CN207211767U - A kind of strip thickness control instrument for concrete floor slab placement construction - Google Patents
A kind of strip thickness control instrument for concrete floor slab placement construction Download PDFInfo
- Publication number
- CN207211767U CN207211767U CN201720903267.0U CN201720903267U CN207211767U CN 207211767 U CN207211767 U CN 207211767U CN 201720903267 U CN201720903267 U CN 201720903267U CN 207211767 U CN207211767 U CN 207211767U
- Authority
- CN
- China
- Prior art keywords
- control instrument
- horizontal pane
- thickness control
- strip thickness
- montant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a kind of strip thickness control instrument for concrete floor slab placement construction, including the horizontal pane formed and the multiple montants (2) being fixedly connected with the horizontal pane of being joined end to end successively by multiple horizon bars (1), multiple horizon bars (1) are generally aligned in the same plane interior;Multiple montants (2) are located at the same side of the horizontal pane, and the one end of each montant (2) away from the horizontal pane and the distance of plane where the horizontal pane are default thickness of slab.Spirit level is eliminated when carrying out concrete floor slab placement construction using strip thickness control instrument provided by the utility model to discharge water the work such as bracing wire between horizontal line and post muscle, the thickness of floor is met code requirement.
Description
Technical field
Technical field of building construction is the utility model is related to, more particularly to a kind of thickness of slab control for concrete floor slab placement construction
Instrument processed.
Background technology
Slab thickness deviation directly influences next procedure construction, such as causes the above ground level, floor tile of water pipe laying can not
A series of chain problems such as mat formation, when agent structure floor concrete casting is constructed, on the control measure of slab thickness, tradition
Method is to release the horizontal line of preset height on post muscle using spirit level, and is poured on post muscle by the use of white glue band as mark
Horizontal line is measured highly to control according to bracing wire during concrete.
When post muscle spacing is larger, the method for bracing wire measurement horizontal line height is not easy to ensure concrete floor slab placement thickness, and increases
The workload of unwrapping wire personnel is added.Meanwhile above-mentioned method for controlling thickness is had a great influence by cast operation level, it is difficult to makes building
Plate integral thickness meets code requirement.
Therefore, how preferably the thickness of floor is met code requirement in pouring construction, become art technology
Personnel's technical problem urgently to be resolved hurrily.
Utility model content
In view of this, the utility model provides a kind of strip thickness control instrument for concrete floor slab placement construction, uses the plate
Thick control instrument preferably can make the thickness of floor meet code requirement in pouring construction.
In order to achieve the above object, the utility model provides following technical scheme:
A kind of strip thickness control instrument for concrete floor slab placement construction, including:
Joined end to end the horizontal pane formed successively by multiple horizon bars, and multiple horizon bars are generally aligned in the same plane interior;
Multiple montants being fixedly connected with the horizontal pane, multiple montants are located at the same side of the horizontal pane, and
The one end of each montant away from the horizontal pane and the distance of plane where the horizontal pane are default thickness of slab.
Preferably, in above-mentioned strip thickness control instrument, the montant is vertical with plane where the horizontal pane.
Preferably, in above-mentioned strip thickness control instrument, the quantity of the horizon bar is 3 or 4.
Preferably, in above-mentioned strip thickness control instrument, the quantity of the montant is 3 or 4.
Preferably, in above-mentioned strip thickness control instrument, the horizon bar and the montant are reinforcing bar, between the horizon bar
And by being weldingly connected between the montant and the horizontal pane.
Preferably, in above-mentioned strip thickness control instrument, a diameter of 14mm~18mm of the reinforcing bar.
Preferably, in above-mentioned strip thickness control instrument, the one end of the montant away from the horizontal pane is enclosed with plastic layer.
It can be seen from above-mentioned technical proposal, the strip thickness control instrument provided by the utility model for concrete floor slab placement construction
In, horizontal pane is joined end to end and formed successively by multiple horizon bars, and multiple montants are located at the same side of horizontal pane, and each montant is remote
, therefore, when concrete floor slab placement is constructed can should from a distance from plane being default thickness of slab where one end and the horizontal pane of horizontal pane
Strip thickness control instrument is directly placed in the scope of operation, horizontal pane upward and be used as absolute altitude control plane, it can be seen that, the thickness of slab control
Instrument processed eliminates spirit level and discharged water the work such as bracing wire between horizontal line and post muscle, and the thickness of floor can be preferably made in pouring construction
Degree meets code requirement.In addition, strip thickness control instrument recycling can be taken out after concrete of having closed a position in time.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is embodiment of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also
Other accompanying drawings can be obtained according to the accompanying drawing of offer.
Fig. 1 is a kind of signal for strip thickness control instrument for concrete floor slab placement construction that the utility model embodiment provides
Figure.
In figure mark for:
1st, horizon bar;2nd, montant.
Embodiment
In order to make it easy to understand, the utility model will be further described below in conjunction with the accompanying drawings.
It is a kind of strip thickness control instrument for concrete floor slab placement construction that the utility model embodiment provides referring to Fig. 1
Schematic diagram.
What the utility model embodiment provided, which is used for the strip thickness control instrument that concrete floor slab placement is constructed, includes horizontal pane (in figure
It is unmarked) and multiple montants 2, wherein, horizontal pane is joined end to end and formed successively by multiple horizon bars 1, and multiple horizon bars 1 are positioned at same
In one plane;Montant 2 is fixedly connected with horizontal pane, and multiple montants 2 are located at the same side of horizontal pane, and each montant 2 is away from water
One end of flat frame and the distance of plane where horizontal pane are default thickness of slab.
" default thickness of slab " refers to the thickness of the cast concrete of floor.
In strip thickness control instrument provided by the utility model for concrete floor slab placement construction, horizontal pane is by multiple horizon bars 1
Join end to end to be formed successively, multiple montants 2 are located at the same side of horizontal pane, and each montant 2 one end and water away from horizontal pane
The distance of plane is default thickness of slab where flat frame, and therefore, concrete floor slab placement can directly put the strip thickness control instrument when constructing
Put in the scope of operation, such as multiple strip thickness control instruments can be with spacing 2m quincuncial arrangements, horizontal pane upward and is used as absolute altitude control
Plane processed, it can be seen that, the strip thickness control instrument eliminates spirit level and discharged water the work such as bracing wire between horizontal line and post muscle, can be more preferable
Ground makes the thickness of floor meet code requirement in pouring construction.In addition, the thickness of slab can be taken out after concrete of having closed a position in time
Control instrument reuses.
The quantity of horizon bar 1 can be 3 or 4, and the quantity of montant 2 equally can be 3 or 4.The present embodiment
In, square frame that horizontal pane is made up of 4 horizon bars 1,4 montants 2 are located at the corner location of horizontal pane, and and horizontal pane respectively
Place plane is vertical.
For convenient material drawing, horizon bar 1 and montant 2 can be reinforcing bar, and the diameter of reinforcing bar can be 14 mm~18mm, system
, can be by being weldingly connected between horizon bar 1 and between montant 2 and horizontal pane when making, and can enter at being welded to connect
The processing of row antirust, anti-corrosive.
Rust spot is produced in floor in order to avoid omitting, in the present embodiment, the one end of montant 2 away from horizontal pane is enclosed with modeling
The bed of material.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality
Type.A variety of modifications to embodiment will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Therefore, originally
Utility model is not intended to be limited to embodiment illustrated herein, and is to fit to and principles disclosed herein and features of novelty
Consistent most wide scope.
Claims (7)
- A kind of 1. strip thickness control instrument for concrete floor slab placement construction, it is characterised in that including:Joined end to end the horizontal pane formed successively by multiple horizon bars (1), and multiple horizon bars (1) are generally aligned in the same plane interior;Multiple montants (2) being fixedly connected with the horizontal pane, multiple montants (2) are located at the same side of the horizontal pane, And the one end of each montant (2) away from the horizontal pane and the distance of plane where the horizontal pane are default thickness of slab.
- 2. strip thickness control instrument according to claim 1, it is characterised in that the montant (2) and horizontal pane place Plane is vertical.
- 3. strip thickness control instrument according to claim 2, it is characterised in that the quantity of the horizon bar (1) is 3 or 4 It is individual.
- 4. strip thickness control instrument according to claim 3, it is characterised in that the quantity of the montant (2) is 3 or 4.
- 5. strip thickness control instrument according to claim 4, it is characterised in that the horizon bar (1) and the montant (2) are Reinforcing bar, by being weldingly connected between the horizon bar (1) and between the montant (2) and the horizontal pane.
- 6. strip thickness control instrument according to claim 5, it is characterised in that a diameter of 14mm~18mm of the reinforcing bar.
- 7. strip thickness control instrument according to claim 6, it is characterised in that the remote horizontal pane of the montant (2) One end is enclosed with plastic layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720903267.0U CN207211767U (en) | 2017-07-24 | 2017-07-24 | A kind of strip thickness control instrument for concrete floor slab placement construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720903267.0U CN207211767U (en) | 2017-07-24 | 2017-07-24 | A kind of strip thickness control instrument for concrete floor slab placement construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207211767U true CN207211767U (en) | 2018-04-10 |
Family
ID=61813736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720903267.0U Expired - Fee Related CN207211767U (en) | 2017-07-24 | 2017-07-24 | A kind of strip thickness control instrument for concrete floor slab placement construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207211767U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700594A (en) * | 2019-10-18 | 2020-01-17 | 上海建工七建集团有限公司 | Simple floor thickness and levelness control tool |
CN110965745A (en) * | 2019-11-05 | 2020-04-07 | 张军 | Paving method of floor tiles and wall tiles |
-
2017
- 2017-07-24 CN CN201720903267.0U patent/CN207211767U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700594A (en) * | 2019-10-18 | 2020-01-17 | 上海建工七建集团有限公司 | Simple floor thickness and levelness control tool |
CN110965745A (en) * | 2019-11-05 | 2020-04-07 | 张军 | Paving method of floor tiles and wall tiles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107700710A (en) | Fill wall construction column template design checking and construction method | |
CN205576955U (en) | Raft foundation's reinforced structure is displaced into to strip footing | |
CN103590602A (en) | Method for constructing cast-in-site concrete hollow floor systems | |
CN207228617U (en) | A kind of concrete-pouring template float Structure for basement barricade single side formwork | |
CN207211767U (en) | A kind of strip thickness control instrument for concrete floor slab placement construction | |
CN107476567A (en) | It is a kind of to control the pitched roof gradient and the construction method and track-type facilities of thickness | |
CN206233596U (en) | Building block exterior wall constructional column concrete casting device | |
CN110080454A (en) | LPM light filling body Construction of Cast-in-situ Concrete Hollow | |
CN106284653B (en) | A kind of construction method that balcony construct capital interspaces in advance | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN104110131B (en) | A kind of wall structure post hollow concrete formwork | |
CN211114798U (en) | Kitchen and bathroom board descending and shaping die | |
CN105599131B (en) | Self-stabilising prefabricated pipeline right-angled intersection reinforcing bar cushion block special | |
CN107386556A (en) | Light composite heat insulation outer wall plate | |
CN206941968U (en) | Reinforcing bar limiting card with the upper oblique bayonet socket being parallel to each other | |
CN110005112A (en) | A kind of pitched roof concrete structure and its construction method | |
CN206815854U (en) | A kind of Height marker for improving the smooth thickness construction first-time qualification rate of cast-in-situ floor | |
CN207582946U (en) | Plate typified form drops in a kind of assembled toilet structure | |
CN206957042U (en) | Light composite heat insulation outer wall plate and particular manufacturing craft | |
CN104631675B (en) | A kind of two-sided prefabricated superimposed sheet | |
CN207553449U (en) | Floor and plate tendon protective layer thickness Comprehensive Control part | |
CN212176547U (en) | Building floor bathroom falls board construction template device in building | |
CN207775725U (en) | A kind of special disposable light filling composite core mould of bridge | |
CN207392752U (en) | For preventing the constructing device of grout leakage of formwork root | |
CN208310277U (en) | A kind of newly-increased floor reinforcing frame trestle and foundation connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180410 Termination date: 20210724 |
|
CF01 | Termination of patent right due to non-payment of annual fee |