CN205591579U (en) Adopt girder steel to consolidate aerated concrete roof boarding structure
CN207143706U (en) A kind of steel box girder bridge once falls frame system
CN105220609B (en) Combined beam self-anchored suspension bridge and construction process thereof
CN210134320U (en) Corrugated steel web prestress UHPC combined box girder
CN208884728U (en) Steel-concrete combines precast beam and prefabricated post connection structure
CN112030707A (en) Assembled prefabricated steel-concrete combined capping beam and construction method thereof
CN214089440U (en) Large-span stiff skeleton concrete arch bridge accurate assembling construction structure
CN219280464U (en) Bridge structure based on subway upper cover
CN103924677A (en) Concrete beam and square-rectangular concrete-filled steel tube column combining joint employing unbonded prestressed and common reinforcement for connection
CN210104533U (en) Tie bar flat bending device capable of reducing prestress loss
CN214573404U (en) Prestressed steel concrete combination box girder suspension splicing construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180420