CN106248495A - The indoor long-term assay device of post grouting pile of simulated groundwater flowing and test method thereof - Google Patents

The indoor long-term assay device of post grouting pile of simulated groundwater flowing and test method thereof Download PDF

Info

Publication number
CN106248495A
CN106248495A CN201610585670.3A CN201610585670A CN106248495A CN 106248495 A CN106248495 A CN 106248495A CN 201610585670 A CN201610585670 A CN 201610585670A CN 106248495 A CN106248495 A CN 106248495A
Authority
CN
China
Prior art keywords
proof box
mud jacking
water
pile
header tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610585670.3A
Other languages
Chinese (zh)
Other versions
CN106248495B (en
Inventor
刘振之
万志辉
戴国亮
邓会元
龚维明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Shanghai Greenland Construction Group Co Ltd
Original Assignee
Southeast University
Shanghai Greenland Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University, Shanghai Greenland Construction Group Co Ltd filed Critical Southeast University
Priority to CN201610585670.3A priority Critical patent/CN106248495B/en
Publication of CN106248495A publication Critical patent/CN106248495A/en
Application granted granted Critical
Publication of CN106248495B publication Critical patent/CN106248495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/14Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by dead weight, e.g. pendulum; generated by springs tension
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0032Generation of the force using mechanical means
    • G01N2203/0033Weight

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses the indoor long-term assay device of post grouting pile of a kind of simulated groundwater flowing, including proof box with toward the dynamic Fluid Dynamics device of injection water flow simulation Groundwater Flow in this proof box, described proof box is built-in with simulation stake, the lower end of this simulation stake offers slurry outlet, and the upper end of this simulation stake connects the squeezing unit for grout injection;Described proof box is provided with lever bracket, and this lever bracket one end is rotatably connected with proof box, and the other end is unsettled, and this free end connects counterweight charger.The indoor long-term assay device of post grouting pile of this simulated groundwater flowing solves the post jacking bearing test under simulated groundwater flox condition, can be fully understood by actual mud jacking process and mud jacking complete after the condensation rate of cement grout, specify the consumption of cement grout and cost-effective;The post grouting pile indoor long term test flowed secondly by this simulated groundwater, can disclose the rule of pouring mortar pile long-time bearing performance, make post-grouting technology more perfect.

Description

The indoor long-term assay device of post grouting pile of simulated groundwater flowing and test method thereof
Technical field
The present invention relates to pouring mortar pile assay device and the test method of field of civil engineering, particularly relate to a kind of simulation ground The indoor long-term assay device of post grouting pile of lower water flowing and construction method thereof.
Background technology
The bearing capacity improving pile foundation is played a significant role by post-grouting technology.Post grouting pile is carried by the most many scholars Mechanism has done corresponding laboratory test analysis and research, has obtained a series of fruitful theory and actual application achievement, but Most post jacking theories are all based on without drawing under subsoil water or subsoil water quiescent conditions.Subsoil water be formed with two kinds Approach, a kind of is that subsoil water causes the flowing of water to form dynamic water owing to region exists head difference;Another is due to waterproof Curtain or waterproof structures existing defects and destruction and cause the seepage of subsoil water to form dynamic water.Therefore, subsurface flow is solved Under the conditions of Dong, grouting result problem just becomes the key improving bearing capacity of pile foundation.Mud jacking theory under the conditions of Groundwater Flow is ground Studying carefully seldom, the research of most of indoor model post-pressure groutings theory is all not consider subsoil water or subsoil water quiescent conditions Under, and under subsoil water quiescent conditions and under the conditions of Groundwater Flow the Diffusion Law of serosity and diffusion mechanism have the biggest not With, the conclusion obtained with the test of subsoil water quiescent conditions drag for mud jacking engineering practice under the conditions of instructing Groundwater Flow is Irrational, it is therefore desirable to post grouting pile laboratory test under the conditions of Groundwater Flow is furtherd investigate.
It would therefore be highly desirable to solution the problems referred to above.
Summary of the invention
Goal of the invention: the first object of the present invention be to provide one can be fully understood by mud jacking process and mud jacking complete after cement The indoor long-term assay device of post grouting pile that the condensation rate of serosity, the simulated groundwater of clear and definite cement mortar consumption flow.
Another goal of the invention of the present invention is to provide the post grouting pile indoor long term test dress of this simulated groundwater flowing The test method put.
Technical scheme: for realizing object above, the post grouting pile of a kind of simulated groundwater of the present invention flowing is indoor Long term test device, including proof box with toward the dynamic Fluid Dynamics device of injection water flow simulation Groundwater Flow, institute in this proof box Stating proof box and be built-in with simulation stake, the lower end of this simulation stake offers slurry outlet, and the upper end of this simulation stake connects to be had for irrigating The squeezing unit of cement mortar;Described proof box is provided with lever bracket, and this lever bracket one end is rotatably connected with proof box, the other end Unsettled, this free end connects and has counterweight charger.
Wherein, described dynamic Fluid Dynamics device includes the header tank at external water source and for fixing the height adjustable of this header tank Frame, the outside of this header tank is equipped with bottom and offers the water-collecting tray of gap, and the bottom of this header tank offers water outlet Mouthful, this outlet injects current by water inlet pipe in proof box;Wherein control flow at water source and make the water yield of inflow header tank More than the water yield of inflow proof box, the current of excess are overflowed into water-collecting tray by header tank top, and flow out from gap, make examination Stable level in tryoff.
Preferably, described squeezing unit includes agitator, pulp-absorbing pipe, mudjack and the feed pipe for mortar being sequentially connected with, this defeated slurry Defeated slurry Pressure gauge it is additionally provided with on pipe.
Further, described simulation stake upper end connects three way cock, defeated with squeezing unit of one end of this three way cock Slurry pipe is connected, and one end is connected with the madjack pipe above simulation stake, and the other end is connected with slurry-returning device;And on madjack pipe 26 It is provided with mud jacking valve.
Preferably, described slurry-returning device includes slurry storing tank and return pipe, and one end of this return pipe is stretched in slurry storing tank, another End is connected with three way cock;Overfall valve and overfall Pressure gauge it is additionally provided with on this return pipe.
Further, described counterweight charger is the counterweight basket that can arbitrarily increase and decrease counterweight.
The test method of the indoor long-term assay device of post grouting pile of a kind of simulated groundwater of present invention flowing, including as follows Step:
(1) inserting in proof box by soil sample, carry out compaction in layers, until design height, Model Pile can pre-buried soil sample or beat Enter in soil sample;
(2) dynamic Fluid Dynamics operation: be connected with proof box by water inlet pipe by header tank, is controlled flow at water source and makes inflow The water yield of header tank is overflowed into water-collecting tray more than the water yield of inflow proof box, the current of excess by header tank top, and from overflowing The mouth of a river is flowed out, and makes header tank Water discharge flow speed reach stable level in design load, and proof box;
(3) mud jacking operation: use three way cock feed pipe for mortar, return pipe and madjack pipe to be connected and form a loop, in pressure It is respectively equipped with mud jacking valve and overfall valve on slurry pipe and return pipe, first overfall valve is reached maximum during mud jacking, make serosity complete Portion returns in slurry storing tank, more slowly turns down overfall valve, makes manometric reading reach the mud jacking pressure of requirement, then by mud jacking valve Door is opened, and regulation mud jacking valve makes pressure be basically stable at mud jacking force value;Model Pile is carried out mud jacking, remembers during mud jacking The record time of mud jacking, mud jacking amount, mud jacking pressure and slurry flow rate;
(4) long-term load operations: after mud jacking terminates and reaches intensity, by increasing the weight of counterweight charger on lever bracket Code carries out bearingtest to Model Pile, persistently observes displacement at pile top situation of change at different time, detects Groundwater Flow bar The grouting result of pouring mortar pile under part.
Beneficial effect: compared with prior art, the present invention has following remarkable advantage: first this simulated groundwater flows The indoor long-term assay device of post grouting pile solves the post jacking bearing test under simulated groundwater flox condition, can be fully understood by Actual mud jacking process and mud jacking complete after the condensation rate of cement grout, specify the consumption of cement grout and cost-effective;The most logical Cross the post grouting pile indoor long term test of this simulated groundwater flowing, the rule of pouring mortar pile long-time bearing performance can be disclosed, after making Grouting Technology is more perfect, it is simple to improve the bearing capacity of pile foundation so that it is preferably apply in Practical Project construction;Furthermore, should Assay device solves the flowing of dynamic water water source simulated groundwater, and head is stablized and the adjustable key issue of head height;Solve Reduce the undulatory property of grouting pressure, protection precision pressure gauge and the key issue of regulation grouting pressure;Finally this assay device Technique is simple and convenient to operate, safe and reliable, economic and practical, it is simple to popularization and application.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the top view of header tank in the present invention;
Fig. 3 is the sectional view of header tank in the present invention;
Fig. 4 is the structural representation of squeezing unit in the present invention;
Fig. 5 is the structural representation of slurry-returning device in the present invention;
Fig. 6 is the top view of lever bracket part in Fig. 1;
Fig. 7 is the partial schematic diagram of lever bracket part in Fig. 1.
Detailed description of the invention
Below in conjunction with the accompanying drawings technical scheme is described further.
As it is shown in figure 1, the indoor long-term assay device of the post grouting pile of a kind of simulated groundwater of present invention flowing includes test Case 1, dynamic Fluid Dynamics device 2, simulation stake 3, slurry outlet 4, squeezing unit 5, lever bracket 6 and counterweight charger 7.This proof box 1 Bottom there is outlet pipe 27.Inserting in proof box 1 by soil (rock) body, placement in layers appropriate compacting, Model Pile can be in back-up sand Time embedment or squeeze in proof box after back-up sand.In this proof box 1, water flow simulation subsoil water is injected by dynamic Fluid Dynamics device 2 Flowing, the upper end of simulation stake 3 is connected to the squeezing unit 5 of grout injection, and the lower end of this simulation stake 3 offers slurry outlet 4. Above-mentioned proof box 1 is provided with lever bracket 6, and this lever bracket 6 one end is rotatably connected with proof box 1, and the other end is unsettled, this free end Upper connection has counterweight charger 7, and this counterweight charger 7 is the counterweight basket that can arbitrarily increase and decrease counterweight.
As shown in Figure 6 and Figure 7, the present invention uses squeezing unit 5 that simulation stake is carried out mud jacking, completes at mud jacking and reaches to set Carry out bearingtest after meter intensity, utilize lever bracket 6 and counterweight charger 7 that Model Pile 3 is carried out long-time bearing performance inspection Survey.Welding lever bracket 6 in proof box 1, with the cushion block 29 on lever bracket 6 as basic point, lever one end is welded on turning of proof box On moving axis 28, in the counterweight basket of the other end hanging of lever bracket, place counterweight, utilize lever principle to load, loaded weight It is multiplied by moment equal to counterweight weight, facilitates long term test to load.Model Pile 3 is positioned at lever bracket 6 times, by increasing counterweight, lever Frame 6 applies pressure to cushion block 29, thus acts on Model Pile 3, and pouring mortar pile can be carried out long-term load test.
As shown in Figures 2 and 3, above-mentioned dynamic Fluid Dynamics device 2 includes the header tank 8 at external water source and catchments for fixing this The Height Adjustable cribbing 9 of case 8, support 9 can arbitrarily regulate the height on its vertical direction.
The outside of this header tank 8 is equipped with bottom and offers the water-collecting tray 11 of gap 10, and the bottom of this header tank 8 offers Outlet 12, this outlet 12 injects current by water inlet pipe 13 in proof box 1;Wherein the water at water source is flowed into by water pipe Header tank 8, water pipe is provided with flow valve, controls flow by regulation flow valve and makes the water yield of inflow header tank more than flowing into test The water yield of case 1, the current of excess are overflowed into water-collecting tray 11 by header tank 8 top, and flow out from gap 10, in making proof box Stable level.
Water at water source is first flowed into header tank 8 by the present invention, makes header tank 8 fill, and the valve then opening header tank 8 makes Water in header tank 8 flows into proof box 1 by water inlet pipe 13, adjusts the water yield at water source and makes the water yield of inflow header tank 8 bigger In the water yield of inflow proof box 1, then the water of excess overflows into water-collecting tray 11 from header tank 8 top, then from water-collecting tray 11 Gap 10 flows out, and the water that gap 10 flows out makes the stable level of header tank 8 at a certain setting height, header tank 8 water inlet The water yield slightly larger than the water yield of outlet 12, make the stable level in proof box 1, and control the current stream flowing into proof box 1 Speed, thus can the impact on post grouting pile of the mould quasi stationary Groundwater Flow.
In order to process of the test provides stable flow rate of water flow, it is desirable to provide a stable head height.Meanwhile, can lead to Overregulate the flow rate of water flow that height bracket simulation is different, i.e. simulate the impact on post grouting pile of the different groundwater velocities.
As shown in Figure 4, above-mentioned squeezing unit 5 includes agitator 14, pulp-absorbing pipe 15, mudjack 16 and the defeated slurry being sequentially connected with Pipe 17, this feed pipe for mortar 17 is additionally provided with mud jacking valve 18 and defeated slurry Pressure gauge 19.
As it is shown in figure 1, simulation stake 3 upper end connects three way cock 20, in one end of this three way cock 20 and squeezing unit 5 Feed pipe for mortar 17 be connected, the other end is connected with slurry-returning device 21.Slurry-returning device 21 includes slurry storing tank 22 and return pipe 23, should One end of return pipe 23 is stretched in slurry storing tank 22, and the other end is connected with three way cock 20;It is additionally provided with overfall on this return pipe 23 Valve 24 and overfall Pressure gauge 25, as shown in Figure 5.
The test method of the indoor long-term assay device of post grouting pile of a kind of simulated groundwater of present invention flowing, its feature exists In, comprise the steps:
(1) soil sample is inserted in proof box 1, carries out compaction in layers, until design height, Model Pile 3 can pre-buried soil sample or Squeeze in soil sample;
(2) dynamic Fluid Dynamics operation: be connected with proof box 1 by water inlet pipe 13 by header tank 8, is controlled flow at water source and makes Flowing into the water yield water yield more than inflow proof box 1 of header tank, the current of excess are overflowed into water-collecting tray by header tank 8 top 11, and flow out from gap 10, make header tank 8 Water discharge flow speed reach stable level in design load, and proof box 1;
(3) mud jacking operation: use three way cock 20 that feed pipe for mortar 17, return pipe 23 and madjack pipe 26 connect formation one and return Road, is respectively equipped with mud jacking valve 18 and overfall valve 24, first by overfall valve 24 during mud jacking on madjack pipe 26 and return pipe 23 Reach maximum, make serosity empty back in slurry storing tank 22, more slowly turn down overfall valve 24, make manometric reading reach requirement Mud jacking pressure, then mud jacking valve 18 is opened, regulation mud jacking valve 18 makes pressure be basically stable at mud jacking force value, reduces pressure Starch the undulatory property of pressure and protect precision pressure gauge;Model Pile 3 is carried out mud jacking, record during mud jacking mud jacking time, Mud jacking amount, mud jacking pressure and slurry flow rate;
(4) long-term load operations: after mud jacking terminates and reaches intensity, by increasing counterweight charger 7 on lever bracket Counterweight carries out bearingtest to Model Pile 3, persistently observes displacement at pile top situation of change at different time, detects Groundwater Flow Under the conditions of the grouting result of pouring mortar pile.

Claims (7)

1. the indoor long-term assay device of the post grouting pile of simulated groundwater flowing, it is characterised in that: include proof box (1) and Injecting the dynamic Fluid Dynamics device (2) of water flow simulation Groundwater Flow in this proof box (1), described proof box (1) is built-in with mould Intending stake (3), the lower end of this simulation stake (3) offers slurry outlet (4), and the upper end of this simulation stake (3) connects to be had for cement injection The squeezing unit (5) of slurry;Described proof box is provided with lever bracket (6), and this lever bracket (6) one end rotatably connects with proof box (1) Connecing, the other end is unsettled, and this free end connects counterweight charger (7).
The indoor long-term assay device of post grouting pile of simulated groundwater the most according to claim 1 flowing, it is characterised in that: Described dynamic Fluid Dynamics device (2) includes the header tank (8) at external water source and is used for fixing the height-adjustable type of this header tank (8) Support (9), the outside of this header tank (8) is equipped with bottom and offers the water-collecting tray (11) of gap (10), the end of this header tank (8) Portion offers outlet (12), and this outlet (12) injects current by water inlet pipe (13) in proof box (1);Wherein control water At source, flow makes the water yield water yield more than inflow proof box (1) of inflow header tank, and the current of excess are overflow by header tank (8) top Go out to enter water-collecting tray (11), and flow out from gap (10), make proof box (1) interior stable level.
The indoor long-term assay device of post grouting pile of simulated groundwater the most according to claim 1 flowing, it is characterised in that: Described squeezing unit (5) includes agitator (14), pulp-absorbing pipe (15), mudjack (16) and the feed pipe for mortar (17) being sequentially connected with, should Defeated slurry Pressure gauge (19) it is additionally provided with on feed pipe for mortar (17).
The indoor long-term assay device of post grouting pile of simulated groundwater the most according to claim 3 flowing, it is characterised in that: Described simulation stake (3) upper end connects three way cock (20), one end of this three way cock (20) and the defeated slurry in squeezing unit (5) Pipe (17) is connected, and one end is connected with the madjack pipe (26) of simulation stake (3) top, and the other end is connected with slurry-returning device (21) Connect;And madjack pipe (26) is provided with mud jacking valve (18).
The indoor long-term assay device of post grouting pile of simulated groundwater the most according to claim 4 flowing, it is characterised in that: Described slurry-returning device (21) includes slurry storing tank (22) and return pipe (23), and slurry storing tank (22) is stretched in one end of this return pipe (23) In, the other end is connected with three way cock (20);Overfall valve (24) and overfall Pressure gauge it is additionally provided with on this return pipe (23) (25)。
6. the indoor long-term assay device of post grouting pile flowed according to the simulated groundwater described in claim 4 or 5, its feature exists In: described counterweight charger (7) is the counterweight basket that can arbitrarily increase and decrease counterweight.
7. the test of the indoor long-term assay device of post grouting pile flowed according to the arbitrary described simulated groundwater of claim 1-6 Method, it is characterised in that comprise the steps:
(1) soil sample is inserted in proof box (1), carries out compaction in layers, until design height, Model Pile (3) can pre-buried soil sample or Squeeze in soil sample;
(2) dynamic Fluid Dynamics operation: header tank (8) is connected with proof box (1) by water inlet pipe (13), controls flow at water source Making the water yield water yield more than inflow proof box (1) of inflow header tank, the current of excess are overflowed into collection by header tank (8) top Water pond (11), and flow out from gap (10), make header tank (8) Water discharge flow speed reach design load, and proof box (1) interior water level is steady Fixed;
(3) mud jacking operation: use three way cock (20) that feed pipe for mortar (17), return pipe (23) and madjack pipe (26) are connected formation one Individual loop, is respectively equipped with mud jacking valve (18) and overfall valve (24) on madjack pipe (26) and return pipe (23), during mud jacking first Overfall valve (24) is reached maximum, makes serosity empty back in slurry storing tank (22), more slowly turn down overfall valve (24), make pressure The reading of power table reaches the mud jacking pressure of requirement, then is opened by mud jacking valve (18), and regulation mud jacking valve (18) makes pressure basic Stable in mud jacking force value;Model Pile (3) is carried out mud jacking, during mud jacking, records the time of mud jacking, mud jacking amount, mud jacking pressure Power and slurry flow rate;
(4) long-term load operations: after mud jacking terminates and reaches intensity, by increasing the weight of counterweight charger (7) on lever bracket Code carries out bearingtest to Model Pile (3), persistently observes displacement at pile top situation of change at different time, detects Groundwater Flow Under the conditions of the grouting result of pouring mortar pile.
CN201610585670.3A 2016-07-25 2016-07-25 Long-term experimental rig and its test method in the post grouting pile room of simulated groundwater flowing Active CN106248495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610585670.3A CN106248495B (en) 2016-07-25 2016-07-25 Long-term experimental rig and its test method in the post grouting pile room of simulated groundwater flowing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610585670.3A CN106248495B (en) 2016-07-25 2016-07-25 Long-term experimental rig and its test method in the post grouting pile room of simulated groundwater flowing

Publications (2)

Publication Number Publication Date
CN106248495A true CN106248495A (en) 2016-12-21
CN106248495B CN106248495B (en) 2019-05-07

Family

ID=57603410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610585670.3A Active CN106248495B (en) 2016-07-25 2016-07-25 Long-term experimental rig and its test method in the post grouting pile room of simulated groundwater flowing

Country Status (1)

Country Link
CN (1) CN106248495B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108956316A (en) * 2018-07-09 2018-12-07 华中科技大学 A kind of Large Deformation Consolidation and contaminant transportation coupling test loading device and platform
CN108956105A (en) * 2018-05-16 2018-12-07 福州大学 Technology of Deepwater Mooring System body bearing capacity simulation test device and test method
CN113756736A (en) * 2021-08-30 2021-12-07 南京东土建设科技有限公司 Pile foundation post-grouting system based on drilling slag recycling and construction method
CN115324126A (en) * 2022-08-16 2022-11-11 中国水利水电第七工程局有限公司 Stirring pile test device for indoor simulation of underground water flow and use method thereof
CN115434378A (en) * 2022-08-12 2022-12-06 青岛理工大学 Single-phase method automatic grouting system and method for energy pile in EICP (electronic engineering and environmental protection) mineralization environment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008077136A1 (en) * 2006-12-19 2008-06-26 Loadtest, Inc. Method and apparatus for testing load-bearing capacity utilizing a ring cell
KR20080086254A (en) * 2007-03-22 2008-09-25 김창근 A construction method for concrete retaining wall using anchor soldier pile-style extracting, non-extracting-type soil nailing
CN103926394A (en) * 2014-04-30 2014-07-16 山东大学 Three-dimensional visible testing system and method of dynamic water grouting model
CN104318843A (en) * 2014-11-18 2015-01-28 成都理工大学 Pressure-bearing well water injection test device
CN104988907A (en) * 2015-08-02 2015-10-21 王继忠 Construction method of concrete pile
CN204825650U (en) * 2015-02-11 2015-12-02 柳州市聚能电气有限公司 Intelligence mud jacking device
CN105137048A (en) * 2015-09-28 2015-12-09 北京建筑大学 Stratum grouting simulation system
CN105258669A (en) * 2015-11-03 2016-01-20 南京电力工程设计有限公司 Simulation test device of sedimentation post-treatment of rain pipe in sea silt and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008077136A1 (en) * 2006-12-19 2008-06-26 Loadtest, Inc. Method and apparatus for testing load-bearing capacity utilizing a ring cell
KR20080086254A (en) * 2007-03-22 2008-09-25 김창근 A construction method for concrete retaining wall using anchor soldier pile-style extracting, non-extracting-type soil nailing
CN103926394A (en) * 2014-04-30 2014-07-16 山东大学 Three-dimensional visible testing system and method of dynamic water grouting model
CN104318843A (en) * 2014-11-18 2015-01-28 成都理工大学 Pressure-bearing well water injection test device
CN204825650U (en) * 2015-02-11 2015-12-02 柳州市聚能电气有限公司 Intelligence mud jacking device
CN104988907A (en) * 2015-08-02 2015-10-21 王继忠 Construction method of concrete pile
CN105137048A (en) * 2015-09-28 2015-12-09 北京建筑大学 Stratum grouting simulation system
CN105258669A (en) * 2015-11-03 2016-01-20 南京电力工程设计有限公司 Simulation test device of sedimentation post-treatment of rain pipe in sea silt and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘影 等: ""灌注桩桩端后压浆效果的室内模型试验"", 《西南科技大学学报》 *
陈火文: ""钻孔灌注桩的后压浆技术"", 《城市道桥与防洪》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108956105A (en) * 2018-05-16 2018-12-07 福州大学 Technology of Deepwater Mooring System body bearing capacity simulation test device and test method
CN108956316A (en) * 2018-07-09 2018-12-07 华中科技大学 A kind of Large Deformation Consolidation and contaminant transportation coupling test loading device and platform
CN108956316B (en) * 2018-07-09 2024-06-04 华中科技大学 Large-deformation consolidation and pollutant migration coupling test loading device and platform
CN113756736A (en) * 2021-08-30 2021-12-07 南京东土建设科技有限公司 Pile foundation post-grouting system based on drilling slag recycling and construction method
CN115434378A (en) * 2022-08-12 2022-12-06 青岛理工大学 Single-phase method automatic grouting system and method for energy pile in EICP (electronic engineering and environmental protection) mineralization environment
CN115434378B (en) * 2022-08-12 2024-04-19 青岛理工大学 Single-phase automatic grouting system and method for energy piles in EICP mineralized environment
CN115324126A (en) * 2022-08-16 2022-11-11 中国水利水电第七工程局有限公司 Stirring pile test device for indoor simulation of underground water flow and use method thereof

Also Published As

Publication number Publication date
CN106248495B (en) 2019-05-07

Similar Documents

Publication Publication Date Title
CN106248495A (en) The indoor long-term assay device of post grouting pile of simulated groundwater flowing and test method thereof
CN103364534B (en) Mining overburden rock isolation grouting filling simulation experiment device and method
CN106049557B (en) Using the test method of the laboratory testing rig of simulation grout pile end follow-up grouting
CN103236209B (en) Riverway cross-section two-dimensional underground seepage hydraulic experiment device
CN205679610U (en) A kind of piping experimental rig that can uniformly lift water level and measure soil pressure
CN205530247U (en) Prebored hole bag slip casting stock structure
CN201241335Y (en) Pile and post in one foundation structure of underground engineering
CN107238482B (en) North China coal field karst collapse column evolution process test device system
CN206523371U (en) Pile-soil interface shearing test device
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN106680467B (en) A kind of buried stratum high-pressure slip-casting simulation test device and test method
CN104900130A (en) Foundation pit pouring demonstrator and foundation pit pouring experiment research method thereof
CN108152118A (en) A kind of pile formula subgrade seepage flow erosion test device of adjustable head
CN107152038B (en) Geotechnical centrifugal model test equipment and excavation simulation method
CN110331743A (en) It is a kind of to test the quiet experimental rig and test method for boring and taking root in stake stake end enlarged footing load-carrying properties
CN105781509B (en) A kind of flat board sandpack column seepage flow experiment system
CN205591900U (en) Dull and stereotyped sand -packed model seepage flow experimental system
CN109632606B (en) Excavation surface seepage test system for river bottom shield tunnel construction under tidal load effect
CN206034512U (en) Bored concrete pile of driling under water construction monitoring devices
CN209745771U (en) Be used for on-spot monocycle infiltration test device
CN205280714U (en) Vertical moisturizing device of soil body in experimental section of thick bamboo of soil
CN104895094B (en) A kind of draining friction pile being automatically adjusted water level and construction method thereof
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN208968853U (en) A kind of sampling lantern ring
CN107728492A (en) A kind of deformable solution-cavity filling automatic simulation system and emulation mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant