CN207206723U - Grouting system for prestressed pipe - Google Patents

Grouting system for prestressed pipe Download PDF

Info

Publication number
CN207206723U
CN207206723U CN201721223970.3U CN201721223970U CN207206723U CN 207206723 U CN207206723 U CN 207206723U CN 201721223970 U CN201721223970 U CN 201721223970U CN 207206723 U CN207206723 U CN 207206723U
Authority
CN
China
Prior art keywords
pipe
group
prestressed
prestressed pipe
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721223970.3U
Other languages
Chinese (zh)
Inventor
杨建约
华雷
赵青
孙石磊
冯栋栋
范雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN201721223970.3U priority Critical patent/CN207206723U/en
Application granted granted Critical
Publication of CN207206723U publication Critical patent/CN207206723U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model provides a mud jacking system for prestressing force pipe, this system includes: the prestressed pipe groups are embedded in the prestressed concrete members, arranged side by side and sequentially connected in series, each prestressed pipe group comprises a first pipeline and a second pipeline, the first pipelines are arranged in the same direction, a grout inlet is formed in the first end of each first pipeline, the second ends of the first pipelines are communicated with the second ends of the second pipelines, a grout outlet is formed in the first end of each second pipeline, and the grout outlet of each prestressed pipe group is communicated with the grout inlet of the next prestressed pipe group; a slurry storage barrel for storing slurry; the first end of the high-pressure grouting pipe is positioned below the liquid level of the grout, the second end of the high-pressure grouting pipe is communicated with the grout inlet of the first group of prestressed pipe groups, and a grouting pump is arranged on the high-pressure grouting pipe; and the grout outlet pipe is communicated with the grout outlet of the last group of prestressed pipe groups and the grout storage barrel to form a circulating loop for grouting grout. The utility model provides a traditional mud jacking technology can appear the not closely knit problem of mud jacking often in the construction.

Description

Mud jacking system for prestressed pipe
Technical field
It the utility model is related to technical field of building construction, and in particular to a kind of mud jacking system for prestressed pipe.
Background technology
In construction, prestressed pipe is embedded in prestressed concrete member in advance, after treating concreting, and And carry out connecting presstressed reinforcing steel after concrete reaches some strength, in prestress pipe, after treating tension of prestressed tendon anchoring, enter Row pumping of prostressed duct, slurries are made to fill up the gap of presstressed reinforcing steel and pipeline so that presstressed reinforcing steel firmly glues with concrete Became one, improve the intensity, rigidity and bending resistance of concrete component, prevent concrete component from occurring crack too early.Tradition The uncompacted problem of mud jacking occurs in construction in mud-jacking technology often.
Utility model content
The defects of to overcome present in prior art, a kind of mud jacking system for prestressed pipe is now provided, to solve to pass The uncompacted problem of mud jacking occurs in construction in system mud-jacking technology often.
To achieve the above object, there is provided a kind of mud jacking system for prestressed pipe, including:
Multigroup prestressed pipe group, multigroup prestressed pipe group is embedded in prestressed concrete member in advance, multigroup described pre- Stress tube group is arranged side by side and is sequentially connected in series, and the prestressed pipe group includes the first pipeline and second pipe set in the same direction, institute The lower section that the first pipeline is located at the second pipe is stated, the first end of first pipeline is formed with stock inlet, first pipe Second end in road is communicated in the second end of the second pipe by the first connecting tube, the first end of the second pipe formed with Grout outlet, the grout outlet of prestressed pipe group described in every group are communicated in prestressed pipe group described in adjacent next group by the second connecting tube Stock inlet;
Slurry storing tank, slurries are stored in the slurry storing tank;
High pressure madjack pipe, the first end of the high pressure madjack pipe are located at below the liquid level of the slurries, the high pressure mud jacking Second end of pipe is communicated in the stock inlet of prestressed pipe group described in first group, and the high pressure madjack pipe is provided with mudjack;And
Grout outlet, the grout outlet and the slurry storing tank for being communicated in last group prestressed pipe group supply the slurry to be formed The circulation loop of liquid grouting.
Further, the end of first pipeline and second pipe is respectively provided with the plugging device of mortar leakage prevention.
Further, the plugging device includes:
Plugging plate, is respectively equipped with the plugging plate in first pipeline and the second pipe, and the plugging plate is along institute Being radially arranged for the first pipeline and the second pipe is stated, connecting hole is offered on the plugging plate;And
Junction block, is communicated in the connecting hole, and the junction block is arranged at the outside of the plugging plate.
Further, the inwall of the connecting hole is formed with internal thread, the junction block formed with the internal thread phase The external screw thread of matching, the junction block are threadedly connected to the connecting hole.
Further, presstressed reinforcing steel is provided with first pipeline and the second pipe, is formed on the plugging plate There is the spacing hole plugged for the presstressed reinforcing steel.
Further, the mud jacking pressure of the stock inlet of prestressed pipe group described in first group is 0.3MPa~0.7MPa.
Further, the stock inlet of prestressed pipe group described in first group is provided with pressure gauge.
The beneficial effects of the utility model are that the utility model is used for the mud jacking system of prestressed pipe in prestressed concrete Pre-buried multigroup prestressed pipe group in native component, by the placed in series up and down of each prestressed pipe group so that each prestressed pipe The stock inlet of group is located at the lower section of grout outlet, then multigroup prestressed pipe group is connected to form an integrally closed prestressed pipe Road, the prestress pipe is cross-shaped, and slurries are pressed into from the stock inlet of lower, circulate in the prestress pipe of cross-like, finally Grout outlet outflow above stock inlet, it is ensured that the slurries low in and high out being poured into prestress pipe, be easy to discharge prestressing force Air in pipeline, it is ensured that the mud jacking compactness of prestress pipe.In addition, multigroup prestress pipe, while be in the milk, and can Accelerating construction progress, improve efficiency of construction.
Brief description of the drawings
Fig. 1 is the schematic diagram of the first embodiment for the mud jacking system that the utility model is used for prestressed pipe.
Fig. 2 is the prestressed concrete member of the first embodiment for the mud jacking system that the utility model is used for prestressed pipe Schematic diagram.
Fig. 3 is the signal of the prestressed pipe group of the first embodiment for the mud jacking system that the utility model is used for prestressed pipe Figure.
Fig. 4 is the side view of the prestressed pipe group of the first embodiment for the mud jacking system that the utility model is used for prestressed pipe Figure.
Fig. 5 is the schematic diagram of the plugging device of the first embodiment for the mud jacking system that the utility model is used for prestressed pipe.
Fig. 6 is the side view of the prestressed pipe group of the second embodiment for the mud jacking system that the utility model is used for prestressed pipe Figure.
Embodiment
Illustrate embodiment of the present utility model below by way of specific instantiation, those skilled in the art can be by this theory Content disclosed by bright book understands other advantages and effect of the present utility model easily.The utility model can also be by addition Different embodiments are embodied or practiced, and the various details in this specification can also be based on different viewpoints with answering With, without departing from it is of the present utility model spirit under carry out various modifications or alterations.
First embodiment
Fig. 1 is that schematic diagram, Fig. 2 of the first embodiment for the mud jacking system that the utility model is used for prestressed pipe are this practicality Schematic diagram, Fig. 3 of the prestressed concrete member of the first embodiment of the new mud jacking system for prestressed pipe are this practicality Schematic diagram, Fig. 4 of the prestressed pipe group of the first embodiment of the new mud jacking system for prestressed pipe use for the utility model Side view, Fig. 5 in the prestressed pipe group of the first embodiment of the mud jacking system of prestressed pipe are used in advance should for the utility model The schematic diagram of the plugging device of the first embodiment of the mud jacking system of solenoid.
Referring to figs. 1 to shown in Fig. 5, the utility model provides a kind of mud jacking system for prestressed pipe, including in advance should Solenoid group 1, slurry storing tank 2, high pressure madjack pipe 3 and grout outlet 4.The quantity of prestressed pipe group 1 is two groups.Two groups of prestressed pipe groups 1 is embedded in prestressed concrete member 5 in advance.Two groups of prestressed pipe groups 1 are arranged side by side and connected.Prestressed pipe group 1 includes in the same direction The first pipeline 11 and second pipe 12 set.First pipeline 11 is located at the lower section of second pipe 12.The first of first pipeline 11 Formed with stock inlet 110, the second end of the first pipeline 11 is communicated in the second end of second pipe 12 by the first connecting tube at end, the The first end of two pipelines 12 is formed with grout outlet 120.The grout outlet 120 of first group of prestressed pipe group 1 is connected by the second connecting tube Pass through the stock inlet 110 of second group of prestressed pipe group 1.First group of prestressed pipe group 1 and second group of prestressed pipe group 1 pass through second Connecting tube connects to form a prestress pipe for slurry flow, stock inlet the entering for the first pipeline 11 of the prestress pipe Mouth 110 is starched, the grout outlet of the prestress pipe is the grout outlet 120 of second pipe 12.The stock inlet of the prestress pipe is located at The lower section of the same side of the grout outlet of the prestress pipe.First connecting tube and the second connecting tube are rubber tube.
Slurry storing tank 2 is mainly used in the slurries that storage is poured into the prestress pipe.
The first end of high pressure madjack pipe 3 is located at below the liquid level of the slurries in slurry storing tank 2, the second end of high pressure madjack pipe 3 The stock inlet 110 of the first pipeline 11 of first group of prestressed pipe group 1 is communicated in, high pressure madjack pipe 3 is provided with mudjack 31.High pressure Madjack pipe 3 is rubber madjack pipe.
Grout outlet 4 is communicated in grout outlet 120 and the slurry storing tank 2 of the second pipe 12 of second group of prestressed pipe group 1 with formation For the circulation loop of slurries grouting.
The utility model be used for prestressed pipe mud jacking system in prestressed concrete member pre-buried multigroup prestressed pipe Group, by the placed in series up and down of each prestressed pipe group so that the stock inlet of each prestressed pipe group is located under grout outlet Side, then multigroup prestressed pipe group is connected to form an integrally closed prestress pipe, the prestress pipe is cross-shaped, Slurries are pressed into from the stock inlet of lower, circulate in the prestress pipe of cross-like, finally the grout outlet outflow above stock inlet, Ensure to be poured into the slurries low in and high out in prestress pipe, be easy to discharge the air in prestress pipe, it is ensured that prestressed pipe The mud jacking compactness in road.The utility model is used for the mud jacking system of prestressed pipe, and to realize each group of prestressed pipe group past from lower Eminence is in the milk, on the one hand, can form bigger than the serum density of advection, more consolidation slurry from lower toward eminence grouting, separately On the one hand, the density of formation is bigger, the slurry of more consolidation in the air in discharging prestress pipe group, discharge the effect of air With it is more efficient, accelerate the grouting construction efficiency and construction quality of prestress pipe group.Finally, multiple prestressed pipe groups are by more Individual first pipeline and second pipe composition.Multiple first pipelines and second pipe are in the milk simultaneously, and and can further adds Fast construction speed, improve efficiency of construction.
As a kind of preferable embodiment, the end of the first pipeline 11 and second pipe 12 is respectively provided with anti-leak-stopping The plugging device 13 of slurry.
Specifically, referring to Fig. 5, plugging device 13 includes plugging plate 131 and junction block 132.Plugging plate 131 is circular steel plate. Plugging plate 131 offers axially disposed connecting hole and spacing hole 1311.
Plugging plate 131 is plugged in the end of the first pipeline 11 and second pipe 12 respectively.Plugging plate 131 is welded to connect in The tube wall of one pipeline 11 and second pipe 12.Plugging plate 131 is radially arranged along the first pipeline 11 and second pipe 12.Plugging plate On offer a connecting hole and multiple spacing holes 1311.Junction block 132 is communicated in connecting hole, and junction block 132 is arranged at plugging plate 131 outside.
In order to reduce construction cost, construction material is recycled, junction block 132 is removably attachable to plugging plate 131. Specifically, the inwall of the connecting hole of plugging plate 131 is outer formed with matching with internal thread formed with internal thread, junction block 132 Screw thread, junction block 132 are threadedly connected to connecting hole.
In the present embodiment, presstressed reinforcing steel (not shown in accompanying drawing) is provided with the first pipeline 11 and second pipe 12, sealed The spacing hole formed on closure plate is mainly used in plugging presstressed reinforcing steel, and spacing hole plays the position of fixed presstressed reinforcing steel.Presstressed reinforcing steel Both ends be inserted in respectively in spacing hole.After tension of prestressed tendon, presstressed reinforcing steel is welded to connect plugging plate so that prestressing force Muscle keeps tensile state.
The junction block 132 for the plugging device 13 that the first end of the first pipeline 11 in each group of prestressed pipe group 1 is set One end away from plugging plate 131 is the stock inlet of the first pipeline 11, is arranged on the junction block 132 of the first end of second pipe 12 One end away from plugging plate 131 is the grout outlet of second pipe 12, and is arranged on the junction block 132 at the second end of the first pipeline 11 The junction block 132 at the second end of second pipe 12 is communicated in by the first connecting tube.Grout outlet in first group of prestressed pipe group 1 The junction block 132 at place is communicated in the junction block at the stock inlet in next group of adjacent prestressed pipe group 1 by the second connecting tube 132。
As a kind of preferable embodiment, it is provided with the junction block of the stock inlet 110 of first group of prestressed pipe group 1 First valve, the second valve is provided with the junction block of the grout outlet 120 of second group of prestressed pipe group 1.
In the present embodiment, when carrying out circulation mud jacking, mud jacking to multigroup prestressed pipe group 1, first prestressing force is controlled The mud jacking pressure of the stock inlet 110 of pipe group 1 is 0.3MPa~0.7MPa.
As a kind of better embodiment, for the mud jacking pressure of the stock inlet 110 of first prestressed pipe group 1 of quantitative observation Power, pressure gauge is provided with to show the stock inlet 110 of first group of prestressed pipe group 1 in the stock inlet 110 of first group of prestressed pipe group 1 Mud jacking pressure value.
The utility model provides a kind of circulation mud jacking method, comprises the following steps:
S0:A set of mud jacking system for prestressed pipe is provided, this is used for the mud jacking system assembles and shape of prestressed pipe Into the circulation loop for slurry filling.
A provides a prestressed concrete member 5, and multigroup prestressed pipe group 1 is embedded with prestressed concrete member 5, more Group prestressed pipe group 1 is arranged side by side and connected successively, and prestressed pipe group 1 includes the first pipeline 11 and second pipe set in the same direction 2, the first pipeline 11 of prestress pipe 1 is located at the lower section of the second pipe 12 of prestress pipe 1.
Each group of prestressed pipe group 1 the first pipeline 11 first end formed with stock inlet 110, in each group of prestressing force The first end of the second pipe 12 of pipe group 1 is connected at the second end of the first pipeline 11 by the first connecting tube formed with grout outlet 120 The second end of second pipe 12 is passed through, the grout outlet 120 of first group of prestressed pipe group 1 is communicated in second by the second connecting tube The stock inlet 110 of group prestressed pipe group 1.First connecting tube and the second connecting tube select high voltage bearing rubber tube.
B provides multiple plugging devices 13, and multiple plugging devices 13 are respectively arranged on to the end of the first pipeline 11 and second pipe 12. Specifically, referring to Fig. 5, plugging device 13 includes plugging plate 131 and junction block 132.Plugging plate 131 is circular steel plate.Plugging plate 131 Home position offer axially disposed connecting hole and spacing hole 1311.The inwall of the connecting hole of plugging plate 131 formed with Internal thread, junction block 132 are threadedly connected to connecting hole formed with the external screw thread to match with internal thread, junction block 132.
In the present embodiment, presstressed reinforcing steel (not shown in accompanying drawing) is provided with the first pipeline 11 and second pipe 12, will More presstressed reinforcing steels are respectively arranged in the first pipeline 11 and second pipe 12.Eight pieces of plugging plates 131 are respectively arranged at first The end of pipeline 11 and second pipe 12, and being radially arranged along the first pipeline 11 and second pipe 12 of plugging plate 131.It will answer in advance The both ends of power muscle are inserted in the spacing hole of plugging plate 131 respectively.By the plugging plate 131 for being inserted with presstressed reinforcing steel be welded to connect in The inwall of first pipeline 11 and second pipe 12.Tensioned prestressing bar.Presstressed reinforcing steel after tensioning is welded to connect in plugging plate 131 so that presstressed reinforcing steel keeps tensile state.
C is pre- in one in formation stock inlet 110 on the plugging device 13 of the first end of the first pipeline 11 of a prestressed pipe group 1 Grout outlet 120 is formed on the plugging device 13 of the first end of the second pipe 112 of stress tube group 1, by the second end of the first pipeline 11 Plugging device 13 be communicated in second pipe 12 the second end plugging device 13.Connect specifically, 8 piece-root grafting head tubes 132 are distinguished into screw thread It is connected to the connecting hole of 8 pieces of plugging plates 131 so that junction block 132 is arranged at the outside of plugging plate 131.In each group of prestressed pipe One end of the remote plugging plate 131 of the junction block 132 for the plugging device 13 that the first end of the first pipeline 11 in group 1 is set is first The stock inlet of pipeline 11, the one end for being arranged on the remote plugging plate 131 of the junction block 132 of the first end of second pipe 12 are second The grout outlet of pipeline 12, and the junction block 132 for being arranged on the second end of the first pipeline 11 is communicated in second pipe by rubber tube The junction block 132 at 12 the second end.
First valve is set on junction block 132 at the stock inlet of first group of prestressed pipe group 1, in second group of prestressing force Second valve is set on junction block 132 at the grout outlet of pipe group 1.
The grout outlet 120 of first group of prestressed pipe group 2 is entered into slurry by what rubber tube was communicated in second group of prestressed pipe group 1 Mouth 110.Specifically, the junction block 132 of the first end of the second pipe 12 of first group of prestressed pipe group 2 is connected by rubber tube In the junction block 132 of the first end of the first pipeline 11 of second group of prestressed pipe group 2.In the present embodiment, junction block 132 is remote One end from plugging plate 131 is arranged with rubber tube, and the outer tube wall of rubber tube is provided with clip so that the inner tubal wall of rubber tube is close Fit in junction block to prevent slurries from revealing.
D provides slurry storing tank 2 and slurries, and slurries are stored in slurry storing tank 2.
E provides high pressure madjack pipe 3, and high pressure madjack pipe 3 is provided with mudjack 31, and the first end of high pressure madjack pipe 3 is set Below the liquid level for the slurries being stored in slurry storing tank 2, the second end of high pressure madjack pipe 3 is communicated in first group of prestressed pipe group 1 stock inlet 110, clip is set to prevent slurries from revealing on the outer tube wall of high pressure madjack pipe 3.In first group of prestressed pipe group Pressure gauge is set on high pressure madjack pipe 3 at 1 stock inlet 110.
F provides grout outlet 4, and grout outlet 4 is communicated in into the grout outlet 120 of second group of prestressed pipe group 1 and slurry storing tank 2 is formed For the circulation loop of serum recycle circulation.Specifically, the first end of grout outlet 4 is sheathed on the of second group of prestressed pipe group 1 On the junction block 132 at the second end of two pipelines 12, and clip is set to prevent slurries from revealing on the outer tube wall of grout outlet 4, then Second end of grout outlet 4 is arranged in slurry storing tank 2, then forms a complete circulation loop for serum recycle perfusion.
S1:Open mudjack 31 so that the slurries being stored in slurry storing tank 2 in advance should by high pressure madjack pipe 3 from first group The stock inlet 110 of solenoid group 1 is poured into multigroup prestressed pipe group 1.The pressure value shown according to pressure gauge so that first group pre- Pressure value at the stock inlet 110 of stress tube group 1 controls the scope in 0.3MPa~0.7MPa.
S2:In the slurries that stock inlet 110 pours into via multigroup prestressed pipe group 1 after last group of prestressed pipe group 1 Grout outlet 120 is discharged into slurry storing tank 2 by grout outlet 4 so that slurries complete the one cycle perfusion of circulation loop.
S3:Via multiple circumfusion so that the air in multigroup prestressing force group 1 is completely exhausted out.
During circumfusion, the second end of observation grout outlet 4 flows to the form of slurries in slurry storing tank 2.Serum recycle stream Morphologic appearance into slurry storing tank:It is clear water shape in the slurries of cycle grouting outflow at initial stage;In the slurry of cycle grouting mid-term outflow Liquid is thin slurry and carries bubble;In the cycle grouting later stage, the slurries of outflow are thick slurry and bubble-free.
S4:Close the grout outlet 120 of last group of prestressed pipe group 1.
When the cycle grouting later stage, when the slurries from grout outlet outflow are thick slurry and bubble-free, it is pre- to close last group Second valve of the grout outlet 120 of stress tube group 1.
S5:Close the stock inlet 110 of first group of prestressed pipe group 1 so that slurry filling is in multigroup prestressed pipe group 1.
After the grout outlet 120 of last group of prestressed pipe group 1 is closed, pressure gauge is observed, first group is then shut off and in advance should First valve of the stock inlet 110 of solenoid group 1, so far the mud jacking perfusion of two groups of prestressed pipe groups terminate.
Second embodiment
With reference to Fig. 6, the utility model provides a kind of mud jacking system for prestressed pipe, including prestressed pipe group, storage Slurry bucket, high pressure madjack pipe and grout outlet.It is in place of the difference of the present embodiment and first embodiment:It is pre- in the present embodiment The quantity of stress tube group is four groups, and the quantity of the prestressed pipe group in first embodiment is two groups, other, is not repeated herein.
Specifically, four groups of prestressed pipe groups are embedded in prestressed concrete member in advance.Four groups of prestressed pipe groups are arranged side by side And it is sequentially connected in series.Prestressed pipe group includes the first pipeline and second pipe set in the same direction.First pipeline is located at second pipe Lower section.The first end of first pipeline is communicated in second pipe formed with stock inlet 110, the second end of the first pipeline by rubber tube The second end, the first end of second pipe is formed with grout outlet 120.The grout outlet 120 of first group of prestressed pipe group passes through rubber Pipe is communicated in the stock inlet of second group of prestressed pipe group, the like, the grout outlet of the 3rd group of prestressed pipe group passes through rubber tube The stock inlet of the 4th group of prestressed pipe group is communicated in, four groups of prestressed pipe groups are sequentially connected in series to form an insertion for slurry flow Prestress pipe, the stock inlet of the prestress pipe is the stock inlet 110 of the first pipeline positioned at lower, and the pre- of the insertion should The grout outlet of hydraulic piping is the grout outlet 120 of the second pipe 12 positioned at eminence.The stock inlet position of the prestress pipe of the insertion In the lower section of the same side of the grout outlet of the prestress pipe of the insertion.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only coordinating Content disclosed in bright book, so that those skilled in the art understands and reads, being not limited to the utility model can implement Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, In the case where not influenceing the effect of the utility model can be generated and the purpose that can reach, all should still fall disclosed in the utility model Technology contents obtain and can cover in the range of.Meanwhile in this specification it is cited as " on ", " under ", "left", "right", " in Between " and " one " etc. term, be merely convenient to understanding for narration, and be not used to limit the enforceable scope of the utility model, its Relativeness is altered or modified, in the case where changing technology contents without essence, when being also considered as the enforceable category of the utility model.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality New restriction, the utility model will be used as protection domain using the scope that appended claims define.

Claims (7)

  1. A kind of 1. mud jacking system for prestressed pipe, it is characterised in that including:Multigroup prestressed pipe group, it is multigroup it is described it is pre- should Solenoid group is embedded in prestressed concrete member in advance, and multigroup prestressed pipe group is arranged side by side and is sequentially connected in series, it is described it is pre- should Solenoid group includes the first pipeline and second pipe set in the same direction, and first pipeline is located at the lower section of the second pipe, institute The first end for stating the first pipeline is communicated in described formed with stock inlet, the second end of first pipeline by the first connecting tube Second end of two pipelines, the first end of the second pipe is formed with grout outlet, and the grout outlet of prestressed pipe group leads to described in every group Cross the stock inlet that the second connecting tube is communicated in prestressed pipe group described in adjacent next group;
    Slurry storing tank, slurries are stored in the slurry storing tank;
    High pressure madjack pipe, the first end of the high pressure madjack pipe are located at below the liquid level of the slurries, the high pressure madjack pipe Second end is communicated in the stock inlet of prestressed pipe group described in first group, and the high pressure madjack pipe is provided with mudjack;And
    Grout outlet, the grout outlet and the slurry storing tank for being communicated in last group prestressed pipe group are filled with being formed for the slurries The circulation loop of slurry.
  2. 2. the mud jacking system according to claim 1 for prestressed pipe, it is characterised in that first pipeline and second The end of pipeline is respectively provided with the plugging device of mortar leakage prevention.
  3. 3. the mud jacking system according to claim 2 for prestressed pipe, it is characterised in that the plugging device includes:
    Plugging plate, is respectively equipped with the plugging plate in first pipeline and the second pipe, and the plugging plate is along described Being radially arranged for one pipeline and the second pipe, connecting hole is offered on the plugging plate;And
    Junction block, is communicated in the connecting hole, and the junction block is arranged at the outside of the plugging plate.
  4. 4. the mud jacking system according to claim 3 for prestressed pipe, it is characterised in that the inwall shape of the connecting hole Into there is internal thread, the junction block is threadedly connected to institute formed with the external screw thread to match with the internal thread, the junction block State connecting hole.
  5. 5. the mud jacking system according to claim 3 for prestressed pipe, it is characterised in that first pipeline and described Presstressed reinforcing steel, the spacing hole plugged on the plugging plate formed with the confession presstressed reinforcing steel are provided with second pipe.
  6. 6. the mud jacking system according to claim 1 for prestressed pipe, it is characterised in that prestressed pipe described in first group The mud jacking pressure of the stock inlet of group is 0.3MPa~0.7MPa.
  7. 7. the mud jacking system according to claim 1 for prestressed pipe, it is characterised in that prestressed pipe described in first group The stock inlet of group is provided with pressure gauge.
CN201721223970.3U 2017-09-22 2017-09-22 Grouting system for prestressed pipe Expired - Fee Related CN207206723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721223970.3U CN207206723U (en) 2017-09-22 2017-09-22 Grouting system for prestressed pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721223970.3U CN207206723U (en) 2017-09-22 2017-09-22 Grouting system for prestressed pipe

Publications (1)

Publication Number Publication Date
CN207206723U true CN207206723U (en) 2018-04-10

Family

ID=61822658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721223970.3U Expired - Fee Related CN207206723U (en) 2017-09-22 2017-09-22 Grouting system for prestressed pipe

Country Status (1)

Country Link
CN (1) CN207206723U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675888A (en) * 2017-09-22 2018-02-09 中国建筑土木建设有限公司 Circulating grouting system and circulating grouting method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675888A (en) * 2017-09-22 2018-02-09 中国建筑土木建设有限公司 Circulating grouting system and circulating grouting method thereof

Similar Documents

Publication Publication Date Title
CN201722685U (en) No-adhesive prestress and pile side rear grouting punching pile structure
CN102828509B (en) Joint grouting method from bottom and side of prestressed pipe pile
CN107675888A (en) Circulating grouting system and circulating grouting method thereof
CN207908334U (en) A kind of presstressed reinforcing steel material corrosion damage pilot system that can simulate complicated Geotechnical Environment
WO2020199657A1 (en) Clearance reinforcement apparatus and reinforcement method after load box self-balance testing
CN110439286A (en) A kind of liner is put more energy into joint steel pipe concrete column drag reduction jack-up construction method of weakening
CN207206723U (en) Grouting system for prestressed pipe
CN201794071U (en) Prestressed anchor rod
CN102808413B (en) Reinforcement-replacing sectional-grouting pipe with inner piston and construction method thereof
CN105568868A (en) Suspension pouring construction method for box girder hanging basket
CN109881668A (en) Foundation construction method for soft soil layer, filling soil and sand soil layer
CN110815547A (en) Prefabricated case roof beam vacuum assisted cycle mud jacking device
CN105350585B (en) The model test apparatus and model test of flocculant are injected in barged-in fill work progress
CN109795031B (en) Automatic slurry supplementing device for post-tensioning prefabricated beam slab and application method of automatic slurry supplementing device
CN109898880A (en) A kind of steel counter-force pressing plate reinforcement means with crack cob wall
CN101949273B (en) Method for plugging spring opening in drilling
CN108222513A (en) A kind of prefabricated concrete structure grout sleeve centering die device
CN107254875A (en) Pile for prestressed pipe pile grouting constructing device and method
CN207260441U (en) A kind of grout sleeve of mortar leakage prevention
CN113756301A (en) Basalt fiber accurate sectional grouting anchoring system and installation method thereof
CN105019540B (en) Method for quickly perforating hole and installing water inlet pipe in water pool
CN101550695B (en) Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method
CN206928283U (en) A kind of pile for prestressed pipe pile grouting constructing device
JP5334379B2 (en) Hollow steel pipe reinforcement method for power transmission tower
CN202688990U (en) Steel-concrete structure for reinforcing bored cast-in-place pile with insufficient concrete mark

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

CF01 Termination of patent right due to non-payment of annual fee