CN110499857A - A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment - Google Patents

A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment Download PDF

Info

Publication number
CN110499857A
CN110499857A CN201910923599.9A CN201910923599A CN110499857A CN 110499857 A CN110499857 A CN 110499857A CN 201910923599 A CN201910923599 A CN 201910923599A CN 110499857 A CN110499857 A CN 110499857A
Authority
CN
China
Prior art keywords
muscle
superimposed sheet
beard
beard muscle
readjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910923599.9A
Other languages
Chinese (zh)
Inventor
鲍丹宇
高新宇
叶帝江
赵子钦
黄其敏
庄金平
陈剑星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN ERJIAN CONSTRUCTION GROUP Co Ltd
Fujian University of Technology
Original Assignee
FUJIAN ERJIAN CONSTRUCTION GROUP Co Ltd
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN ERJIAN CONSTRUCTION GROUP Co Ltd, Fujian University of Technology filed Critical FUJIAN ERJIAN CONSTRUCTION GROUP Co Ltd
Priority to CN201910923599.9A priority Critical patent/CN110499857A/en
Publication of CN110499857A publication Critical patent/CN110499857A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The present invention relates to the installation methods that a kind of precast concrete superimposed sheet vertically goes out muscle and readjustment, and installation method is the following steps are included: the beard muscle for overlapping board ends is bent upwards 90 degree by (1);(2) beam forms and plank sheathing are arranged, foam glue strip is set in the plank sheathing upper surface at the beam forming cavity accent edge of beam forms;(3) beam forming cavity places steel reinforcement cage, and beam steel is bound in advance by traditional method, and the superimposed sheet scene of transporting is carried out vertical lifting placement;(4) the beard muscle for overlapping board ends is bent downward and reverts to horizontality;(5) pouring for concrete, maintenance a period of time are then carried out according to a conventional method.Realize the Fast Installation of superimposed sheet, it avoids the roof beam of superimposed sheet beard muscle and Vierendeel girder from indulging muscle and generates collision, accelerate construction efficiency, reduce labor workload, simultaneously without tilting installation, in superimposed sheet hoisting process, superimposed sheet and foam glue strip CONTACT WITH FRICTION are avoided, prevents that spillage occurs when beam and superimposed sheet concreting.

Description

A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment
Technical field
The present invention relates to the installation methods that a kind of precast concrete superimposed sheet vertically goes out muscle and readjustment.
Background technique
Assembly concrete building is referred in body structure portion or is all assembled using precast concrete Reinforced concrete structure building.In order to guarantee that the holistic resistant behavior of precast reinforced concrete structure is equal with whole structure of pouring, It needs to take corresponding reliable construction measure and construction method, pre-erection, cast-in-place part, node in guarantee fabricated construction Etc. can cooperate, and ensure that its stress performance pours structure at or above whole.
Currently, beam column uses cast-in-place construction, plate is also one of common form of construction work now using prefabricated superimposed sheet, still Prefabricated superimposed sheet and beams of concrete are used in floor when cast-in-place concrete beam width is larger, to need to use in cast-in-place system When four limbs stirrup, there are collision problems for back longitudinal reinforcement and superimposed sheet overhanging " beard muscle ".Frame joist steel is used in construction Muscle first binds, binds after secondary beam steel, therefore in superimposed sheet hoisting process, overhanging " beard muscle " meeting of superimposed sheet wherein one end With longitudinal reinforcement " fighting " at the top of Vierendeel girder.When traditional method is superimposed sheet lifting in the inclined insertion beam of beard muscle, often fold " foam glue strip " on plywood meeting friction destruction beam side, so that later period beam slab junction spillage.
Summary of the invention
In view of the deficiencies in the prior art, technical problem to be solved by the invention is to provide a kind of precast concrete superimposed sheets The vertical installation method of muscle and readjustment out.
In order to solve the above-mentioned technical problem, the technical scheme is that a kind of precast concrete superimposed sheet vertically goes out muscle And the installation method of readjustment, the installation method is the following steps are included: the beard muscle for overlapping board ends is bent upwards 90 by (1) Degree;(2) beam forms and plank sheathing are arranged, foamed glue is set in the plank sheathing upper surface at the beam forming cavity accent edge of beam forms Item;(3) beam forming cavity places steel reinforcement cage, and beam steel is bound in advance by traditional method, the superimposed sheet scene of transporting is carried out vertical Lifting is placed;(4) the beard muscle for overlapping board ends is bent downward and reverts to horizontality;(5) it then carries out according to a conventional method Concrete pours, maintenance a period of time.
Preferably, in step (1), when element precast field makes superimposed sheet, the reinforcing bar process of binding inside superimposed sheet In the beard muscle of board ends is bent upwards 90 degree in advance, and in the superimposed sheet lower inside of beard muscle root binding one article the One longitudinal reinforcement is used to undertake actuating pressure when construction in later period scene beard muscle is bent downwardly to concrete, in beard muscle root Superimposed sheet inner upper bind second longitudinal direction reinforcing bar for undertaking when construction in later period scene beard muscle is bent downwardly to mixed The effect top power for coagulating soil, is then poured, maintenance component appropriate.
Preferably, beam forms includes vertical supporting frame, and vertical supporting top of the trellis is provided with keel, is provided with wood at the top of keel Brick, woodbox top are provided with the beam forming cavity to lacing wire;Plank sheathing bottom is provided with keel, and the cohesive end of plank sheathing is equal It is flushed with the beam forming cavity accent edge of ipsilateral beam forms.
Preferably, it in step (2), first arranges the vertical supporting frame of beam forms, dragon is then installed on vertical supporting frame Bone, and two pieces of rectangle woodboxs are arranged to guarantee that load uniformly transfers on beam bottom keel, so in beam forming cavity bottom template It is arranged afterwards in beam forming cavity both sides side template and lacing wire is carried out by rectangle woodbox to drawing, template when resisting casting concrete Lateral pressure, the deformation of beam when preventing casting concrete, the finally table on the plank sheathing at the beam forming cavity accent edge of beam forms Foam glue strip is arranged in face.
Preferably, in step (4), beard muscle is bent downward before reverting to horizontality, is needed beam steel cage office Portion lifts, and is passed through below bearing rod using rectangular wooden unit, and rectangular wooden unit is supported on superimposed sheet upper surface, steel reinforcement cage is provoked.
Preferably, in step (4), beard muscle is bent using reinforcing bar bending auxiliary tool, reinforcing bar bends auxiliary tool packet Include steel bar, one end of steel bar be installed with it is arc-shaped turn portion, the side for turning portion is installed with two pieces of steel billets, two pieces of steel billets it Between form bayonet to card beard muscle, two pieces of steel billets are each perpendicular to steel bar and turn plane where portion;By beard muscle when use It is stuck on bayonet, pulls steel bar down and bend downward beard muscle and revert to horizontality.
Preferably, if being intended to further strengthen the protection to concrete local around beard muscle, two reinforcing bars can be used Bending auxiliary tool is simultaneously bent a beard muscle, i.e. the bending point that a tool blocks beard muscle is motionless, another Tool carries out bending operation in beard muscle end, and since tool is seized bending point, the beard muscle after bending point would not occur Deformation, and then avoid the extruding to concrete.
Preferably, beard muscle is bent downward revert to horizontality after, rectangular wooden unit is extracted out, rectangular wooden unit is repeatable It is finished using the beard muscle horizontal curvature until entire superimposed sheet one end.
Preferably, steel reinforcement cage further includes that beam indulges muscle and beam stirrup.
Compared with prior art, the invention has the following advantages: realizing the Fast Installation of superimposed sheet, superimposed sheet is avoided The roof beam of beard muscle and Vierendeel girder indulges muscle and generates collision, accelerates construction efficiency, reduces labor workload, while without tilting peace Dress, in superimposed sheet hoisting process, avoids superimposed sheet and foam glue strip CONTACT WITH FRICTION, when preventing beam and superimposed sheet concreting Spillage occurs.
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Detailed description of the invention
Fig. 1 is the superimposed sheet organigram one of the embodiment of the present invention.
Fig. 2 is the superimposed sheet organigram two of the embodiment of the present invention.
Fig. 3 is the Construction State schematic diagram one of the embodiment of the present invention.
Fig. 4 is the Construction State schematic diagram two of the embodiment of the present invention.
Fig. 5 is the Construction State schematic diagram three of the embodiment of the present invention.
Fig. 6 is the Construction State schematic diagram four of the embodiment of the present invention.
Fig. 7 is the organigram that reinforcing bar bends auxiliary tool.
Fig. 8 is the usage state diagram that reinforcing bar bends auxiliary tool.
Fig. 9 is the Construction State schematic diagram five of the embodiment of the present invention.
Figure 10 is the Construction State schematic diagram six of the embodiment of the present invention.
Figure 11 is the perspective view of Figure 10.
Specific embodiment
To make the foregoing features and advantages of the present invention clearer and more comprehensible, special embodiment below, and cooperate attached drawing, make detailed Carefully it is described as follows.
As shown in Fig. 1 ~ 11, a kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment, the installation Method is the following steps are included: the beard muscle 2 at 1 both ends of superimposed sheet is bent upwards 90 degree by (1);(2) beam forms 3 and plank sheathing are arranged 4, in the plank sheathing upper surface at the 5 accent edge of beam forming cavity of beam forms, foam glue strip 6 is set;(3) beam forming cavity places reinforcing bar Cage, beam steel are bound in advance by traditional method, the superimposed sheet scene of transporting are carried out vertical lifting placement, since beard muscle is prior Bending need not tilt installation when placing superimposed sheet, prevent friction from steeping even the problem so four limbs hoop will not collide Foam adhesive tape;(4) the beard muscle for overlapping board ends is bent downward and reverts to horizontality;(5) it is then mixed according to a conventional method Solidifying soil pours, maintenance a period of time.
In embodiments of the present invention, in step (1), when element precast field makes superimposed sheet, the steel inside superimposed sheet The beard muscle of board ends is bent upwards 90 degree, and the superimposed sheet lower inside in beard muscle root in advance in muscle process of binding A first longitudinal direction reinforcing bar 7 is bound to be used to undertake actuating pressure when construction in later period scene beard muscle is bent downwardly to concrete, Superimposed sheet inner upper in beard muscle root bind second longitudinal direction reinforcing bar 8 for undertake construction in later period scene beard muscle to It to the effect top power of concrete when lower bending, is then poured, maintenance component appropriate;First longitudinal direction reinforcing bar and second longitudinal direction Reinforcing bar is avoided that the damage that construction site superimposed sheet overhanging " beard muscle " is in the process of bending formed concrete slab.
In embodiments of the present invention, beam forms includes vertical supporting frame 9, and vertical supporting top of the trellis is provided with keel 10, dragon It is provided with woodbox 11 at the top of bone, is provided at the top of woodbox with the beam forming cavity to lacing wire 12;Plank sheathing bottom is provided with dragon Bone, the cohesive end of plank sheathing are flushed with the beam forming cavity accent edge of ipsilateral beam forms.
In embodiments of the present invention, in step (2), the vertical supporting frame of beam forms is first arranged, then in vertical supporting Keel are installed on frame, and arrange two pieces of rectangle woodboxs in beam forming cavity bottom template to guarantee that load is uniformly transferred in beam bottom On keel, then it is arranged in beam forming cavity both sides side template and lacing wire is carried out by rectangle woodbox to drawing, resistance pours coagulation The lateral pressure of template when native, the deformation of beam when preventing casting concrete, finally at the beam forming cavity accent edge of beam forms Foam glue strip is arranged in plank sheathing upper surface.
In embodiments of the present invention, in step (4), beard muscle is bent downward before reverting to horizontality, need by Beam steel cage locally lifts, and is passed through below bearing rod using rectangular wooden unit 13, rectangular wooden unit is supported on superimposed sheet upper surface, by steel Muscle cage is provoked.
In embodiments of the present invention, in step (4), beard muscle, reinforcing bar bending are bent using reinforcing bar bending auxiliary tool Auxiliary tool includes steel bar 14, one end of steel bar be installed with it is arc-shaped turn portion 15, the side for turning portion is installed with two blocks of small steel Block 16, forms the bayonet to card beard muscle between two pieces of steel billets, and two pieces of steel billets are each perpendicular to steel bar and turn flat where portion Face;Beard muscle is stuck on bayonet when use, steel bar is pulled down and bends downward beard muscle and revert to horizontality.
In embodiments of the present invention, if being intended to further strengthen the protection to concrete local around beard muscle, can make A beard muscle is bent simultaneously with two reinforcing bar bending auxiliary tools, i.e., a tool blocks the bending point of beard muscle not Dynamic, another tool carries out bending operation in beard muscle end, and since tool is seized bending point, the beard muscle after bending point is just It will not deform, and then avoid the extruding to concrete.
In embodiments of the present invention, beard muscle is bent downward revert to horizontality after, rectangular wooden unit is extracted out, it is rectangular Wooden unit is reusable until the beard muscle horizontal curvature of entire superimposed sheet one end finishes.
In embodiments of the present invention, steel reinforcement cage further includes that beam indulges muscle 17 and beam stirrup 18.
The present invention is not limited to above-mentioned preferred forms, anyone can show that other are each under the inspiration of the present invention The precast concrete superimposed sheet of kind form vertically goes out the installation method of muscle and readjustment.It is all to be done according to scope of the present invention patent Equivalent changes and modifications are all covered by the present invention.

Claims (9)

1. the installation method that a kind of precast concrete superimposed sheet vertically goes out muscle and readjustment, it is characterised in that: the installation method The following steps are included: the beard muscle for overlapping board ends is bent upwards 90 degree by (1);(2) beam forms and plank sheathing are arranged, in beam form Foam glue strip is arranged in the plank sheathing upper surface at the beam forming cavity accent edge of plate;(3) beam forming cavity places steel reinforcement cage, and beam steel is pressed Traditional method is bound in advance, and the superimposed sheet scene of transporting is carried out vertical lifting placement;(4) will overlap the beard muscle of board ends to Lower bending reverts to horizontality;(5) pouring for concrete, maintenance a period of time are then carried out according to a conventional method.
2. the installation method that precast concrete superimposed sheet according to claim 1 vertically goes out muscle and readjustment, it is characterised in that: In step (1), when element precast field makes superimposed sheet, in advance by board ends in reinforcing bar process of binding inside the superimposed sheet Beard muscle is bent upwards 90 degree, and binds a first longitudinal direction reinforcing bar for holding in the superimposed sheet lower inside of beard muscle root Superimposed sheet inner upper to the actuating pressure of concrete when load construction in later period scene beard muscle is bent downwardly, in beard muscle root Bind a second longitudinal direction reinforcing bar for undertaking effect top power when construction in later period scene beard muscle is bent downwardly to concrete, so After poured, maintenance component appropriate.
3. the installation method that precast concrete superimposed sheet according to claim 1 vertically goes out muscle and readjustment, it is characterised in that: Beam forms includes vertical supporting frame, and vertical supporting top of the trellis is provided with keel, and woodbox, setting at the top of woodbox are provided at the top of keel Have with the beam forming cavity to lacing wire;Plank sheathing bottom is provided with keel, the cohesive end of plank sheathing with ipsilateral beam forms Beam forming cavity accent edge flushes.
4. the installation method that precast concrete superimposed sheet according to claim 3 vertically goes out muscle and readjustment, it is characterised in that: In step (2), the vertical supporting frame of beam forms is first arranged, keel are then installed on vertical supporting frame, and form in beam Bottom of chamber portion template arranges two pieces of rectangle woodboxs to guarantee that load uniformly transfers on beam bottom keel, then on beam forming cavity both sides Side template setting carries out to drawing lacing wire by rectangle woodbox, and the lateral pressure of template, prevents from pouring when resisting casting concrete Finally foam glue strip is arranged in the plank sheathing upper surface at the beam forming cavity accent edge of beam forms in the deformation of beam when building concrete.
5. the installation method that precast concrete superimposed sheet according to claim 1 vertically goes out muscle and readjustment, it is characterised in that: In step (4), beard muscle is bent downward before reverting to horizontality, needs locally to lift beam steel cage, use is rectangular Wooden unit passes through below bearing rod, and rectangular wooden unit is supported on superimposed sheet upper surface, steel reinforcement cage is provoked.
6. the installation method that precast concrete superimposed sheet according to claim 1 vertically goes out muscle and readjustment, it is characterised in that: In step (4), beard muscle is bent using reinforcing bar bending auxiliary tool, reinforcing bar bending auxiliary tool includes steel bar, and the one of steel bar End be installed with it is arc-shaped turn portion, the side for turning portion is installed with two pieces of steel billets, is formed to card recklessly between two pieces of steel billets The bayonet of sub- muscle, two pieces of steel billets are each perpendicular to steel bar and turn plane where portion;Beard muscle is stuck on bayonet when use, down It pulls steel bar and bends downward beard muscle and revert to horizontality.
7. the installation method that precast concrete superimposed sheet according to claim 6 vertically goes out muscle and readjustment, it is characterised in that: If being intended to further strengthen the protection to concrete local around beard muscle, two reinforcing bar bending auxiliary tools can be used simultaneously A piece beard muscle is bent, i.e. the bending point that a tool blocks beard muscle is motionless, another tool is in beard muscle end Bending operation is carried out, since tool is seized bending point, the beard muscle after bending point would not deform, and then avoid pair The extruding of concrete.
8. the installation method that precast concrete superimposed sheet according to claim 5 vertically goes out muscle and readjustment, it is characterised in that: Beard muscle is bent downward revert to horizontality after, rectangular wooden unit is extracted out, rectangular wooden unit is reusable until entirely folding The beard muscle horizontal curvature of plywood one end finishes.
9. the installation method that precast concrete superimposed sheet according to claim 1 vertically goes out muscle and readjustment, it is characterised in that: Steel reinforcement cage further includes that beam indulges muscle and beam stirrup.
CN201910923599.9A 2019-09-27 2019-09-27 A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment Pending CN110499857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910923599.9A CN110499857A (en) 2019-09-27 2019-09-27 A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910923599.9A CN110499857A (en) 2019-09-27 2019-09-27 A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment

Publications (1)

Publication Number Publication Date
CN110499857A true CN110499857A (en) 2019-11-26

Family

ID=68592940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910923599.9A Pending CN110499857A (en) 2019-09-27 2019-09-27 A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment

Country Status (1)

Country Link
CN (1) CN110499857A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042520A (en) * 2019-11-28 2020-04-21 江苏永联精筑建设集团有限公司 Slurry overflow prevention construction process for prefabricated part
CN112982773A (en) * 2021-02-26 2021-06-18 重庆中科建筑科技(集团)有限公司 Construction method of prefabricated reinforced concrete composite slab with extending reinforcing steel bars

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144410A (en) * 1994-11-25 1996-06-04 Maeda Corp Floor slab
CN203394027U (en) * 2013-01-05 2014-01-15 贺育安 Semi-assembled construction system for frame-shear wall tube structure
CN203420486U (en) * 2013-07-29 2014-02-05 江苏南通三建集团有限公司 Plate-type prefabricated concrete structure
JP2014109152A (en) * 2012-12-03 2014-06-12 Taisei Corp Beam member and floor structure
CN205147172U (en) * 2015-12-07 2016-04-13 中民筑友有限公司 Steel bar bending device
CN105756252A (en) * 2015-04-03 2016-07-13 张波 Pre-stressed concrete truss composite slab and manufacturing method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144410A (en) * 1994-11-25 1996-06-04 Maeda Corp Floor slab
JP2014109152A (en) * 2012-12-03 2014-06-12 Taisei Corp Beam member and floor structure
CN203394027U (en) * 2013-01-05 2014-01-15 贺育安 Semi-assembled construction system for frame-shear wall tube structure
CN203420486U (en) * 2013-07-29 2014-02-05 江苏南通三建集团有限公司 Plate-type prefabricated concrete structure
CN105756252A (en) * 2015-04-03 2016-07-13 张波 Pre-stressed concrete truss composite slab and manufacturing method thereof
CN205653944U (en) * 2015-04-03 2016-10-19 张波 Prestressed concrete truss superimposed sheet
CN205147172U (en) * 2015-12-07 2016-04-13 中民筑友有限公司 Steel bar bending device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042520A (en) * 2019-11-28 2020-04-21 江苏永联精筑建设集团有限公司 Slurry overflow prevention construction process for prefabricated part
CN112982773A (en) * 2021-02-26 2021-06-18 重庆中科建筑科技(集团)有限公司 Construction method of prefabricated reinforced concrete composite slab with extending reinforcing steel bars

Similar Documents

Publication Publication Date Title
CN105863253B (en) Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN103470040A (en) Method of splicing laminated floor slab and beam
CN104264895A (en) Prestressed concrete F slab and frame structure system
CN106638947A (en) Prefabricated frame structure and cascaded prefabrication construction method thereof
CN206428968U (en) A kind of steel bar girder formula is without supporting template system
CN110499857A (en) A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment
CN102619331A (en) Once molding construction method of beam-type conversion layer of high-rise building by steel pipe supporting and laminated pouring
CN110512785A (en) A kind of end tongue and groove does not go out the unidirectional superimposed sheet of muscle and formwork erecting structure and construction method
CN207812307U (en) The construction system of Cable stayed Bridge Main Tower and steel anchor beam
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN211850272U (en) Assembled superimposed sheet bearing structure
CN211421637U (en) Connecting structure of prefabricated gutter
CN210164120U (en) Beam slab structure
CN208396106U (en) Detachable bed die steel bar truss floor support plate
CN211037486U (en) One-way superimposed sheet and formwork structure with no rib at groove and tongue of end part
JPH05287901A (en) Construction of stairs
CN108590194B (en) Method for binding connecting beam reinforcing steel bars between assembled laminated plates
CN106836641A (en) Side sticking steel plate formula Combined concrete coupling beam
CN108442594A (en) A kind of thin floor and its construction technology
CN211074020U (en) Prefabricated superimposed sheet of muscle and pretension are to drawing formwork structure are gone out to slant
CN211421372U (en) Prefabricated beam type balcony and connecting structure of prefabricated beam type balcony and prefabricated wall board
CN214884357U (en) Assembled building frame construction
CN105019655B (en) A kind of construction method of casting concrete beam
US1883192A (en) Concrete floor construction
CN217204663U (en) Reinforced connection structure of reinforced concrete constructional column and floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination