CN207217613U - The buried waterproof construction of lead-acid accumulator - Google Patents
The buried waterproof construction of lead-acid accumulator Download PDFInfo
- Publication number
- CN207217613U CN207217613U CN201720957144.5U CN201720957144U CN207217613U CN 207217613 U CN207217613 U CN 207217613U CN 201720957144 U CN201720957144 U CN 201720957144U CN 207217613 U CN207217613 U CN 207217613U
- Authority
- CN
- China
- Prior art keywords
- lead
- acid accumulator
- spool
- ground
- waterproof construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Abstract
The utility model discloses a kind of buried waterproof construction of lead-acid accumulator, and it includes lead-acid accumulator, bucker, pedestal, electric wire, spool, flat cover and ground.Digged pit on the ground, pedestal is formed in hole bottom tiling fragment of brick, lead-acid accumulator horizontal connects electric wire respectively on pedestal at both positive and negative polarity binding post upward, the spool that sagging electric wire is vertically arranged from lead-acid accumulator bottom into side, its output end are drawn from one end that spool bassets.The bucker is plastic membrane product, and on lead-acid accumulator, four sagging sides are compacted the direct enclosure with fragment of brick.The flat cover is placed in lead-acid accumulator top layer, vertical height h at least 600mm between flat cover and ground level.After above-mentioned buried waterproof construction to be done, for backfill to ground level, the buried waterproof construction of the utility model is simple, construct easy, good water-proof effect, engineering cost are low, and does not influence the greening on the ground of place toward in cheating.
Description
Technical field
A kind of street lamp accumulator mounting structure is the utility model is related to, specifically, the utility model is related to a kind of road
The buried waterproof construction of lamp lead-acid accumulator.
Background technology
City, plant area and public way brightening are a foundation engineerings for being related to the people's livelihood, such engineering have a large capacity and a wide range, it is necessary to
It is lasting to promote and implement.The precondition of road lighting engineering is that to have enough electric energy supplies, with lighting engineering and new energy
The progress of source technology, many road lighting engineerings use wind light mutual complementing powering mode.The powering mode advanced technology, energy-saving ring
Protect, but power generation conditions are had a great influence by factor of natural environment, it is necessary to which the battery for configuring respective volume is used for stored energy source.Due to
Lead-acid Battery Technology is ripe, and stable performance is cheap, so being used widely in road lighting engineering.But city
It is relatively large to sell lead-acid accumulator volume, heavier-weight, in order to accomplish that configuration does not influence the appearance of the city, examined from safety utilization of electric power angle yet
Consider, the underground being generally embedded in lead-acid accumulator nearby in engineering by electric pole.Prior art is using placement is stored sth. in a cellar, i.e., residing
The ground of position is digged pit, and can only accommodate the open of lead-acid accumulator to be installed with concreting one in hole cheats, and treats open hole
Lead-acid accumulator is laid after solidification again, is then capped to open hole.Although such a hard hole structure is very simple, it is easy to implement, energy
Enough effectively placement lead-acid accumulators, but build hard hole and the problems such as consuming man-hour length, taking material be present.In addition, hard cheats waterproof energy
Power is poor, the lead-acid accumulator built in rainy season infiltration etch, causes binding post chlorination to be corroded, so as to increase fault rate.
Utility model content
The utility model cheats the deficiency of pre-buried lead-acid accumulator mainly for existing hard, with proposing a kind of lead-acid accumulator
Waterproof construction is buried, this is simple in construction, making is easy, placement is safe, waterproof ability is strong.
The utility model is achieved through the following technical solutions technical goal.
The buried waterproof construction of lead-acid accumulator, it include lead-acid accumulator, bucker, pedestal, electric wire, spool, flat cover and
Ground.It is theed improvement is that:The ground is located at by electric pole, is digged pit downwards from ground, is laid at hole bottom few two layers
Brick forms hard pedestal.The lead-acid accumulator horizontal connects electric wire respectively on pedestal at both positive and negative polarity binding post upward.
Enter the spool that is vertically arranged of side from lead-acid accumulator bottom after the electric wire is sagging, its output end is from one end that spool bassets
Draw.The bucker is to have to push up bottomless flexible rectangular cover, from top to bottom enclosure lead-acid accumulator, four sagging sides of bucker
It is compacted beyond pedestal and with fragment of brick.The flat cover is 10~30mm of thickness plastics plate, and the flat cover of horizontal covers lead-acid accumulator,
Per the overhanging at least 10mm in side, at least reserved 600mm of flat cover top layer to ground level vertical height h, complete to lead-acid accumulator
After burying waterproof construction, toward hole in backfill to ground level.
In said structure, spool is the plastic tube by S-shaped bending, and spool bassets vertical height at least 200mm.
In said structure, bucker is manufactured with 0.05~0.20mm of thickness plastic sheeting.
The utility model compared with prior art, has the positive effect that:
1st, after being digged pit in target floor, only make basement construction, implement easily, fast;
2nd, the lead-acid accumulator bucker enclosure laid in cheating, along with flat cover is protected, such a simple in construction, waterproof effect
Fruit is good;
3rd, plastic sheeting bucker, easy to manufacture, low production cost, be advantageous to reduce engineering expenditure;
4th, appropriate buried lead-acid accumulator, does not influence the greening construction on road ground.
Brief description of the drawings
Fig. 1 is the utility model structural profile illustration.
Embodiment
Below according to accompanying drawing and in conjunction with the embodiments, the utility model is described in further detail.
The buried waterproof construction of lead-acid accumulator shown in Fig. 1, it includes lead-acid accumulator 1, bucker 2, pedestal 3, electric wire
4th, spool 5, flat cover 6 and ground 7.The ground 7 is located at by target electric pole, is digged pit downwards from ground 7, cheats and is cheated for rectangle,
At hole bottom, brick tiles two layers, and the hard pedestal 3 of formation is used to lay lead-acid accumulator 1.The lead-acid accumulator 1 of horizontal is in place
Afterwards, electric wire 4 is connected respectively at both positive and negative polarity binding post upward, sagging electric wire 4 enters side from the bottom of lead-acid accumulator 1
The spool 5 being vertically arranged, its output end from spool 5 basset 7 one end draw.In order to avoid the rainwater on ground pours in down a chimney, application
Spool 5 be bent into S-shaped with plastic tube, and the 7 one end vertical height of basseting is at least 200mm.In the utility model
Main body waterproof construction is the bucker 2 being located on the outer wall of lead-acid accumulator 1, and from top to bottom the bucker 2 of the enclosure directly contains lead
Acid accumulator 1, four sagging sides of bucker 2 exceed pedestal 3, and in order to further prevent underground water air infiltration from entering, bucker 2 is sagging
Four sides are compacted on pedestal 3 with fragment of brick.The bucker 2 applied in the present embodiment is a kind of cuboid cover, is that one kind has top bottomless
Cuboid cover, manufactured with thick 0.05mm plastic sheeting, such a flexible bucker 2, it is easy to manufacture, production cost is low, often
Only 0.5 yuan or so of cost, it is low more than prior art hard hole building cost, only this item with regard to can greatly reduce engineering construction into
This.Along with the bucker 2 of plastics matter is flexible body, it is easy in place, advantageously forms the waterproof construction of closed.The flat cover
6 be another flashing member in the utility model, and flat cover 6 made of plastic is directly covered at the top of lead-acid accumulator 1.This
The flat cover 6 of embodiment is rectangular plastic plate, its thickness 15mm, the corresponding lead-acid accumulator 1 of flat cover 6 corresponding side during placement.
In order to ensure flat cover 6 effectively blocks lead-acid accumulator 1, the planar dimension of flat cover 6 is larger than the perspective plane of lead-acid accumulator 1,
The present embodiment is per the overhanging 10mm in side.Greenbelt is typically provided with by electric pole, in order to not influence plant growth, is stored using buried plumbic acid
The scheme of battery 1, the top layer of the present embodiment flat cover 6 to the vertical height h of ground 7 is 600mm.It is to be done buried to lead-acid accumulator 1 anti-
After water-bound, toward anti-interior backfill to ground level, place ground 7 is by normal greening requirement plantation flowers and plants.
Claims (3)
1. a kind of buried waterproof construction of lead-acid accumulator, it includes lead-acid accumulator(1), bucker(2), pedestal(3), electric wire
(4), spool(5), flat cover(6)And ground(7);It is characterized in that:The ground(7)By electric pole, from ground(7)On to
Under dig pit, being laid in few two layers of brick at hole bottom forms hard pedestal(3);The lead-acid accumulator(1)Horizontal is in pedestal(3)On,
Electric wire is connected respectively at both positive and negative polarity binding post upward(4);The electric wire(4)From lead-acid accumulator after sagging(1)Bottom is entered
Enter the spool that side is vertically arranged(5), its output end is from spool(5)Basset(7)One end draw;The bucker(2)To have
Bottomless flexible rectangular cover is pushed up, from top to bottom enclosure lead-acid accumulator(1), bucker(2)Four sagging sides exceed pedestal(3)And
It is compacted with fragment of brick;The flat cover(6)For 10~30mm of thickness plastics plate, the flat cover 6 of horizontal covers lead-acid accumulator(1), often
The overhanging at least 10mm in side, flat cover(6)Top layer is completed to lead-acid accumulator at least reserved 600mm of ground level vertical height h
(1)After buried waterproof construction, toward hole in backfill to ground level.
2. the buried waterproof construction of lead-acid accumulator according to claim 1, it is characterised in that:The spool(5)For by S-shaped
The plastic tube of bending, spool(5)Basset(7)Vertical height at least 200mm.
3. the buried waterproof construction of lead-acid accumulator described in supporting claim 1, it is characterised in that:The bucker(2)With thickness
0.05~0.20mm plastic sheeting manufacture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720957144.5U CN207217613U (en) | 2017-08-02 | 2017-08-02 | The buried waterproof construction of lead-acid accumulator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720957144.5U CN207217613U (en) | 2017-08-02 | 2017-08-02 | The buried waterproof construction of lead-acid accumulator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207217613U true CN207217613U (en) | 2018-04-10 |
Family
ID=61817494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720957144.5U Active CN207217613U (en) | 2017-08-02 | 2017-08-02 | The buried waterproof construction of lead-acid accumulator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207217613U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107293675A (en) * | 2017-08-02 | 2017-10-24 | 双登集团股份有限公司 | The buried waterproof construction of lead-acid accumulator |
-
2017
- 2017-08-02 CN CN201720957144.5U patent/CN207217613U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107293675A (en) * | 2017-08-02 | 2017-10-24 | 双登集团股份有限公司 | The buried waterproof construction of lead-acid accumulator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105465613B (en) | Urban underground water drainage pipe road leakage orienting system and its construction method | |
CN105299577A (en) | Multifunctional greening lamp pole used for saline-alkali soil | |
CN100424281C (en) | Linear contacting water-collecting device | |
CN211581069U (en) | Pavement tree root growth support system under urban hard pavement interface | |
CN207217613U (en) | The buried waterproof construction of lead-acid accumulator | |
CN103790181B (en) | Daylight illumination device pier base and manufacturing method thereof | |
CN207130765U (en) | A kind of Construction of Civil Engineering retaining wall with greening and discharge structure | |
CN107119525B (en) | It multifunctional ecological sponge-type assembled building blocks and is formed by terrace and mats formation and retaining wall | |
CN107293675A (en) | The buried waterproof construction of lead-acid accumulator | |
CN212053497U (en) | Building energy-saving green ecological roof | |
CN202047535U (en) | Microtopographic structure for planting trees on roofs | |
CN205090319U (en) | A multi -functional afforestation lamp pole for saline and alkaline land | |
CN204409087U (en) | Roof mounted vegetable planting pot | |
CN205077513U (en) | Utility tunnel and underpass uncovered formula structure of building together | |
CN204782130U (en) | View mima type microrelief founds structure | |
CN206350369U (en) | One kind simulation sunk type protected fruit trees energy-saving heliogreenhouse | |
CN208486282U (en) | A kind of vertical layered assembled environment-friendly concrete basis | |
CN207211539U (en) | Water collection type Green Roof structure | |
CN201933508U (en) | Ginger storage pit | |
CN2277174Y (en) | Combined insulating green-making flower-pot | |
CN206978155U (en) | With environmentally friendly case for greening by plant growing in a kind of construction of road bridges | |
CN203768945U (en) | Daylight illumination device pier base | |
CN214033788U (en) | Novel cable inspection well and street lamp foundation combined system in mechanical and non-isolation belt | |
CN202425380U (en) | Sunlight greenhouse | |
CN213939052U (en) | Active heat storage type earth wall sunlight greenhouse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |