CN109898880A - A kind of steel counter-force pressing plate reinforcement means with crack cob wall - Google Patents

A kind of steel counter-force pressing plate reinforcement means with crack cob wall Download PDF

Info

Publication number
CN109898880A
CN109898880A CN201810794719.5A CN201810794719A CN109898880A CN 109898880 A CN109898880 A CN 109898880A CN 201810794719 A CN201810794719 A CN 201810794719A CN 109898880 A CN109898880 A CN 109898880A
Authority
CN
China
Prior art keywords
crack
cob wall
fracture spaces
grouting material
pressing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810794719.5A
Other languages
Chinese (zh)
Inventor
柏文峰
刘翔
王云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Zhongqian Integrated House Co Ltd
Original Assignee
Yunnan Zhongqian Integrated House Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Zhongqian Integrated House Co Ltd filed Critical Yunnan Zhongqian Integrated House Co Ltd
Publication of CN109898880A publication Critical patent/CN109898880A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to a kind of steel counter-force pressing plate reinforcement means with crack cob wall, belongs to construction engineering technical field.The present invention by two hollow stretching screws, isolated film, snap rubber pad, steel counter-force pressing plate cob wall crack segmentation be independent fracture spaces;Open up slurry outlet among hollow stretching screw, by low-pressure grouting pipe into independent fracture spaces pressure injection grouting material.Grouting material is soil: fine sand: curing agent: sticky filler made of waterglass=2.8:4:0.15:3.Operation of the present invention is simple, low cost, and fracture closing is closely knit, can significantly improve the existing globality with crack cob wall, and then improve earth building anti-seismic performance, has significant application value to rural area dilapidated buildings renovation and rehabilitating historic building.

Description

A kind of steel counter-force pressing plate reinforcement means with crack cob wall
Technical field
The present invention relates to a kind of steel counter-force pressing plate reinforcement means with crack cob wall, belongs to construction engineering technical field.
Background technique
Cob wall largely exists in China's traditional countryside house, is the important component of traditional architecture culture.By tradition More crack is often distributed in building technology limitation, traditional cob wall, these cracks reduce the globality of cob wall, shock resistance Deficiency, all previous larger earthquake all bring serious life and property loss to occupant.Crack on cob wall is also mouse worm disengaging room The channel in room leads to indoor sanitation worsening condition, is unfavorable for the health of occupant.In China rural area dilapidated buildings renovation (abbreviation agriculture danger Change) in work, cob wall load-bearing earthquake-resistant building strengthening reconstruction is a difficult field, and traditional cob wall house is rural area spy again The important component of color style and features is the important carrier of traditional architecture culture, and therefore, the cob wall crack of developing low-cost, which reinforces, mends Strong method improves traditional cob wall load-carrying members agriculture room anti-seismic performance, reduces to remove and rebuild, and working China's agriculture transformation of dangerous building and retaining passes Traditional earth building characteristic is held to be of great significance.
Summary of the invention
The technical problem to be solved by the present invention is to by a kind of steel counter-force pressing plate reinforcement means with crack cob wall, with two Hollow stretching screw, isolated film, snap rubber pad, steel counter-force pressing plate cob wall crack segmentation be independent fracture spaces, with The means to break the whole up into parts, fracture carry out segmentation repairing, to improve the existing globality with crack cob wall, and then improve the raw-soil and build Build anti-seismic performance.
The technical scheme is that a kind of 1, steel counter-force pressing plate reinforcement means with crack cob wall
Step 1: successively by isolated film (5), snap rubber pad (6), steel counter-force pressing plate (7) stacked alignment form fixation kit, Two holes are bored in the fixation kit both sides suitable position of stacking, hole size can be such that hollow stretching screw passes through;
Step 2: since the initial position in cob wall (1) crack, will by isolated film (5), snap rubber pad (6), steel counter-force pressure The fixation kit of plate (7) composition is temporarily fixed along the direction in cob wall (1) crack, is made by isolated film (5), is snapped rubber pad (6), the gap in position of opening alignment cob wall (1) crack of the fixation kit of steel counter-force pressing plate (7) composition;
Step 3: along by isolated film (5), snap the hole position of rubber pad (6), the fixation kit that steel counter-force pressing plate (7) forms The aperture on cob wall (1) is set, aperture size is consistent with fixation kit;
Step 4: the hole determined successively is penetrated with the hollow stretching screw of lower hollow stretching screw (14) and top (3), and Castle nut (12) is put on to tighten, by isolated film (5), snap rubber pad (6), steel counter-force pressing plate (7) is fixed on cob wall (1) Two sides;
Step 5: low-pressure grouting pipe (8) being covered in one end of lower hollow stretching screw (14), the other end is blocked with pipe close (9). It is blocked simultaneously in one end of the hollow stretching screw in top (3) with pipe close (9), the other end is kept unimpeded;
Step 6: opening slip casting valve, slip casting starting at low-pressure grouting pipe (8);
Step 7: one end that slip casting to the hollow stretching screw in top (3) is open begins with slurries and oozes, and closes slip casting valve, completes The perfusion of this independent fracture spaces (13);
Step 8: being ejected this hollow stretching screw in independent fracture spaces (13) lower end (3) with stifled slurry bamboo trunk (15).Lower end is hollow After stretching screw (3) is ejected cob wall, stifled slurry bamboo trunk (15) is retained in cob wall;
Step 9: will by isolated film (5), snap rubber pad (6), fixation kit that steel counter-force pressing plate (7) forms it is hollow with top Stretching screw (3) is axis rotation, turns to next section of fractuer direction, and the lower part position of opening of fixation kit is made to be directed at crack gaps. Lower hollow stretching screw (14) becomes the hollow stretching screw in top (3) at this time, forms new independent fracture spaces (13);
Step 3 ~ 9 are repeated, until glued crack finishes, remove associated fixture, so far a kind of steel counter-force with crack loam wall The construction of pressing plate reinforcement means finishes.
The hollow stretching screw (3) (14) is equipped with the slurry outlet (4) of 4 different directions on tube wall, is convenient for independence Grouting material (11) are injected in fracture spaces (13), to clog independent fracture spaces (13);Or it is convenient for independent fracture spaces (13) Interior grouting material (11) is overflowed, to judge whether slip casting is closely knit in independent fracture spaces (13).
It is described by tightening castle nut (12) so that snap rubber pad (6) be pressurized be tightly attached to cob wall surface, due to snapping Rubber pad (6) has the ability of flexible deformation, can compress on cob wall (1) independent fracture spaces (13) rough table nearby Face squeeze out grouting material (11) will not from cob wall surface and be lost;
It is described to snap between rubber pad (6) and independent fracture spaces (13) setting isolated film (5), will snap rubber pad (6) with Grouting material (11) is isolated in independent fracture spaces (16), and the alkaline corrosion of grouting material (11) is avoided to snap rubber pad (6), to maintain The flatness on rubber pad (6) surface is snapped, the service life for snapping rubber pad (6) is extended.
The grouting material is soil: fine sand: curing agent: sticky filler made of waterglass=2.8:4:0.15:3, after solidification There is good bonding with cob wall (1), reinforces the globality of cracking cob wall, improve the bearing capacity and anti-seismic performance of cob wall.
It is described by the hollow stretching screw in top (3) with slurry outlet (4), lower hollow stretching screw (14), isolated film (5), rubber pad (6), steel counter-force pressing plate (7) are snapped, the crack (2) of loam wall (1) is divided into independent fracture spaces (13).Solely Vertical fracture spaces (13) are the sub-fractions of cob wall primary fracture (2), and grouting material (11) is facilitated to inject, and are easy to grouting material (11) expansion Dissipate full entire independent fracture spaces (13).
It is described after independent fracture spaces (13) slip casting, with the independent fracture spaces of stifled slurry bamboo trunk (10) ejection (13) lower hollow stretching screw (14), then by isolated film (5), snap rubber pad (6), steel counter-force pressing plate (7) around not tearing open The hollow stretching screw (3) of another removed rotates by a certain angle, and is pressed on cob wall (1) crack, then penetrates the hollow drawing in top Tight screw rod (3), tightens castle nut (12), can form a new independent fracture spaces (13), Xiang Duli fracture spaces (13) it fills grouting material (11), such circulate operation, the whole crack of existing cob wall can be completed fills up work.
After there is grouting material (11) spilling in independent fracture spaces (13) upper end hollow stretching screw (3) one end, pipe close is used (9) it clogs, continues to inject grouting material (11), until independent fracture spaces (13) upper end hollow stretching screw (3) other end also has After grouting material (11) overflows, it is closely knit to can determine whether that independent fracture spaces (13) interior slip casting fills.
After the completion of the interior slip casting of the independent fracture spaces (13), with stifled slurry bamboo trunk (15) by independent fracture spaces (13) lower end Hollow stretching screw (3) ejection.After the hollow stretching screw in lower end (3) is ejected cob wall, stifled slurry bamboo trunk (15) is retained in cob wall, While realizing that hollow thread pull rod (14) are reusable, ensure that independent fracture spaces (13) interior grouting material (11) is blocked slurry Bamboo trunk (10) closing, avoids grouting material (11) from flowing out, maintains independent fracture spaces (13) interior grouting material (11) to fill closely knit.
The beneficial effects of the present invention are:
1, longer crack is divided into shorter crack and carries out slip casting by the thinking to break the whole up into parts, and is easy to guarantee that slip casting is closely knit full, By reinforcing the reparation that cob wall crack is segmented the globality of entire cob wall, the seismic hardening to rural area cob wall load-bearing house is played Effect;
2, by the reinforcement and repair to a large amount of old cob walls, so that Traditional Rural characteristic style and features is proud to continue;
3, material cost, and the recycling of entire reinforcement feature are controlled by research to injecting paste material, be truly realized with The technical solution of rural area cob wall crack reinforcement and strengthening under premised on low cost.
Detailed description of the invention
Fig. 1 is that cob wall crack of the present invention reinforces elevational schematic view;
Fig. 2 is that cob wall crack of the present invention reinforces diagrammatic cross-section;
Fig. 3 is that cob wall crack of the present invention reinforces hollow stretching screw schematic diagram;
Fig. 4 is Component composition schematic diagram of the present invention.
In figure: 1- cob wall, the crack 2-, the hollow stretching screw in the top 3-, 4- slurry outlet, 5- isolated film, 6- snap rubber Pad, the stifled slurry bamboo trunk of 7- steel counter-force pressing plate, 8- low-pressure grouting pipe, 9- pipe close, 10-, 11- grouting material, 12- castle nut, 13- are independent Fracture spaces, 14- lower hollow stretching screw.
Specific embodiment
With reference to the accompanying drawings and detailed description, the invention will be further described.
Embodiment 1: preparing the grouting material (11) for reinforcement crack (2) first, and grouting material is soil: fine sand: curing agent: water Sticky filler made of glass=2.8:4:0.15:3.Then, successively by isolated film (5), snap rubber pad (6), steel counter-force Pressing plate (7) stacked alignment forms fixation kit, bores two holes in the fixation kit both sides suitable position of stacking, hole size can make Hollow stretching screw passes through;Since the initial position in cob wall (1) crack (2), will by isolated film (5), snap rubber pad (6), steel counter-force pressing plate (7) composition fixation kit temporarily fixed along the direction in cob wall (1) crack, make by isolated film (5), Snap the gap in position of opening alignment cob wall (1) crack of rubber pad (6), the fixation kit that steel counter-force pressing plate (7) forms;Along By isolated film (5), the hole location of rubber pad (6), the fixation kit that steel counter-force pressing plate (7) forms is snapped on cob wall (1) Aperture, aperture size are consistent with fixation kit;Successively worn with the hollow stretching screw of lower hollow stretching screw (14) and top (3) Enter the hole determined, and put on castle nut (12) and tighten, by isolated film (5), snaps rubber pad (6), steel counter-force pressing plate (7) two sides of cob wall (1) are fixed on, independent fracture spaces (13) are formed;Low-pressure grouting pipe (8) is covered and tenses spiral shell in lower hollow One end of bar (14), the other end are blocked with pipe close (9).Slip casting valve is opened, is started at low-pressure grouting pipe (8) to independent crack Grouting material (11) are injected in space (13);One end of slip casting to the hollow stretching screw in top (3) begins with grouting material (11) spilling, At this point, one end that the hollow stretching screw in top (3) overflows grouting material (11) is blocked with pipe close (9), the other end is kept unimpeded;After Continuous injection grouting material (11), until the other end has grouting material (11) spilling.Slip casting valve is closed, this independent fracture spaces is completed (13) perfusion;This independent fracture spaces (13) lower hollow stretching screw (14) is ejected with stifled slurry bamboo trunk (15).Lower end is empty After heart stretching screw (14) is ejected cob wall (1), stifled slurry bamboo trunk (15) is retained in cob wall, and grouting material (11) is prevented to flow out;It will By isolated film (5), snap rubber pad (6), fixation kit that steel counter-force pressing plate (7) forms is with the hollow stretching screw in top (3) For axis rotation, next section of fractuer direction is turned to, the top position of opening of fixation kit is made to be directed at crack (2) gap.Top at this time Hollow stretching screw (3) becomes lower hollow stretching screw (14), forms new independent fracture spaces (13), passes through lower hollow Stretching screw (14) injects grouting material (11) into new independent fracture spaces (13);Above step is repeated, until crack (2) are complete Portion is full of by grouting material (11), removes associated fixture, and so far a kind of steel counter-force pressing plate reinforcement means with crack loam wall is applied Work finishes.

Claims (9)

1. a kind of steel counter-force pressing plate reinforcement means with crack cob wall, it is characterised in that: including the hollow tension with slurry outlet (4) Screw rod (3), isolated film (5) snap rubber pad (6), steel counter-force pressing plate (7) crack (2) of loam wall (1) are divided into independence Fracture spaces (13);
There is the hollow stretching screw in top (3) in independent fracture spaces (13) upper end, and there is a lower hollow stretching screw in lower end (14);
Tighten castle nut (12), make isolated film (5), snap rubber pad (6), steel counter-force pressing plate (7) is tightly attached to crack (2) Other loam wall surface;With low-pressure grouting pipe (8) by the lower hollow stretching screws (14) of independent fracture spaces (13) to only Vertical fracture spaces (13) interior pressure injection grouting material (11);
When there is grouting material (11) spilling in independent fracture spaces (13) top hollow stretching screw (3) side, clogged with pipe close (9) One end that the hollow stretching screw in top (3) has grouting material (11) to overflow, then proceedes to the interior pressure injection grouting material of fracture spaces (13) (11), until stopping when independent fracture spaces (13) upper end hollow stretching screw (3) other side also has grouting material (11) spilling Slip casting;
Loosen castle nut (12), ejects independent fracture spaces (13) lower hollow thread (14) with stifled slurry bamboo trunk (10);
Centered on the top hollow thread pull rod (13) of reservation, rotation isolated film (5) snaps rubber pad (6), steel counter-force pressure Plate (7) covers next section of crack (2), is inserted into the hollow stretching screw in top (3) in the upper end in next section of crack, forms one Low-pressure grouting pipe (8) is connected to new independent fracture spaces (13) lower hollow at this time and tensed by new independent fracture spaces (13) The filling to new dead-end fracture space is completed, is recycled past to new independent fracture spaces (13) interior slip casting in screw rod (14) end It is multiple, until whole crack closures are completed on cob wall (1).
2. a kind of steel counter-force pressing plate reinforcement means with crack cob wall according to claim 1, it is characterised in that: hollow drawing Tight screw rod (3) (14) is equipped with the slurry outlet (4) of 4 different directions on tube wall, convenient for the injection into independent fracture spaces (13) Grouting material (11), to clog independent fracture spaces (13);Or overflowed convenient for independent fracture spaces (13) interior grouting material (11), with Judge whether slip casting is closely knit in independent fracture spaces (13).
3. a kind of steel counter-force pressing plate reinforcement means with crack cob wall according to claim 1, it is characterised in that: pass through torsion Tight castle nut (12) is tightly attached to cob wall surface so that snapping rubber pad (6) and being pressurized, and has elasticity due to snapping rubber pad (6) The ability of deformation can compress on cob wall (1) independent fracture spaces (13) rough surface nearby, make grouting material (11) no It can squeeze out and be lost from cob wall surface.
4. a kind of steel counter-force pressing plate reinforcement means with crack cob wall according to claim 1, it is characterised in that: snap rubber Isolated film (5) are set between rubber mat (6) and independent fracture spaces (13), rubber pad (6) and independent fracture spaces will be snapped (16) grouting material (11) is isolated in, and the alkaline corrosion of grouting material (11) is avoided to snap rubber pad (6), to maintain to snap rubber pad (6) flatness on surface extends the service life for snapping rubber pad (6).
5. a kind of steel counter-force pressing plate reinforcement means with crack cob wall according to claim 1, it is characterised in that: grouting material For soil: fine sand: curing agent: sticky filler made of waterglass=2.8:4:0.15:3 has after solidification with cob wall (1) good Bonding reinforces the globality of cracking cob wall, improves the bearing capacity and anti-seismic performance of cob wall.
6. a kind of steel counter-force pressing plate reinforcement means with crack cob wall according to claim 1, it is characterised in that: by taking out of Starch the hollow stretching screw in top (3) of hole (4), lower hollow stretching screw (14), isolated film (5), snap rubber pad (6), The crack (2) of loam wall (1) is divided into independent fracture spaces (13) by steel counter-force pressing plate (7);
Independent fracture spaces (13) are the sub-fractions of cob wall primary fracture (2), facilitate grouting material (11) to inject, are easy to grouting material (11) the full entire independent fracture spaces (13) of diffusion.
7. a kind of steel counter-force pressing plate reinforcement means with crack cob wall according to claim 1, it is characterised in that: when one After independent fracture spaces (13) slip casting, independent fracture spaces (13) lower hollow stretching screw is ejected with stifled slurry bamboo trunk (10) (14), then by isolated film (5), snap rubber pad (6), counter-force pressing plate (7) around another hollow stretching screw that do not remove (3) it rotates by a certain angle, is pressed on cob wall (1) crack, then penetrate the hollow stretching screw in top (3), tighten castle nut (12), a new independent fracture spaces (13) can be formed, Xiang Duli fracture spaces (13) fill grouting material (11), so follow Ring operation, the whole crack of existing cob wall can be completed fills up work.
8. a kind of steel counter-force pressing plate reinforcement means with crack cob wall according to claim 1, it is characterised in that: independently split It after there is grouting material (11) spilling in gap space (13) upper end hollow stretching screw (3) one end, is clogged with pipe close (9), continues injection and fill Slurry (11), until after independent fracture spaces (13) upper end hollow stretching screw (3) other end also has grouting material (11) spilling, it can It is closely knit to judge that independent fracture spaces (13) interior slip casting fills.
9. a kind of steel counter-force pressing plate reinforcement means with crack cob wall according to claim 1, it is characterised in that: independently split After the completion of gap space (13) interior slip casting, the hollow stretching screw in independent fracture spaces (13) lower end (3) is pushed up with stifled slurry bamboo trunk (15) Out;
After the hollow stretching screw in lower end (3) is ejected cob wall, stifled slurry bamboo trunk (15) is retained in cob wall, is realizing hollow thread drawing While bar (14) is reusable, ensures that independent fracture spaces (13) interior grouting material (11) is blocked and starch bamboo trunk (10) closing, keep away Exempt from grouting material (11) outflow, maintains independent fracture spaces (13) interior grouting material (11) to fill closely knit.
CN201810794719.5A 2017-12-07 2018-07-19 A kind of steel counter-force pressing plate reinforcement means with crack cob wall Pending CN109898880A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201721683979 2017-12-07
CN2017216839792 2017-12-07

Publications (1)

Publication Number Publication Date
CN109898880A true CN109898880A (en) 2019-06-18

Family

ID=66943097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810794719.5A Pending CN109898880A (en) 2017-12-07 2018-07-19 A kind of steel counter-force pressing plate reinforcement means with crack cob wall

Country Status (1)

Country Link
CN (1) CN109898880A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111550070A (en) * 2020-05-09 2020-08-18 上海橡树装饰工程有限公司 Deep seam repairing construction method
CN112267702A (en) * 2020-10-15 2021-01-26 深圳市众安工程技术有限公司 Crack reinforcing structure of wall body
CN114673062A (en) * 2022-04-08 2022-06-28 程志东 Crack repairing device and method for highway construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111550070A (en) * 2020-05-09 2020-08-18 上海橡树装饰工程有限公司 Deep seam repairing construction method
CN112267702A (en) * 2020-10-15 2021-01-26 深圳市众安工程技术有限公司 Crack reinforcing structure of wall body
CN112267702B (en) * 2020-10-15 2022-06-14 深圳市众安工程技术有限公司 Repairing method of crack reinforcing structure of wall
CN114673062A (en) * 2022-04-08 2022-06-28 程志东 Crack repairing device and method for highway construction
CN114673062B (en) * 2022-04-08 2024-05-17 石家庄市宏通公路建设养护有限公司 Crack repairing device and repairing method for highway construction

Similar Documents

Publication Publication Date Title
CN109898880A (en) A kind of steel counter-force pressing plate reinforcement means with crack cob wall
CN206034677U (en) Side fascia installation node
CN207176717U (en) A kind of assembly concrete foot joint of encased steel plate
CN104088254A (en) Leakage repairing device for pressure-bearing reinforced concrete structure and construction method thereof
CN206625403U (en) A kind of sleeve grouting envelope storehouse system
CN108149945A (en) A kind of quick crack repairing structure of easy construction and its construction method
CN105464396A (en) Reinforcing method for external wall of protective historical building
CN104895581A (en) Tunnel lining rapid repair structure based on carbon fiber woven mesh and repair method thereof
CN207211432U (en) A kind of stifled slurry system of sleeve grouting
CN109680675A (en) A kind of Stabilizing Grout method that can dynamically control grouting amount and harden opportunity
CN206189870U (en) Improves construction quality,
CN109339238A (en) A kind of prefabricated assembled profile steel concrete column splicing node structure and its construction method
CN204435906U (en) Planting reinforced bar into concrete device
CN208294125U (en) A kind of plugging structure in concrete exterior wall split bolt hole
CN203977368U (en) Pressure-bearing reinforced concrete structure leakage repair device
CA2838882C (en) System of tying, cleaning and re-cementing masonry using port anchors
CN105019540B (en) Method for quickly perforating hole and installing water inlet pipe in water pool
CN211817425U (en) Plugging assembly for air-permeable sleeve grouting connection or slurry anchor connection
KR101284618B1 (en) Dry way injection grouting method for concrete structure in water
CN105926650A (en) Concrete layer landslide prevention fixing device for slope building
JP6985717B2 (en) Pinning method
CN205976150U (en) Side fascia installation node
CN108755776A (en) A kind of underground structure bottom plate leak Integrated Processing Unit and its processing method
CN206220315U (en) A kind of Side fascia installs node
CN201704810U (en) Heat-preserving decorating plate capable of being rigidly connected with wall and decorating surface layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190618