CN207176790U - A kind of high efficiency cubic metre of earth and stone Excavating bucket - Google Patents
A kind of high efficiency cubic metre of earth and stone Excavating bucket Download PDFInfo
- Publication number
- CN207176790U CN207176790U CN201721129175.8U CN201721129175U CN207176790U CN 207176790 U CN207176790 U CN 207176790U CN 201721129175 U CN201721129175 U CN 201721129175U CN 207176790 U CN207176790 U CN 207176790U
- Authority
- CN
- China
- Prior art keywords
- bucket
- earth
- excavating
- bucket body
- fixed column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004575 stone Substances 0.000 title claims abstract description 26
- 230000011218 segmentation Effects 0.000 claims description 21
- 239000000463 material Substances 0.000 abstract description 32
- 238000010521 absorption reaction Methods 0.000 abstract description 6
- 239000002689 soil Substances 0.000 description 7
- 230000000694 effects Effects 0.000 description 6
- 101100460844 Mus musculus Nr2f6 gene Proteins 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000007123 defense Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of high efficiency cubic metre of earth and stone Excavating bucket, including bucket body, bucket ear and hanging hole, the bucket body upper end is fixedly connected with bucket ear and hanging hole, the hanging hole is positioned at bucket ear side, the bucket body is internally provided with fixed column, the fixed column upper end is provided with telescopic mast and spring, and the spring is located on the outside of telescopic mast, and the telescopic mast upper end is fixedly connected with pushing assisted plate.The utility model, when bucket body enters material, is dropped on pushing assisted plate by being provided with pushing assisted plate and fixed column, after telescopic mast is pressed into fixed column by pushing assisted plate stress, spring stress, when Excavating bucket pours out material, weight saving, spring eject pushing assisted plate, and material is released in Excavating bucket, prevent material from being accumulated in bucket, have the function that to improve operating efficiency, can effectively avoid traditional Excavating bucket, in the course of the work, have material absorption on headwall, take Excavating bucket space the problem of.
Description
Technical field
A kind of excavator equipment is the utility model is related to, more particularly to a kind of high efficiency cubic metre of earth and stone Excavating bucket.
Background technology
The cubic metre of earth and stone, it is the general name of the earthwork and the cubic meter of stone, is Tu Heshi, measurement unit is generally cubic meter, cubic metre of earth and stone work
Journey includes digging watchman's wooden clapper of all native (stones) sides, fills, transports and draining, precipitation etc., and the cubic metre of earth and stone is typically widely present in
In the excavation project of soil and stone, common earth and rock works has:Levelling of the land, foundation ditch(Groove)With pipe canal digging, road excavation,
Civil air defense constructions and installations is excavated, terrace bankets, and roadbed filling and foundation ditch backfill, reasonable arrangement construction plan, is tried not to be arranged in
Rainy season, while in order to reduce earth and rock works operating expenses, implement and do not account for or account for less farmland and arable land and be advantageous to make with changing
The principle in field, will make the rational allocation scheme of the cubic metre of earth and stone, overall arrangement, and stonework is that one wide, amount is big, labour is numerous
The engineering project of weight, in work progress, the condition of construction is also extremely complex.But a cubic meter Excavating bucket is conventionally used to, just
In normal engineering, substantial amounts of soil is easily accumulated in bucket, takes the space in bucket, influences the efficiency of work, and in engineering
Need to fill more scattered and soft soil when backfill, traditional Excavating bucket can not make soil dispersion, while traditional
Bucket tooth can not be changed, and reduce overall service life.A kind of therefore, it is proposed that high efficiency cubic metre of earth and stone Excavating bucket.
Utility model content
Main purpose of the present utility model is to provide a kind of high efficiency cubic metre of earth and stone Excavating bucket, by be provided with pushing assisted plate and
Fixed column, when bucket body enters material, drop on pushing assisted plate, after telescopic mast is pressed into fixed column by pushing assisted plate stress, bullet
Spring stress, when Excavating bucket pours out material, weight saving, spring ejects pushing assisted plate, and material is released in Excavating bucket, prevents thing
Material accumulates in bucket, has the function that to improve operating efficiency, can effectively avoid traditional Excavating bucket, in the course of the work, have
Material is adsorbed on headwall, the problem of taking Excavating bucket space, and effectively can quickly be released in bucket material, be shortened
The time of action is poured out, the efficiency of work is improved, by setting segmentation framework, according to requirement of engineering, manually passes through hook
Segmentation framework is fixed on Excavating bucket with projection, material is entered by rounding knife group in bucket, reaches dispersed material volume
Effect, can effectively avoid volume of material larger, enter bucket in after absorption on headwall, cause be difficult to take out to ask
Topic, the dividing function of Excavating bucket is strengthened, improve the practicality of work, and can be effectively by soil, into bucket body
Before crushed, improve efficiency during engineering, while easy for removal and installation, convenience during use improved, by setting
Pin is put, manually pin is inserted into the slotted eye of bucket body, after being fixed by block tongue, reaches the work of bucket tooth easy to disassemble
With, it can effectively avoid on traditional Excavating bucket, the problem of bucket tooth can not be changed, improve convenience during renewal part, and
And can effectively it avoid because the problem of bucket tooth can not be changed, and caused Excavating bucket work quality reduces, improves work
Efficiency, while the overall appearance effect of Excavating bucket can be effectively lifted, effectively can solve the problems, such as in background technology.
To achieve the above object, the technical scheme that the utility model is taken is:
A kind of high efficiency cubic metre of earth and stone Excavating bucket, including bucket body, bucket ear and hanging hole, the bucket body upper end are fixedly connected with bucket ear
And hanging hole, the hanging hole are internally provided with fixed column positioned at bucket ear side, the bucket body, the fixed column upper end is provided with flexible
Post and spring, the spring are located on the outside of telescopic mast, and the telescopic mast upper end is fixedly connected with pushing assisted plate.
Further, the bucket body surface is provided with segmentation framework, and segmentation framework upper end side is provided with hook, institute
State segmentation framework lower end and be provided with projection, the segmentation framework surface is provided with rounding knife group, and the segmentation framework passes through hook
It is fixedly connected with projection with bucket body.
Further, described bucket body one end is provided with bucket tooth and bucket tooth is fixedly connected by pin and block tongue with bucket body.
Further, the telescopic mast passes through spring and fixed column sleeve connection.
Further, the bucket body is the bucket body for setting grooved hole.
Compared with prior art, the utility model has the advantages that:
1. the utility model by being provided with pushing assisted plate and fixed column, when bucket body enters material, is dropped on pushing assisted plate,
After telescopic mast is pressed into fixed column by pushing assisted plate stress, spring stress, when Excavating bucket pours out material, weight saving, spring
Pushing assisted plate is ejected, material is released in Excavating bucket, prevents material from being accumulated in bucket, has the function that to improve operating efficiency, energy
It is enough effectively to avoid traditional Excavating bucket, in the course of the work, there is material absorption on headwall, the problem of taking Excavating bucket space,
And effectively material can be quickly released in bucket, shorten the time for pouring out action, improve the efficiency of work.
2. the utility model is by setting segmentation framework, according to requirement of engineering, manually by hook and projection by divided frame
Frame is fixed on Excavating bucket, material is entered by rounding knife group in bucket, is haveed the function that dispersed material volume, can be effective
Avoid volume of material larger, after entering in bucket absorption the problem of causing to be difficult to take out, strengthen Excavating bucket on headwall
Dividing function, the practicality of work is improved, and can be crushed, improved before bucket body is entered effectively by soil
Efficiency during engineering, at the same it is easy for removal and installation, improve convenience during use.
3. pin is manually inserted into the slotted eye of bucket body, consolidated by block tongue by setting pin by the utility model
After fixed, have the function that bucket tooth easy to disassemble, can effectively avoid on traditional Excavating bucket that the problem of can not changing bucket tooth carries
Convenience during renewal part has been risen, and can effectively have been avoided because bucket tooth can not be changed, caused Excavating bucket as received basis
The problem of amount reduces, improves the efficiency of work, while can effectively lift the overall appearance effect of Excavating bucket.
Brief description of the drawings
Fig. 1 is a kind of side structure schematic view of high efficiency cubic metre of earth and stone Excavating bucket of the utility model.
Fig. 2 is a kind of fixed column structural representation of high efficiency cubic metre of earth and stone Excavating bucket of the utility model.
Fig. 3 is a kind of positive structure diagram of high efficiency cubic metre of earth and stone Excavating bucket of the utility model.
Fig. 4 is a kind of segmentation framework structural representation of high efficiency cubic metre of earth and stone Excavating bucket of the utility model.
Fig. 5 is a kind of Tooth structure schematic diagram of high efficiency cubic metre of earth and stone Excavating bucket of the utility model.
In figure:1st, bucket body;2nd, struggle against ear;3rd, hanging hole;4th, projection;5th, pin;6th, bucket tooth;7th, fixed column;8th, telescopic mast;9th, bullet
Spring;10th, pushing assisted plate;11st, segmentation framework;12nd, link up with;13rd, rounding knife group;14th, block tongue.
Embodiment
Technological means, creation characteristic, reached purpose and effect to realize the utility model are easy to understand, below
With reference to embodiment, the utility model is expanded on further.
As Figure 1-5, a kind of high efficiency cubic metre of earth and stone Excavating bucket, including bucket body 1, bucket ear 2 and hanging hole 3, on the bucket body 1
End is fixedly connected with bucket ear 2 and hanging hole 3, and the hanging hole 3 is internally provided with fixed column 7, institute positioned at bucket ear 2 side, the bucket body 1
State the upper end of fixed column 7 and be provided with telescopic mast 8 and spring 9, the spring 9 is located at the outside of telescopic mast 8, and the upper end of telescopic mast 8 is consolidated
Surely it is connected with pushing assisted plate 10.
Wherein, the surface of bucket body 1 is provided with segmentation framework 11, and the upper end side of segmentation framework 11 is provided with hook
12, the lower end of segmentation framework 11 is provided with projection 4, and the surface of segmentation framework 11 is provided with rounding knife group 13, the segmentation
Framework 11 is fixedly connected by hook 12 and projection 4 with bucket body 1.
Wherein, described one end of bucket body 1 is provided with bucket tooth 6 and bucket tooth 6 is fixedly connected by pin 5 and block tongue 14 with bucket body 1.
Wherein, the telescopic mast 8 passes through spring 9 and the sleeve connection of fixed column 7.
Wherein, the bucket body 1 is the bucket body for setting grooved hole.
It should be noted that the utility model is a kind of high efficiency cubic metre of earth and stone Excavating bucket, when in use, pass through the He of ear 2 of struggling against
Hanging hole 3 is operated after bucket body 1 is attached with motion arm, when bucket body 1 enters material, is dropped on pushing assisted plate 10, is helped
After telescopic mast 8 is pressed into fixed column 7 by the stress of push pedal 10, the stress of spring 9, when Excavating bucket pours out material, weight saving, bullet
Spring 9 ejects pushing assisted plate 10, and material is released in Excavating bucket, prevents material from being accumulated in bucket, reaches the work for improving operating efficiency
With, traditional Excavating bucket can be effectively avoided, in the course of the work, has material absorption on headwall, occupancy Excavating bucket space
Problem, and effectively can quickly release material in bucket, the time for pouring out action is shortened, improves the effect of work
Rate, according to requirement of engineering, manually segmentation framework 11 is fixed on Excavating bucket by hook 12 and projection 4, makes material through undue
Cutter group 13 is entered in bucket, has the function that dispersed material volume, can effectively be avoided volume of material larger, be entered bucket
Absorption the problem of causing to be difficult to take out, strengthens the dividing function of Excavating bucket, improves the practicality of work on headwall after interior
Property, and can be crushed effectively by soil before bucket body is entered, efficiency during engineering is improved, at the same it is easy to disassemble
And installation, convenience during use is improved, is manually inserted into pin 5 in the slotted eye of bucket body 1, is fixed by block tongue 14
Afterwards, have the function that bucket tooth easy to disassemble, can effectively avoid on traditional Excavating bucket, the problem of bucket tooth can not be changed, lifting
Convenience during renewal part, and can effectively avoid because bucket tooth can not be changed, caused Excavating bucket work quality
The problem of reduction, the efficiency of work is improved, while can effectively lift the overall appearance effect of Excavating bucket.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above.One's own profession
The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification
Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also
Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model
Claimed scope is by appended claims and its equivalent thereof.
Claims (5)
1. a kind of high efficiency cubic metre of earth and stone Excavating bucket, including bucket body(1), bucket ear(2)And hanging hole(3), the bucket body(1)Upper end is fixed
It is connected with bucket ear(2)And hanging hole(3), the hanging hole(3)Positioned at bucket ear(2)Side, it is characterised in that:The bucket body(1)It is internal
It is provided with fixed column(7), the fixed column(7)Upper end is provided with telescopic mast(8)And spring(9), the spring(9)Positioned at flexible
Post(8)Outside, the telescopic mast(8)Upper end is fixedly connected with pushing assisted plate(10).
A kind of 2. high efficiency cubic metre of earth and stone Excavating bucket according to claim 1, it is characterised in that:The bucket body(1)Surface is set
It is equipped with segmentation framework(11), the segmentation framework(11)Upper end side is provided with hook(12), the segmentation framework(11)Lower end
It is provided with projection(4), the segmentation framework(11)Surface is provided with rounding knife group(13), the segmentation framework(11)Pass through hook
(12)And projection(4)With bucket body(1)It is fixedly connected.
A kind of 3. high efficiency cubic metre of earth and stone Excavating bucket according to claim 1, it is characterised in that:The bucket body(1)One end is set
It is equipped with bucket tooth(6)And bucket tooth(6)Pass through pin(5)And block tongue(14)With bucket body(1)It is fixedly connected.
A kind of 4. high efficiency cubic metre of earth and stone Excavating bucket according to claim 1, it is characterised in that:The telescopic mast(8)Pass through
Spring(9)With fixed column(7)Sleeve connection.
A kind of 5. high efficiency cubic metre of earth and stone Excavating bucket according to claim 1, it is characterised in that:The bucket body(1)To set
The bucket body of grooved hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721129175.8U CN207176790U (en) | 2017-09-05 | 2017-09-05 | A kind of high efficiency cubic metre of earth and stone Excavating bucket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721129175.8U CN207176790U (en) | 2017-09-05 | 2017-09-05 | A kind of high efficiency cubic metre of earth and stone Excavating bucket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207176790U true CN207176790U (en) | 2018-04-03 |
Family
ID=61742966
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721129175.8U Expired - Fee Related CN207176790U (en) | 2017-09-05 | 2017-09-05 | A kind of high efficiency cubic metre of earth and stone Excavating bucket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207176790U (en) |
-
2017
- 2017-09-05 CN CN201721129175.8U patent/CN207176790U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102155009A (en) | Crushed rock pile used for strengthening extremely soft soil foundation and construction method thereof | |
CN204023578U (en) | Retaining Structure with Double-row Piles | |
CN103670448B (en) | A kind of underground utilities protective device and apply the supporting method of this device | |
CN108049395A (en) | A kind of anti-collapse impact holing construction method in complex karst place | |
CN107964995A (en) | A kind of pile foundation borehole device | |
CN207176790U (en) | A kind of high efficiency cubic metre of earth and stone Excavating bucket | |
CN205329445U (en) | Compound resistance to compression road bed | |
CN207498973U (en) | A kind of power station grout curtain cuts dirty drainage tube | |
CN208472716U (en) | Crack geology mortar leakage prevention drill-pouring pilework | |
CN107975027B (en) | Construction method for reinforcing soil body at shield launching and arrival end | |
CN108457279A (en) | A kind of foundation pit enclosure structure cast-in-situ bored pile collapse hole in-situ treatment method | |
CN209523165U (en) | A kind of hydraulic engineering dam configuration | |
CN201635765U (en) | Sand throwing device for gob under highway | |
CN212052857U (en) | Concrete buttress formula retaining wall structure permeates water | |
CN205024694U (en) | Superplasticity concrete drilling bored concrete pile dado | |
CN106703021A (en) | Construction method for pile cap of screw pile, and device thereof | |
CN103195077A (en) | Dam foundation reinforcement frame structure and dam foundation reinforcement method | |
CN203129163U (en) | Reinforcing framework structure for dam foundation | |
CN202450511U (en) | Grouting device | |
CN203174586U (en) | Concrete pipe pile for reinforcing railway soft soil foundation | |
CN209053086U (en) | A kind of dual-purpose composite pile device of the pumping grouting of band rigidity tubing | |
CN202989785U (en) | Light type bridge abutment forward-inclination reinforcing device | |
CN106351253A (en) | Novel water conservancy project retaining wall | |
CN207392201U (en) | A kind of packaged type slip casting platform | |
CN206844129U (en) | A kind of new diagonal brace composite support device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 314000 No. 55, Zhangqiao section, 07 provincial road, Caoqiao street, Pinghu City, Jiaxing City, Zhejiang Province Patentee after: Zhejiang Senke Construction Co.,Ltd. Address before: 314000 No. 55, Zhangqiao section, 07 provincial road, Caoqiao street, Pinghu City, Jiaxing City, Zhejiang Province Patentee before: PINGHU SENKE LANDSCAPE ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180403 |
|
CF01 | Termination of patent right due to non-payment of annual fee |