CN207177303U - Rail mounted vibrating spear - Google Patents

Rail mounted vibrating spear Download PDF

Info

Publication number
CN207177303U
CN207177303U CN201721178039.8U CN201721178039U CN207177303U CN 207177303 U CN207177303 U CN 207177303U CN 201721178039 U CN201721178039 U CN 201721178039U CN 207177303 U CN207177303 U CN 207177303U
Authority
CN
China
Prior art keywords
vibrating spear
caput
rail mounted
vibrating
annulus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721178039.8U
Other languages
Chinese (zh)
Inventor
韩阳
陈娣
吕小龙
齐玉顺
杨华
陈琳璞
孟祥永
王春红
王依列
李光
张东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Divison Group Huajiang Construction Co Ltd
China Construction First Divison Group Huazhong Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Divison Group Huazhong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Divison Group Huazhong Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201721178039.8U priority Critical patent/CN207177303U/en
Application granted granted Critical
Publication of CN207177303U publication Critical patent/CN207177303U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of rail mounted vibrating spear, by setting the caput of a barrel mast shape outside traditional vibrating spear, caput outer surface straight line welds some annulus hoops, and some annulus hoops are enclosed on a slideway being made up of round steel and formed jointly.Pull traditional vibrating spear, caput can be slided by annulus hoop on slideway, make it the bar-mat reinforcement for being smoothly through curved-surface structure or reinforcing bar close quarters, smoothly pass in and out concrete vibrating region, reach the vibrating spear not purpose of " card rod " and raising concrete vibrating quality.Rail mounted vibrating spear of the present utility model can both meet that irregular building mean camber concrete members were vibrated, it is equally applicable to traditional wall, post, beam, vertical and horizontal member the concrete vibrating of plate class, it is more suitable for vibrating for reinforcing bar close quarters concrete, application value is wide.Using rail mounted vibrating spear of the present utility model, effectively solve the problems, such as in building construction process the card rod of " lower rod is difficult, rod withdrawal is more difficult ", drastically increase concrete vibrating quality and perception degree.

Description

Rail mounted vibrating spear
Technical field
A kind of instrument that vibrates of concreting is the utility model is related to, more particularly to a kind of rail mounted vibrating spear.
Background technology
Vibrating spear is that concrete works vibrates the common tool of construction.Domestic irregular building emerges in an endless stream at present, superelevation Layer architectural engineering also increasing day by day, in curved-surface structure building, when component Curvature varying is larger, conventional use of vibrating spear without The radian that method adapts to curved-surface structure building changes, and the reinforcing bar system inside curved-surface structure hinders the feeding or extraction of vibrating spear.I.e. It is that concrete component under conventional sense is smash and shaken, vibrating spear shakes in reinforcing bar encrypted area or beam, Column border node reinforcing bar close quarters Tamper can not pass through bar-mat reinforcement, and vibrating spear is often blocked by bar-mat reinforcement, causes constructional difficulties of vibrating.In vibrating spear operation " lower rod is difficult, rod withdrawal is more difficult " be FAQs." card rod " phenomenon occurs during vibrating spear operation, it may appear that concrete vibrating The quality problems of leakage or owed to shake, make the concrete vibrating quality of curved-surface structure or reinforcing bar close quarters can not be guaranteed, sternly Structure safety is directly affected during weight.Therefore, vibrating spear can be made smoothly to pass in and out concrete vibrating region, it is urgently to solve to avoid " card rod " Certainly the problem of.
Utility model content
The purpose of this utility model is that to solve traditional vibrating spear to pass in and out difficulty in curved-surface structure and reinforcing bar close quarters, is shaken Tamper easily " card rod " the problem of, it is smooth to provide a kind of vibrating spear disengaging concrete vibrating region, can improve curved-surface structure or steel The rail mounted vibrating spear of muscle close quarters concrete vibrating quality.
What the purpose of this utility model was that by.The utility model rail mounted vibrating spear includes traditional vibrating spear, this Utility model rail mounted vibrating spear is characterised by:The caput of one barrel mast shape of socket outside traditional vibrating spear, caput Several annulus hoops are uniformly welded in same side, and some annulus hoops on caput are jointly outer to be enclosed on a slideway, the slideway It is located in the bar-mat reinforcement mesh of curved-surface structure or reinforcing bar close quarters and is embedded in from bottom to up in cast-in-place concrete.
The utility model rail mounted vibrating spear, wherein the slideway 4 is made up of φ 6-8mm round steel, the caput is by φ 50mm, L500mm low-carbon alloy steel are formed, and the annulus hoop is made up of φ 6-8mm steel strand wires into annular welding.
The utility model rail mounted vibrating spear, wherein the annulus hoop welded on the caput is at least provided with three, annulus hoop The spacing of each two is not more than 200mm, and the center of circle of at least three annulus hoops is on slideway center line.
The utility model rail mounted vibrating spear, wherein traditional vibrating spear is existed by the annulus hoop on caput and caput There is the sliding trace of about one dragging on slideway.
The utility model rail mounted vibrating spear difference from prior art is that the utility model rail mounted vibrating spear is Will the caput of a barrel mast shape be set, caput outer surface straight line welds several annulus hoops, Ruo Ganyuan outside traditional vibrating spear Hoop is jointly outer to be enclosed on a slideway being made up of round steel.Traditional vibrating spear is pulled, caput is slided on slideway, is made it The reinforcing bar mesh of curved-surface structure or reinforcing bar close quarters is passed through, concrete vibrating region is smoothly extracted, reaches vibrating spear not " card rod " and the purpose for improving concrete vibrating quality.Rail mounted vibrating spear of the present utility model, can both meet irregular building Mean camber concrete members are vibrated, and are readily applicable to traditional wall, post, beam, vertical and horizontal member the concrete of plate class Vibrate, be more suitable for vibrating for reinforcing bar close quarters concrete, application value is wide.Using rail mounted vibrating spear of the present utility model, Effectively solve the problems, such as in building construction process the card rod of " lower rod is difficult, rod withdrawal is more difficult ", drastically increase coagulation Native vibration compacting degree and impression quality.
Rail mounted vibrating spear of the present utility model is described further below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model rail mounted vibrating spear.
Fig. 2 is application schematic diagram of the utility model rail mounted vibrating spear under vertical intensive reinforcing bar mesh state.
Fig. 3 is application schematic diagram of the utility model rail mounted vibrating spear under curved-surface structure reinforcing bar mesh state.
Embodiment
As shown in Figure 1, Figure 2 and Figure 3, the utility model rail mounted vibrating spear is realized using traditional vibrating spear 1.This reality With new rail mounted vibrating spear be outside traditional vibrating spear 1 be socketed a barrel mast shape caput 2, the same side of caput 2 Uniformly weld several annulus hoops 3, some annulus hoops 3 on caput 2 are common outer to be enclosed on what is realized on a slideway 4.This practicality The slideway 4 of new rail mounted vibrating spear is located in the mesh of bar-mat reinforcement 5 of curved-surface structure or reinforcing bar close quarters and from bottom to up Ground is embedded in cast-in-place concrete 6.
In the utility model rail mounted vibrating spear, slideway 4 is made up of φ 6-8mm round steel, the caput 2 by φ 50mm, L500mm low-carbon alloy steel is formed, and the annulus hoop 3 is made up of φ 6-8mm steel strand wires into annular welding.
In the utility model rail mounted vibrating spear, the annulus hoop 3 that is welded on caput 2 is at least provided with three, annulus hoop 3 every two Individual spacing is not more than 200mm, and the center of circle of at least three annulus hoops 3 is on the center line of slideway 4.
In the utility model rail mounted vibrating spear, traditional vibrating spear 1 is by the annulus hoop 3 on caput 2 and caput 2 in cunning There is the sliding trace of about one dragging on road 4.
Use the utility model rail mounted vibrating spear:In caput 2(Such as Fig. 1)After completing, by the way that track 4 is penetrated into circle The mode of hoop 3 connects caput 2 and track 4(Such as Fig. 2, Fig. 3)Together.By caput 2 along delivering to component to be poured before pouring Bottom.Progressively traditional vibrating spear 1 is pulled upwards in concreting process, finally takes out traditional vibrating spear along track 4 1,4 exposed portion of track is cut away after the completion of pouring.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality New scope is defined, and on the premise of the utility model design spirit is not departed from, those of ordinary skill in the art are to this The various modifications and improvement that the technical scheme of utility model is made, the protection of the utility model claims book determination all should be fallen into In the range of.

Claims (4)

1. a kind of rail mounted vibrating spear, including traditional vibrating spear(1), it is characterised in that:Traditional vibrating spear(1)Outside socket The caput of one barrel mast shape(2), caput(2)Same side uniformly weld several annulus hoops(3), caput(2)On it is some Annulus hoop(3)A slideway is enclosed on outside common(4)On, the slideway(4)It is located at the reinforcing bar of curved-surface structure or reinforcing bar close quarters Net(5)It is embedded in mesh and from bottom to up cast-in-place concrete(6)In.
2. rail mounted vibrating spear according to claim 1, it is characterised in that:The slideway(4)By φ 6-8mm round steel structures Into the caput(2)It is made up of φ 50mm, L500mm low-carbon alloy steel, the annulus hoop(3)By φ 6-8mm steel strand wires into Annular welding is made.
3. rail mounted vibrating spear according to claim 1 or 2, it is characterised in that:The caput(2)The annulus hoop of upper welding (3)At least provided with three, annulus hoop(3)The spacing of each two is not more than 200mm, at least three annulus hoops(3)Center of circle Jun Chu In slideway(4)On center line.
4. rail mounted vibrating spear according to claim 3, it is characterised in that:Traditional vibrating spear(1)Pass through caput(2) And caput(2)On annulus hoop(3)In slideway(4)The upper sliding trace with about one dragging.
CN201721178039.8U 2017-09-14 2017-09-14 Rail mounted vibrating spear Active CN207177303U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721178039.8U CN207177303U (en) 2017-09-14 2017-09-14 Rail mounted vibrating spear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721178039.8U CN207177303U (en) 2017-09-14 2017-09-14 Rail mounted vibrating spear

Publications (1)

Publication Number Publication Date
CN207177303U true CN207177303U (en) 2018-04-03

Family

ID=61746359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721178039.8U Active CN207177303U (en) 2017-09-14 2017-09-14 Rail mounted vibrating spear

Country Status (1)

Country Link
CN (1) CN207177303U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374521A (en) * 2018-04-19 2018-08-07 中国三冶集团有限公司 A kind of construction method and its formwork erection structure of concrete profiled pile
CN108678381A (en) * 2018-06-29 2018-10-19 衡阳泰源商砼有限公司 A kind of concrete vibration stick
CN109469365A (en) * 2018-10-20 2019-03-15 山西太行建设开发有限公司 Dual crossing space inclined strut clear water and construction of high-performance concrete engineering method
CN110685441A (en) * 2019-10-30 2020-01-14 中国建筑第八工程局有限公司 Vibrating construction method of special-shaped concrete member
CN112431356A (en) * 2020-11-27 2021-03-02 中国十七冶集团有限公司 Large-slope inclined column concrete vibrating auxiliary method
CN114135307A (en) * 2021-12-06 2022-03-04 中铁五局集团有限公司 Tunnel excavation and supporting equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374521A (en) * 2018-04-19 2018-08-07 中国三冶集团有限公司 A kind of construction method and its formwork erection structure of concrete profiled pile
CN108678381A (en) * 2018-06-29 2018-10-19 衡阳泰源商砼有限公司 A kind of concrete vibration stick
CN109469365A (en) * 2018-10-20 2019-03-15 山西太行建设开发有限公司 Dual crossing space inclined strut clear water and construction of high-performance concrete engineering method
CN110685441A (en) * 2019-10-30 2020-01-14 中国建筑第八工程局有限公司 Vibrating construction method of special-shaped concrete member
CN112431356A (en) * 2020-11-27 2021-03-02 中国十七冶集团有限公司 Large-slope inclined column concrete vibrating auxiliary method
CN114135307A (en) * 2021-12-06 2022-03-04 中铁五局集团有限公司 Tunnel excavation and supporting equipment
CN114135307B (en) * 2021-12-06 2024-01-16 中铁五局集团有限公司 Tunnel excavation, supporting equipment

Similar Documents

Publication Publication Date Title
CN207177303U (en) Rail mounted vibrating spear
CN206267422U (en) A kind of assembly concrete superposed column
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN105839850A (en) Basement reverse-construction scape post-casting pre-stressed construction method
CN106284840B (en) A kind of second pouring steel reinforced concrete frame beam and its construction method
CN206971732U (en) A kind of doubly-linked beam forms pouring structure
CN104831932B (en) A kind of construction technology of high-grade concrete suspension column
CN106401207A (en) Superimposed connection structure for additionally arranging column foundation on existing building and construction method of superimposed connection structure
CN101487293A (en) Concreting method with different intensity grades for beam column nodes
CN106760050A (en) The attachment structure and through processing method of shear wall and after-pouring concrete frame beam
CN107053440A (en) A kind of precast plate girder pedestal preparation method
CN107700358A (en) The construction method of track traffic pier stud
CN106906841A (en) One kind is used for lateral wall form bracing system construction
CN109469094A (en) Super High bottom plate interpolation fashioned iron column construction method and fixed structure
CN106760502A (en) Shear wall end cylinder construction method
CN108412094A (en) The construction method and device of the hollow concrete wall of masonry between a kind of replacement shear wall
CN206844138U (en) A kind of bar construction of domatic isolated footing
CN206829498U (en) A kind of reinforced column tie hoop ruggedized construction
CN205889488U (en) Steel sleeve box's precast reinforced concrete back cover template and hoist device thereof
CN209397712U (en) The connection structure of antidetonation steel pipe in a kind of shear wall
CN106567329A (en) Semi-prefabricated reinforced concrete wall type guardrail
CN106567328A (en) Half-prefabricated reinforced concrete wall-type guardrail construction process
CN110439592A (en) Shield tunnel two serves as a contrast concrete structure and construction method
CN207376882U (en) A kind of assembly concrete variable cross-section newel post type shearing wall member and its making mold
CN107939094B (en) Conical concrete funnel construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Han Yang

Inventor after: Cheng Peng

Inventor after: Jia Congjun

Inventor after: Wang Yansheng

Inventor after: Zhu Qi

Inventor after: Chen Zhenhuan

Inventor after: Liu Hongzhu

Inventor after: Zhang Dong

Inventor after: Chen Di

Inventor after: Lv Xiaolong

Inventor after: Qi Yushun

Inventor after: Yang Hua

Inventor after: Chen Linpu

Inventor after: Meng Xiangyong

Inventor after: Wang Chunhong

Inventor after: Wang Yilie

Inventor before: Han Yang

Inventor before: Li Guang

Inventor before: Zhang Dong

Inventor before: Chen Di

Inventor before: Lv Xiaolong

Inventor before: Qi Yushun

Inventor before: Yang Hua

Inventor before: Chen Linpu

Inventor before: Meng Xiangyong

Inventor before: Wang Chunhong

Inventor before: Wang Yilie

CB03 Change of inventor or designer information