CN108872297A - A kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig - Google Patents

A kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig Download PDF

Info

Publication number
CN108872297A
CN108872297A CN201810982699.4A CN201810982699A CN108872297A CN 108872297 A CN108872297 A CN 108872297A CN 201810982699 A CN201810982699 A CN 201810982699A CN 108872297 A CN108872297 A CN 108872297A
Authority
CN
China
Prior art keywords
model
test apparatus
load plate
casing
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810982699.4A
Other languages
Chinese (zh)
Other versions
CN108872297B (en
Inventor
李明宇
赵世永
刘玉豪
郭城林
庞磊
崔鑫磊
孙立光
靳军伟
魏艳卿
曾力
刘建伟
马友利
马世举
黄应华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
China Railway 15th Bureau Group Co Ltd
Urban Rail Transit Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
Zhengzhou University
China Railway 15th Bureau Group Co Ltd
Urban Rail Transit Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University, China Railway 15th Bureau Group Co Ltd, Urban Rail Transit Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical Zhengzhou University
Priority to CN201810982699.4A priority Critical patent/CN108872297B/en
Publication of CN108872297A publication Critical patent/CN108872297A/en
Application granted granted Critical
Publication of CN108872297B publication Critical patent/CN108872297B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N25/00Investigating or analyzing materials by the use of thermal means
    • G01N25/02Investigating or analyzing materials by the use of thermal means by investigating changes of state or changes of phase; by investigating sintering
    • G01N25/12Investigating or analyzing materials by the use of thermal means by investigating changes of state or changes of phase; by investigating sintering of critical point; of other phase change

Abstract

The present invention relates to a kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rigs, including for holding the model casing for filling out model clay, it is characterised in that:The top releasable connection of the model casing has steel pipe sheet model, the bottom end of model casing is provided with load plate component, load plate component includes load plate, the spring connecting with load plate and the reaction beam being fixedly connected with spring, load plate, spring and reaction beam are sequentially arranged up and down, for the upside plate face of load plate for contacting with model clay, model test apparatus further includes for applying stressed pressure exerting arrangement to the reaction beam.The present invention solves the problems, such as that the prior art cannot simulate in shield machine tunneling process synchronous grouting after section of jurisdiction is detached from shield tail and lead to duct piece float upward.

Description

A kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig
Technical field
The present invention relates to a kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rigs.
Background technique
In recent years, with the continuous development of city underground cause, subway work technology is also completed constantly.However, Research in terms of the influence of corresponding shield grouting rear slurry condensation process and different geological conditions to slurries setting strength is but compared It is less.The Chinese patent of Publication No. CN205643289U discloses " a kind of shield tunnel synchronous grouting simulation test system ", The synchronous grouting simulation test system includes the model casing for filling model clay, and the bottom of model casing, which is provided with, can slide back and forth Drawing device, the Grouting Pipe being connected to inside model casing is equipped in drawing device, synchronous grouting simulation test system further includes Reaction frame is provided with jack on reaction frame.
When test, model clay is filled into model casing, pre-buried good strain gauge, strain transducer and displacement sensor, Drawing device slip casting into model casing while pull, jack simulated formation pressure are synchronous to simulate one shield tail of shield machine The working condition of slip casting.Existing this simulation experiment system has the following problems:In slip casting condensation process on caused section of jurisdiction Floating, subsidence problems cannot be simulated effectively;In addition, the soil in true stratum is that have certain compactness, and the prior art In simulation experiment system cannot achieve the adjustment of compactness.
Summary of the invention
The purpose of the present invention is to provide a kind of grouting at the tail of the shield machine slurries condensation and duct piece float upward process model experimental rig, with Solve the problems, such as that the prior art cannot simulate duct piece float upward in slip casting condensation process.
In order to solve the above technical problems, technical scheme is as follows:
A kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig, including for holding the model for filling out model clay Case, the top releasable connection of the model casing have steel pipe sheet model, and the bottom end of model casing is provided with load plate component, load board group Part includes load plate, the spring connecting with load plate and the reaction beam being fixedly connected with spring, on load plate, spring and reaction beam Lower sequence arrangement, for the upside plate face of load plate for contacting with model clay, model test apparatus further includes for the counter-force Beam applies stressed pressure exerting arrangement.
Water filling port and water outlet are provided on the side wall of the model casing.
Flow control valve is connected on the water filling port.
The steel pipe sheet model is arc section of jurisdiction of the lower circumferential surface convex in the model casing.
Grouting port is provided on the model casing side wall and steel pipe sheet model.
Model test apparatus further includes the soil solidifying compression plate that can be moved up and down in model casing and the driving soil body The system for compacting that consolidation compression plate presses to model clay consolidates and is provided with permeable hole in compression plate.
The soil body unity compression plate is the equal proportion convex structure being arranged in parallel with steel pipe sheet model.
The threaded hole that axis vertically extends is provided in the middle part of steel pipe sheet model, model test apparatus further includes using In being threadedly coupled with the threaded hole with the pushing tow bolt of soil solidifying compression plate described in downward pushing tow.
Beneficial effects of the present invention are:In grouting test, pressure exerting arrangement passes through model clay of the load plate into model casing Apply pressure, to simulate the soil pressure of different soil depth, in slip casting condensation process, float or settle if there is soil layer, The amplitude of native ground settlement can be displayed by the floating of the opposite reaction beam of load plate, to realize that steel pipe sheet model floats Simulation.
Further, by water filling water pressure adjusting and opening and closing come the groundwater condition in simulated formation.
Further, before carrying out grouting test, system for compacting first passes through consolidation compression plate and presses to model clay, so that Model clay obtains the compactness of predetermined soil layer, to simulate more true ground environment.
Further, consolidation compression plate is and model tile equal proportion arc structure disposed in parallel, in this way process consolidation The slip casting region of arc is formed between the model clay and model tile of compression plate compacting, it is consistent with true slip casting region shape, Simulation test is more nearly real working condition.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of one embodiment of the present of invention;
Fig. 2 is the side view of Fig. 1.
Specific embodiment
The embodiment of a kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig is as shown in Figure 1 and 2:Packet It includes inner cavity and is fixed on model casing support frame 8 for filling the model casing 7 of model clay, model casing 7 by bolt.Model casing it is interior Double-deck non-skid film is posted on wall, non-skid film is made of tetrafluoro dragon film in the present embodiment, is filled with stone between the tetrafluoro dragon film of two sides Ink, to reduce the frictional force between two layers of tetrafluoro dragon film, the top of model casing is connected with steel pipe sheet mould by removable fixed structure Type 3, removable fixed structure include the clamping screw that axis vertically extends and the model casing screw thread being set on model casing Hole, steel pipe sheet model 3 are fixed on the upper end of model casing 7, steel pipe sheet mould by the clamping screw being threaded onto model casing threaded hole The lower circumferential surface convex of type 3 is in model casing.The sidewall upper of steel pipe sheet model and model casing is provided with grouting port 1, steel pipe sheet The axis of grouting port on model vertically extends, and is provided with what axis vertically extended in the middle part of steel pipe sheet model Section of jurisdiction threaded hole 15, section of jurisdiction threaded hole 15 constitute the grouting port.The bottom of model casing is provided with load plate component, loads board group Part includes reaction beam 11 and floats by spring 9 to be set to the load plate 10 of the upside of reaction beam 11, load plate 10 can on float downward Dynamic, the upper end of spring 9 is fixedly connected with load plate, and the lower end of spring 9 is fixedly connected with reaction beam, the upside plate face of load plate 10 For contacting power transmission with model clay, model test apparatus further includes for applying stressed pressure exerting arrangement to reaction beam(In figure not It shows), pressure exerting arrangement is hydraulic cylinder in the present embodiment.Model test apparatus further include can in model casing up and down guiding movement The system for compacting that soil solidifying compression plate 4 and driving soil solidifying compression plate press to model clay(It is not shown in the figure), compacting machine Structure includes the pushing tow bolt being threadedly coupled with section of jurisdiction threaded hole 15, by the lower end of pushing tow bolt to soil solidifying compression plate top Push away, soil solidifying compression plate can downward compacted fill when not in use, can will be pushed up with simulating the secret room degree of true soil layer It pushes away bolt to dismantle, section of jurisdiction threaded hole is for realizing the lifting to steel pipe sheet model.
Permeable hole 2 is provided in soil solidifying compression plate 4.It is additionally provided on the side wall of model casing spaced apart up and down Water filling port 5 and water outlet 6, water filling port and water outlet can be blocked by block head, be additionally provided with conducting wire on the side wall of model casing Mouthful.An at least side box wall for model casing is made of clear material, to facilitate observation experiment process, on the transparent side wall of model casing The scale value arranged along the vertical direction can also be set, to facilitate the float value of observation load plate.
When test, model clay 12 is placed in model casing, the sensors such as pre-buried pressure cell in model clay, the route of sensor It is drawn through guidewire port, first unity compression plate, is placed in the upside of model clay, by system for compacting to group by uneasiness steel loading section of jurisdiction model Compression plate pressure is tied, model clay is compacted, extra moisture can be overflowed through permeable mouth in model clay, simulate true soil layer with this Compactness, by water filling port pressure and opening and closing come the groundwater condition in simulated formation.Then unity compression plate is taken out, passes through Steel pipe sheet model is fixed on the upper end of model casing by bolt, by the grouting port on model casing side wall and steel pipe sheet model to steel pipe Slip casting between piece model and model clay, pressure exerting arrangement press to model clay by load plate, to simulate the ground lamination of Different Strata Power controls the process of the pressure simulation duct piece float upward of load plate when slip casting is in process of setting, until experiment is completed, takes out The slurries of condensation carry out slurry intensity measurement.
The present invention can be by the slurries condensation process that configures different model soil samples to simulate in Different Strata, and the present invention is also Different slurries can be simulated by configuring different slurries to the slurries condensation process on same stratum;By adjusting load plate component The soil pressure of different soil depth is simulated to the pressure of model clay;It is simulated by adjusting water injection pressure and the opening and closing of water filling port Groundwater condition in stratum;The influence that different grouting pressures condense slurries is simulated by adjusting grouting port pressure.This hair It is bright that there is good general utility functions, suitable for the slip casting condensation process simulation to different situations, convenient for providing ginseng to work progress Number accelerates construction progress, and ensures construction safety.The model test apparatus can simulate shield grouting under any geological conditions and starch Liquid condensation process and floating-upward process;Pressure exerting arrangement can effectively simulate the weight stress of duct piece float upward process.Experiment every time Energy recovery section soil body material is completed, it is economic and environment-friendly;This simulation test device, which need to only control pressure exerting arrangement, can complete experiment, easily In operation, accuracy decline caused by accidental error in experimentation is reduced.Section of jurisdiction spiral shell in the present invention in the middle part of steel pipe sheet model Pit can be used for slip casting, lifting and the load to unity compression plate, and the space between steel pipe sheet model and the soil body is for simulating Shield tail gap, shield tail gap is filled in slip casting in test, simulates synchronous grouting process in Practical Project, by consolidation compression plate to soil The simulation to soil sample compactness is completed in the compression of sample, and before slip casting, consolidation compression plate is taken out from model casing, reaction beam Reaction force is provided for spring, and can be used as the support frame of model casing, model test apparatus further includes Grouting Pipe and slip casting machine, to Water filling port water filling or draining, can arbitrarily set the water level in soil.Model test apparatus further includes the discharge outlet with lower position Connected water-level observation pipe, the variation for observed stage.
In other embodiments of the invention, section of jurisdiction fixed structure, which can also be that buckle etc. is other, can be realized steel pipe sheet mould The releasable connection structure of type and model casing releasable connection;Certainly consolidation compression plate can not also be set, and steel pipe sheet model can be at this time Non-disconnectable is fixed on model casing, model clay can be inserted into model casing from the side of model casing.

Claims (9)

1. a kind of grouting at the tail of the shield machine slurries condensation and duct piece float upward process model experimental rig, including for holding the mould for filling out model clay Molding box, it is characterised in that:The top releasable connection of the model casing has steel pipe sheet model, and the bottom end of model casing is provided with load plate Component, load plate component include load plate, the spring connecting with load plate and the reaction beam being fixedly connected with spring, load plate, Spring and reaction beam sequentially arrange that for contacting with model clay, model test apparatus further includes the upside plate face of load plate up and down For applying stressed pressure exerting arrangement to the reaction beam.
2. model test apparatus according to claim 1, it is characterised in that:Water filling is provided on the side wall of the model casing Mouth and water outlet.
3. model test apparatus according to claim 2, it is characterised in that:Flow adjusting is connected on the water filling port Valve.
4. model test apparatus according to claim 1, it is characterised in that:The steel pipe sheet model be lower circumferential surface convex in Arc section of jurisdiction in the model casing.
5. model test apparatus according to claim 1, it is characterised in that:On the model casing side wall and steel pipe sheet model It is provided with grouting port.
6. model test apparatus according to claim 1, it is characterised in that:An at least side box wall for model casing is glass box Wall is provided with the scale arranged along the vertical direction on transparent tank wall.
7. model test apparatus described in any one according to claim 1 ~ 6, it is characterised in that:Model test apparatus further includes The pressure that the soil solidifying compression plate and the driving soil solidifying compression plate that can be moved up and down in model casing press to model clay Real machine structure is provided with permeable hole in soil solidifying compression plate.
8. model test apparatus according to claim 7, it is characterised in that:The soil body unity compression plate is and steel pipe sheet The equal proportion convex structure of model parallel arrangement.
9. model test apparatus according to claim 7, it is characterised in that:Axis edge is provided in the middle part of steel pipe sheet model The section of jurisdiction threaded hole that up and down direction extends, model test apparatus further includes for being threadedly coupled with the section of jurisdiction threaded hole with downward The pushing tow bolt of soil solidifying compression plate described in pushing tow.
CN201810982699.4A 2018-08-27 2018-08-27 Shield tail grouting slurry coagulation and segment floating process model test device Active CN108872297B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810982699.4A CN108872297B (en) 2018-08-27 2018-08-27 Shield tail grouting slurry coagulation and segment floating process model test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810982699.4A CN108872297B (en) 2018-08-27 2018-08-27 Shield tail grouting slurry coagulation and segment floating process model test device

Publications (2)

Publication Number Publication Date
CN108872297A true CN108872297A (en) 2018-11-23
CN108872297B CN108872297B (en) 2023-12-05

Family

ID=64321695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810982699.4A Active CN108872297B (en) 2018-08-27 2018-08-27 Shield tail grouting slurry coagulation and segment floating process model test device

Country Status (1)

Country Link
CN (1) CN108872297B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826652A (en) * 2019-02-01 2019-05-31 上海工程技术大学 The simulation test device and method of slurries loss amount in shield synchronization slip casting
CN110219294A (en) * 2019-07-15 2019-09-10 深圳市勘察测绘院(集团)有限公司 It is applicable in the soil pressure cell inbuilt device of Soft Soil Area
CN110646164A (en) * 2019-10-18 2020-01-03 浙江科技学院 Experimental device for simulation shield tunnel section of jurisdiction come-up process
CN110657943A (en) * 2019-10-18 2020-01-07 浙江科技学院 Experimental device for simulating shield tunnel segment floating
CN111272980A (en) * 2020-02-29 2020-06-12 西南石油大学 Simulation system and experimental method for regulating shield floating of mudstone stratum
CN113418647A (en) * 2021-06-22 2021-09-21 腾达建设集团股份有限公司 Floating force testing device and method for shield segment in surrounding rock
CN113670500A (en) * 2019-10-18 2021-11-19 浙江科技学院 Experimental device for buoyancy measurement model of shield tunnel segment
CN114034845A (en) * 2021-06-01 2022-02-11 浙江工业大学 Visual test device for simulating grouting of grouting holes in different positions of duct piece and test method thereof
CN114659895A (en) * 2022-04-13 2022-06-24 西南交通大学 Simulation device and simulation method for shield tunnel segment deformation and ground surface settlement
CN114910282A (en) * 2022-04-19 2022-08-16 中国海洋大学 High-water-pressure shield tunnel wall back grouting and duct piece floating model test device and method
CN111272980B (en) * 2020-02-29 2024-04-19 西南石油大学 Simulation system and experimental method for regulating shield floating of mudstone stratum

Citations (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241707Y (en) * 2008-08-15 2009-05-20 上海隧道工程股份有限公司 Tunnel upward floating model trial apparatus
CN101672186A (en) * 2009-07-28 2010-03-17 中铁隧道股份有限公司 Method and device for synchronously grouting shield tunnel pipe sheet
CN101705829A (en) * 2009-10-21 2010-05-12 上海隧道工程股份有限公司 Method for controlling quality of tunnel pipe sheet built by using shield method and pipe sheet structure
CN201843623U (en) * 2010-11-03 2011-05-25 上海盾构设计试验研究中心有限公司 Sealing and guiding device of synchronous grouting simulation test platform for shield machine
CN202578708U (en) * 2012-03-13 2012-12-05 湖北省产品质量监督检验研究院 Effectiveness evaluation simulation device for shield tunnel synchronous grouting in soft foundation dynamic water stratum
CN103675231A (en) * 2013-11-22 2014-03-26 长沙理工大学 Soil layer sedimentation tester and test method thereof
CN103913289A (en) * 2012-12-31 2014-07-09 同济大学 Simulating system used for shield tunnel synchronous grouting test and test method thereof
CN104298206A (en) * 2014-10-27 2015-01-21 山东科技大学 Indoor three-dimensional grouting model test servo control system and test method
CN104677664A (en) * 2015-02-12 2015-06-03 上海交通大学 Model test device of shield tunnel uplifting mechanism
CN104931414A (en) * 2015-06-18 2015-09-23 同济大学 Testing device for analyzing stress of slurry balance shield tunnel pipe piece in swelling soil area
CN204703926U (en) * 2015-06-17 2015-10-14 中铁十局集团第三建设有限公司 A kind of shield-tunneling construction synchronous grouting simulation test platform
CN104989423A (en) * 2015-06-11 2015-10-21 同济大学 Visual single-circle shield tunneling synchronous grouting slurry diffusion mode study platform and application of platform
CN205643289U (en) * 2016-04-21 2016-10-12 同济大学 Synchronous slip casting analogue test system of shield tunnel
CN106226497A (en) * 2016-08-17 2016-12-14 上海交通大学 Simulation shield tunnel synchronous grouting is to the assay device of stratum settlement influence and method
CN106289614A (en) * 2016-08-17 2017-01-04 上海交通大学 The model test apparatus of Indoor measurement Earth Pressure for Shield Tunnel Lining and method
CN106768153A (en) * 2016-12-29 2017-05-31 中国人民解放军63926部队 A kind of slurry consolidation cubical contraction test device and method of testing
CN106948833A (en) * 2017-04-05 2017-07-14 宁波大学 Pin-connected panel service channel structure and its construction method
CN107100211A (en) * 2017-05-11 2017-08-29 同济大学 A kind of experimental rig of the pile-soil interaction in full size stake footpath
CN107191197A (en) * 2017-06-14 2017-09-22 中铁第四勘察设计院集团有限公司 A kind of shield duct piece and its pushed away in shield sky by the application in Tunneling by mining method
CN107831073A (en) * 2017-11-02 2018-03-23 中山大学 Shield-tunneling construction synchronous grouting experimental rig and test method
CN107976369A (en) * 2017-11-17 2018-05-01 西南石油大学 A kind of simulation system and experimental method for shield method synchronous grouting
WO2018101790A1 (en) * 2016-12-01 2018-06-07 안석 Fault fracture zone reinforcement method for rock tbm tunnel
CN207620797U (en) * 2017-11-22 2018-07-17 中国铁路总公司 A kind of shield tunnel construction phase Load Simulation and structural internal force test system
CN108333054A (en) * 2018-04-26 2018-07-27 北京交通大学 Tunnel threedimensional model bracket loading test platform and the test method observed for tunnel defect
CN208805482U (en) * 2018-08-27 2019-04-30 郑州大学 The condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig

Patent Citations (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241707Y (en) * 2008-08-15 2009-05-20 上海隧道工程股份有限公司 Tunnel upward floating model trial apparatus
CN101672186A (en) * 2009-07-28 2010-03-17 中铁隧道股份有限公司 Method and device for synchronously grouting shield tunnel pipe sheet
CN101705829A (en) * 2009-10-21 2010-05-12 上海隧道工程股份有限公司 Method for controlling quality of tunnel pipe sheet built by using shield method and pipe sheet structure
CN201843623U (en) * 2010-11-03 2011-05-25 上海盾构设计试验研究中心有限公司 Sealing and guiding device of synchronous grouting simulation test platform for shield machine
CN202578708U (en) * 2012-03-13 2012-12-05 湖北省产品质量监督检验研究院 Effectiveness evaluation simulation device for shield tunnel synchronous grouting in soft foundation dynamic water stratum
CN103913289A (en) * 2012-12-31 2014-07-09 同济大学 Simulating system used for shield tunnel synchronous grouting test and test method thereof
CN103675231A (en) * 2013-11-22 2014-03-26 长沙理工大学 Soil layer sedimentation tester and test method thereof
CN104298206A (en) * 2014-10-27 2015-01-21 山东科技大学 Indoor three-dimensional grouting model test servo control system and test method
CN104677664A (en) * 2015-02-12 2015-06-03 上海交通大学 Model test device of shield tunnel uplifting mechanism
CN104989423A (en) * 2015-06-11 2015-10-21 同济大学 Visual single-circle shield tunneling synchronous grouting slurry diffusion mode study platform and application of platform
CN204703926U (en) * 2015-06-17 2015-10-14 中铁十局集团第三建设有限公司 A kind of shield-tunneling construction synchronous grouting simulation test platform
CN104931414A (en) * 2015-06-18 2015-09-23 同济大学 Testing device for analyzing stress of slurry balance shield tunnel pipe piece in swelling soil area
CN205643289U (en) * 2016-04-21 2016-10-12 同济大学 Synchronous slip casting analogue test system of shield tunnel
CN106226497A (en) * 2016-08-17 2016-12-14 上海交通大学 Simulation shield tunnel synchronous grouting is to the assay device of stratum settlement influence and method
CN106289614A (en) * 2016-08-17 2017-01-04 上海交通大学 The model test apparatus of Indoor measurement Earth Pressure for Shield Tunnel Lining and method
WO2018101790A1 (en) * 2016-12-01 2018-06-07 안석 Fault fracture zone reinforcement method for rock tbm tunnel
CN106768153A (en) * 2016-12-29 2017-05-31 中国人民解放军63926部队 A kind of slurry consolidation cubical contraction test device and method of testing
CN106948833A (en) * 2017-04-05 2017-07-14 宁波大学 Pin-connected panel service channel structure and its construction method
CN107100211A (en) * 2017-05-11 2017-08-29 同济大学 A kind of experimental rig of the pile-soil interaction in full size stake footpath
CN107191197A (en) * 2017-06-14 2017-09-22 中铁第四勘察设计院集团有限公司 A kind of shield duct piece and its pushed away in shield sky by the application in Tunneling by mining method
CN107831073A (en) * 2017-11-02 2018-03-23 中山大学 Shield-tunneling construction synchronous grouting experimental rig and test method
CN107976369A (en) * 2017-11-17 2018-05-01 西南石油大学 A kind of simulation system and experimental method for shield method synchronous grouting
CN207620797U (en) * 2017-11-22 2018-07-17 中国铁路总公司 A kind of shield tunnel construction phase Load Simulation and structural internal force test system
CN108333054A (en) * 2018-04-26 2018-07-27 北京交通大学 Tunnel threedimensional model bracket loading test platform and the test method observed for tunnel defect
CN208805482U (en) * 2018-08-27 2019-04-30 郑州大学 The condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826652B (en) * 2019-02-01 2023-10-13 上海工程技术大学 Simulation test device and method for slurry loss in shield synchronous grouting
CN109826652A (en) * 2019-02-01 2019-05-31 上海工程技术大学 The simulation test device and method of slurries loss amount in shield synchronization slip casting
CN110219294A (en) * 2019-07-15 2019-09-10 深圳市勘察测绘院(集团)有限公司 It is applicable in the soil pressure cell inbuilt device of Soft Soil Area
CN110646164A (en) * 2019-10-18 2020-01-03 浙江科技学院 Experimental device for simulation shield tunnel section of jurisdiction come-up process
CN110657943A (en) * 2019-10-18 2020-01-07 浙江科技学院 Experimental device for simulating shield tunnel segment floating
CN110646164B (en) * 2019-10-18 2021-09-14 浙江科技学院 Experimental device for simulation shield tunnel section of jurisdiction come-up process
CN110657943B (en) * 2019-10-18 2021-09-28 浙江科技学院 Experimental device for simulating shield tunnel segment floating
CN113670500A (en) * 2019-10-18 2021-11-19 浙江科技学院 Experimental device for buoyancy measurement model of shield tunnel segment
CN111272980A (en) * 2020-02-29 2020-06-12 西南石油大学 Simulation system and experimental method for regulating shield floating of mudstone stratum
CN111272980B (en) * 2020-02-29 2024-04-19 西南石油大学 Simulation system and experimental method for regulating shield floating of mudstone stratum
CN114034845A (en) * 2021-06-01 2022-02-11 浙江工业大学 Visual test device for simulating grouting of grouting holes in different positions of duct piece and test method thereof
CN113418647A (en) * 2021-06-22 2021-09-21 腾达建设集团股份有限公司 Floating force testing device and method for shield segment in surrounding rock
CN114659895A (en) * 2022-04-13 2022-06-24 西南交通大学 Simulation device and simulation method for shield tunnel segment deformation and ground surface settlement
CN114910282A (en) * 2022-04-19 2022-08-16 中国海洋大学 High-water-pressure shield tunnel wall back grouting and duct piece floating model test device and method
CN114910282B (en) * 2022-04-19 2023-02-03 中国海洋大学 High-water-pressure shield tunnel wall back grouting and duct piece floating model test device and method

Also Published As

Publication number Publication date
CN108872297B (en) 2023-12-05

Similar Documents

Publication Publication Date Title
CN108872297A (en) A kind of condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig
CN207198149U (en) One kind is based on numerical simulation study close-in seamses group's water-retaining production experimental provision
CN104200734B (en) A kind of method of inverting coal seam bottom water bursting
CN101308126B (en) Offshore mining top board seepage flow sudden inflow test method and device
CN103983742B (en) Coal seam overlying strata are disrumpent feelings coal and rock gas migration and extraction experimental system
CN201007871Y (en) Water-keeping mining solid-liquid coupling three-dimensional physical analog test stand
CN205176016U (en) Simulation modeling experiment device at adjustable inclination
CN103953074A (en) Opened tubular pile hammering injection and static load simulation experiment device and method
CN211602719U (en) Stope mine pressure three-dimensional physical simulation test platform of multi-functional top bottom plate gushing water
CN104931414B (en) A kind of swelled ground area slurry balance shield tunnel duct piece force analysis experimental rig
CN107178102B (en) Test system and test method for ultimate bearing capacity model of through-hole type foundation pile
CN202216789U (en) Test stand of adsorption force of bottom of pile shoe of self-elevating platform
CN102539244A (en) Unsaturated soil anisotropic consolidation test device
CN205176021U (en) Tunnelling simulation modeling experiment device
CN103760096B (en) A kind of side direction pressurization analog simulation experimental device and experimental technique
CN115839822B (en) System and method for testing process of submerged and pumping drainage of mountain tunnel induced by heavy rainfall
CN109975117A (en) Push pipe experimental box and experimental method
CN104990659B (en) A kind of swelled ground area slurry balance shield tunnel tunnel face expansive force experimental rig
CN208805482U (en) The condensation of grouting at the tail of the shield machine slurries and duct piece float upward process model experimental rig
CN104988956A (en) Device for testing stress condition of pile group under asymmetric edge loads
CN207650031U (en) Concrete sample Hydraulic fracturing test sealing device under axial force
CN111926868B (en) Simulation immersed tube stake end defect processing's work progress presentation device
CN108051304A (en) A kind of experimental provision and experimental method at multifunction three-dimensional visual structure interface
CN110439043A (en) It is a kind of can multidirectional load swelled ground pile foundation experimental provision
CN110528602A (en) Earth lateral pressure experiment simulator under diaphram wall difference level of ground water operating condition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 6 / F, NO.666 Gonghe Xin Road, Jing'an District, Shanghai 200040

Applicant after: CHINA RAILWAY 15TH CONSTRUCTION BUREAU GROUP Co.,Ltd.

Applicant after: URBAN RAIL TRANSIT ENGINEERING COMPANY LIMITED OF CHINA RAILWAY 15TH BUREAU

Applicant after: Zhengzhou University

Address before: 450001 No. 100 science Avenue, Henan, Zhengzhou

Applicant before: Zhengzhou University

Applicant before: CHINA RAILWAY 15TH CONSTRUCTION BUREAU GROUP Co.,Ltd.

Applicant before: URBAN RAIL TRANSIT ENGINEERING COMPANY LIMITED OF CHINA RAILWAY 15TH BUREAU

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhao Shiyong

Inventor after: Zeng Li

Inventor after: Liu Jianwei

Inventor after: Ma Youli

Inventor after: Ma Shiju

Inventor after: Huang Yinghua

Inventor after: Li Mingyu

Inventor after: Liu Yuhao

Inventor after: Guo Chenglin

Inventor after: Pang Lei

Inventor after: Cui Xinlei

Inventor after: Sun Liguang

Inventor after: Jin Junwei

Inventor after: Wei Yanqing

Inventor before: Li Mingyu

Inventor before: Zeng Li

Inventor before: Liu Jianwei

Inventor before: Ma Youli

Inventor before: Ma Shiju

Inventor before: Huang Yinghua

Inventor before: Zhao Shiyong

Inventor before: Liu Yuhao

Inventor before: Guo Chenglin

Inventor before: Pang Lei

Inventor before: Cui Xinlei

Inventor before: Sun Liguang

Inventor before: Jin Junwei

Inventor before: Wei Yanqing

GR01 Patent grant
GR01 Patent grant