Lead
Technical field
The utility model belongs to coal mining equipment technical field, and in particular to a kind of lead.
Background technology
Support apparatus in colliery is the important step for being related to worker's production safety.At present, China's coal-mine fully mechanized mining fills
Quickly, unprecedented levels have been arrived in the development of coal mine fully-mechanized mining filling technique, in coal production and safety guarantee, play key for reform and development
With very important effect.But traditional filling process is realized in a manner of mining area is all filled, cause the time,
The waste of financial resources, material resources, it is clear that conventional filling mining technique is therefore a kind of it is impossible to meet the development of following filling mining
The new filling process to solve the above problems arises at the historic moment, and need not be stuffed entirely with the region being produced, be filled out using house column type
Fill, fill the mixture that can quickly solidify in a mold, loading time can be shortened, improve production efficiency.Coordinate new fill
The auxiliary support apparatus for filling out technique is also required to make and is correspondingly improved.
Coal mine fully-mechanized mining supporting in recent years is quickly grown, and miscellaneous guiding stabilizing mechanism design changes ten thousand times without leaving the original aim or stand, and one
As be square structure, structure interval is big and Yi Bieka, and the structure can not meet portions of client demand at present.
The content of the invention
Technical problem to be solved in the utility model is:A kind of lead is provided, will not during being oriented to
There is the phenomenon do not blocked, ensure the stability and reliability being oriented to.
In order to solve the above technical problems, the technical solution of the utility model is:
Lead, it is characterised in that the lead includes:The column casing of hollow cylinder, the column casing is interior to be provided with live post,
The bottom of the live post is provided with piston, and the piston is slidably matched with the column casing, and guide ring one is provided with the piston,
The upper end of the column casing is fixed with the guide sleeve being set in the live post, and guide ring is provided with the inwall of the guide sleeve
Two.
Further, dust ring is additionally provided between the live post and the guide sleeve, the dust ring is led positioned at described
To the top of ring two.
Further, guide sleeve groove is offered on the guide sleeve, the dust ring is positioned over the guide sleeve groove
It is interior.
Further, it is provided with reinforcement on the outer peripheral face of the column casing.
Further, the lower end of the reinforcement is provided with connecting hole.
Further, the reinforcement spaced set has four.
Further, the upper end of the live post is circular arc-shaped end.
Further, the guide ring one is arranged with twice in parallel.
By adopting the above-described technical solution, the beneficial effects of the utility model are:
Lead of the present utility model includes the column casing of hollow cylinder, and live post is provided with column casing, and the bottom of live post is set
There is piston, piston is slidably matched with column casing, and guide ring one is provided with piston, and the upper end of column casing, which is fixed with, to be set in live post
Guide sleeve, guide ring two is provided with the inwall of guide sleeve.It is big compared to gap existing for traditional square guiding mechanism and
Easily there is the problem of not blocking, the structure of this lead is not in the phenomenon do not blocked during being oriented to, and ensures to lead
To stability and reliability.
Dust ring is additionally provided between live post and guide sleeve, and dust ring is located at the top of guide ring two, effectively
Avoid the inside that dust enters column casing.
Guide sleeve groove is offered on guide sleeve, dust ring is placed in guide sleeve groove, is first directed to set, guide ring
Two and dust ring be combined into one structure, then guide sleeve is integrally set in live post again, and be fixed on the upper of column casing
End, is easily installed and dismantles.
Brief description of the drawings
Fig. 1 is the structural representation of lead of the present utility model;
Fig. 2 is Fig. 1 upward view;
Fig. 3 is the structural representation using the filling servicing unit of lead of the present utility model;
Fig. 4 is Fig. 3 left view;
In figure, filling auxiliary unit on the right side of 1-, 11- filling caps, 12- back timbers, 13- bases, hydraulic vertical prop before 14-, 15-
Hydraulic vertical prop afterwards, 16- leads, 161- column casings, 162- live posts, 1621- live posts upper end, 163- guide rings one, 164- pistons,
165- guide rings two, 166- guide sleeves, 167- dust rings, 168- reinforcements, 1681- reinforcement connecting holes, 17- deep beads, 18-
Operation valve, 19- suspension ring, 2- left sides filling auxiliary unit, 3- supra polymer baffle plates.
Embodiment
Lead of the present utility model is further illustrated with reference to the accompanying drawings and examples.
Jointly shown with reference to Fig. 1 and Fig. 2, the upper end of lead 16 is connected on back timber 12, and the lower end of lead 16 connects
It is connected on base 13.Lead 16 includes column casing 161, is provided with live post 162 in column casing 161, the bottom of live post 162 is provided with piston
164, piston 164 can be linked together with live post 162 by way of welding, it is of course also possible to pass through other conventional companies
The mode of connecing is fixed together.Guide ring 1 is provided with piston 164, in order to preferably play a part of guiding, is oriented to
Ring 1 is arranged with twice in parallel, and piston 164 is slidably matched with column casing 161.
The upper end of column casing 161 is fixed with the guide sleeve 166 being set in live post 162, in order to preferably play the work of guiding
With being provided with guide ring 2 165 on the inwall of guide sleeve 166.
In order to prevent dust from entering the inside of column casing 161, it is additionally provided between live post 162 and guide sleeve 166 dust-proof
Circle 167, and cause dust ring 167 to be located at the top of guide ring 2 165.
For the ease of being installed on dismounting, guide sleeve groove is offered on guide sleeve 166, dust ring 167 is placed on guiding
Cover in groove, be first directed to set 166, guide ring 2 165 and dust ring 167 and be combined into one structure then again guide sleeve
166 entirety are set in live post 162, and are fixed on the upper end of column casing 161.And it is provided with the inwall of guide sleeve 166
Screw thread, the upper end that set 166 is directly screwed in column casing 161 can be directed to.
Reinforcement 168 is provided with the outer peripheral face of column casing 161, for the ease of being connected with other parts, is being strengthened
The bottom of muscle 168 offers reinforcement connecting hole 1681.Reinforcement 168 can have four with spaced set.
The live post upper end 1621 of live post 162 is circular arc-shaped end.
Jointly shown with reference to Fig. 3 and Fig. 4, one kind filling servicing unit, it is auxiliary that it includes two hinged fillings
Unit is helped, is respectively right side filling auxiliary unit 1 and left side filling auxiliary unit 2, and right side fills auxiliary unit 1 and left side
It is identical to fill the structure of auxiliary unit 2.Filled at two on the adjacent side of auxiliary unit and be all provided with hinged ear, worn by bearing pin
It is hinged to cross hinged ear, for anti-leak-stopping cash, horizontal supra polymer baffle plate 3 is provided with hinged place.Filled with right side
Exemplified by auxiliary unit 1, right side filling auxiliary unit 1 includes back timber 12, base 13 and is vertically arranged in back timber 12 and base 13
Between retractable supports structure;Retractable supports structure includes hydraulic vertical prop and lead 16, and hydraulic vertical prop is provided with two,
Respectively preceding hydraulic vertical prop 14 and rear hydraulic vertical prop 15, and two hydraulic vertical props are separately positioned on the both sides of lead 16.Liquid
Pressure column controls lifting, hydraulic control system control hydraulic vertical prop by hydraulic control system with hydraulic vertical prop by operation valve 18
Lifting process, belong to prior art to those skilled in the art, will not be repeated here.
The bottom of the column casing 161 of lead 16 is inserted directly into base, the reinforcement connecting hole 1681 of four reinforcements 168
Linked together with four lead engaging lugs being arranged on base by bearing pin.The live post upper end 1621 of live post 162 is
Circular arc-shaped end, it is connected by bearing pin with back timber.
The outside of back timber 12 respectively sets one group of suspension ring 19, and mould is filled for hanging.The rear end of back timber 12 is provided with deep bead
17, effectively ensure the ventilation of working face.
Filling base 11 is provided with the front end of base 13, to the main filling pipeline of stationary face.
The technical characteristic (such as guide ring one, guide ring are second-class) with sequence number name being related in this specification, only
It is to distinguish each technical characteristic, does not represent position relationship, erection sequence and job order between each technical characteristic etc..
In the description of this specification, it is to be understood that " left side filling auxiliary unit ", " right side filling auxiliary unit "
Deng the orientation of description, either position relationship is to be based on orientation shown in the drawings or position relationship, it is only for be easy to description this
Invent and simplify description, rather than the device or element of instruction or hint meaning there must be specific orientation, with specific side
Position construction and operation, therefore it is not intended that to limitation of the present utility model.
Although the foregoing describing specific embodiment of the present utility model, it should be appreciated by those skilled in the art,
Described embodiment is only part of the embodiment of the present utility model, rather than whole embodiments, and these are only to lift
Example explanation, the scope of protection of the utility model is to be defined by the appended claims.Those skilled in the art is without departing substantially from this
, can be to these embodiments under any performing creative labour of no process on the premise of the principle and essence of utility model
Various changes or modifications are made, but these changes and modification each fall within the scope of protection of the utility model.