A kind of stair template
Technical field
It the utility model is related to a kind of building template technical field, more particularly to a kind of stair template.
Background technology
Structural elements necessary to stair are each engineerings, is typically formed by concrete casting, and needs basis to set before pouring
The size for counting stair sets up various templates, after concrete casting is completed solidification, takes template apart, obtains required stair.
Because aluminum template has the advantages that light, high reuse number, is easily installed and transmits, in the market
Template uses aluminum template mostly, but because aluminum template cost is higher, and the shaped piece of stair template is often according to every building
Structure customization, it must be scrapped after the completion of often being poured in every building, cause to waste if the aluminum template to involve great expense is used,
And to reuse number relatively low for iron template, and heavier mass is unfavorable for transmitting and installation.
Utility model content
Technical problem to be solved in the utility model is:A kind of stair template is provided, solves existing stair template structure
Middle the problem of high cost or inconvenience installation are produced using single material or is transmitted.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:A kind of stair template is provided, including
Side plate, mark time baffle plate and bottom plate;
The side plate is spliced by multiple side plate monomers, and the side plate monomer includes pouring panel, reinforcement, connection
Plate, the first bolt hole, the second bolt hole and the 3rd bolt hole;
The material for pouring panel is iron, and the material of the baffle plate of marking time is aluminium, and the material of the bottom plate is aluminium;
The connecting plate vertical welding is in the edge for pouring panel;
The reinforcement is welded in the back side for pouring panel, and the reinforcement includes the first reinforcement and the second reinforcement,
The quantity of first reinforcement is 2, is parallel to each other between first reinforcement and another the first reinforcement, described the
A plurality of second reinforcement is connected between one reinforcement and another the first reinforcement, first reinforcement adds perpendicular to second
Strengthening tendons;
The bottom for pouring panel is evenly arranged with multiple first bolts hole;Described pour is uniformly arranged in the middle part of panel
There are multiple second bolts hole;Multiple 3rd bolts hole are evenly arranged with the connecting plate;
The side plate monomer wears the first bolt hole bolt hole corresponding with bottom plate sidepiece by bolt with bottom plate sidepiece and connected
Connect;The side plate monomer wears the second bolt hole bolt hole corresponding with baffle plate sidepiece of marking time with baffle plate sidepiece of marking time by bolt
Connection;Corresponding 3rd bolt hole on connecting plate is arranged between the side plate monomer by bolt to connect.
Further, the back side for pouring panel is welded with multiple first pads, is provided with the middle part of first pad
With the first countersink type identical first through hole, the first through hole overlaps with the first bolt hole.
Further, the back side for pouring panel is welded with multiple second pads, is provided with the middle part of second pad
With second the second through hole of countersink type identical, second through hole overlaps with the second bolt hole.
Further, the back side for pouring panel is welded with multiple 3rd pads, is provided with the middle part of the 3rd pad
With the 3rd countersink type identical third through-hole, the third through-hole overlaps with the 3rd bolt hole.
Further, the back side for pouring panel and the junction of connecting plate are evenly arranged with multiple triangle reinforced sheets,
The triangle reinforced sheet is shaped as right angled triangle, and a wherein right-angle side for the triangle reinforced sheet, which is welded in, pours panel
The back side, another right-angle side of the triangle reinforced sheet be welded in connecting plate.
Further, first bolt hole is diameter 16.5mm manhole;The shape of second bolt hole with
First bolt hole is identical;The shape of 3rd bolt hole is identical with the shape of the first bolt hole.
Further, the thickness for pouring panel is 3-4mm.
Further, the reinforcement is square iron pipe.
The beneficial effects of the utility model are:In the stair template structure that the utility model is related to, mark time baffle plate and bottom
Sheet material matter is aluminium, and the panel material that pours of side plate is iron;It is different because the bottom plate of stair template and baffle plate of marking time are modulus template
Repeat and utilize between building, and the reuse number of aluminum template makes more than 3 times of iron template, and there is light weight, easily
Transfer, it is easy to install the advantages of;And shaped piece of the side plate as stair template, every building, which is finished, to be scrapped;Therefore side plate pours
It is iron to build panel material, to reduce the cost of manufacture of stair template;So as to solve that single material is used in existing stair template structure
Matter and produce high cost or inconvenience installation or transmit the problem of.The back side for pouring panel is welded with reinforcement, to ensure to pour face
The stress of plate, so as to which reduce side plate pours panel caused deformation in concreting process.
Brief description of the drawings
Fig. 1 is a kind of lateral plate structure schematic diagram of stair template of the utility model embodiment;
Fig. 2 is a kind of lateral plate structure sectional view of stair template of the utility model embodiment;
Label declaration:
1st, side plate monomer;2nd, panel is poured;3rd, the first reinforcement;4th, the second reinforcement 5, connecting plate;6th, the first bolt hole;
7th, the second bolt hole;8th, the 3rd bolt hole;9th, the first pad;10th, the second pad;11st, the 3rd pad;12nd, triangle reinforced sheet.
Embodiment
For detailed description technology contents of the present utility model, the objects and the effects, below in conjunction with embodiment and match somebody with somebody
Accompanying drawing is closed to be explained.
The design of the utility model most critical is:Mark time baffle plate and bottom plate material is aluminium, side plate pours panel material
For iron;Solve the problems, such as to produce high cost or inconvenience installation using single material in existing stair template structure or transmit.
Fig. 1 and Fig. 2 is refer to, the utility model is related to a kind of stair template, including side plate, mark time baffle plate and bottom plate;
The side plate is spliced by multiple side plate monomers 1, and the side plate monomer 1 includes pouring panel 2, reinforcement, company
Fishplate bar 5, the first bolt hole 6, the second bolt hole 7 and the 3rd bolt hole 8;
The material for pouring panel 2 is iron, and the material of the baffle plate of marking time is aluminium, and the material of the bottom plate is aluminium;
The vertical welding of connecting plate 5 is in the edge for pouring panel 2;
The reinforcement is welded in the back side for pouring panel 2, and the reinforcement includes the first reinforcement 3 and the second reinforcement
4, the quantity of first reinforcement 3 is 2, is parallel to each other between first reinforcement 3 and another the first reinforcement 3,
A plurality of second reinforcement 4 is connected between first reinforcement 3 and another the first reinforcement 3, first reinforcement 3 hangs down
Directly in the second reinforcement 4;
The bottom for pouring panel 2 is evenly arranged with multiple first bolts hole 6;It is described pour panel 2 middle part it is uniform
It is provided with multiple second bolts hole 7;Multiple 3rd bolts hole 8 are evenly arranged with the connecting plate 5;
The side plate monomer 1 wears the first bolt hole 6 bolt hole corresponding with bottom plate sidepiece with bottom plate sidepiece by bolt
Connection;The side plate monomer 1 wears the second bolt hole 7 spiral shell corresponding with baffle plate sidepiece of marking time with baffle plate sidepiece of marking time by bolt
Keyhole connects;Corresponding 3rd bolt hole 8 on connecting plate 5 is arranged between the side plate monomer 1 by bolt to connect.
The beneficial effect of above-mentioned stair template is:In the stair template structure that the utility model is related to, mark time baffle plate and
Bottom plate material is aluminium, and the material of panel 2 that pours of side plate is iron;Because the bottom plate of stair template and baffle plate of marking time are modulus template,
Repeat and utilize between different buildings, and the reuse number of aluminum template makes more than 3 times of iron template, and there is quality
Gently, easily transfer, it is easy to install the advantages of;And shaped piece of the side plate as stair template, every building, which is finished, to be scrapped;Therefore side plate
The material of panel 2 that pours be iron, to reduce the cost of manufacture of stair template;So as to solve in existing stair template structure using single
One material and produce high cost or inconvenience installation or transmit the problem of.The back side for pouring panel 2 is welded with reinforcement, to ensure to pour
The stress of panel 2 is built, so as to which reduce side plate pours the caused deformation in concreting process of panel 2.
Further, in above-mentioned stair template, the back side for pouring panel 2 is welded with multiple first pads 9, and described
The middle part of one pad 9 is provided with and the shape identical first through hole of the first bolt hole 6, the first through hole and the weight of the first bolt hole 6
Close.
Further, in above-mentioned stair template, the back side for pouring panel 2 is welded with multiple second pads 10, described
The middle part of second pad 10 is provided with and the second through hole of shape identical of the second bolt hole 7, second through hole and the second bolt hole 7
Overlap.
Further, in above-mentioned stair template, the back side for pouring panel 2 is welded with multiple 3rd pads 11, described
The middle part of 3rd pad 11 is provided with and the shape identical third through-hole of the 3rd bolt hole 8, the third through-hole and the 3rd bolt hole 8
Overlap.
The bolt hole position welding gasket of side plate, to ensure that it is relatively reliable that side plate and other templates are bolted.
Further, in above-mentioned stair template, the back side for pouring panel 2 and the junction of connecting plate 5 are uniformly arranged
There are multiple triangle reinforced sheets 12, the triangle reinforced sheet 12 is shaped as right angled triangle, and the triangle reinforced sheet 12 is wherein
One right-angle side is welded in the back side for pouring panel 2, and another right-angle side of the triangle reinforced sheet 12 is welded in connecting plate 5.
Triangle reinforced sheet 12 can improve connecting plate 5 with pouring the steadiness and perpendicularity that panel 2 is connected, so as to improve building
The sealing of terraced concrete casting.
Further, in above-mentioned stair template, first bolt hole 6 is diameter 16.5mm manhole;Described
The shape of two bolts hole 7 is identical with the first bolt hole 6;The shape and the shape phase of the first bolt hole 6 of 3rd bolt hole 8
Together.
Further, in above-mentioned stair template, the thickness for pouring panel 2 is 3-4mm.
Further, in above-mentioned stair template, the reinforcement is square iron pipe.
Embodiment 1
A kind of stair template, including side plate, mark time baffle plate and bottom plate;The side plate is spliced by multiple side plate monomers 1,
The side plate monomer 1 includes pouring panel 2, reinforcement, connecting plate 5, the first bolt hole 6, the second bolt hole 7 and the 3rd bolt hole
8;The material for pouring panel 2 is iron, and the material of the baffle plate of marking time is aluminium, and the material of the bottom plate is aluminium;The connection
The vertical welding of plate 5 is in the edge for pouring panel 2;The reinforcement is welded in the back side for pouring panel 2, and the reinforcement includes the
One reinforcement 3 and the second reinforcement 4, the quantity of first reinforcement 3 are 2, first reinforcement 3 with another first
It is parallel to each other between reinforcement 3, a plurality of second is connected between first reinforcement 3 and another the first reinforcement 3 and is strengthened
Muscle 4, first reinforcement 3 is perpendicular to the second reinforcement 4;The bottom for pouring panel 2 is evenly arranged with multiple first spiral shells
Keyhole 6;The middle part for pouring panel 2 is evenly arranged with multiple second bolts hole 7;It is evenly arranged with the connecting plate 5 more
Individual 3rd bolt hole 8;It is corresponding with bottom plate sidepiece that the side plate monomer 1 with bottom plate sidepiece wears the first bolt hole 6 by bolt
Bolt hole connects;The side plate monomer 1 and baffle plate sidepiece of marking time wear the second bolt hole 7 and baffle plate sidepiece pair of marking time by bolt
The bolt hole connection answered;Corresponding 3rd bolt hole 8 on connecting plate 5 is arranged between the side plate monomer 1 by bolt to connect.
The back side for pouring panel 2 is welded with multiple first pads 9, and the middle part of the first pad 9 is provided with and the shape of the first bolt hole 6
Shape identical first through hole, the first through hole overlap with the first bolt hole 6.The back side for pouring panel 2 is welded with multiple
Second pad 10, the middle part of the second pad 10 are provided with logical with the second through hole of shape identical of the second bolt hole 7, described second
Hole overlaps with the second bolt hole 7.The back side for pouring panel 2 is welded with multiple 3rd pads 11, in the 3rd pad 11
Portion is provided with to be overlapped with the shape identical third through-hole of the 3rd bolt hole 8, the third through-hole with the 3rd bolt hole 8.It is described to pour
Build the back side of panel 2 and be evenly arranged with multiple triangle reinforced sheets 12, the shape of the triangle reinforced sheet 12 with the junction of connecting plate 5
Shape is right angled triangle, and a wherein right-angle side for the triangle reinforced sheet 12 is welded in the back side for pouring panel 2, the triangle
Another right-angle side of reinforced sheet 12 is welded in connecting plate 5.First bolt hole 6 is diameter 16.5mm manhole;Institute
The shape for stating the second bolt hole 7 is identical with the first bolt hole 6;The shape of 3rd bolt hole 8 and the shape of the first bolt hole 6
It is identical.The thickness for pouring panel 2 is 3-4mm.The reinforcement is square iron pipe.The bolt hole position welding gasket of side plate,
To ensure that it is relatively reliable that side plate and other templates are bolted.Triangle reinforced sheet 12 can improve connecting plate 5 and pour face
The steadiness and perpendicularity that plate 2 connects, so as to improve the sealing of stair concrete casting.
In summary, in stair template structure provided by the utility model, mark time baffle plate and bottom plate material is aluminium, side plate
It is iron to pour panel material;Because the bottom plate of stair template and baffle plate of marking time are modulus template, repeat and utilize between different buildings,
And the reuse number of aluminum template makes more than 3 times of iron template, and there is light weight, easily transfer, it is easy to install the advantages of;
And shaped piece of the side plate as stair template, every building, which is finished, to be scrapped;Therefore the panel material that pours of side plate is iron, with drop
The cost of manufacture of low stair template;So as to solve to produce high cost or inconvenience using single material in existing stair template structure
The problem of installation or transmission.The back side for pouring panel is welded with reinforcement, to ensure to pour the stress of panel, so as to reduce side plate
Pour panel caused deformation in concreting process.
Embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, it is every
The equivalents made using the utility model specification and accompanying drawing content, or directly or indirectly it is used in the technology neck of correlation
Domain, similarly it is included in scope of patent protection of the present utility model.