CN110344322A - A kind of temporary support and the method using support progress bridge conversion - Google Patents

A kind of temporary support and the method using support progress bridge conversion Download PDF

Info

Publication number
CN110344322A
CN110344322A CN201910733605.4A CN201910733605A CN110344322A CN 110344322 A CN110344322 A CN 110344322A CN 201910733605 A CN201910733605 A CN 201910733605A CN 110344322 A CN110344322 A CN 110344322A
Authority
CN
China
Prior art keywords
height
temporary support
air bag
support
supporting pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910733605.4A
Other languages
Chinese (zh)
Other versions
CN110344322B (en
Inventor
王一光
高继平
王新刚
华升
徐咏梅
张哲�
冯志强
申磊
郭付印
赵静
董增强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Henan Provincial Communication Planning and Design Institute Co Ltd
Original Assignee
Zhengzhou University
Henan Provincial Communication Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University, Henan Provincial Communication Planning and Design Institute Co Ltd filed Critical Zhengzhou University
Priority to CN201910733605.4A priority Critical patent/CN110344322B/en
Publication of CN110344322A publication Critical patent/CN110344322A/en
Application granted granted Critical
Publication of CN110344322B publication Critical patent/CN110344322B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/048Bearings being adjustable once installed; Bearings used in incremental launching
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of temporary support and the methods for carrying out bridge conversion using the support, temporary support, support body including being placed on bent cap top surface, support body includes supporting pad and around solid multiple mutually indepedent, air bags with air inlet in supporting pad surrounding, and each air bag is full of the height that the height after gas is above supporting pad.The invention has the advantages that structure is simple, ingenious, after the air emptying in each air bag, the weight of girder is fallen on naturally on permanent support, is realized the separation of girder and temporary support, is manually removed temporary support, highly-safe, is removed simply, fast, time saving and energy saving;Four air bags are mutually indepedent, can inflate or be vented respectively adjustment height, girder height, Slope angle adjustment may be implemented, meet design requirement;Air bag is made of lightweight polyester flexible plastics, have it is flexible well, avoid with girder hard contact, prevent girder from local damage occur because hardness is touched.

Description

A kind of temporary support and the method using support progress bridge conversion
Technical field
The present invention relates to field of bridge construction, more particularly, to one kind temporary support used in bridge construction process, The invention further relates to a kind of methods for carrying out bridge conversion using the temporary support.
Background technique
In bridge construction process, to generally require to be arranged the needs of meeting construction technology and step (such as Program for structural Transformation) Temporary support again removes temporary support after the completion of construction.Currently, facing in bridge construction frequently with sulphur-bonded mortar support and husky cylinder When support, sulphur-bonded mortar temporary support is that heating wire is pre-filled in sulphur-bonded mortar, melts sulphur-bonded mortar by electric heating and tears open Except temporary support, system transform is completed;This kind of support intensity is very high, but sulphur-bonded mortar prepares trouble, at high cost, is unable to adjust Local support height, once heating wire is blown, sulphur-bonded mortar cuts just extremely difficult.Sand Bucket temporary support can pass through release Bottom screw, which releases fine sand in bucket, to be had to achieve the purpose that dismounting temporary support and is easy to high-altitude carrying, facilitates operation and installation The advantages that, but such as fine sand makes moist or meet water consolidation, it will there is plug-hole phenomenon, prevent fine sand is from flowing out, and then causes Steel drum in Sand Bucket cannot continue to settle, and increase and remove difficulty.For this purpose, research and develop it is a kind of it is safe and reliable, easy to adjust, can be quick Disassembly and temporary support at low cost are the targets that science of bridge building Shi Yizhi is pursued.
Summary of the invention
The temporary support that it is an object of that present invention to provide a kind of processing costs is low, reusable, dismounting is simple and convenient, this Invention additionally provides the method for carrying out bridge conversion using the temporary support.
To achieve the above object, the present invention takes following technical proposals:
Temporary support of the present invention, the support body including being placed on bent cap top surface, the support body includes supporting pad With around solid multiple mutually indepedent, air bags with air inlet in the supporting pad surrounding, each air bag is full of after gas Height is above the height of supporting pad.
Each air bag of lightweight polyester flexible plastics by being made, and each air bag is full of the height and supporting pad after gas Difference in heightΔHIt is 10 mm~15mm.
The supporting pad is laminated rubber bearing, and the air bag is linked together with supporting pad by hot melt.
The air bag is four.
Valve inside is provided at the air inlet of each air bag.
The present invention also provides a kind of methods of Program for structural Transformation in bridge construction process, are faced using of the present invention When support, construction procedure includes:
The first step places temporary support in the pre-position of bent cap top surface, and inflation adjusts the height of each air bag respectively, makes each gas Capsule height is consistent with supporting pad height;
Second step hangs precast main beam on temporary support, is inflated respectively to the air bag around supporting pad, makes prefabricated master Beam is gradually lifted and is detached from supporting pad, and that completes precast main beam hangs operation;
Third step repeats the first step and second step, and that completes remaining precast main beam hangs operation;
4th step installs permanent support in bent cap top surface after the completion of precast main beam is all hung, then again precast main beam it Between pour bridge Cast-in-Situ Segment formed continuous beam;
Air in each air bag of temporary support is emptied respectively after bridge Cast-in-Situ Segment load, makes precast main beam by the 5th step Weight fallen on permanent support naturally, remove temporary support, complete Program for structural Transformation.
The invention has the advantages that structure is simple, ingenious, removes simple, quick and may be reused, save the cost, specifically It is embodied in the following:
1), the present invention is had good by four common support girders of air bag, air bag by being made of lightweight polyester flexible plastics Flexibility, avoid with girder hard contact, prevent girder from local damage occur because hardness is touched;
2), four air bags of supporting pad surrounding of the present invention are mutually indepedent, can inflate or be vented respectively adjustment height, may be implemented to lead Depth of beam, Slope angle adjustment, meet design requirement;
3), when placing girder, when air bag leaks air or when other fortuitous events, supporting pad can be used for support girder, safety Property it is high;
4), the present invention removes simple, and the height of supporting pad is lower than the height of permanent support, main after the air emptying in each air bag The weight of beam is fallen on naturally on permanent support, is realized the separation of girder and temporary support, is manually removed temporary support, safety Property it is high, remove it is simple, quick, it is time saving and energy saving.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the A-A of Fig. 1 to schematic cross-sectional view.
Fig. 3-5 is state diagram of the present invention in bridge conversion process.
Specific embodiment
As shown in Figure 1, 2, temporary support of the present invention, including support body, support body include supporting pad 2(branch Stake pad 2 is laminated rubber bearing) He Raogu is in four of 2 surrounding of the supporting pad mutually indepedent, air bags 4 with air inlet 3, and four Air bag 4 is the rectangular parallelepiped structure made of high-intensitive, lightweight polyester flexible plastics, and each air bag 4 is equal full of the height after gas Higher than the height of supporting pad 2, each air bag 4 is full of height and the difference in height of supporting pad 2 after gasΔHIn the mm of 10 mm~15 In range, the difference in height of four air bags 4 and supporting pad 2ΔHIt is equal (certainly according to practice of construction demand, four air bags 4 and branch The difference in height of stake pad 2ΔHCan also be not mutually equal), so that each air bag 4 is there is height adjustment space, it is every by individually adjusting The height of a air bag 4 adjusts precast main beam height, gradient.
When practical manufacture, to prevent air bag 4 from exhaust situation occur due to by pressure, it is all provided at the air inlet 3 of each air bag 4 It is equipped with valve inside.When practical manufacture, air bag 4 is linked together with supporting pad 2 by hot melting way.
For the bearing capacity for guaranteeing temporary support, a length of mm of 150 mm~800, the width of supporting pad 2 are 150 mm~800 Mm, a height of mm of 40 mm~100;The width of each air bag 4 is the mm of 150 mm~800, a length of mm of 50 mm~100.For convenience It removes, the height of supporting pad 2 is lower than the height of permanent support.
Below by taking the seat structure system transform of two precast main beams as an example, illustrates and carried out using temporary support of the present invention The method of bridge conversion, construction procedure include:
The first step places temporary support in the pre-position of 1 top surface of bent cap, and inflation adjusts the height of each air bag 4 respectively, makes each 4 height of air bag is consistent with 2 height of supporting pad;
Second step hangs precast main beam 5 on temporary support, and support precast main beam 5(is certain jointly for supporting pad 2 and air bag 4, Precast main beam can also be temporarily supported merely with supporting pad 2 when practice of construction);Then according to bridge main body predetermined design position, The air bag 4 of 2 surrounding of supporting pad is inflated respectively, be lifted precast main beam 5 gradually and is detached from supporting pad 2, is completed prefabricated Girder 5 hangs operation;In to each 4 gas replenishment process of air bag, precast main beam can be realized by controlling the aeration quantity of each air bag 4 5 height, Slope angle adjustment;
Third step repeats the first step and second step, and that completes precast main beam 6 hangs operation, specific as shown in Figure 3;
4th step installs permanent support 7 in 1 top surface of bent cap, then pre- after the completion of precast main beam 5 and precast main beam 6 are hung Bridge Cast-in-Situ Segment 8 is poured between girder 5 processed and precast main beam 6 forms continuous beam, it is specific as shown in Figure 4;
5th step, after 8 load of bridge Cast-in-Situ Segment, since the height of supporting pad 2 is lower than permanent 7 height of support, by temporary support Each air bag 4 in air emptying after, the weight of precast main beam 5 and precast main beam 6 is fallen in naturally on permanent support 7, is removed Temporary support completes Program for structural Transformation, specific as shown in Figure 5.

Claims (6)

1. a kind of temporary support, the support body including being placed on bent cap top surface, it is characterised in that: the support body includes branch Stake pad and around solid multiple mutually indepedent, air bags with air inlet in the supporting pad surrounding, each air bag is full of gas Height afterwards is above the height of supporting pad.
2. temporary support according to claim 1, it is characterised in that: each air bag is to be moulded by lightweight polyester flexible Material is made, difference in height of each air bag full of height and supporting pad after gasΔHIt is the mm of 10 mm~15.
3. temporary support according to claim 2, it is characterised in that: the supporting pad is laminated rubber bearing, the gas Capsule is linked together with supporting pad by hot melt.
4. temporary support according to claim 1, it is characterised in that: the air bag is four.
5. temporary support according to claim 1, it is characterised in that: be respectively provided at the air inlet of each air bag There is valve inside.
6. a kind of method of Program for structural Transformation in bridge construction process, it is characterised in that: use and face as described in claim 1 When support, construction procedure includes:
The first step places temporary support in the pre-position of bent cap top surface, and inflation adjusts the height of each air bag respectively, makes each gas Capsule height is consistent with supporting pad height;
Second step hangs precast main beam on temporary support, is inflated respectively to the air bag around supporting pad, makes prefabricated master Beam is gradually lifted and is detached from supporting pad, and that completes precast main beam hangs operation;
Third step repeats the first step and second step, and that completes remaining precast main beam hangs operation;
4th step installs permanent support in bent cap top surface after the completion of precast main beam is all hung, then again precast main beam it Between pour bridge Cast-in-Situ Segment formed continuous beam;
Air in each air bag of temporary support is emptied respectively after bridge Cast-in-Situ Segment load, makes precast main beam by the 5th step Weight fallen on permanent support naturally, remove temporary support, complete Program for structural Transformation.
CN201910733605.4A 2019-08-09 2019-08-09 Temporary support and method for converting bridge structural system by adopting same Active CN110344322B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910733605.4A CN110344322B (en) 2019-08-09 2019-08-09 Temporary support and method for converting bridge structural system by adopting same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910733605.4A CN110344322B (en) 2019-08-09 2019-08-09 Temporary support and method for converting bridge structural system by adopting same

Publications (2)

Publication Number Publication Date
CN110344322A true CN110344322A (en) 2019-10-18
CN110344322B CN110344322B (en) 2024-02-06

Family

ID=68184464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910733605.4A Active CN110344322B (en) 2019-08-09 2019-08-09 Temporary support and method for converting bridge structural system by adopting same

Country Status (1)

Country Link
CN (1) CN110344322B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356596A (en) * 2021-04-07 2021-09-07 杭州闪易科技有限公司 Closed space construction method based on flexible material and rigid support structure

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262515A (en) * 2000-03-23 2001-09-26 Taisei Corp Method for constructing temporary bearing
CN101942803A (en) * 2010-07-09 2011-01-12 中冶建工有限公司 Bridge construction method implemented by simply supporting, forming continuous beam and removing temporary medium steel support in sequence
CN102080356A (en) * 2010-12-17 2011-06-01 中铁大桥局集团第四工程有限公司 Box girder positioning temporary supporting seat and positioning construction method of box girder
CN102518046A (en) * 2011-12-29 2012-06-27 广东冠粤路桥有限公司 Method for eliminating secondary internal force of sinking of support saddle of continuous beam during cantilever construction
CN202482769U (en) * 2011-12-29 2012-10-10 广东冠粤路桥有限公司 Novel temporary support used in bridge construction
CN105133487A (en) * 2015-10-08 2015-12-09 北京城建道桥建设集团有限公司 Combined type bridge temporary support and construction method for rapidly building continuous beams by virtue of same
CN207259935U (en) * 2017-07-28 2018-04-20 山西省交通科学研究院 A kind of simple supported-to-continuous girder bridge built a bridge at once system
CN207846231U (en) * 2018-01-11 2018-09-11 中铁十九局集团第七工程有限公司 A kind of adjustable for height lip block
CN207878267U (en) * 2018-01-06 2018-09-18 四川双建路桥机械有限责任公司 A kind of temporary support device for bridge construction
CN210458925U (en) * 2019-08-09 2020-05-05 河南省交通规划设计研究院股份有限公司 Temporary support for bridge structural system conversion

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262515A (en) * 2000-03-23 2001-09-26 Taisei Corp Method for constructing temporary bearing
CN101942803A (en) * 2010-07-09 2011-01-12 中冶建工有限公司 Bridge construction method implemented by simply supporting, forming continuous beam and removing temporary medium steel support in sequence
CN102080356A (en) * 2010-12-17 2011-06-01 中铁大桥局集团第四工程有限公司 Box girder positioning temporary supporting seat and positioning construction method of box girder
CN102518046A (en) * 2011-12-29 2012-06-27 广东冠粤路桥有限公司 Method for eliminating secondary internal force of sinking of support saddle of continuous beam during cantilever construction
CN202482769U (en) * 2011-12-29 2012-10-10 广东冠粤路桥有限公司 Novel temporary support used in bridge construction
CN105133487A (en) * 2015-10-08 2015-12-09 北京城建道桥建设集团有限公司 Combined type bridge temporary support and construction method for rapidly building continuous beams by virtue of same
CN207259935U (en) * 2017-07-28 2018-04-20 山西省交通科学研究院 A kind of simple supported-to-continuous girder bridge built a bridge at once system
CN207878267U (en) * 2018-01-06 2018-09-18 四川双建路桥机械有限责任公司 A kind of temporary support device for bridge construction
CN207846231U (en) * 2018-01-11 2018-09-11 中铁十九局集团第七工程有限公司 A kind of adjustable for height lip block
CN210458925U (en) * 2019-08-09 2020-05-05 河南省交通规划设计研究院股份有限公司 Temporary support for bridge structural system conversion

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356596A (en) * 2021-04-07 2021-09-07 杭州闪易科技有限公司 Closed space construction method based on flexible material and rigid support structure

Also Published As

Publication number Publication date
CN110344322B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN106087752B (en) Multispan cable-carried arch bridge construction method
CN105177202B (en) A kind of blast furnace overhaul method
CN109505267A (en) A kind of Hanging Basket cantilever pouring construction method
CN105586867B (en) The installation method of ultralong overweight steel reinforcement cage
CN110093869A (en) A kind of bridge decentralization dismounting device and bridge decentralization Demolition Construction method based on mobile support
CN102518046B (en) Method for eliminating secondary internal force of sinking of support saddle of continuous beam during cantilever construction
CN110344322A (en) A kind of temporary support and the method using support progress bridge conversion
CN113152306B (en) Small-radius large-gradient prefabricated T beam frame construction method
CN210458925U (en) Temporary support for bridge structural system conversion
CN207103480U (en) A kind of wind-power tower flange ovality apparatus for correcting
CN205442393U (en) Posture that falls suspension system
CN202139255U (en) Tooling platform for assembling converter body equipment
CN205840345U (en) A kind of embedded type tower crane funnel
CN110195514A (en) A kind of segment-shaped dome concreting method
CN207524830U (en) Hoisting bracket and handling mobile device
CN109811725A (en) A kind of canal for water conveyance is not cut off the water Quick overhaul method
CN206570700U (en) The continuous lowering system of steel jacket box
CN104847090B (en) Construction method of small-section-size ventilating duct
CN105970988B (en) The construction method of elevator sidewall reinforcing bar is installed in raft foundation
CN105464123B (en) Clamp plate type steel reinforcement cage mounting platform
CN107881912B (en) Assembled steel bridge face structure and construction method containing buffer layer, rigid layer, water-proof antifriction layer
CN211173029U (en) A liftable platform structure for chimney reinforcement construction
CN208716676U (en) Electric precipitation anode module hanging device
CN208325261U (en) A kind of cover board transport installation vehicle
CN103043454A (en) Silo feeding equipment mounting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant