CN207143706U - A kind of steel box girder bridge once falls frame system - Google Patents

A kind of steel box girder bridge once falls frame system Download PDF

Info

Publication number
CN207143706U
CN207143706U CN201721133206.7U CN201721133206U CN207143706U CN 207143706 U CN207143706 U CN 207143706U CN 201721133206 U CN201721133206 U CN 201721133206U CN 207143706 U CN207143706 U CN 207143706U
Authority
CN
China
Prior art keywords
steel box
girder
temporary support
temporary
frame system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721133206.7U
Other languages
Chinese (zh)
Inventor
王磊
韩之江
吴佳佳
刘志华
赵雷
汪永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201721133206.7U priority Critical patent/CN207143706U/en
Application granted granted Critical
Publication of CN207143706U publication Critical patent/CN207143706U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

It the utility model is related to a kind of steel box girder bridge and once fall frame system, including:Steel box-girder, bent cap, permanent bearing, temporary support, Temporary Piers and floorings.Permanent bearing is installed on bent cap;Set again on mid-span bent cap depending on temporary support, temporary support be highly computed;Temporary Piers are set at mid-span span centre;After the completion of steel box-girder on-site consolidation, welding, lift to temporary support and Temporary Piers;After the welding of steel box-girder mid-span is closed up, floorings construction is carried out on steel box-girder;Temporary support is finally released, steel box-girder forces falling to design attitude.Compared with prior art, it is described in the utility model once to fall the final internal force status of frame system and reach built a bridge at once state, and precompression is formed in floorings, whole process is simple to operate, and construction is quick, and system stress is clear and definite, structure is safe and reliable.

Description

A kind of steel box girder bridge once falls frame system
Technical field
The utility model belongs to technical field of bridge engineering, it particularly relates to once fall frame system to a kind of steel box girder bridge System.
Background technology
Steel-mixed composite beam bridge has the advantages that high capacity, ductility are good, rigidity is big, in highway, railway and urban interchange In obtained relatively broad application.But common continuous composite beam bridge is due to intermediate support hogging moment area concrete slab tension The backed off after random that ftractures works, and causes section rigidity to reduce, depression of bearing force.It is also easy to cause the steel in concrete after floorings cracking Muscle corrosion, influence the durability of structure.Stiffener configures in concrete slab, and its bending resistance and rigidity are generally also bright The aobvious compound section less than positive moment of span central point area.
Utility model content
In order to solve the above technical problems, the utility model, which provides a kind of steel box girder bridge, once falls frame system, it is applicable to prolong Cracking that is slow or suppressing hogging moment area concrete slab, improves the rigidity of structure.
A kind of steel box girder bridge once falls frame system, including:Bent cap (1), permanent bearing (2), temporary support (3), Temporary Piers (4), steel box-girder (5) and concrete slab (6);Wherein:
The permanent bearing (2) is installed on the bent cap (1);The temporary support (3) is arranged on bent cap (1);Institute The height for stating temporary support (3) is more than the height of the permanent bearing (2);The Temporary Piers (4) are arranged at mid-span and height It is concordant with the permanent bearing (2);Steel box-girder (5) lifting is fixed on the temporary support (3) and Temporary Piers (4);It is mixed Native floorings (6) are coagulated to be arranged on the steel box-girder (5).
Preferably, the bent cap (1) is mid-span bent cap.
Preferably, the temporary support (3) is the prefabricated temporary support of meltability sulphur-bonded mortar.
Preferably, after steel box-girder (5) lifting is in place, Temporary Piers (4) are detachable.
Preferably, after concrete slab (6) completion, temporary support (3) is detachable.
Preferably, after the temporary support (3) and Temporary Piers (4) are removed, the steel box-girder (5) is supported in permanent bearing (2) on.
When in use, can carry out in accordance with the following steps:(1) after the completion of bridge pier, Coping Construction, installed on bent cap permanent Bearing, temporary support is set again on mid-span bent cap;(2) Temporary Piers, Temporary Piers height and permanent branch are set at mid-span span centre Seat keeps concordant;(3) after the completion of steel box-girder on-site consolidation, welding, in correct lifting to temporary support, Temporary Piers;(4) steel box-girder After installation is in place, Temporary Piers are removed;(5) steel box-girder mid-span carries out welding closure construction;(6) after the completion of closure construction, in steel case Concrete slab pouring construction is carried out on beam;(7) temporary support is finally released, steel box-girder forces falling to design attitude.
Compared with prior art, it is described in the utility model once to fall the final internal force status of frame system and reach built a bridge at once shape State, and precompression is formed in floorings, whole process is simple to operate, and construction is quick, and system stress is clear and definite, structure safely may be used Lean on.
Brief description of the drawings
Fig. 1 is the initial scheme of installation of steel box-girder.
Fig. 2 is steel box girder cantilever view.
Fig. 3 is that steel box-girder closes up schematic diagram.
Fig. 4 is concrete slab construction schematic diagram.
Fig. 5 is structural system into bridge schematic diagram.
Fig. 6 is temporary support scheme of installation.
Description of reference numerals:
The permanent bearing of 1- bent caps, 2-, 3- temporary supports, 4- Temporary Piers, 5- steel box-girders, 6- concrete slabs.
Embodiment
To make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings to this reality Once fall frame system with a kind of steel box girder bridge of new offer to be described in detail.
A kind of steel box girder bridge once falls frame system, including:Bent cap 1, permanent bearing 2, temporary support 3, Temporary Piers 4, steel case Beam 5 and concrete slab 6.
Permanent bearing 2 is installed on bent cap 1, temporary support 3 is set again on mid-span bent cap 1.Temporary support 3 can use meltability Sulphur-bonded mortar is prefabricated to be formed.Depending on the height △ of temporary support 3 is computed and it is higher than permanent bearing 2.Temporary Piers 4 are arranged on mid-span And height is concordant with permanent bearing 2.
After the completion of the on-site consolidation of steel box-girder 5, welding, correctly it is lifted on temporary support 3 and Temporary Piers 4.Steel box-girder 5 is installed After in place, Temporary Piers 4 are removed.Concrete slab 6 is carried out after the completion of the welding of the mid-span of steel box-girder 5 is closed up, on steel box-girder 5 to construct. After the completion of concrete slab 6 is constructed, temporary support 3 is released, steel box-girder 5 forces falling to design attitude;Steel box-girder 5 finally props up Support on permanent bearing 2.
When in use, can carry out in accordance with the following steps:
(1) after the completion of bridge pier, Coping Construction, permanent bearing is installed on bent cap, interim branch is set again on mid-span bent cap Seat, is shown in Fig. 6;
(2) the setting Temporary Piers at mid-span span centre, Temporary Piers height are concordant with the holding of permanent bearing;
(3) after the completion of steel box-girder on-site consolidation, welding, in correct lifting to temporary support, Temporary Piers, shown in Fig. 1;
(4) after steel box-girder installation is in place, Temporary Piers is removed, see Fig. 2;
(5) steel box-girder mid-span carries out welding closure construction, such as Fig. 3;
(6) after the completion of closure construction, concrete slab pouring construction, such as Fig. 4 are carried out on steel box-girder;
(7) temporary support is finally released, steel box-girder forces falling to see Fig. 5 to design attitude.
Compared with prior art, it is described in the utility model once to fall the final internal force status of frame system and reach built a bridge at once shape State, and precompression is formed in floorings, whole process is simple to operate, and construction is quick, and system stress is clear and definite, structure safely may be used Lean on.
It is understood that embodiment of above is merely to illustrate that principle of the present utility model and used exemplary Embodiment, but the utility model is not limited thereto.For those skilled in the art, this is not being departed from In the case of the spirit and essence of utility model, various changes and modifications can be made therein, and these variations and modifications are also considered as this reality With new protection domain.

Claims (6)

1. a kind of steel box girder bridge once falls frame system, including:Bent cap (1), permanent bearing (2), temporary support (3), Temporary Piers (4), steel box-girder (5) and concrete slab (6);It is characterized in that:
The permanent bearing (2) is installed on the bent cap (1);The temporary support (3) is arranged on bent cap (1);It is described to face When bearing (3) height be more than the height of the permanent bearing (2);The Temporary Piers (4) are arranged at mid-span and height and institute It is concordant to state permanent bearing (2);Steel box-girder (5) lifting is fixed on the temporary support (3) and Temporary Piers (4);Concrete Floorings (6) are arranged on the steel box-girder (5).
2. steel box girder bridge according to claim 1 once falls frame system, it is characterised in that:The bent cap (1) is mid-span lid Beam.
3. steel box girder bridge according to claim 2 once falls frame system, it is characterised in that:The temporary support (3) is can The prefabricated temporary support of fusibleness sulphur-bonded mortar.
4. steel box girder bridge according to claim 3 once falls frame system, it is characterised in that:Steel box-girder (5) lifting is just Behind position, Temporary Piers (4) are detachable.
5. steel box girder bridge according to claim 4 once falls frame system, it is characterised in that:The concrete slab (6) After completion, temporary support (3) is detachable.
6. steel box girder bridge according to claim 5 once falls frame system, it is characterised in that:The temporary support (3) and face When pier (4) remove after, the steel box-girder (5) is supported on permanent bearing (2).
CN201721133206.7U 2017-09-05 2017-09-05 A kind of steel box girder bridge once falls frame system Expired - Fee Related CN207143706U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721133206.7U CN207143706U (en) 2017-09-05 2017-09-05 A kind of steel box girder bridge once falls frame system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721133206.7U CN207143706U (en) 2017-09-05 2017-09-05 A kind of steel box girder bridge once falls frame system

Publications (1)

Publication Number Publication Date
CN207143706U true CN207143706U (en) 2018-03-27

Family

ID=61677561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721133206.7U Expired - Fee Related CN207143706U (en) 2017-09-05 2017-09-05 A kind of steel box girder bridge once falls frame system

Country Status (1)

Country Link
CN (1) CN207143706U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055902A (en) * 2019-05-23 2019-07-26 中铁二局集团有限公司 Bridge construction method and its erection method on a kind of large-tonnage box beam normotopia bale handle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055902A (en) * 2019-05-23 2019-07-26 中铁二局集团有限公司 Bridge construction method and its erection method on a kind of large-tonnage box beam normotopia bale handle
US11391004B1 (en) 2019-05-23 2022-07-19 China Railway No. 2 Engineering Group Co. LTD. Construction method for upright lifting of large-tonnage box girder to bridge, and erection method for large-tonnage box girder

Similar Documents

Publication Publication Date Title
CN210636312U (en) Prefabricated structure of assembling of assembled bridge of high-speed railway
CN103266574B (en) Simply-supported box girder bridge strengthening method with oblique cables
CN105803916B (en) Light-duty combined box-type bent cap of steel and ultra-high performance concrete and preparation method thereof
CN104404869A (en) Pile column type concrete hollow pile pier structure
CN207143733U (en) A kind of simple-supported thencontinuous bridge system converting system
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN106894346B (en) A kind of the continuous beam bridge construction method
CN104153284A (en) Partial filling type steel box concrete continuous composite girder bridge and construction method thereof
CN104452567B (en) A kind of swing dual deck bridge framed bent and mounting method thereof
CN110130424B (en) Method for reinforcing prestressed anchor bolt fan foundation
CN207143706U (en) A kind of steel box girder bridge once falls frame system
CN102392416A (en) Pier-beam temporary consolidation post-installed fastening system construction method
CN105088961A (en) Side-span closure section and cast-in-place section combining construction method
CN108396632A (en) Reduce the method for PK combination girder stayed-cable bridge auxiliary pier pier top girder hogging moments
CN205501843U (en) Consolidate rigid framed arch bridge
CN203729211U (en) Suspension type curved bridge panel cast-in-situ formwork
CN203741729U (en) Pre-stress supporting system used for bridge incremental launching construction method
CN105603890A (en) Extradosed type external cable reinforced girder bridge
CN202170474U (en) Support system mixing type combined beam cable-stayed bridge
CN207259935U (en) A kind of simple supported-to-continuous girder bridge built a bridge at once system
CN211772868U (en) Pier temporary consolidation device in large-span continuous beam
CN204982933U (en) Concrete boiler foundation
CN209082553U (en) Retaining Wall structure
CN110306425B (en) Pier bottom structure of short pier rigid frame bridge capable of greatly reducing bearing bending moment
CN207633235U (en) A kind of mixed composite beam bridge system transform system of the steel-based on re-building of old bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

Termination date: 20180905

CF01 Termination of patent right due to non-payment of annual fee