CN207228644U - Wallboard installing structure - Google Patents

Wallboard installing structure Download PDF

Info

Publication number
CN207228644U
CN207228644U CN201721232421.2U CN201721232421U CN207228644U CN 207228644 U CN207228644 U CN 207228644U CN 201721232421 U CN201721232421 U CN 201721232421U CN 207228644 U CN207228644 U CN 207228644U
Authority
CN
China
Prior art keywords
installing structure
wallboard installing
prefabricated
wallboard
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721232421.2U
Other languages
Chinese (zh)
Inventor
周义
汪中林
李家亮
魏来
成小星
阙开财
鲍清泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Practical Building Materials Co Ltd
Original Assignee
Huizhou Practical Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Practical Building Materials Co Ltd filed Critical Huizhou Practical Building Materials Co Ltd
Priority to CN201721232421.2U priority Critical patent/CN207228644U/en
Application granted granted Critical
Publication of CN207228644U publication Critical patent/CN207228644U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of wallboard installing structure, it includes multiple piers, multiple prefabricated panels and multiple supporting items, each of which pier has body and multiple first reinforcing bars, multiple first steel-bar arrangements are in body, each prefabricated panel has wall and multiple second reinforcing bars, in in wall, multiple prefabricated panels are respectively arranged between adjacent two piers multiple second steel-bar arrangements, and at least one end of each supporting item is supported in corresponding prefabricated panel.The wallboard installing structure of the application is to fall to insert on method mounting structure existing, save grout sleeve and grouting with plunger, increase cast-in-situ pile cap and support, embedded bar on cast-in-situ pile cap, by being lifted on adjacent pier, it is aided with support, ensures overall stability, and the cast-in-place concrete between adjacent pier and contiguous prefabricated wallboard, ensure that prefabricated panel forms complete metope structure with pier.

Description

Wallboard installing structure
Technical field
It the utility model is related to a kind of building structure field, more particularly to a kind of wallboard installing structure.
Background technology
Known prefabricated panel installation is embedded in sleeve on the top of component using falling to insert the connection of method sleeve grouting reinforcement, Joint bar is reserved in the lower part of component, and the sleeve of joint bar alignment lower floor component is inserted into by when lifting component.In embedded sleeve barrel, it is necessary to Stayed on sleeve and set Grouting Pipe, increase production operation difficulty;The a large amount of joint bars in prefabricated panel lower part need accurate insertion during lifting In lower floor's component sleeve, operation difficulty is larger.In addition, a large amount of sleeves use and slip casting make it that cost is higher.
Utility model content
For the big and of high cost deficiency of production operation difficulty of the prior art, and then propose a kind of structure-improved.This The purpose of utility model is to provide a kind of wallboard installing structure.
In order to solve the above-mentioned technical problem, this application discloses a kind of wallboard installing structure, it includes multiple piers, multiple Prefabricated panel and multiple supporting items.Each pier has body and multiple first reinforcing bars, and multiple first steel-bar arrangements are in this In vivo, each prefabricated panel has wall and multiple second reinforcing bars, and multiple second steel-bar arrangements are in wall, multiple dry walls Plate is respectively arranged between adjacent two piers, and at least one end of each supporting item is supported in corresponding prefabricated panel.
According to presently filed embodiment, above-mentioned multiple first reinforcing bars further respectively from the inside of multiple bodies to The upper surface of multiple bodies is protruded out outside.
According to presently filed embodiment, above-mentioned multiple second reinforcing bars further respectively from the inside of multiple walls to The side surface of multiple walls is protruded out outside.
According to presently filed embodiment, above-mentioned multiple supporting items are channel steel.
According to presently filed embodiment, the both ends of above-mentioned multiple supporting items are respectively supported at two walls relative to each other The top of body.
According to presently filed embodiment, the both ends of above-mentioned multiple supporting items are respectively supported at the top of two prefabricated panels Portion, and form angle between two prefabricated panels.
According to presently filed embodiment, the angle formed between above-mentioned two prefabricated panels is 90 degree.
According to presently filed embodiment, one end of above-mentioned multiple supporting items is oblique to rest against corresponding prefabricated panel, Its other end is then supported in supporting surface.
Compared with prior art, the application can be obtained including following effect:
The wallboard installing structure of the application eliminates grout sleeve and grouting material, reduces cost, reaches economical and practical Effect.
For the wallboard installing structure of the application without being accurately inserted into grout hole, reinforcement location allowable error is very big, reaches quick The effect of installation.
The wallboard installing structure of the application and the cast-in-place connection indifference of tradition, structure are reliable.
Brief description of the drawings
Attached drawing described herein is used to provide a further understanding of the present invention, and forms one of the utility model Point, the exemplary embodiment and its explanation of the utility model are used to explain the utility model, do not form to the utility model Improper restriction.In the accompanying drawings:
Fig. 1 is the schematic perspective view of the wallboard installing structure of the utility model.
Embodiment
Presently filed embodiment will be disclosed with schema below, as clearly stated, details in many practices will be Illustrate in the lump in described below.It should be appreciated, however, that the details in these practices is not applied to limit the application.That is, In some embodiments of the application, the details in these practices is non-essential.In addition, for the sake of simplifying schema, some Known usual structure will illustrate it in a manner of simply illustrative in the drawings with component.
Referring to Fig. 1, its schematic perspective view for the wallboard installing structure of the utility model;As shown in the figure, the application carries For a kind of wallboard installing structure, it is used for the installation of multiple wallboards of building structure, and wallboard installing structure 1 includes multiple piers 11st, multiple prefabricated panels 13 and multiple supporting items 15.
In embodiment, cast-in-place multiple piers 11 on the ground, when cast-in-place pre-buried multiple first on each pier 11 Reinforcing bar 113, after the completion of pouring, multiple 11 coagulation formings of pier.Each pier 11 has body 111 and multiple first reinforcing bars 113, Multiple first reinforcing bars 113 stretch out the upper surface of body 111 from the inside convex of body 111.Each prefabricated panel 13 has Wall 131 and multiple second reinforcing bars 135, multiple second reinforcing bars 135 stretch out side surface from the inside convex of wall 131 respectively. I.e. multiple second reinforcing bars 135, which convexedly stretch in wall 131, has the side surface of most short side.Multiple prefabricated panels 13 are lifted on adjacent respectively Between two piers 11, the wall 131 of prefabricated panel 13 vertically in adjacent two piers 1 body 111 upper surface.Its In protrude out second reinforcing bar 135 on 13 left and right side surface of dry wall slope and correspond respectively to protrude out 11 upper table of adjacent two piers First reinforcing bar 113 in face.
From the above, while lift multiple prefabricated panel 13, wallboard installing structure 1 more adds multiple supporting items 15, and these multiple supporting items 15 can be divided into support member 151, guesset 153 and bracing element 155, each to support member 151 two End is respectively supported at the top of two walls 131 relative to each other.The both ends of each guesset 153 are respectively supported at mutual phase The top of two adjacent walls 131, and the angle formed between adjacent two walls 131 is 90 degree.Each bracing element 155 One end skewed horizontal load in corresponding single wall 131, the other end is then supported in supporting surface (such as ground), so to ensure wallboard The overall stability of mounting structure 1, in present embodiment, all supporting items 15 are made by channel steel.
After the completion of lifting, show multiple second reinforcing bars 135 that casting concrete is protruded out in the bottom of dry wall slope 13 with it, And between adjacent two piers 11 of support dry wall slope 13, make above-mentioned adjacent multiple piers 11 with it is corresponding multiple prefabricated The bottom of wallboard 13 is combined into complete wallboard installing structure 1.
Above-mentioned, cast-in-place concrete is protruded out in two adjacent prefabricated panels 13 and each multiple second reinforcing bars 135 are connect, And corresponding between the pier 11 between this two adjacent prefabricated panel 13 and the first reinforcing bar 113 for protruding out upper surface, make Multiple prefabricated panels 13 are combined into complete wallboard installing structure 1 with corresponding multiple piers 11.
In conclusion in presently filed embodiment, the wallboard installing structure of the application eliminates grout sleeve and grouting Material, reduces cost.At the same time without being accurately inserted into grout hole, reinforcement location allowable error is very big, can Fast Installation.In addition with biography Unite cast-in-place connection indifference, structure is reliable.
The upper only presently filed embodiment, is not limited to the application.For those skilled in the art For, the application can have various modifications and variations.All any modifications made in spirit herein and principle, be equal Replace, improve etc., it should all be included within the scope of claims hereof.

Claims (8)

  1. A kind of 1. wallboard installing structure, it is characterised in that it includes:
    Multiple piers, each described pier have body and multiple first reinforcing bars, and the multiple first steel-bar arrangement is in described In body;
    Multiple prefabricated panels, each described prefabricated panel have wall and multiple second reinforcing bars, and the multiple second reinforcing bar is set It is placed in the wall, the multiple prefabricated panel is respectively arranged between adjacent two piers;And
    Multiple supporting items, at least one end of each supporting item are supported in the corresponding prefabricated panel.
  2. 2. wallboard installing structure according to claim 1, it is characterised in that wherein the multiple first reinforcing bar further divides The upper surface of the multiple body is not stretched out from the inside convex of the multiple body.
  3. 3. wallboard installing structure according to claim 1, it is characterised in that wherein the multiple second reinforcing bar further divides The side surface of the multiple wall is not stretched out from the inside convex of the multiple wall.
  4. 4. wallboard installing structure according to claim 1, it is characterised in that wherein the multiple supporting item is channel steel.
  5. 5. wallboard installing structure according to claim 1, it is characterised in that prop up respectively at the both ends of wherein the multiple supporting item Support in the top of two walls relative to each other.
  6. 6. wallboard installing structure according to claim 1, it is characterised in that prop up respectively at the both ends of wherein the multiple supporting item Support in the top of two prefabricated panels, and angle is formed between two prefabricated panels.
  7. 7. wallboard installing structure according to claim 6, it is characterised in that wherein described angle is 90 degree.
  8. 8. wallboard installing structure according to claim 1, it is characterised in that one end of wherein the multiple supporting item is oblique to lean on The corresponding prefabricated panel is against, its other end is then supported in supporting surface.
CN201721232421.2U 2017-09-25 2017-09-25 Wallboard installing structure Active CN207228644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721232421.2U CN207228644U (en) 2017-09-25 2017-09-25 Wallboard installing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721232421.2U CN207228644U (en) 2017-09-25 2017-09-25 Wallboard installing structure

Publications (1)

Publication Number Publication Date
CN207228644U true CN207228644U (en) 2018-04-13

Family

ID=61863763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721232421.2U Active CN207228644U (en) 2017-09-25 2017-09-25 Wallboard installing structure

Country Status (1)

Country Link
CN (1) CN207228644U (en)

Similar Documents

Publication Publication Date Title
CN106088396B (en) The preparation method of 3D printing filled wall
US9453350B2 (en) Shuttering
CN104328845B (en) The method of attachment of 3D printing reinforced masonry shear wall and attachment structure
CN104532953B (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN204126048U (en) Bracket steel bar concrete shear force wall connecting pin contact assembled architecture
CN206189647U (en) Novel infilled wall brickwork drawknot muscle structure
US20100212247A1 (en) Block wall system
CN104196054A (en) Basement double-layer overlapping prefabricated outer wall
CN207348095U (en) The special bearing diagonal component of piping lane
ITBO20060649A1 (en) APPARATUS FOR RIGID ANCHORING BETWEEN PREFABRICATED SLEEPER BEAMS AND PREFABRICATED PILLARS, IN CONSTRUCTION BUILDINGS WITH MULTI-STAINED HOUSING AND REINFORCED CONCRETE.
CN105019645B (en) Fetch earth in contrary sequence method and the template system and construction method of xoncrete structure are built at mouth
CN109779241A (en) A kind of multifunctional wall body formwork root positioning system and its construction method
CN207228644U (en) Wallboard installing structure
CN206681359U (en) One kind cheats new formwork system in hole
CN106917508A (en) Support system and its construction method on a kind of concrete inclined member
CN210086685U (en) Prefabricated staircase and connection structure of prefabricated staircase and floor slab
CN105113626B (en) Cast-in-place post precast beam construction method
CN205046560U (en) Muscle formula bracket
CN204098063U (en) The double-layered precast facade of a kind of basement
CN209670329U (en) A kind of multifunctional wall body formwork root positioning system
CN208235561U (en) A kind of new-type piling strtucture
CN206359993U (en) Stud structure for main transformer fire wall
KR20200010841A (en) Precast concrete floor and floor structure
CN206693476U (en) A kind of marginal texture construction of Sloping roof structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant