CN207211740U - A kind of stair template - Google Patents

A kind of stair template Download PDF

Info

Publication number
CN207211740U
CN207211740U CN201721135860.1U CN201721135860U CN207211740U CN 207211740 U CN207211740 U CN 207211740U CN 201721135860 U CN201721135860 U CN 201721135860U CN 207211740 U CN207211740 U CN 207211740U
Authority
CN
China
Prior art keywords
bolt hole
reinforcement
hole
plate
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721135860.1U
Other languages
Chinese (zh)
Inventor
张自品
饶松青
钟文辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Southern Aluminum Structure Technology Co.,Ltd.
Original Assignee
Fujian South Aluminium Mould Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian South Aluminium Mould Technology Co Ltd filed Critical Fujian South Aluminium Mould Technology Co Ltd
Priority to CN201721135860.1U priority Critical patent/CN207211740U/en
Application granted granted Critical
Publication of CN207211740U publication Critical patent/CN207211740U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

It the utility model is related to a kind of stair template, including side plate, mark time baffle plate and bottom plate;Wherein mark time baffle plate and bottom plate material is aluminium, the panel material that pours of side plate is iron;Because the bottom plate of stair template and baffle plate of marking time be modulus template, repeat and utilize between different buildings, and the reuses number of aluminum template makes more than 3 times of iron template, and there is light weight, it is easy to shift, it is easy to install the advantages of;And shaped piece of the side plate as stair template, every building, which is finished, to be scrapped;Therefore the panel material that pours of side plate is iron, to reduce the cost of manufacture of stair template;So as to solve the problems, such as to produce high cost or inconvenience installation using single material in existing stair template structure or transmit.The back side for pouring panel is welded with reinforcement, to ensure to pour the stress of panel, so as to which reduce side plate pours panel caused deformation in concreting process.

Description

A kind of stair template
Technical field
It the utility model is related to a kind of building template technical field, more particularly to a kind of stair template.
Background technology
Structural elements necessary to stair are each engineerings, is typically formed by concrete casting, and needs basis to set before pouring The size for counting stair sets up various templates, after concrete casting is completed solidification, takes template apart, obtains required stair.
Because aluminum template has the advantages that light, high reuse number, is easily installed and transmits, in the market Template uses aluminum template mostly, but because aluminum template cost is higher, and the shaped piece of stair template is often according to every building Structure customization, it must be scrapped after the completion of often being poured in every building, cause to waste if the aluminum template to involve great expense is used, And to reuse number relatively low for iron template, and heavier mass is unfavorable for transmitting and installation.
Utility model content
Technical problem to be solved in the utility model is:A kind of stair template is provided, solves existing stair template structure Middle the problem of high cost or inconvenience installation are produced using single material or is transmitted.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:A kind of stair template is provided, including Side plate, mark time baffle plate and bottom plate;
The side plate is spliced by multiple side plate monomers, and the side plate monomer includes pouring panel, reinforcement, connection Plate, the first bolt hole, the second bolt hole and the 3rd bolt hole;
The material for pouring panel is iron, and the material of the baffle plate of marking time is aluminium, and the material of the bottom plate is aluminium;
The connecting plate vertical welding is in the edge for pouring panel;
The reinforcement is welded in the back side for pouring panel, and the reinforcement includes the first reinforcement and the second reinforcement, The quantity of first reinforcement is 2, is parallel to each other between first reinforcement and another the first reinforcement, described the A plurality of second reinforcement is connected between one reinforcement and another the first reinforcement, first reinforcement adds perpendicular to second Strengthening tendons;
The bottom for pouring panel is evenly arranged with multiple first bolts hole;Described pour is uniformly arranged in the middle part of panel There are multiple second bolts hole;Multiple 3rd bolts hole are evenly arranged with the connecting plate;
The side plate monomer wears the first bolt hole bolt hole corresponding with bottom plate sidepiece by bolt with bottom plate sidepiece and connected Connect;The side plate monomer wears the second bolt hole bolt hole corresponding with baffle plate sidepiece of marking time with baffle plate sidepiece of marking time by bolt Connection;Corresponding 3rd bolt hole on connecting plate is arranged between the side plate monomer by bolt to connect.
Further, the back side for pouring panel is welded with multiple first pads, is provided with the middle part of first pad With the first countersink type identical first through hole, the first through hole overlaps with the first bolt hole.
Further, the back side for pouring panel is welded with multiple second pads, is provided with the middle part of second pad With second the second through hole of countersink type identical, second through hole overlaps with the second bolt hole.
Further, the back side for pouring panel is welded with multiple 3rd pads, is provided with the middle part of the 3rd pad With the 3rd countersink type identical third through-hole, the third through-hole overlaps with the 3rd bolt hole.
Further, the back side for pouring panel and the junction of connecting plate are evenly arranged with multiple triangle reinforced sheets, The triangle reinforced sheet is shaped as right angled triangle, and a wherein right-angle side for the triangle reinforced sheet, which is welded in, pours panel The back side, another right-angle side of the triangle reinforced sheet be welded in connecting plate.
Further, first bolt hole is diameter 16.5mm manhole;The shape of second bolt hole with First bolt hole is identical;The shape of 3rd bolt hole is identical with the shape of the first bolt hole.
Further, the thickness for pouring panel is 3-4mm.
Further, the reinforcement is square iron pipe.
The beneficial effects of the utility model are:In the stair template structure that the utility model is related to, mark time baffle plate and bottom Sheet material matter is aluminium, and the panel material that pours of side plate is iron;It is different because the bottom plate of stair template and baffle plate of marking time are modulus template Repeat and utilize between building, and the reuse number of aluminum template makes more than 3 times of iron template, and there is light weight, easily Transfer, it is easy to install the advantages of;And shaped piece of the side plate as stair template, every building, which is finished, to be scrapped;Therefore side plate pours It is iron to build panel material, to reduce the cost of manufacture of stair template;So as to solve that single material is used in existing stair template structure Matter and produce high cost or inconvenience installation or transmit the problem of.The back side for pouring panel is welded with reinforcement, to ensure to pour face The stress of plate, so as to which reduce side plate pours panel caused deformation in concreting process.
Brief description of the drawings
Fig. 1 is a kind of lateral plate structure schematic diagram of stair template of the utility model embodiment;
Fig. 2 is a kind of lateral plate structure sectional view of stair template of the utility model embodiment;
Label declaration:
1st, side plate monomer;2nd, panel is poured;3rd, the first reinforcement;4th, the second reinforcement 5, connecting plate;6th, the first bolt hole; 7th, the second bolt hole;8th, the 3rd bolt hole;9th, the first pad;10th, the second pad;11st, the 3rd pad;12nd, triangle reinforced sheet.
Embodiment
For detailed description technology contents of the present utility model, the objects and the effects, below in conjunction with embodiment and match somebody with somebody Accompanying drawing is closed to be explained.
The design of the utility model most critical is:Mark time baffle plate and bottom plate material is aluminium, side plate pours panel material For iron;Solve the problems, such as to produce high cost or inconvenience installation using single material in existing stair template structure or transmit.
Fig. 1 and Fig. 2 is refer to, the utility model is related to a kind of stair template, including side plate, mark time baffle plate and bottom plate;
The side plate is spliced by multiple side plate monomers 1, and the side plate monomer 1 includes pouring panel 2, reinforcement, company Fishplate bar 5, the first bolt hole 6, the second bolt hole 7 and the 3rd bolt hole 8;
The material for pouring panel 2 is iron, and the material of the baffle plate of marking time is aluminium, and the material of the bottom plate is aluminium;
The vertical welding of connecting plate 5 is in the edge for pouring panel 2;
The reinforcement is welded in the back side for pouring panel 2, and the reinforcement includes the first reinforcement 3 and the second reinforcement 4, the quantity of first reinforcement 3 is 2, is parallel to each other between first reinforcement 3 and another the first reinforcement 3, A plurality of second reinforcement 4 is connected between first reinforcement 3 and another the first reinforcement 3, first reinforcement 3 hangs down Directly in the second reinforcement 4;
The bottom for pouring panel 2 is evenly arranged with multiple first bolts hole 6;It is described pour panel 2 middle part it is uniform It is provided with multiple second bolts hole 7;Multiple 3rd bolts hole 8 are evenly arranged with the connecting plate 5;
The side plate monomer 1 wears the first bolt hole 6 bolt hole corresponding with bottom plate sidepiece with bottom plate sidepiece by bolt Connection;The side plate monomer 1 wears the second bolt hole 7 spiral shell corresponding with baffle plate sidepiece of marking time with baffle plate sidepiece of marking time by bolt Keyhole connects;Corresponding 3rd bolt hole 8 on connecting plate 5 is arranged between the side plate monomer 1 by bolt to connect.
The beneficial effect of above-mentioned stair template is:In the stair template structure that the utility model is related to, mark time baffle plate and Bottom plate material is aluminium, and the material of panel 2 that pours of side plate is iron;Because the bottom plate of stair template and baffle plate of marking time are modulus template, Repeat and utilize between different buildings, and the reuse number of aluminum template makes more than 3 times of iron template, and there is quality Gently, easily transfer, it is easy to install the advantages of;And shaped piece of the side plate as stair template, every building, which is finished, to be scrapped;Therefore side plate The material of panel 2 that pours be iron, to reduce the cost of manufacture of stair template;So as to solve in existing stair template structure using single One material and produce high cost or inconvenience installation or transmit the problem of.The back side for pouring panel 2 is welded with reinforcement, to ensure to pour The stress of panel 2 is built, so as to which reduce side plate pours the caused deformation in concreting process of panel 2.
Further, in above-mentioned stair template, the back side for pouring panel 2 is welded with multiple first pads 9, and described The middle part of one pad 9 is provided with and the shape identical first through hole of the first bolt hole 6, the first through hole and the weight of the first bolt hole 6 Close.
Further, in above-mentioned stair template, the back side for pouring panel 2 is welded with multiple second pads 10, described The middle part of second pad 10 is provided with and the second through hole of shape identical of the second bolt hole 7, second through hole and the second bolt hole 7 Overlap.
Further, in above-mentioned stair template, the back side for pouring panel 2 is welded with multiple 3rd pads 11, described The middle part of 3rd pad 11 is provided with and the shape identical third through-hole of the 3rd bolt hole 8, the third through-hole and the 3rd bolt hole 8 Overlap.
The bolt hole position welding gasket of side plate, to ensure that it is relatively reliable that side plate and other templates are bolted.
Further, in above-mentioned stair template, the back side for pouring panel 2 and the junction of connecting plate 5 are uniformly arranged There are multiple triangle reinforced sheets 12, the triangle reinforced sheet 12 is shaped as right angled triangle, and the triangle reinforced sheet 12 is wherein One right-angle side is welded in the back side for pouring panel 2, and another right-angle side of the triangle reinforced sheet 12 is welded in connecting plate 5.
Triangle reinforced sheet 12 can improve connecting plate 5 with pouring the steadiness and perpendicularity that panel 2 is connected, so as to improve building The sealing of terraced concrete casting.
Further, in above-mentioned stair template, first bolt hole 6 is diameter 16.5mm manhole;Described The shape of two bolts hole 7 is identical with the first bolt hole 6;The shape and the shape phase of the first bolt hole 6 of 3rd bolt hole 8 Together.
Further, in above-mentioned stair template, the thickness for pouring panel 2 is 3-4mm.
Further, in above-mentioned stair template, the reinforcement is square iron pipe.
Embodiment 1
A kind of stair template, including side plate, mark time baffle plate and bottom plate;The side plate is spliced by multiple side plate monomers 1, The side plate monomer 1 includes pouring panel 2, reinforcement, connecting plate 5, the first bolt hole 6, the second bolt hole 7 and the 3rd bolt hole 8;The material for pouring panel 2 is iron, and the material of the baffle plate of marking time is aluminium, and the material of the bottom plate is aluminium;The connection The vertical welding of plate 5 is in the edge for pouring panel 2;The reinforcement is welded in the back side for pouring panel 2, and the reinforcement includes the One reinforcement 3 and the second reinforcement 4, the quantity of first reinforcement 3 are 2, first reinforcement 3 with another first It is parallel to each other between reinforcement 3, a plurality of second is connected between first reinforcement 3 and another the first reinforcement 3 and is strengthened Muscle 4, first reinforcement 3 is perpendicular to the second reinforcement 4;The bottom for pouring panel 2 is evenly arranged with multiple first spiral shells Keyhole 6;The middle part for pouring panel 2 is evenly arranged with multiple second bolts hole 7;It is evenly arranged with the connecting plate 5 more Individual 3rd bolt hole 8;It is corresponding with bottom plate sidepiece that the side plate monomer 1 with bottom plate sidepiece wears the first bolt hole 6 by bolt Bolt hole connects;The side plate monomer 1 and baffle plate sidepiece of marking time wear the second bolt hole 7 and baffle plate sidepiece pair of marking time by bolt The bolt hole connection answered;Corresponding 3rd bolt hole 8 on connecting plate 5 is arranged between the side plate monomer 1 by bolt to connect. The back side for pouring panel 2 is welded with multiple first pads 9, and the middle part of the first pad 9 is provided with and the shape of the first bolt hole 6 Shape identical first through hole, the first through hole overlap with the first bolt hole 6.The back side for pouring panel 2 is welded with multiple Second pad 10, the middle part of the second pad 10 are provided with logical with the second through hole of shape identical of the second bolt hole 7, described second Hole overlaps with the second bolt hole 7.The back side for pouring panel 2 is welded with multiple 3rd pads 11, in the 3rd pad 11 Portion is provided with to be overlapped with the shape identical third through-hole of the 3rd bolt hole 8, the third through-hole with the 3rd bolt hole 8.It is described to pour Build the back side of panel 2 and be evenly arranged with multiple triangle reinforced sheets 12, the shape of the triangle reinforced sheet 12 with the junction of connecting plate 5 Shape is right angled triangle, and a wherein right-angle side for the triangle reinforced sheet 12 is welded in the back side for pouring panel 2, the triangle Another right-angle side of reinforced sheet 12 is welded in connecting plate 5.First bolt hole 6 is diameter 16.5mm manhole;Institute The shape for stating the second bolt hole 7 is identical with the first bolt hole 6;The shape of 3rd bolt hole 8 and the shape of the first bolt hole 6 It is identical.The thickness for pouring panel 2 is 3-4mm.The reinforcement is square iron pipe.The bolt hole position welding gasket of side plate, To ensure that it is relatively reliable that side plate and other templates are bolted.Triangle reinforced sheet 12 can improve connecting plate 5 and pour face The steadiness and perpendicularity that plate 2 connects, so as to improve the sealing of stair concrete casting.
In summary, in stair template structure provided by the utility model, mark time baffle plate and bottom plate material is aluminium, side plate It is iron to pour panel material;Because the bottom plate of stair template and baffle plate of marking time are modulus template, repeat and utilize between different buildings, And the reuse number of aluminum template makes more than 3 times of iron template, and there is light weight, easily transfer, it is easy to install the advantages of; And shaped piece of the side plate as stair template, every building, which is finished, to be scrapped;Therefore the panel material that pours of side plate is iron, with drop The cost of manufacture of low stair template;So as to solve to produce high cost or inconvenience using single material in existing stair template structure The problem of installation or transmission.The back side for pouring panel is welded with reinforcement, to ensure to pour the stress of panel, so as to reduce side plate Pour panel caused deformation in concreting process.
Embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, it is every The equivalents made using the utility model specification and accompanying drawing content, or directly or indirectly it is used in the technology neck of correlation Domain, similarly it is included in scope of patent protection of the present utility model.

Claims (8)

1. a kind of stair template, it is characterised in that including side plate, mark time baffle plate and bottom plate;
The side plate is spliced by multiple side plate monomers, and the side plate monomer includes pouring panel, reinforcement, connecting plate, the One bolt hole, the second bolt hole and the 3rd bolt hole;
The material for pouring panel is iron, and the material of the baffle plate of marking time is aluminium, and the material of the bottom plate is aluminium;
The connecting plate vertical welding is in the edge for pouring panel;
The reinforcement is welded in the back side for pouring panel, and the reinforcement includes the first reinforcement and the second reinforcement, described The quantity of first reinforcement is 2, is parallel to each other between first reinforcement and another the first reinforcement, and described first adds A plurality of second reinforcement is connected between strengthening tendons and another the first reinforcement, first reinforcement is strengthened perpendicular to second Muscle;
The bottom for pouring panel is evenly arranged with multiple first bolts hole;It is described pour be evenly arranged with the middle part of panel it is more Individual second bolt hole;Multiple 3rd bolts hole are evenly arranged with the connecting plate;
The side plate monomer wears the first bolt hole bolt hole corresponding with bottom plate sidepiece by bolt with bottom plate sidepiece and connected;Institute State side plate monomer and the bolt hole connection corresponding with baffle plate sidepiece of marking time of the second bolt hole is worn by bolt with baffle plate sidepiece of marking time; Corresponding 3rd bolt hole on connecting plate is arranged between the side plate monomer by bolt to connect.
2. stair template according to claim 1, it is characterised in that the back side for pouring panel is welded with multiple first Pad, the first pad middle part are provided with and the first countersink type identical first through hole, the first through hole and first Bolt hole overlaps.
3. stair template according to claim 1, it is characterised in that the back side for pouring panel is welded with multiple second Pad, the second pad middle part are provided with and second the second through hole of countersink type identical, second through hole and second Bolt hole overlaps.
4. stair template according to claim 1, it is characterised in that the back side for pouring panel is welded with multiple three Pad, the 3rd pad middle part are provided with and the 3rd countersink type identical third through-hole, the third through-hole and the 3rd Bolt hole overlaps.
5. stair template according to claim 1, it is characterised in that the connection at the back side and connecting plate for pouring panel Place is evenly arranged with multiple triangle reinforced sheets, and the triangle reinforced sheet is shaped as right angled triangle, the triangle reinforced sheet A wherein right-angle side is welded in the back side for pouring panel, and another right-angle side of the triangle reinforced sheet is welded in connecting plate.
6. stair template according to claim 1, it is characterised in that first bolt hole is diameter 16.5mm circle Through hole;The shape of second bolt hole is identical with the first bolt hole;The shape of 3rd bolt hole and the first bolt hole Shape is identical.
7. stair template according to claim 1, it is characterised in that the thickness for pouring panel is 3-4mm.
8. stair template according to claim 1, it is characterised in that the reinforcement is square iron pipe.
CN201721135860.1U 2017-09-06 2017-09-06 A kind of stair template Active CN207211740U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721135860.1U CN207211740U (en) 2017-09-06 2017-09-06 A kind of stair template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721135860.1U CN207211740U (en) 2017-09-06 2017-09-06 A kind of stair template

Publications (1)

Publication Number Publication Date
CN207211740U true CN207211740U (en) 2018-04-10

Family

ID=61827193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721135860.1U Active CN207211740U (en) 2017-09-06 2017-09-06 A kind of stair template

Country Status (1)

Country Link
CN (1) CN207211740U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409816A (en) * 2018-04-27 2019-11-05 湖南好快省建筑科技有限公司 Stair template with check of staircase
CN110409819A (en) * 2018-04-27 2019-11-05 湖南好快省建筑科技有限公司 Stair template system
CN112663951A (en) * 2020-12-29 2021-04-16 晟通科技集团有限公司 Beam formwork and beam formwork combination

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409816A (en) * 2018-04-27 2019-11-05 湖南好快省建筑科技有限公司 Stair template with check of staircase
CN110409819A (en) * 2018-04-27 2019-11-05 湖南好快省建筑科技有限公司 Stair template system
CN112663951A (en) * 2020-12-29 2021-04-16 晟通科技集团有限公司 Beam formwork and beam formwork combination

Similar Documents

Publication Publication Date Title
CN207211740U (en) A kind of stair template
CN105839667A (en) Construction and manufacturing process of total-prefabricated superimposed assembly type underground pipe gallery
CN207619856U (en) A kind of replaceable combination girder segment for bridge construction
CN205653782U (en) Mould is repaired to bored concrete pile pile head
CN108425319A (en) A kind of construction system and form of construction work of column
CN209277531U (en) It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall
CN208266668U (en) A kind of construction system of column
CN208995861U (en) A kind of concrete road surface rod piece installation stationary steel bushing tube stent device
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN202831643U (en) Combined type concrete chute
CN210032622U (en) Easy-to-detach end sealing template component
CN208777690U (en) A kind of reserved floor sealing hole template component of drainage pipeline
CN216109710U (en) Novel recyclable small-section constructional column formwork-supporting vibration opening
CN206753038U (en) It is a kind of to wear joist steel sleeve pipe applied in aluminum dipping form
CN109208786A (en) A kind of ring muscle that is easily installed fastens shear wall structure and its installation method
CN106638679B (en) A kind of precast concrete pipe gallery connection method
CN210477335U (en) Precast box culvert concreting equipment
CN212336467U (en) Assembled full-prefabricated floor structure
CN212224627U (en) Pipeline preformed hole plugging die
CN210032613U (en) Pre-buried section structure in entrance to a cave, case and pre-buried structure, reservation entrance to a cave
CN210758391U (en) Prefabricated component demoulding horizontal hoisting assembly capable of being recycled
CN207526109U (en) Hole blocking device penetrating through vertical pipe of floor slab
CN207436338U (en) A kind of new precast panel
CN207003738U (en) A kind of prefabricated steel faced wall with stirrup
CN208183950U (en) A kind of prefabricated foundation raft board concrete leads wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200615

Address after: 350000 Fujian Fuzhou high tech Zone Haixi science and Technology East Road universal R & D center 8 layers

Patentee after: CHINALCO NANPING ALUMINIUM (FUJIAN) ALUMINUM STRUCTURE TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: Nanping City, Fujian province 353099 Yanping District Industrial Road No. 91

Patentee before: FUJIAN NANLYU ALUMINUM MOLD TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 350000 8 / F, universal R & D center, science and Technology East Road, haixiyuan, high tech Zone, Fuzhou City, Fujian Province

Patentee after: Fujian Southern Aluminum Structure Technology Co.,Ltd.

Address before: 350000 8 / F, universal R & D center, science and Technology East Road, haixiyuan, high tech Zone, Fuzhou City, Fujian Province

Patentee before: CHINALCO NANPING ALUMINIUM (FUJIAN) ALUMINUM STRUCTURE TECHNOLOGY DEVELOPMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder