CN101550695B - Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method - Google Patents

Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method Download PDF

Info

Publication number
CN101550695B
CN101550695B CN2009100961313A CN200910096131A CN101550695B CN 101550695 B CN101550695 B CN 101550695B CN 2009100961313 A CN2009100961313 A CN 2009100961313A CN 200910096131 A CN200910096131 A CN 200910096131A CN 101550695 B CN101550695 B CN 101550695B
Authority
CN
China
Prior art keywords
slip casting
stake
sick
reinforced
steel twist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100961313A
Other languages
Chinese (zh)
Other versions
CN101550695A (en
Inventor
朱奎
叶长青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Kechuang Jiasi Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100961313A priority Critical patent/CN101550695B/en
Publication of CN101550695A publication Critical patent/CN101550695A/en
Application granted granted Critical
Publication of CN101550695B publication Critical patent/CN101550695B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction method of reinforcing broken stump by using prestress Steel twist-beam replacement grouting method, includes using stiffness steel twist-beam to replace incompact concrete, strength loss caused by compensating concrete defect of stump, and using high-pressure groutig method to form the steel twist-beam and the stump body into a whole, the construction steps including: a) drilliing, b) cleaning holes, c) bottom of the holes is provided with anchorage and steel twist-beam, d) prestress strengthing, e) grouting and sealing. Because in the invention provided broken stump reinforcing method, using stiffness steel twist-beam to replace incompact concrete, strength loss caused by compensating concrete defect of stump, and using high-pressure groutig method to form the steel twist-beam and the stump body into a whole, so the broken stump can be integrated into a whole for improving its intensity.

Description

The prestress steel twist-beam replacement slip casting method is reinforced the job practices of sick stake
Technical field
The present invention relates to a kind of prestress steel twist-beam replacement slip casting method and reinforce the job practices of sick stake.
Background technology
The large diameter pile concrete can cause the bad phenomenon such as hole, serious segregation because of construction wrong.The sick stake of this class inner concrete intensity is very low, has caused concrete crushing strength inadequate, and is larger thereby bearing capacity reduces.And this class stake effect aspect carrying is larger, is generally a post or two posts etc., and this type of situation is difficult to process after mass defect occurring.
Summary of the invention
The technical problem that the present invention solves is to provide a kind of not high prestress steel twist-beam replacement slip casting method that causes the inadequate problem of bearing capacity of large diameter pile inner concrete intensity that can solve and reinforces the job practices of sick stake.
For this reason, prestress steel twist-beam replacement slip casting method provided by the invention is reinforced the job practices of sick stake, comprise with the loose concrete of stiffness steel twist-beam replacement, the loss of strength that compensation pile concrete defect causes, and adopt high pressure grouting method to make steel skein and pile concrete form an integral body, its construction sequence comprises:
A) boring.
B) clear hole.
C) bury ground tackle and steel skein at the bottom of hole underground.
D) prestressed stretch-draw.
E) injection hole sealing.
Owing to adopting the loose concrete of stiffness steel twist-beam replacement in sick stake reinforcement means provided by the invention, the loss of strength that compensation pile concrete defect causes, and adopt high pressure grouting method to make steel skein and pile concrete form an integral body, therefore sick stake can be integrated into as a wholely, strengthen its intensity.
Description of drawings
It is the stake after the job practices processing that the prestress steel twist-beam replacement slip casting method is reinforced sick stake in figure
In each accompanying drawing: 1, steel skein, 2 injecting cement pastes, 3, concrete.
The specific embodiment
Below describe the present invention, its invention construction sequence is as follows:
A) boring
Boring will be noted the requirement of verticality, and the verticality of boring is controlled in 0.8%, avoids boring to deflect away from pile body, causes the string hole, causes the destruction to pile body.
B) clear hole
Adopt floral tube to rinse pile bottom sediment, flushing pressure is controlled at 1.5~3MPa, stops punching after returning clear water.
C) bury ground tackle and steel skein at the bottom of hole underground.
Ground tackle adopts tapered ground tackle, with the sealing of 50cm high-strength cement slurry.Carry out prestressed stretch-draw after high-strength cement slurry intensity reaches 100%, steel skein 1 protruded length is not less than 400mm as shown in the figure, to meet the stretch-draw requirement,
The area design formulas of steel skein 1 is as follows:
Figure G2009100961313D00021
F in formula cFor concrete crushing strength; A is the stake section area; f c1For injecting cement paste compressive strength; A c1For the boring section area;
Figure G2009100961313D00022
, for the collaborative work coefficient, get 0.85~0.95; f yFor reinforcing bar compressive strength; A sFor area of reinforcement.
D) prestressed stretch-draw
Implement during prestress steel twist-beam 1 stretching construction " dual control ", namely with elongation value of stretching, check control stress for prestressing, the error between actual measurement stretch value and theoretical value should be controlled in 6%, otherwise should suspend stretch-draw, after finding out reason and taking corresponding adjustment measure, can continue stretch-draw.
Stressing sequence is: 0 → initial stress, 0.1 σ k→ 103% σ k (holding lotus 2min) → σ k, σ kFor prestress control stress.
E) injection hole sealing.
Injection hole sealing comprises pipe laying, water pressure testing, slip casting, sealing of hole Four processes, and is specific as follows:
1) burying Grouting Pipe underground is the important step that concerns grouting quality, and burying underground must be firm, with mortar leakage prevention.Basic way is: stop up closely knit with textile bag the gap of Grouting Pipe and steel skein; Grouting Pipe is exposed approximately 20~30cm of a face, adopt electricity beat setscrew and with transverse reinforcement, Grouting Pipe and its spot welding connect at stake face, overlap with the steel bar end electric welding in pipe and between the steel skein, then use high-grade cement mortar (the appropriate early strength admixture of admixture) will manage outer wrapping (only exposing mouth of pipe screw thread); Carry out slip casting after 3d.Grouting Pipe, apart from 10cm at the bottom of hole, avoids lower end Grouting Pipe outlet blocked.
2) water pressure testing
, in order to understand in hole situations such as connecting hole, pressure and midge amount, inject the clear water water pressure testing.
3) slip casting
Slip casting divides two stages, is first the pressure rise stage, then is the relative voltage stabilizing stage, stops slip casting when grout absorption reaches the final midge amount of design.In the grouting construction process, grouting pressure can progressively rise generally, and can keep voltage stabilizing, illustrate slurries all the time in pile body and the pile top position spread and permeate, grouting effect can meet instructions for use.As find grouting pump pressure gauge pointer indicated pressure number suddenly significantly drop wait abnormality, taked following treatment measures: 1) intermittently slip casting: stop 2~3h, restart slip casting after the slurries initial set.2) reduce the slurry water gray scale, increase concentration of slurry.3) mix the swell soil of cement consumption 5% in slurries.
4) sealing of hole
After slip casting finished, shut off valve was pulled, and keeps the hole internal pressure, treats that pressure progressively dissipates, and after cement is completed initial set, the dismounting valve is pulled, with cement doping chemical pulp closed orifices.
Estimate slip casting effect and can use following formula:
n=V/V 1
In formula, n is fullness coefficient; V is the volume that pours into slurries; V 1Volume for boring.
Fullness coefficient is controlled at 2~3 under normal circumstances.
Pile center after the job practices processing that the prestress steel twist-beam replacement slip casting method is reinforced sick stake arranges steel skein 1 as shown in the figure, and steel skein 1 is peripheral parcel injecting cement paste 2 and concrete 3 successively.

Claims (10)

1. a prestress steel twist-beam replacement slip casting method is reinforced the job practices of sick stake, it is characterized in that: with stiffness steel skein (1), replace loose concrete, the loss of strength that compensation pile concrete defect causes, and adopt high pressure grouting method to make steel skein (1) and pile concrete form an integral body, its construction sequence comprises:
A) boring,
B) clear hole,
C) bury ground tackle and steel skein (1) at the bottom of hole underground,
D) prestressed stretch-draw,
E) injection hole sealing.
2. prestress steel twist-beam replacement slip casting method according to claim 1 is reinforced the job practices of sick stake, and it is characterized in that: the verticality of boring is controlled in 0.8%.
3. prestress steel twist-beam replacement slip casting method according to claim 1 and 2 is reinforced the job practices of sick stake, it is characterized in that: during clear hole, flushing pressure is controlled at 1.5~3MPa, stops punching after returning clear water.
4. prestress steel twist-beam replacement slip casting method according to claim 1 and 2 is reinforced the job practices of sick stake, it is characterized in that: adopt tapered ground tackle while burying ground tackle underground at the bottom of hole, with the sealing of 50cm high-strength cement slurry.
5. prestress steel twist-beam replacement slip casting method according to claim 3 is reinforced the job practices of sick stake, it is characterized in that: adopt tapered ground tackle while burying ground tackle underground at the bottom of hole, with the sealing of 50cm high-strength cement slurry.
6. prestress steel twist-beam replacement slip casting method according to claim 1 and 2 is reinforced the job practices of sick stake, it is characterized in that: check control stress for prestressing with elongation value of stretching during prestressed stretch-draw.
7. prestress steel twist-beam replacement slip casting method according to claim 5 is reinforced the job practices of sick stake, it is characterized in that: check control stress for prestressing with elongation value of stretching when the steel skein is implemented prestressed stretch-draw.
8. prestress steel twist-beam replacement slip casting method according to claim 1 and 2 is reinforced the job practices of sick stake, and it is characterized in that: injection hole sealing comprises pipe laying, water pressure testing, slip casting, sealing of hole Four processes.
9. prestress steel twist-beam replacement slip casting method according to claim 7 is reinforced the job practices of sick stake, and it is characterized in that: injection hole sealing comprises pipe laying, water pressure testing, slip casting, sealing of hole Four processes.
10. prestress steel twist-beam replacement slip casting method according to claim 8 is reinforced the job practices of sick stake, it is characterized in that: during pipe laying, Grouting Pipe is apart from 10cm at the bottom of hole.
CN2009100961313A 2009-02-10 2009-02-10 Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method Active CN101550695B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100961313A CN101550695B (en) 2009-02-10 2009-02-10 Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100961313A CN101550695B (en) 2009-02-10 2009-02-10 Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method

Publications (2)

Publication Number Publication Date
CN101550695A CN101550695A (en) 2009-10-07
CN101550695B true CN101550695B (en) 2013-11-13

Family

ID=41155166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100961313A Active CN101550695B (en) 2009-02-10 2009-02-10 Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method

Country Status (1)

Country Link
CN (1) CN101550695B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345292B (en) * 2011-07-21 2016-01-27 从卫民 A kind of composite prestressed uplift pile with enlarged footing
CN103174135B (en) * 2011-12-23 2015-06-03 五冶集团上海有限公司 Repair method of unqualified post-grouting bored concrete pile
CN103225300B (en) * 2013-04-18 2015-03-18 贵州建工集团第二建筑工程有限责任公司 Process and equipment for reinforcing and strengthening concrete filling pile
CN109680737B (en) * 2017-10-18 2021-05-07 中车株洲电力机车研究所有限公司 Foundation deviation correction construction method for wind generating set
CN111945716A (en) * 2020-06-22 2020-11-17 广东省建筑科学研究院集团股份有限公司 Reinforcing construction method for mud-sandwiched fractured cast-in-place pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3483707A (en) * 1968-03-11 1969-12-16 Homayoun Joe Meheen Method for reinforcing steel pipe piling in situ and the resultant piling
CN1137088A (en) * 1996-04-10 1996-12-04 李宪奎 Construction method for soil bulkhead structure
CN2365264Y (en) * 1998-12-23 2000-02-23 刘冀豪 Reinforced cast-in-place pile
CN1619063A (en) * 2004-12-08 2005-05-25 重庆交通科研设计院 Post stress method stake body prestressed antislid stake and construction method
CN1837469A (en) * 2006-03-30 2006-09-27 中铁八局集团有限公司 Stretching method for applying prestress on track slab
CN101070702A (en) * 2007-06-14 2007-11-14 北京科技大学 Single-hole composite anchoring pile

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3289085B2 (en) * 1995-05-02 2002-06-04 株式会社大阪防水建設社 Repair method of foundation pile
JP3245669B2 (en) * 1995-05-02 2002-01-15 株式会社大阪防水建設社 Repair method of foundation pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3483707A (en) * 1968-03-11 1969-12-16 Homayoun Joe Meheen Method for reinforcing steel pipe piling in situ and the resultant piling
CN1137088A (en) * 1996-04-10 1996-12-04 李宪奎 Construction method for soil bulkhead structure
CN2365264Y (en) * 1998-12-23 2000-02-23 刘冀豪 Reinforced cast-in-place pile
CN1619063A (en) * 2004-12-08 2005-05-25 重庆交通科研设计院 Post stress method stake body prestressed antislid stake and construction method
CN1837469A (en) * 2006-03-30 2006-09-27 中铁八局集团有限公司 Stretching method for applying prestress on track slab
CN101070702A (en) * 2007-06-14 2007-11-14 北京科技大学 Single-hole composite anchoring pile

Also Published As

Publication number Publication date
CN101550695A (en) 2009-10-07

Similar Documents

Publication Publication Date Title
CN101550695B (en) Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method
CN103967036B (en) Stake and sleeve grouting attachment structure and construction method thereof for offshore wind farm
KR101069815B1 (en) Post grouting system of Cast-in-place concrete piles and the post grouting method for increasing end bearing capacity at pile base
CN201722685U (en) No-adhesive prestress and pile side rear grouting punching pile structure
CN102828509B (en) Joint grouting method from bottom and side of prestressed pipe pile
JP2008150774A (en) Two step high/low concentration grout construction method
CN104846810A (en) Self-circulating posterior grouting bored pile construction method
CN104976424B (en) Anchor cable construction method for rectangular top pipe joint connecting and strengthening
CN103541359A (en) Method for repairing and treating quality defect of cast-in-place pile
CN102828498B (en) Method for constructing gravel pile of hoop of immersed tube for reinforcing soft foundation
CN103410182A (en) Unilateral pile foundation unloading horizontal top-level pull deviation rectifying and broken pile reinforcement construction method
CN101200897A (en) Construction method for grouting curtain combined with steel reinforced concrete guard ring
CN109208631A (en) A kind of gravity retaining wall inclination deviation rectification and reinforcement means
CN201241344Y (en) Controllable capsule type expansion device
CN103410144B (en) Prestressed reinforcement piles set into rock and construction method
CN102808413A (en) Reinforcement-replacing sectional-grouting pipe with inner piston and construction method thereof
CN112012749A (en) Tunnel advanced grouting small conduit and construction method
CN105714827A (en) Post-grouting construction method of cast-in-situ bored pile
CN102094421A (en) Prestressed anchor bar and construction method using same
CN111350310B (en) Reinforcing method for finding that steel bars at lower section in full grouting sleeve are cut off before grouting
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN104018499A (en) Grouting method capable of saving grouting amount on pre-stressed anchor cable tension section
CN104032738B (en) Pre-stressed anchor rod and construction method using same
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN209162840U (en) A kind of more anchor disk jet mixing stiffening piles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: ZHU KUI

Effective date: 20150604

Owner name: LAI BIN

Free format text: FORMER OWNER: YE CHANGQING

Effective date: 20150604

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 325000 WENZHOU, ZHEJIANG PROVINCE TO: 330000 NANCHANG, JIANGXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150604

Address after: 330000 Jiangxi city of Nanchang province Xihu District Xinyu garden 11 Building 2 unit 801 room

Patentee after: Lai Bin

Address before: Ouhai District of Zhejiang city in Wenzhou province 325000 Rong Road No. 39

Patentee before: Ye Changqing

Patentee before: Zhu Kui

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20091007

Assignee: CHENGDU KECHUANG JIASI TECHNOLOGY CO., LTD.

Assignor: Lai Bin

Contract record no.: 2015360000076

Denomination of invention: Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method

Granted publication date: 20131113

License type: Exclusive License

Record date: 20150610

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151125

Address after: 330000 Jiangxi city of Nanchang Province in the Tang Nan Town Nanchang County Street No. 28

Patentee after: CHENGDU KECHUANG JIASI TECHNOLOGY CO., LTD.

Address before: 330000 Jiangxi city of Nanchang province Xihu District Xinyu garden 11 Building 2 unit 801 room

Patentee before: Lai Bin

DD01 Delivery of document by public notice

Addressee: CHENGDU KECHUANG JIASI TECHNOLOGY CO., LTD.

Document name: Notification of Passing Examination on Formalities