CN207177303U - Rail mounted vibrating spear - Google Patents
Rail mounted vibrating spear Download PDFInfo
- Publication number
- CN207177303U CN207177303U CN201721178039.8U CN201721178039U CN207177303U CN 207177303 U CN207177303 U CN 207177303U CN 201721178039 U CN201721178039 U CN 201721178039U CN 207177303 U CN207177303 U CN 207177303U
- Authority
- CN
- China
- Prior art keywords
- vibrating spear
- caput
- rail mounted
- vibrating
- annulus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721178039.8U CN207177303U (en) | 2017-09-14 | 2017-09-14 | Rail mounted vibrating spear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721178039.8U CN207177303U (en) | 2017-09-14 | 2017-09-14 | Rail mounted vibrating spear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207177303U true CN207177303U (en) | 2018-04-03 |
Family
ID=61746359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721178039.8U Active CN207177303U (en) | 2017-09-14 | 2017-09-14 | Rail mounted vibrating spear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207177303U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374521A (en) * | 2018-04-19 | 2018-08-07 | 中国三冶集团有限公司 | A kind of construction method and its formwork erection structure of concrete profiled pile |
CN108678381A (en) * | 2018-06-29 | 2018-10-19 | 衡阳泰源商砼有限公司 | A kind of concrete vibration stick |
CN109469365A (en) * | 2018-10-20 | 2019-03-15 | 山西太行建设开发有限公司 | Dual crossing space inclined strut clear water and construction of high-performance concrete engineering method |
CN110685441A (en) * | 2019-10-30 | 2020-01-14 | 中国建筑第八工程局有限公司 | Vibrating construction method of special-shaped concrete member |
CN112431356A (en) * | 2020-11-27 | 2021-03-02 | 中国十七冶集团有限公司 | Large-slope inclined column concrete vibrating auxiliary method |
CN114135307A (en) * | 2021-12-06 | 2022-03-04 | 中铁五局集团有限公司 | Tunnel excavation and supporting equipment |
-
2017
- 2017-09-14 CN CN201721178039.8U patent/CN207177303U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374521A (en) * | 2018-04-19 | 2018-08-07 | 中国三冶集团有限公司 | A kind of construction method and its formwork erection structure of concrete profiled pile |
CN108678381A (en) * | 2018-06-29 | 2018-10-19 | 衡阳泰源商砼有限公司 | A kind of concrete vibration stick |
CN109469365A (en) * | 2018-10-20 | 2019-03-15 | 山西太行建设开发有限公司 | Dual crossing space inclined strut clear water and construction of high-performance concrete engineering method |
CN110685441A (en) * | 2019-10-30 | 2020-01-14 | 中国建筑第八工程局有限公司 | Vibrating construction method of special-shaped concrete member |
CN112431356A (en) * | 2020-11-27 | 2021-03-02 | 中国十七冶集团有限公司 | Large-slope inclined column concrete vibrating auxiliary method |
CN114135307A (en) * | 2021-12-06 | 2022-03-04 | 中铁五局集团有限公司 | Tunnel excavation and supporting equipment |
CN114135307B (en) * | 2021-12-06 | 2024-01-16 | 中铁五局集团有限公司 | Tunnel excavation, supporting equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207177303U (en) | Rail mounted vibrating spear | |
CN206267422U (en) | A kind of assembly concrete superposed column | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN105839850A (en) | Basement reverse-construction scape post-casting pre-stressed construction method | |
CN106284840B (en) | A kind of second pouring steel reinforced concrete frame beam and its construction method | |
CN206971732U (en) | A kind of doubly-linked beam forms pouring structure | |
CN104831932B (en) | A kind of construction technology of high-grade concrete suspension column | |
CN106401207A (en) | Superimposed connection structure for additionally arranging column foundation on existing building and construction method of superimposed connection structure | |
CN101487293A (en) | Concreting method with different intensity grades for beam column nodes | |
CN106760050A (en) | The attachment structure and through processing method of shear wall and after-pouring concrete frame beam | |
CN107053440A (en) | A kind of precast plate girder pedestal preparation method | |
CN107700358A (en) | The construction method of track traffic pier stud | |
CN106906841A (en) | One kind is used for lateral wall form bracing system construction | |
CN109469094A (en) | Super High bottom plate interpolation fashioned iron column construction method and fixed structure | |
CN106760502A (en) | Shear wall end cylinder construction method | |
CN108412094A (en) | The construction method and device of the hollow concrete wall of masonry between a kind of replacement shear wall | |
CN206844138U (en) | A kind of bar construction of domatic isolated footing | |
CN206829498U (en) | A kind of reinforced column tie hoop ruggedized construction | |
CN205889488U (en) | Steel sleeve box's precast reinforced concrete back cover template and hoist device thereof | |
CN209397712U (en) | The connection structure of antidetonation steel pipe in a kind of shear wall | |
CN106567329A (en) | Semi-prefabricated reinforced concrete wall type guardrail | |
CN106567328A (en) | Half-prefabricated reinforced concrete wall-type guardrail construction process | |
CN110439592A (en) | Shield tunnel two serves as a contrast concrete structure and construction method | |
CN207376882U (en) | A kind of assembly concrete variable cross-section newel post type shearing wall member and its making mold | |
CN107939094B (en) | Conical concrete funnel construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Han Yang Inventor after: Cheng Peng Inventor after: Jia Congjun Inventor after: Wang Yansheng Inventor after: Zhu Qi Inventor after: Chen Zhenhuan Inventor after: Liu Hongzhu Inventor after: Zhang Dong Inventor after: Chen Di Inventor after: Lv Xiaolong Inventor after: Qi Yushun Inventor after: Yang Hua Inventor after: Chen Linpu Inventor after: Meng Xiangyong Inventor after: Wang Chunhong Inventor after: Wang Yilie Inventor before: Han Yang Inventor before: Li Guang Inventor before: Zhang Dong Inventor before: Chen Di Inventor before: Lv Xiaolong Inventor before: Qi Yushun Inventor before: Yang Hua Inventor before: Chen Linpu Inventor before: Meng Xiangyong Inventor before: Wang Chunhong Inventor before: Wang Yilie |
|
CB03 | Change of inventor or designer information |