CN207163774U - Sand fills operation servicing unit in a kind of model test - Google Patents
Sand fills operation servicing unit in a kind of model test Download PDFInfo
- Publication number
- CN207163774U CN207163774U CN201720616717.8U CN201720616717U CN207163774U CN 207163774 U CN207163774 U CN 207163774U CN 201720616717 U CN201720616717 U CN 201720616717U CN 207163774 U CN207163774 U CN 207163774U
- Authority
- CN
- China
- Prior art keywords
- case
- sand
- groove profile
- fill
- filling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses sand in a kind of model test to fill operation servicing unit, is formed by filling case, plane steel wire, groove profile funnel, support.Filling has handle on box outer wall, there is graduated scale vertically on inwall corner, can be with holding plane steel wire in case filling, filling case bottom sides has switchable sand removing hole, there is gate outside sand removing hole, groove profile funnel, which can be fixed on, fills bottom portion, fills after case is fixed with groove profile funnel and can be placed on support.The utility model can be used in Piled Embankments filling for sand in soil arching effect experimental study:The gate size of case left and right sides is filled by regulation and case position is filled in movement, the speed that sand can be controlled to fill, realizes uniformly filling for sand.The utility model can fill sand, and link operation is easier to be accurate, and it is workable, simple in construction, is readily produced, easy to utilize.
Description
Technical field
The utility model is the test operation for being related to a kind of highway and railway engineering Eccentric Loads in Layered Soils and Research technical field
Servicing unit, concretely relate to the sand in a kind of Piled Embankments in soil arching effect effect study model test and fill behaviour
Make servicing unit.
Background technology
In Piled Embankments, because the intensity of stake is much larger than the intensity of weak soil, it is uneven heavy to be produced in embankment filled soil layer
Drop, promotes shearing strain or the generation of shear surface, so as to produce the phenomenon of stresses re-distribution, comes from embankment and upper load
Vertical stress can redistribute so that be delivered to the vertical stress increase of stake top, and the vertical stress for being delivered to weak soil can wait
Amount is reduced, and the phenomenon of this stresses re-distribution caused by differential settlement is defined as " soil arching effect ".Study pile
Soil arching effect in formula embankment, frequently with the mode of indoor model test, tested using model groove, needed during experiment
Sand is filled in model groove to simulate the sand in Practical Project.Operating mode for placement in layers sand is, it is necessary in model
The sand for determining volume is filled in experiment step by step.Accuracy for guarantee test is, it is necessary to slowly uniformly fill sand.Sand fills
Operating process accounts for a big chunk of whole experiment process, and sand, which fills operation servicing unit, can make sand fill operation more
Simplicity, make bulk testing easier, sand is lacked in existing model test apparatus and fills operation servicing unit.
The content of the invention
The purpose of this utility model is to overcome deficiency of the prior art, there is provided soil arch effect in a kind of Piled Embankments
Answer the sand in research model experiment to fill operation servicing unit, can easily fill in test the sand for determining volume.
In order to solve the above-mentioned technical problem, the utility model is to be achieved through the following technical solutions:
Sand fills operation servicing unit in a kind of model test of the present utility model, by filling case, plane steel wire, groove
Type funnel, support composition, it is stainless steel to fill case, plane steel wire, groove profile funnel, support material.Plane steel wire is placed
Filling in case, groove profile funnel, which is fixed on, fills bottom portion, fills after case fixes with groove profile funnel and is placed on support, fills
There is handle in the middle part of box outer wall left and right side, there is sand removing hole left and right side bottom, has up and down gate outside sand removing hole, for controlling
Sediment outflow speed processed, the attachment strap for also having on box outer wall left and right side and being used for stablizing gate is filled, fills box outer wall front and back sides bottom
Respectively there are two screw bolt and nut for being used to fix groove profile funnel, have the flat board for support support in the middle part of outer wall front and back sides, fill out
Build on chamber interior wall covered with iron sheet, have the graduated scale vertically that minimum scale is 1mm on inwall corner, have on inwall perpendicular
To mobile cushion cap, with having magnet on inwall opposite side, plane steel wire is lain in a horizontal plane on the cushion cap filled in case cushion cap.
The bell mouth of groove profile funnel is linear pattern, and two J-type necks are respectively arranged at groove profile funnel front and rear sides face top, and funnel top, which encases, to be filled out
Bottom portion is built, the bolt card for filling bottom portion is fixed in J-type neck with nut, groove profile funnel and is filled after case fixes, groove
Type funnel left and right sides are with filling case sand removing hole face.Support is made up of six roots of sensation quadrangular and cuboid bottom plate, the rib of the six roots of sensation four
Post is just withstood on the flat board for filling case front and rear sides, is filled after case and groove profile funnel be connected, is placed on support, hopper base
Portion is hanging.
Determine to fill case by the volume of the known sand that fills case internal diameter size and graduated scale, can fill as needed
The height of sand loaded in advance is needed, cushion cap and plane steel wire can determine the particular location of sand height, and auxiliary is in advance
Filling.Fill sand and may be selected to fill sand removing hole direct filling or groove profile funnel at left and right sides of case and fill.
Compared with prior art, the beneficial effects of the utility model are:
It can be used to fill the sand for determining volume in the experiment of soil arching effect research model in Piled Embankments, aid in sand
Soil fills operation, is convenient for the placement in layers of sand, and controllable sand fills speed, slowly can equably fill sand, make
In model test sand fill link operation it is easier, make bulk testing easier, accurate, it is workable, structure
Simply, it is readily produced, it is easy to utilize.
Brief description of the drawings
Fig. 1 is that sand fills operation assistant apparatus structure schematic diagram in a kind of model test of the utility model
Fig. 2 is to fill box structure schematic diagram
Fig. 3 is to fill case internal structure schematic diagram
Fig. 4 is to fill case top view
Fig. 5 is groove profile funnel structure schematic diagram
Fig. 6 is groove profile funnel top view
Fig. 7 is supporting structure schematic diagram
1 is fills case in figure, and 2 be plane steel wire, and 3 be groove profile funnel, and 4 be support, and 5 be handle, and 6 be bolt, and 7 be spiral shell
Mother, 8 be flat board, and 9 be graduated scale, and 10 be cushion cap, and 11 be sand removing hole, and 12 be gate, and 13 be attachment strap, and 14 be J-type neck, and 15 be leakage
Quarrel.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
Sand fills operation servicing unit in a kind of model test shown in Fig. 1, by fill case (1), plane steel wire (2),
Groove profile funnel (3), support (4) composition, filling middle part at left and right sides of case (1) outer wall has handle (5), and sediment outflow is arranged at left and right sides bottom
Mouthful (11), there is gate (12) outside sand removing hole, the attachment strap (13) for there are stable gate (12) on this both sides, before and after filling case (1) outer wall
Side bottom respectively has the bolt (6) and nut (7) of two fixed groove profile funnels (3), has on front and back sides and is supported for support (4)
Flat board (8), filling has the cushion cap (10) with magnet on case (1) inwall, magnet is located at cushion cap (10) and filled in case (1)
Wall opposite side, cushion cap (10) can move up dynamic in inwall, and plane steel wire (2) can be placed on cushion cap (10), fill case (1)
There is the graduated scale (9) of vertical direction on inwall corner.Groove profile funnel (3), which can be fixed on, fills case (1) bottom, groove profile funnel (3)
Face fills two sand removing holes (11) of case (1) at left and right sides of top.Fill case (1) groove profile funnel (3) can be fixed and place afterwards
On support (4).
Sand fills groove profile funnel (3) in operation servicing unit and fills case in a kind of model test of the present utility model
(1) it is connected and is placed on comprising the following steps that on support (4):
The first step, the bolt (6) of case (1) bottom will be filled from J-type neck (14) card entry slot of groove profile funnel (3) two sides
In type funnel (3), until groove profile funnel (3) is suspended on bolt (6);
Second step, it is connected with nut (7) and bolt (6), groove profile funnel (3) is connected admittedly with filling case (1) bottom
It is fixed;
3rd step, the six roots of sensation quadrangular in flat board alignment bracket (4) that will be filled on case (1) outer wall, will fill case (1) and puts
Put on support (4).
Utility model works principle:The utility model is converted by determining the sand of volume and filling the internal diameter of case (1)
Obtain filling level on the sand for needing to load in advance in case (1), then by filling the graduated scale (9) in case (1), can
The cushion cap (10) of activity can determine that the particular location of plane on sand, and plane steel wire (2) then is placed on into cushion cap (10) again
On, aid in filling sand in advance.After sand is filled in filling case (1), it handle (5) can be held will fill case (1) and lift,
Sand is carried out on model test groove and fills operation, speed can be filled by moving up and down the gate (12) of sand removing hole (11) outside to control
Degree.It can directly be filled by the sand removing hole (11) filled on case (1), can be also connected groove profile filling case (1) bottom
Filled after funnel (3) by groove profile funnel (3).
Claims (4)
1. sand fills operation servicing unit in a kind of model test, including fills case, plane steel wire, groove profile funnel, support,
It is characterized in that:The plane steel wire, which is placed on, to be filled in case, and the groove profile funnel is fixed on bottom portion of filling, described to fill case
It is placed on after being fixed with groove profile funnel on support, described fill in the middle part of box outer wall left and right side has handle, left and right side bottom
There is sand removing hole, have gate movable up and down outside sand removing hole, fill the attachment strap for also having stable gate on box outer wall left and right side, fill out
Building box outer wall front and back sides bottom respectively has two to be used to fixing the screw bolt and nut of groove profile funnel, useful in the middle part of outer wall front and back sides
In the flat board of support support, fill on chamber interior wall covered with iron sheet, there is the graduated scale that minimum scale is 1mm on inwall corner, it is interior
Having on wall can be with vertically movable cushion cap, and with having magnet on inwall opposite side, the plane steel wire is lain in a horizontal plane in cushion cap
Fill on the cushion cap in case.
2. sand fills operation servicing unit in a kind of model test according to claim 1, it is characterized in that:The groove profile
Funnel, its bell mouth are linear pattern, and two J-type necks are respectively arranged at groove profile funnel front and rear sides face top, and funnel top, which encases, fills
Bottom portion, the bolt card for filling bottom portion are fixed in J-type neck with nut, groove profile funnel and are filled after case fixes, groove profile
Funnel left and right sides are with filling case sand removing hole face.
3. sand fills operation servicing unit in a kind of model test according to claim 1, it is characterized in that:The branch
Frame, it is made up of six roots of sensation quadrangular and cuboid bottom plate, six roots of sensation quadrangular can be just withstood on the flat board for filling case front and rear sides,
Fill after case and groove profile funnel be connected, be placed on support, funnel bottom is hanging.
4. sand fills operation servicing unit in a kind of model test according to claim 1, it is characterized in that:It is described to fill
Case, plane steel wire, groove profile funnel, support material are stainless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720616717.8U CN207163774U (en) | 2017-05-31 | 2017-05-31 | Sand fills operation servicing unit in a kind of model test |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720616717.8U CN207163774U (en) | 2017-05-31 | 2017-05-31 | Sand fills operation servicing unit in a kind of model test |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207163774U true CN207163774U (en) | 2018-03-30 |
Family
ID=61709235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720616717.8U Active CN207163774U (en) | 2017-05-31 | 2017-05-31 | Sand fills operation servicing unit in a kind of model test |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207163774U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113588921A (en) * | 2021-07-29 | 2021-11-02 | 西南交通大学 | Embankment layered filling device for geotechnical centrifugal model test |
-
2017
- 2017-05-31 CN CN201720616717.8U patent/CN207163774U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113588921A (en) * | 2021-07-29 | 2021-11-02 | 西南交通大学 | Embankment layered filling device for geotechnical centrifugal model test |
CN113588921B (en) * | 2021-07-29 | 2022-03-15 | 西南交通大学 | Embankment layered filling device for geotechnical centrifugal model test |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105277444B (en) | Fully mechanical pile foundation model test apparatus and test method based on multidirectional loading | |
CN203981507U (en) | A kind of novel planar strain consolidation testing device | |
CN104674856B (en) | Base Pit Excavation Simulation device when hypergravity | |
CN108152118A (en) | A kind of pile formula subgrade seepage flow erosion test device of adjustable head | |
CN210071552U (en) | Triaxial confining pressure test device for pile and anchor rod | |
CN107354961B (en) | Variable-rigidity pre-stressed anchor-pull type retaining wall soil arch effect test model device and method | |
CN103485283A (en) | Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof | |
CN108872297A (en) | A kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig | |
CN201666857U (en) | Large-scale rockfill confining creep deformation compression instrument | |
CN206467702U (en) | A kind of multi-functional pile foundation simulation chamber | |
CN108717107B (en) | Side slope physical experiment model | |
CN207163774U (en) | Sand fills operation servicing unit in a kind of model test | |
CN203247614U (en) | Anchor-pulling type retaining wall model test device | |
CN110082202B (en) | Flat plate load indoor model test device and use method | |
CN102998168A (en) | Fixing device for load test of pre-stressed concrete beam and testing method | |
CN103278612A (en) | Sand rain-type filling device for geotechnical engineering model test | |
CN106248495A (en) | The indoor long-term assay device of post grouting pile of simulated groundwater flowing and test method thereof | |
CN104965061B (en) | Assembled type multifunctional model experiment trough | |
CN114002060A (en) | Performance test system and method of reinforced geotechnical structure under multi-field coupling effect | |
CN210136137U (en) | Soil pressure testing device | |
CN204590103U (en) | Base Pit Excavation Simulation device under hypergravity condition | |
CN106400857B (en) | For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile | |
CN115343448B (en) | Novel movable door model test device and method based on soil arch effect research | |
CN216410886U (en) | Working condition simulator for applying multi-field coupling effect to reinforced geotechnical structure | |
CN207944491U (en) | A kind of anchor ingot plate improved adjusting device for the isolator on architecture foundation pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |