CN209277531U - It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall - Google Patents

It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall Download PDF

Info

Publication number
CN209277531U
CN209277531U CN201821733951.XU CN201821733951U CN209277531U CN 209277531 U CN209277531 U CN 209277531U CN 201821733951 U CN201821733951 U CN 201821733951U CN 209277531 U CN209277531 U CN 209277531U
Authority
CN
China
Prior art keywords
steel
template
back cord
meet
enough
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821733951.XU
Other languages
Chinese (zh)
Inventor
吴冰雨
李鹏辉
张衡
朱光华
周义强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
Third Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Third Engineering Division filed Critical Third Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201821733951.XU priority Critical patent/CN209277531U/en
Application granted granted Critical
Publication of CN209277531U publication Critical patent/CN209277531U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Template is had enough to meet the need for reinforce expansion joint shear wall the utility model relates to a kind of, steel platform template corresponding with the plank sheathing is arranged in the opposite of the plank sheathing, square steel time back cord above laterally and vertically is being staggeredly distributed in spacing distance respectively in pairs on the lateral surface of the steel platform template, the infall that square steel time back cord and setting square steel vertically time back cord horizontally is arranged described in every group is equipped with sealing steel plate, across every place, the sealing steel plate has the Screw arbor with nut at both-ends of the connection steel platform template and plank sheathing, the both ends of each Screw arbor with nut at both-ends are equipped with hex nut and are locked to the steel platform template and plank sheathing.Template provided by the utility model of having enough to meet the need has the advantages that structure is simple, installation and removal are convenient, at low cost and availability is high, while also mitigating the labor intensity of construction personnel, improves construction efficiency.

Description

It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall
Technical field
The utility model relates to technical field of building construction, in particular to it is a kind of for reinforce expansion joint shear wall can week Revolving die plate.
Background technique
Current residential project is increasingly strict to daylighting requirement, and developer increases family under the premise of meeting daylighting requirement The increase house unit for counting and taking becomes optimal selection.In order to reduce the deformation and sinking of building construction, expansion joint is settled Setting it is more and more common.However the sedimentation expansion joint width of residential building is generally between 110mm~270mm, which results in Shear wall formwork construction the problem of there is no operating spaces of two sides at expansion joint, tearing peace open becomes very difficult.
Existing formwork way is general are as follows: is respectively provided with plank sheathing+secondary back cord (flitch)+main back cord in the two sides of shear wall (steel pipe)+split bolt, width 15mm+70mm+48mm+50mm=183mm, this there have been the shear wall of rear construction by Template peace is caused in narrow space, tears difficulty, the low problem of construction efficiency open, and part expansion joint can not construct, or even if can apply Work, and construction formwork reinforcement system is simplified, construction quality cannot ensure that safety coefficient substantially reduces;Meanwhile This traditional construction formwork can only have enough to meet the need 5~8 times, and loss and waste are also than more serious.
Therefore, how could be not only convenient for construction under the premise of meeting expansion joint design requirement in residential building, but also can improve Safety coefficient guarantees that quality becomes the important directions that concrete engineering construction is explored.
Utility model content
For the deficiencies in the prior art, the utility model provide it is a kind of for reinforce expansion joint shear wall can week Revolving die plate, the advantage that succinct with connection type, vertical smooth control is accurate and turnover reuse rate is high.
Used specific technical solution is the utility model to solve above-mentioned technical problem:
It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall, it easily constructs the wooden model of side including shear wall is arranged in Plate, the vertically arranged lumps of wood time back cord on the lateral surface of the plank sheathing are laterally arranged on the lateral surface of the lumps of wood time back cord Pair the main back cord of steel pipe, steel platform template corresponding with the plank sheathing is arranged in the opposite of the plank sheathing, and the steel is put down On the lateral surface of platform template in pairs respectively laterally and it is vertical upper be staggeredly distributed with square steel time back cord in spacing distance, every group The infall of square steel time back cord and setting the square steel vertically time back cord of the setting horizontally is equipped with sealing steel plate, wears Cross the Screw arbor with nut at both-ends that every place sealing steel plate has the connection steel platform template and plank sheathing, each Screw arbor with nut at both-ends Both ends be equipped with hex nut and be locked to the steel platform template and plank sheathing.
Further, left and right one round steel of each setting is hung on one group of transverse direction square steel time back cord of the steel platform die head Ring, the lifting for the steel platform template.
Further, the steel platform template can be one block of steel plate, be also possible to be spliced by plurality of steel plates.
Compared with prior art, the utility model has the beneficial effects that
Using the template of having enough to meet the need described in the utility model for reinforcing expansion joint shear wall, the advantage protruded is to pass through Shear wall reinforce to drawing by opposite Screw arbor with nut at both-ends and nut, and at expansion joint, manually operable side leads to Screw arbor with nut at both-ends It crosses shear wall to be placed in the reserved bolt hole of steel platform template, be fastened after each Screw arbor with nut at both-ends is all in place. It need to be reinforced in two sides compared to traditional plank sheathing, the utility model has enough to meet the need template and only need to can not manually reinforce in place Steel platform formwork hoisting is in place by side, is then reinforced from artificial operable side, and connection type is succinct, Solve the problems, such as that existing formwork way is not easy to construct;Meanwhile the utility model makes vertical flatness using steel platform template It is precisely controlled, and the repeatable advantage for being used in turn, having utilization rate high of steel platform template;In addition, the utility model Have enough to meet the need template side using steel platform template, side still uses plank sheathing, had not only saved cost in this way but also made entirely to fill It sets easy to operate efficient.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the utility model can have enough to meet the need template.
Fig. 2 is the steel platform template part structural schematic diagram that the utility model can have enough to meet the need template.
It is as shown in the figure: 1- steel platform template, 2- square steel time back cord, 3- sealing steel plate, 4- Screw arbor with nut at both-ends, 5- hex nut, 6- round steel hanging ring, 7- plank sheathing, the 8- lumps of wood time back cord, the main back cord of 9- steel pipe.
Specific embodiment
The present invention will be further described in the following with reference to the drawings and specific embodiments.
As shown in Figs. 1-2, the present embodiment provides a kind of for reinforcing the template of having enough to meet the need of expansion joint shear wall, including setting It easily constructs the plank sheathing 7 of side in shear wall, the vertically arranged lumps of wood time back cord 8, the lumps of wood on the lateral surface of the plank sheathing 7 The main back cord 9 of steel pipe being laterally arranged on the lateral surface of secondary back cord 8 pair, opposite setting and the wooden model of the plank sheathing 7 The corresponding steel platform template 1 of plate 7, on the lateral surface of the steel platform template 1 in pairs respectively laterally and it is vertical on be in Spacing distance is staggeredly distributed with square steel time back cord 2, and square steel time back cord 2 horizontally is arranged described in every group and is arranged vertically The infall of square steel time back cord 2 be equipped with sealing steel plate 3, across every place, the sealing steel plate 3 has the connection steel platform The both ends of the Screw arbor with nut at both-ends 4 of template 1 and plank sheathing 7, each Screw arbor with nut at both-ends 4 are equipped with hex nut 5 to the steel platform Template 1 and plank sheathing 7 are locked.
Specifically, one round steel hanging ring of each setting in left and right on one group of transverse direction square steel time back cord 2 at 1 top of steel platform template 6, for the lifting of the steel platform template 1,6 two-sided welding of round steel hanging ring is in steel platform template 1 and square steel time back cord 2 On.
Specifically, the steel platform template 1 can be the steel plate of one piece of 5mm thickness, it is also possible to by the steel plate of muti-piece 5mm thickness It is spliced.
Specifically, the square steel that the square steel time back cord 2 is side length 40mm.
Specifically, the sealing steel plate 3 is the steel plate of 10mm thickness, for eliminating between square steel time back cord 2 and hex nut 5 Play stress spread.
Specifically, the specification that the Screw arbor with nut at both-ends 4 and hex nut engaged therewith 5 are selected is diameter 14mm.
Specifically, the diameter of the round steel hanging ring 6 is 20mm.
It is provided in this embodiment to have enough to meet the need template when in use, at expansion joint after shear force wall reinforcing steel bar binding construction, one In place by 1 handling of steel platform template, Screw arbor with nut at both-ends 4 in place, is then inserted into pair that need to be reinforced by the other side by 7 handling of plank sheathing for side In the bolt hole for answering the square steel time back cord 2 of steel platform template 1 reserved;In the side of plank sheathing 1, rotation Screw arbor with nut at both-ends 4 is allowed to and seals Mouth steel plate 3 and hex nut 5 are fastened by screw thread, then reinforce 1 side hex nut 5 of plank sheathing, finally use torque spanner Check the intensity of Screw arbor with nut at both-ends 4, it is ensured that it is intact, next process is entered after acceptance(check).
When removing steel platform template 1 after the completion of construction, the hex nut 5 of 1 side of plank sheathing only need to be reversely unscrewed, it is whole A installation and disassembly process are all carried out in artificial 1 side of plank sheathing convenient for operation, and the other side of operating difficulties is only needed Steel platform template 1 is lifted, solves the problems, such as existing formwork way operating difficulties;And the steel platform template of the utility model 1 after dismounting can Reusability, improve utilization rate.In short, provided by the utility model a kind of for reinforcing expansion joint scissors The template of having enough to meet the need of wall has the advantages that structure is simple, installation and removal are convenient, at low cost and availability is high, while also mitigating The labor intensity of construction personnel, improves construction efficiency.
The part not illustrated in specification is the prior art or common knowledge.It is practical new that the present embodiment is merely to illustrate this Type, rather than limitation the scope of the utility model, the equivalent replacement etc. that those skilled in the art do the utility model Modification is deemed to fall in the utility model claims book institute protection scope.

Claims (7)

1. a kind of have enough to meet the need template for reinforce expansion joint shear wall, easily construct the plank sheathing of side including shear wall is arranged in (7), the vertically arranged lumps of wood time back cord (8) on the lateral surface of the plank sheathing (7), on the lateral surface of the lumps of wood time back cord (8) The main back cord of steel pipe (9) being laterally arranged to pair, it is characterised in that: opposite setting and the plank sheathing of the plank sheathing (7) (7) corresponding steel platform template (1), in pairs respectively laterally and vertical on the lateral surface of the steel platform template (1) It is upper to be staggeredly distributed with square steel time back cord (2) in spacing distance, square steel time back cord (2) horizontally and setting are set described in every group The infall of square steel time back cord (2) vertically is equipped with sealing steel plate (3), and passing through every place sealing steel plate (3) has one The Screw arbor with nut at both-ends (4) of the steel platform template (1) and plank sheathing (7) is connected, the both ends of each Screw arbor with nut at both-ends (4) are equipped with Hex nut (5) is locked to the steel platform template (1) and plank sheathing (7).
2. a kind of template is had enough to meet the need for reinforce expansion joint shear wall according to claim 1, it is characterised in that: described One round steel hanging ring (6) of each setting in left and right on one group of transverse direction square steel time back cord (2) at the top of steel platform template (1).
3. a kind of template is had enough to meet the need for reinforce expansion joint shear wall according to claim 2, it is characterised in that: described Steel platform template (1) is the steel plate of one piece of 5mm thickness, or forms for the steel plate splicing of muti-piece 5mm thickness.
4. a kind of template is had enough to meet the need for reinforce expansion joint shear wall according to claim 3, it is characterised in that: described The square steel that square steel time back cord (2) is side length 40mm.
5. a kind of template is had enough to meet the need for reinforce expansion joint shear wall according to claim 4, it is characterised in that: described Seal the steel plate that steel plate (3) are 10mm thickness.
6. a kind of template is had enough to meet the need for reinforce expansion joint shear wall according to claim 5, it is characterised in that: described The diameter of Screw arbor with nut at both-ends (4) and hex nut engaged therewith (5) is 14mm.
7. a kind of template is had enough to meet the need for reinforce expansion joint shear wall according to claim 2, it is characterised in that: described The diameter of round steel hanging ring (6) is 20mm.
CN201821733951.XU 2018-10-24 2018-10-24 It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall Expired - Fee Related CN209277531U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821733951.XU CN209277531U (en) 2018-10-24 2018-10-24 It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821733951.XU CN209277531U (en) 2018-10-24 2018-10-24 It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall

Publications (1)

Publication Number Publication Date
CN209277531U true CN209277531U (en) 2019-08-20

Family

ID=67599264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821733951.XU Expired - Fee Related CN209277531U (en) 2018-10-24 2018-10-24 It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall

Country Status (1)

Country Link
CN (1) CN209277531U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287451A (en) * 2020-02-25 2020-06-16 中国二十二冶集团有限公司 Expansion joint formwork supporting tool
CN111502244A (en) * 2020-05-06 2020-08-07 无锡锡晟建设有限公司 Full-steel large formwork structure for wall boards on two sides of expansion joint and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287451A (en) * 2020-02-25 2020-06-16 中国二十二冶集团有限公司 Expansion joint formwork supporting tool
CN111502244A (en) * 2020-05-06 2020-08-07 无锡锡晟建设有限公司 Full-steel large formwork structure for wall boards on two sides of expansion joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN209277531U (en) It is a kind of to have enough to meet the need template for reinforce expansion joint shear wall
CN110306774B (en) Method and device for installing socket type cantilever scaffold
CN101748887B (en) Bin wall template construction device of cylinder bin with large diameter
CN204492168U (en) A kind of quick detach supporting member of early-dismantling formwork system
CN108678417A (en) A kind of floor of steel structure transformation node
CN206917265U (en) A kind of adjustable small bore beam side reinforcement tools
CN207738316U (en) Large scale single wall bottom board steel lifting box integral hoisting suspender
CN203462754U (en) Free-disassembly suspension template
CN202577939U (en) Reusable overhanging I-beam fixing device
CN103046743A (en) High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN201158932Y (en) Self-chucking platform especially for high-rise building elevator shaft formwork supports
CN110700573A (en) Construction method, device and application of formwork support system adopting steel beam
CN206562782U (en) Glomeration builds self-tightening type block masonry wall binding apparatus
CN208792806U (en) A kind of floor of steel structure transformation node
CN214329599U (en) Steel reinforcement cage interfacing apparatus
CN101864835B (en) Early-dismantling support of aluminum alloy top plate
CN204492173U (en) Elevator shaft integral lifting template operation platform
CN106760570A (en) Glomeration builds self-tightening type block masonry wall binding apparatus
CN211036599U (en) Road surface plate block convenient to lift
CN209556351U (en) A kind of readily removable section construction aluminum alloy pattern plate
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN211421839U (en) Hoop type concrete pouring template system for plugging through floor slab pipeline hole gap
CN203603461U (en) Floor aluminum shuttering splicing formwork structure system
CN209099602U (en) A kind of removable steel bar truss floor template in UHPC ultra-high performance concrete bottom
CN201581635U (en) Formwork construction device for wall of large diameter silo

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190820

CF01 Termination of patent right due to non-payment of annual fee