CN106917508A - Support system and its construction method on a kind of concrete inclined member - Google Patents
Support system and its construction method on a kind of concrete inclined member Download PDFInfo
- Publication number
- CN106917508A CN106917508A CN201710078074.0A CN201710078074A CN106917508A CN 106917508 A CN106917508 A CN 106917508A CN 201710078074 A CN201710078074 A CN 201710078074A CN 106917508 A CN106917508 A CN 106917508A
- Authority
- CN
- China
- Prior art keywords
- concrete
- inclined member
- steel
- support frame
- support system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses support system and its construction method on a kind of concrete inclined member, support system is ridden upon on completed armored concrete inclined member on concrete inclined member, including some grades of concrete steps along the domatic setting of armored concrete inclined member, the armored concrete inclined member is domatic to be provided with the shearing resistance indent and vertical joint bar for being poured with concrete step and being integrated, elongated I-steel is laid on the concrete step, support frame is set up above I-steel, the supported rod erecting of support frame is supported on I-steel.The concentrated force of support frame is converted into even distributed force by the present invention by setting concrete step and increasing I-steel, eliminates the destruction to top board surface layer, and vertical rod section uniform force, and perpendicularity can guarantee that, enhance the local stability of rod member.
Description
Technical field
The present invention relates to building construction technology.
Background technology
In building structure construction, underground garage ramp is ramp, and basement roof is the situation of inclined member, generally will
Directly branch is located at the load that transmission support top superstructure beam slab is transmitted on swash plate to support system.Support system on common swash plate
The construction way for installing is simple, or just without way, direct vertical rod branch is located on top board.Problem well imagines mainly have:
First, directly branch is located at the vertical rod on swash plate, and producing concentrated force to swash plate, and backing plate cannot be simply provided carries out accepting diffusion, right
Not up to the concrete of design strength produces flush shear force, causes swash plate surface layer to destroy;2nd, vertical rod eccentric force, frangibility and change
Shape, local stability is not enough, can sink after the formwork system stress of part, and floor flatness is uneven;3rd, vertical rod and swash plate contact surface
Stiction with vertical rod stress increase and increase, when stiction increases to maximum static friction force, formwork system produce cunning
Move, and then will overall collapse, cause security incident.
In view of the Construction quality and safety problem that causes of three class Mechanics Causes for existing, design more than one kind can solve
Setting up for support system constructs and its construction method on three kinds of concrete inclined members of the quality security problem of generally existing, just
Problem as professional's urgent need to resolve.
The content of the invention
The technical problems to be solved by the invention are just to provide support system on a kind of concrete inclined member, solve swash plate
The problem of swash plate punching failure, vertical rod local buckling and mould bases overall collapse during formwork.
In order to solve the above technical problems, the present invention is adopted the following technical scheme that:Supporter on a kind of concrete inclined member
System, rides upon on completed armored concrete inclined member, including along some of the domatic setting of armored concrete inclined member
Level concrete step, the armored concrete inclined member is domatic to be provided with the shearing resistance indent for being poured with concrete step and being integrated
With vertical joint bar, elongated I-steel is laid on the concrete step, support frame, the support of support frame are set up above I-steel
Vertical rod is supported on I-steel.
Preferably, the armored concrete inclined member is domatic to be provided with the dabbing being combined together with concrete step
Face.
Entirety is formed preferably, being used with the I-steel on one-level concrete step and linking bar connecting.
Preferably, the I-steel edge of a wing center weldment bar dowel, supported rod erecting is inserted on bar dowel.
Preferably, the concrete step correspondence I-steel position is embedded with supporting steel plate, set on the supporting steel plate
There is spacer bar, the I-steel is provided with the location hole plugged together with spacer bar.
Present invention also offers a kind of construction method of support system on concrete inclined member, comprise the following steps:Step
Rapid one:Concrete step is designed on armored concrete inclined member section, and determines every grade of concrete step highly, walkthrough branch
Support, it is determined that often arranging support frame vertical rod vertically and horizontally spacing;
Step 2:The swash plate reinforcing bar of assembling reinforcement concrete inclined member, and pre-buried vertical joint bar, vertical joint bar use with
The mode of the face reinforcement welding of armored concrete inclined member;
Step 3:Colligation section is the template of 80mm × 15mm as template at shearing resistance indent on the reinforcing bar of face;
Step 4:Pouring reinforcement concrete inclined member, after reaching people's intensity, digs out template at shearing resistance indent, opposite
Layer carries out the work of dabbing and cleaning, it is ensured that has at contact surface and is engaged enough;
Step 5:Formwork and casting concrete step;
Step 6:The line of I-steel is ejected on concrete step, while I-steel edge of a wing center weldment bar dowel;
Step 7:I-steel to correct position is put, along elongated I-steel length direction, is spaced a distance with linking steel
Muscle couples together I-steel;
Step 7:Foundation《Construction fastener type steel pipe scaffold technical specification of security》With《Building construction formwork safety
Technical specification》Support frame is set up, the supported rod erecting of support frame is supported on I-steel;
Step 8:After the completion of Superstructure Construction, support frame is removed, cut concrete step.
The technical solution adopted by the present invention, by setting concrete step and increasing I-steel, by the concentrated force of support frame
Even distributed force is converted into, the destruction to top board surface layer, and vertical rod section uniform force is eliminated, perpendicularity can guarantee that, enhance bar
The local stability of part;Simultaneously step and inclined member junction be provided with shearing resistance indent, contact surface dabbing treatment, bar dowel and
The ways such as reinforcing bar are linked, the bonding strength of contact surface is improve, the monolithic stability of support frame is improve.It is substituted for for steel pipe perpendicular
To heavy steel member support system, it may have larger bearing capacity, therefore on concrete inclined member, support system is set up
Construction and its construction method, with universal applicability, all have to improving floor slab construction quality and reducing construction safety hidden danger
Very real reference significance.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and detailed description:
Fig. 1 is the general structure schematic diagram of the embodiment of the present invention 1;
Fig. 2 is the partial structural diagram one of the embodiment of the present invention 1;
Fig. 3 is the partial structural diagram two of the embodiment of the present invention 1;
Fig. 4 is the partial structural diagram of the embodiment of the present invention 2.
Specific embodiment
Embodiment 1, as shown in Figure 1 to Figure 3, support system on a kind of concrete inclined member rides upon completed steel
On reinforced concrete inclined member 1, it is included along some grades of concrete steps 2 of the domatic setting of armored concrete inclined member.It is mixed
Elongated I-steel 3 is laid on solidifying earthen platform rank 2, support frame 4 is set up above I-steel, the supported rod erecting of support frame is supported on I-shaped
On steel.
Wherein, the domatic of the armored concrete inclined member 1 is provided with the dabbing being combined together with concrete step 2
Face 11, further, armored concrete inclined member is domatic to be provided with the shearing resistance indent 12 for being poured with concrete step and being integrated,
The vertical joint bar 21 in insertion armored concrete inclined member is poured in concrete step 2.Abovementioned technology improves and connects
The bonding strength of contacting surface, it is ensured that the monolithic stability of support frame.
In addition, form overall using the connection of reinforcing bar 31 is linked with the I-steel on one-level concrete step, to ensure shaped steel
The globality of base, improves stability.The I-steel edge of a wing center weldment bar dowel 32, supported rod erecting 41 is inserted in bar dowel
On, positioning is formed, the position of vertical rod is strictly controlled, also function to the effect for preventing vertical rod from slipping.
The present invention also provides the construction method set up of support system on concrete inclined member, comprises the following steps:
Step one:It is step-like by inclined member in-depth, and determines every section of shoulder height, by CAD walkthrough support frames,
It is determined that often arranging support frame vertical rod vertically and horizontally spacing
Step 2:Assembling reinforcement concrete swash plate reinforcing bar, it is pre-buried vertical16 joint bars, using the side with face reinforcement welding
Formula;
Step 3:Colligation section is the template of 80mm × 15mm as template at indent on the reinforcing bar of face;
Step 4:Pouring reinforcement concrete inclined member, after reaching people's intensity, digs out template at indent, to swash plate face
Layer carries out the work of dabbing and cleaning, it is ensured that has at contact surface and is engaged enough;
Step 5:Formwork and pour plain concrete step, it is ensured that the flatness of step surface layer;
Step 6:The line of I-steel is ejected on step, on the I-shaped steel base edge of a wing, by high-countcotton yarn spacing, welding
16 bar dowels, strictly control the position of vertical rod, also function to the effect for preventing vertical rod from slipping;
Step 7:I-steel to correct position is put, along elongated I-steel length direction, be spaced a distance use16
Link reinforcing bar to couple together formed steel base, the globality of enhanced type steel base;
Step 7:Foundation《Construction fastener type steel pipe scaffold technical specification of security》With《Building construction formwork safety
Technical specification》Support frame is set up, strict control is swept the floor the construction connection way of bar;
Step 8:After the completion of Superstructure Construction, support frame is removed, cut step concrete.
Embodiment 2, as shown in figure 4, being with the difference of embodiment 1, the domatic correspondence coagulation of armored concrete inclined member
Native stepped locations are embedded with screw shell, and screw rod 22 is combined with screw shell internal thread, on screw rod by nut be fixed with
Concrete step pours the reinforcement gusset 23 being integrated.The handle of concrete step 2 is made a concerted effort in order to further enhance, strengthens gusset
23 can be vertically arranged reinforcement.Therefore, the bonding strength of contact surface is further increased, the monolithic stability of support frame is improve
In addition, the concrete step correspondence I-steel position is embedded with abutment sleeve, I-steel is provided with insertion positioning
The positioning bar of sleeve, to reach quick positioning I-steel, and ensures the purpose of I-steel stability.
Claims (6)
1. support system on a kind of concrete inclined member, rides upon on completed armored concrete inclined member, its feature
It is:Including some grades of concrete steps along the domatic setting of armored concrete inclined member, the oblique structure of armored concrete
Part is domatic to be provided with the shearing resistance indent and strengthening rib strip for being poured with concrete step and being integrated, and lays logical on the concrete step
I-steel long, sets up support frame above I-steel, and the supported rod erecting of support frame is supported on I-steel.
2. support system on a kind of concrete inclined member according to claim 1, it is characterised in that:The reinforced concrete
Native inclined member is domatic to be provided with the roughened surface being combined together with concrete step.
3. support system on a kind of concrete inclined member according to claim 1, it is characterised in that:With one-level concrete
I-steel use on step links bar connecting and forms entirety.
4. support system on a kind of concrete inclined member according to claim 1, it is characterised in that:The I-steel wing
Edge center weldment bar dowel, supported rod erecting is inserted on bar dowel.
5. support system on a kind of concrete inclined member according to claim 1, it is characterised in that:The reinforced concrete
The native domatic correspondence concrete step position of inclined member is embedded with screw shell, and the screw shell internal thread is combined with screw rod,
It is fixed with by nut on the screw rod and the reinforcement gusset being integrated is poured with concrete step.
6. support system construction method on a kind of concrete inclined member, it is characterised in that comprise the following steps:
Step one:Concrete step is designed on armored concrete inclined member section, and determines every grade of concrete step highly,
Walkthrough support frame, it is determined that often arranging support frame vertical rod vertically and horizontally spacing;
Step 2:The swash plate reinforcing bar of assembling reinforcement concrete inclined member, and pre-buried vertical joint bar, vertical joint bar are used and reinforcing bar
The mode of the face reinforcement welding of concrete inclined member;
Step 3:Colligation section is the template of 80mm × 15mm as template at shearing resistance indent on the reinforcing bar of face;
Step 4:Pouring reinforcement concrete inclined member, after reaching people's intensity, digs out template at shearing resistance indent, and surface layer is entered
Row dabbing and the work of cleaning, it is ensured that have at contact surface and be engaged enough;
Step 5:Formwork and casting concrete step;
Step 6:The line of I-steel is ejected on concrete step, while I-steel edge of a wing center weldment bar dowel;
Step 7:I-steel to correct position is put, along elongated I-steel length direction, is spaced a distance with linking reinforcing bar general
I-steel is coupled together;
Step 7:Foundation《Construction fastener type steel pipe scaffold technical specification of security》With《Building construction formwork safe practice
Specification》Support frame is set up, the supported rod erecting of support frame is supported on I-steel;
Step 8:After the completion of Superstructure Construction, support frame is removed, cut concrete step.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710078074.0A CN106917508A (en) | 2017-02-14 | 2017-02-14 | Support system and its construction method on a kind of concrete inclined member |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710078074.0A CN106917508A (en) | 2017-02-14 | 2017-02-14 | Support system and its construction method on a kind of concrete inclined member |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106917508A true CN106917508A (en) | 2017-07-04 |
Family
ID=59454160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710078074.0A Pending CN106917508A (en) | 2017-02-14 | 2017-02-14 | Support system and its construction method on a kind of concrete inclined member |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106917508A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107288154A (en) * | 2017-07-26 | 2017-10-24 | 中交公局海威工程建设有限公司 | A kind of support suitable for pipe gallery slope section sets up structure |
CN107299766A (en) * | 2017-07-12 | 2017-10-27 | 中建局集团建设发展有限公司 | A kind of Prefabricated slope roof surface board support system and its construction method |
CN115807485A (en) * | 2022-12-23 | 2023-03-17 | 深圳市胜德建筑科技有限公司 | Assembly type prefabricated reversed ridge connecting structure and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1422349A (en) * | 2000-03-29 | 2003-06-04 | 福井福男 | Method of constructing structures useful as catwalks and building scaffolds on slopes, and catwalk and building scaffold constructed thereby |
CN1690334A (en) * | 2004-04-28 | 2005-11-02 | 李晓亮 | Large contact surface support frame |
CN1796703A (en) * | 2004-12-20 | 2006-07-05 | 久纳利彦 | Working surface construction system of slope, working surface construction apparatus and working panel |
CN203755640U (en) * | 2014-03-28 | 2014-08-06 | 中国葛洲坝集团股份有限公司 | Slope surface scaffold pedestal device |
CN105113786A (en) * | 2015-08-17 | 2015-12-02 | 刘海宁 | Pad block support system for supporting fixed adjustable cast-in-situ stair formwork |
CN205400020U (en) * | 2016-03-10 | 2016-07-27 | 重庆建工住宅建设有限公司 | Construction equipment of scaffold is set up on inclined plane basis |
-
2017
- 2017-02-14 CN CN201710078074.0A patent/CN106917508A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1422349A (en) * | 2000-03-29 | 2003-06-04 | 福井福男 | Method of constructing structures useful as catwalks and building scaffolds on slopes, and catwalk and building scaffold constructed thereby |
CN1690334A (en) * | 2004-04-28 | 2005-11-02 | 李晓亮 | Large contact surface support frame |
CN1796703A (en) * | 2004-12-20 | 2006-07-05 | 久纳利彦 | Working surface construction system of slope, working surface construction apparatus and working panel |
CN203755640U (en) * | 2014-03-28 | 2014-08-06 | 中国葛洲坝集团股份有限公司 | Slope surface scaffold pedestal device |
CN105113786A (en) * | 2015-08-17 | 2015-12-02 | 刘海宁 | Pad block support system for supporting fixed adjustable cast-in-situ stair formwork |
CN205400020U (en) * | 2016-03-10 | 2016-07-27 | 重庆建工住宅建设有限公司 | Construction equipment of scaffold is set up on inclined plane basis |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107299766A (en) * | 2017-07-12 | 2017-10-27 | 中建局集团建设发展有限公司 | A kind of Prefabricated slope roof surface board support system and its construction method |
CN107299766B (en) * | 2017-07-12 | 2023-08-22 | 中建一局集团建设发展有限公司 | Prefabricated sloping roof plate supporting system and construction method thereof |
CN107288154A (en) * | 2017-07-26 | 2017-10-24 | 中交公局海威工程建设有限公司 | A kind of support suitable for pipe gallery slope section sets up structure |
CN115807485A (en) * | 2022-12-23 | 2023-03-17 | 深圳市胜德建筑科技有限公司 | Assembly type prefabricated reversed ridge connecting structure and construction method thereof |
CN115807485B (en) * | 2022-12-23 | 2023-08-11 | 深圳市胜德建筑科技有限公司 | Assembled prefabricated inverted ridge connecting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106351333B (en) | A kind of precast concrete slab-column connections and attaching method thereof | |
CN108331158A (en) | A kind of joint connection in site method of precast reinforced concrete beam column | |
CN206233563U (en) | A kind of subsided rest room internal model system | |
CN104032854B (en) | Assembled T-shaped mixing coupled wall and construction method thereof | |
CN103726589B (en) | I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice | |
CN106917508A (en) | Support system and its construction method on a kind of concrete inclined member | |
CN106760052A (en) | A kind of horizontal piece steel welding of prefabricated shear wall connection device in succession | |
CN108252504A (en) | Tube shear wall concrete structure large form hoisting type construction method and constructing device | |
CN103726586A (en) | H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method | |
CN108316524A (en) | A kind of straight section exempts to tear concrete blinding wall open and its wears muscle installation method | |
CN207003723U (en) | High-rise assembled single row of holes precast shear wall and its assembling structure | |
CN106978909A (en) | A kind of method that beams of concrete is connected with profile steel concrete column joint reinforcing bar | |
CN203834738U (en) | T-shaped prefabricated mixed coupled wall | |
CN110499857A (en) | A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment | |
CN104032855B (en) | Assembled cross mixing coupled wall and construction method thereof | |
CN206956979U (en) | A kind of Linear shear wall with fore-set | |
CN108775086A (en) | The additional assembled integral beam-column node structure and construction method for being closed connection reinforcing bar | |
CN204475714U (en) | A kind of ready-package precast stair | |
CN208733878U (en) | Assembled mould plate for shear wall corner sleeper region | |
CN108729466B (en) | Large formwork supporting method for constructing anchor-free concrete retaining wall | |
CN203834737U (en) | Cross-shaped prefabricated mixed coupled wall | |
CN102852279A (en) | Prestressed reinforced concrete superposed beam having convex-concave superposed surfaces | |
CN205576737U (en) | Trompil steel pipe steel and concrete composite beam bridge structure | |
CN105113626B (en) | Cast-in-place post precast beam construction method | |
CN108951643A (en) | The big region support replacement construction method of Super High deep basal pit basement Core Walls Structure large span |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |