CN110439592A - Shield tunnel two serves as a contrast concrete structure and construction method - Google Patents
Shield tunnel two serves as a contrast concrete structure and construction method Download PDFInfo
- Publication number
- CN110439592A CN110439592A CN201910729720.4A CN201910729720A CN110439592A CN 110439592 A CN110439592 A CN 110439592A CN 201910729720 A CN201910729720 A CN 201910729720A CN 110439592 A CN110439592 A CN 110439592A
- Authority
- CN
- China
- Prior art keywords
- arch
- concrete
- antiarch
- concrete layer
- following
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 121
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 239000011376 self-consolidating concrete Substances 0.000 claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 238000005086 pumping Methods 0.000 claims abstract description 13
- 238000007569 slipcasting Methods 0.000 claims description 18
- 239000000463 material Substances 0.000 claims description 15
- 238000005266 casting Methods 0.000 claims description 9
- 238000009415 formwork Methods 0.000 claims description 6
- 230000002000 scavenging effect Effects 0.000 claims description 6
- 239000002689 soil Substances 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 5
- 230000015271 coagulation Effects 0.000 claims description 4
- 238000005345 coagulation Methods 0.000 claims description 4
- 239000003566 sealing material Substances 0.000 claims description 4
- 239000002002 slurry Substances 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000009471 action Effects 0.000 abstract description 5
- 230000006872 improvement Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910729720.4A CN110439592A (en) | 2019-08-08 | 2019-08-08 | Shield tunnel two serves as a contrast concrete structure and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910729720.4A CN110439592A (en) | 2019-08-08 | 2019-08-08 | Shield tunnel two serves as a contrast concrete structure and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110439592A true CN110439592A (en) | 2019-11-12 |
Family
ID=68433989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910729720.4A Pending CN110439592A (en) | 2019-08-08 | 2019-08-08 | Shield tunnel two serves as a contrast concrete structure and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110439592A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939463A (en) * | 2019-11-21 | 2020-03-31 | 中铁隧道局集团有限公司 | Movable full-section integral steel mould lining trolley and application thereof in pumping and pouring of secondary lining concrete |
CN113833480A (en) * | 2021-09-29 | 2021-12-24 | 成都建工第九建筑工程有限公司 | Shield initial tunneling and arrival construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104295305A (en) * | 2014-02-12 | 2015-01-21 | 齐洪军 | Process for achieving synchronous implementation of lining vault filling grouting and tunnel lining and equipment |
CN107762532A (en) * | 2016-08-23 | 2018-03-06 | 中铁十局集团第工程有限公司 | Tunnel vault band mould grouting construction method |
CN210686009U (en) * | 2019-08-08 | 2020-06-05 | 广东水电二局股份有限公司 | Shield tunnel two-lining concrete structure |
-
2019
- 2019-08-08 CN CN201910729720.4A patent/CN110439592A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104295305A (en) * | 2014-02-12 | 2015-01-21 | 齐洪军 | Process for achieving synchronous implementation of lining vault filling grouting and tunnel lining and equipment |
CN107762532A (en) * | 2016-08-23 | 2018-03-06 | 中铁十局集团第工程有限公司 | Tunnel vault band mould grouting construction method |
CN210686009U (en) * | 2019-08-08 | 2020-06-05 | 广东水电二局股份有限公司 | Shield tunnel two-lining concrete structure |
Non-Patent Citations (2)
Title |
---|
王利民等: "洞桩法暗挖地铁车站关键节点防水施工技术", 《铁道建筑》, 31 May 2012 (2012-05-31), pages 70 - 73 * |
耿新胜: "隧洞二衬混凝土施工工艺", 《黑龙江水利科技》, 30 April 2013 (2013-04-30), pages 17 - 19 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939463A (en) * | 2019-11-21 | 2020-03-31 | 中铁隧道局集团有限公司 | Movable full-section integral steel mould lining trolley and application thereof in pumping and pouring of secondary lining concrete |
CN113833480A (en) * | 2021-09-29 | 2021-12-24 | 成都建工第九建筑工程有限公司 | Shield initial tunneling and arrival construction method |
CN113833480B (en) * | 2021-09-29 | 2024-05-24 | 成都建工第九建筑工程有限公司 | Construction method for initial tunneling and arrival of shield |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207739264U (en) | A kind of Grouting Pipe | |
CN207177303U (en) | Rail type vibrating rod | |
CN110439592A (en) | Shield tunnel two serves as a contrast concrete structure and construction method | |
CN108385986A (en) | A kind of device and method ensureing constructional column reinforcement location | |
CN104652371B (en) | The glue of crossing set up based on old dam coagulates rock-fill dams and construction method thereof | |
CN107012861B (en) | A kind of discrete material core expansive concrete stake and its construction method | |
CN107489432A (en) | Tunnel support grouting equipment and its grouting method | |
CN208472708U (en) | A kind of grouting behind shaft or drift lining filling pile structure | |
CN206495331U (en) | A kind of easy reassembling type built-in fitting of builder's jack | |
CN105937221A (en) | Manufacturing method for drilled grouting piles | |
CN209429263U (en) | A kind of prefabricated column connected node fixing templates | |
CN109989395A (en) | A kind of large-scale storage tank bored concrete pile assembled pile cover and its construction method | |
CN109750832A (en) | A kind of construction method of constructional column concrete self-compaction | |
CN206971247U (en) | Concrete toe board foundation reinforcing structure arranged on unloading rock mass | |
CN103741651B (en) | A kind of concrete teeth groove stiling basin and construction method thereof | |
CN205714221U (en) | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure | |
CN205475206U (en) | Drainage formula cast in situ concrete thin wall tubular pile | |
CN205577430U (en) | Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground | |
CN207813015U (en) | Floor slab preformed hole tool-typed formwork support construction | |
CN205976503U (en) | Vertical concrete structure's template lacing device | |
CN108193706A (en) | A kind of downward construction concrete pouring procedure of part contrary sequence method vertical structure | |
CN212003113U (en) | Broken rock mass slip casting is with only thick liquid device | |
CN211008658U (en) | Construction structure for preventing two lining vault from being hollow at railway tunnel vault | |
CN210686009U (en) | Shield tunnel two-lining concrete structure | |
CN106761823A (en) | Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Country or region after: China Address after: 511340 20 / F, A-1 business center, Shuidian Plaza, building 1, Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province Applicant after: Guangdong Construction Engineering Group Co.,Ltd. Address before: 511340 20 / F, A-1 business center, Shuidian Plaza, building 1, Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province Applicant before: GUANGDONG NO. 2 HYDROPOWER ENGINEERING Co.,Ltd. Country or region before: China |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20240620 Address after: Room 1201-1208, Building 1, No. 1 Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province, 511340 Applicant after: Guangdong Hydropower Second Bureau Group Co.,Ltd. Country or region after: China Applicant after: Guangdong Construction Engineering Group Co.,Ltd. Address before: 511340 20 / F, A-1 business center, Shuidian Plaza, building 1, Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province Applicant before: Guangdong Construction Engineering Group Co.,Ltd. Country or region before: China |
|
TA01 | Transfer of patent application right |