CN207148105U - By instructing the support pile experimental rig destroyed in excavation models experiment - Google Patents

By instructing the support pile experimental rig destroyed in excavation models experiment Download PDF

Info

Publication number
CN207148105U
CN207148105U CN201721084872.6U CN201721084872U CN207148105U CN 207148105 U CN207148105 U CN 207148105U CN 201721084872 U CN201721084872 U CN 201721084872U CN 207148105 U CN207148105 U CN 207148105U
Authority
CN
China
Prior art keywords
cylinder
steel shaft
stake
destroyed
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721084872.6U
Other languages
Chinese (zh)
Inventor
郑刚
程雪松
雷亚伟
李溪源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201721084872.6U priority Critical patent/CN207148105U/en
Application granted granted Critical
Publication of CN207148105U publication Critical patent/CN207148105U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of support pile experimental rig destroyed in excavation models experiment by instruction, for simulating the transmission of foundation pit supporting pile local failure in the longitudinal direction so as to triggering the mechanism continuously destroyed, including prefabricated broken pile, magnet, linear bearing, steel shaft, cylinder counter-force block, steel wire rope and cylinder, the prefabricated broken pile includes the upper half stake and lower half stake, the junction center of the upper half stake and lower half stake is respectively fixed with a linear bearing, the steel shaft is slidably connected in the linear bearing, it is used to prevent steel shaft from falling because of deadweight at the top of the steel shaft that the magnet is arranged in the upper half stake;Steel shaft bottom is provided with the piston rod of the cylinder counter-force block and cylinder, the steel wire rope connection steel shaft and the cylinder in the lower half stake, and the prefabricated broken pile is externally provided with the magnetic valve for controlling cylinder.The utility model can accomplish to result of the test disturb it is less, destroyed while different number support piles can be simulated.

Description

By instructing the support pile experimental rig destroyed in excavation models experiment
Technical field
The utility model is related to a kind of experimental rig in Geotechnical Engineering, if in particular it relates in a kind of research foundation ditch by The model test apparatus that foundation ditch caused by dry root support pile destroys locally collapses and continuously collapsed.
Background technology
Made both at home and abroad there occurs a large amount of great foundation ditch collapse accidents, such as the ground such as Singapore, Hangzhou, Cologne in recent years Into very serious loss.Find that the unstable failure of foundation ditch is an extremely complex process, is especially existed according to these accidents In the case that foundation ditch is deep, big, flat shape is irregular or supporting construction is complicated, its destruction is probably then by a certain local failure Cause, and then development evolvement is the pattern of a variety of destructions, it is also possible to drawn by local Support structure damage or local sediment failure Rise, and then cause periphery supporting construction until the pattern collapsed on a large scale, i.e. the process of collapsing of deep basal pit is a continuous destruction Process.
According to the record of Singapore's Nicoll Highway subway foundation pit accident destructive process it can be found that growing nearly hundred meters It is since local most weak position (i.e. 66kV cables ground-connecting-wall from has the position of breach) that foundation ditch, which collapses,.Incident The same day, ground-connecting-wall indentation, there the 9th support (S335) purlin and support disengage first, and cause herein ground-connecting-wall collapse, Destroy after stopping 2 minutes, beginning of caving in develops along foundation ditch length direction, until collapsing to outside 100m.A large amount of foundation pit accident hairs After life, the investigation and summary of many accidents still can ignore the continuous failure mechanism of accident.
In structural engineering field, for the constructions of structures such as multi-rise building, large-span structure and bridge blast, earthquake, Continuous collapse research under the emergency cases such as fire, shock is more ripe, and research meanses are also very abundant, including theory pushes away Lead, model test and numerical simulation etc., while many countries and regions are to the progressive collapse-resisting design construction of superstructure Related specification and directive document.Compared with research with continuously destroying problem in Structural Engineering has been achieved with remarkable break-throughs, mesh The research that preceding Geotechnical Engineering field is continuously destroyed is also seldom, and does not cause due attention also.
(monolithic stability destruction, overturning, bottom heave destroys and skirt destroys for current foundation ditch stability disruption pattern Deng) it obviously can not reflect the characteristics of deep basal pit continuously destroys and mechanism, while can not also be carried for the research of its control method For enough supports, therefore, the generation for destroying this great underground engineering disasters continuous to deep basal pit carries out deep with Evolution Mechanism Entering research is extremely necessary, only discloses transmission hair of the destruction of local failure initiation along foundation depth, width, length direction Mechanism and natural termination mechanism are opened up, and establishes the quantitatively evaluating index and evaluation method of evaluation foundation ditch continuous collapse possibility, Energy proposes to prevent the theory and design method of foundation pit supporting construction progressive collapse-resisting.
The problem of due to the continuous destruction of deep basal pit being a large deformation, non-linear, multi- scenarios method, existing limiting equilibrium The methods of method, limit analysis method, conventional elasto-plastic finite element method and Strength Reduction Method, which can only mostly be related to foundation ditch, to destroy Critical condition, as the development and differentiation destroyed after starting, these conventional methods are difficult to simulate and describe.Therefore, it is Continuously damage study means are also badly in need of for the continuous destruction of research deep basal pit, rational large deformation computational methods and model test etc. Explore.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, there is provided a kind of to lead in excavation models experiment The support pile experimental rig that instruction destroys is crossed, solves the problems, such as that local support pile is simulated in continuous damage model test to be destroyed, It can accomplish less to result of the test disturbance;The utility model not waited using number simultaneously, can simulate different number supportings Destroyed while stake.
The purpose of this utility model is achieved through the following technical solutions:
A kind of support pile experimental rig destroyed in excavation models experiment by instruction, for simulating foundation pit supporting pile office Portion destroys transmission in the longitudinal direction so as to trigger the mechanism continuously destroyed, including prefabricated broken pile, magnet, linear bearing, steel Axle, cylinder counter-force block, steel wire rope and cylinder, the prefabricated broken pile include the upper half stake and lower half stake, the upper half stake and The junction center of lower half stake is respectively fixed with a linear bearing, and the steel is slidably connected in the linear bearing Axle, the steel shaft top that the magnet is arranged in the upper half stake are used to prevent steel shaft from falling because of deadweight;The lower half stake Interior steel shaft bottom is provided with the piston rod of the cylinder counter-force block and cylinder, the steel wire rope connection steel shaft and the cylinder, described Prefabricated broken pile is externally provided with the magnetic valve for controlling cylinder.
Further, the frictional force between the steel shaft and the linear bearing is less than the gravity of steel shaft.
Further, failure test while different number support piles can be simulated by adjusting the experimental rig quantity.
Further, the prefabricated broken pile is made up of aluminum, irony, stainless steel or PVC any materials therein Rectangular configuration.
Compared with prior art, beneficial effect caused by the technical solution of the utility model is:
1. realize the controllability that pile body invalid position during local failure occurs for Row Piles Supporting Structure.
2. using different number of the utility model experimental rig simultaneously, and it is arranged according to simulation demand, Ke Yishi Destroyed while existing varying number, diverse location support pile.
3. realizing crash simulation of the support pile under different excavation of foundation pit depth, soil pressure in excavation models experiment is overcome The smaller contradiction with support pile intensity between higher of power.
4. using the steel shaft connection broken pile of carry magnet, it is ensured that the Model Pile destroyed before occurring, which has, meets supporting demand Strength and stiffness.
5. realizing the acceptable instruction of Model Pile by control of the magnetic valve to cylinder inner push-rod to fracture, examination can be made Part destroys in the range of less load.
It is practical reliable 6. the utility model device overall structure is simple, it is easy to operation and be easily achieved, for simulating foundation ditch The model investigation of Row Piles Supporting Structure destructive process is significant under excavation and smaller soil disturbance.
Brief description of the drawings
Fig. 1 is schematic cross-section when the upper and lower half stake of the utility model links together;
Fig. 2 is schematic diagram when upper lower half stake separates after the utility model cylinder is released;
Fig. 3 is foundation ditch schematic diagram when the utility model is tested;
Reference:1st, the upper half stake, 2, magnet, 3, linear bearing, 4, lower half stake, 5, steel shaft, 6, steel wire rope, 7, gas Cylinder counter-force block, 8, cylinder, 9, magnetic valve
Embodiment
The utility model will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, in simulation foundation ditch local failure and the model test continuously destroyed, complete model examination Test the rectangular pile that prefabricated broken pile is usually the plastic materials such as aluminum, irony, stainless steel or PVC.Because excavation models test size Much smaller than the size of Practical Project, the soil pressure suffered by support pile is smaller, therefore complete support pile is difficult the institute in model test Destroyed in the range of the load being subject to.It is locally broken that the support pile that receiving instruction destroys can be used in simulation foundation pit supporting pile Bad transmission in the longitudinal direction is so as to triggering the mechanism continuously destroyed.In the normal excavation stage of foundation ditch experiment, prefabricated broken pile Including the upper half stake 1 and lower half stake 4, the junction center of the upper half stake 1 and lower half stake 4 is respectively fixed with one directly Bobbin holds 3, and steel shaft 5 is slidably connected in linear bearing 3, and the top of steel shaft 5 that magnet 2 is arranged in the upper half stake 1 is used to prevent Steel shaft 5 is fallen because of deadweight;The bottom of steel shaft 5 is provided with cylinder counter-force block 7 and cylinder 8 in lower half stake 4, and steel wire rope 6 connects cylinder Piston rod and steel shaft 5, prefabricated broken pile are externally provided with the magnetic valve 9 for controlling cylinder.
Steel shaft 5 is to transmit the moment of flexure between upper and lower half stake, and its stress and deformation characteristic are close to complete model stake;Just After the normally opened digging stage terminates, by controlling magnetic valve 9 to inflate cylinder moment, cylinder push-rod ejects immediately, will by steel wire rope 6 Steel shaft 5 draws in lower half stake, and the upper half stake 1 and the two-section stake of lower half stake 4 disconnect, and the broken of foundation ditch part support pile is simulated with this It is bad.
The step of being tested by the utility model experimental rig is as follows:
1. upper and lower half stake is docking together, steel shaft, then the utility model by some numbers are held with upper magnet Device is placed on foundation ditch precalculated position with common support pile, prepares model test soil body;
2. debugging, setting up test monitoring equipment, carry out testing the normal excavation stage, now the utility model and common supporting Stake forms cantilever style campshed supporting together, stops excavating after normally excavating to desired depth and monitors;
3. the air inlet of magnetic valve is connected into upper cylinder, cylinder is pressurized to predetermined pressure, opens cylinder gas outlet;
4. power of electromagnetic valve, the utility model upper and lower half after the completion of test monitoring equipment debugging, erection, will be connected again Stake separation is cut, because soil pressure acts on after stake, the upper half stake is collapsed into foundation ditch.
The application method of foundation ditch local failure is simulated for the experimental rig above, by the utility model with being monitored in experiment Stake, soil pressure cell and subsequent burst stake are used in conjunction with, and are successfully simulated transmittance process and termination situation that foundation ditch continuously destroys, are obtained The mechanism of load transmission when foundation ditch continuously destroys is gone out.
The utility model is not limited to embodiments described above.The description to embodiment is intended to describe above With explanation the technical solution of the utility model, above-mentioned embodiment is only schematical, is not restricted. In the case of not departing from the utility model aims and scope of the claimed protection, one of ordinary skill in the art is in this practicality The specific conversion of many forms can be also made under new enlightenment, these are belonged within the scope of protection of the utility model.

Claims (4)

1. by instructing the support pile experimental rig destroyed in excavation models experiment, for simulating foundation pit supporting pile local failure Transmission in the longitudinal direction is so as to triggering the mechanism continuously destroyed, it is characterised in that including prefabricated broken pile, magnet, linear axis Hold, steel shaft, cylinder counter-force block, steel wire rope and cylinder, the prefabricated broken pile include the upper half stake and lower half stake, described the upper half The junction center of stake and lower half stake is respectively fixed with a linear bearing, is slidably connected in the linear bearing Steel shaft is stated, is used to prevent steel shaft from falling because of deadweight at the top of the steel shaft that the magnet is arranged in the upper half stake;The lower half The piston rod that steel shaft bottom in stake is provided with the cylinder counter-force block and cylinder, the steel wire rope connection steel shaft and the cylinder is cut, The prefabricated broken pile is externally provided with the magnetic valve for controlling cylinder.
2. according to claim 1 by instructing the support pile experimental rig destroyed in excavation models experiment, its feature exists In the frictional force between the steel shaft and the linear bearing is less than the gravity of steel shaft.
3. according to claim 1 by instructing the support pile experimental rig destroyed in excavation models experiment, its feature exists In failure test while can simulating different number support piles by adjusting the experimental rig quantity.
4. according to claim 1 by instructing the support pile experimental rig destroyed in excavation models experiment, its feature exists In the prefabricated broken pile is the rectangular configuration being made up of aluminum, irony, stainless steel or PVC any materials therein.
CN201721084872.6U 2017-08-28 2017-08-28 By instructing the support pile experimental rig destroyed in excavation models experiment Active CN207148105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721084872.6U CN207148105U (en) 2017-08-28 2017-08-28 By instructing the support pile experimental rig destroyed in excavation models experiment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721084872.6U CN207148105U (en) 2017-08-28 2017-08-28 By instructing the support pile experimental rig destroyed in excavation models experiment

Publications (1)

Publication Number Publication Date
CN207148105U true CN207148105U (en) 2018-03-27

Family

ID=61670361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721084872.6U Active CN207148105U (en) 2017-08-28 2017-08-28 By instructing the support pile experimental rig destroyed in excavation models experiment

Country Status (1)

Country Link
CN (1) CN207148105U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107367598A (en) * 2017-08-28 2017-11-21 天津大学 By instructing the support pile experimental rig destroyed and method in excavation models experiment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107367598A (en) * 2017-08-28 2017-11-21 天津大学 By instructing the support pile experimental rig destroyed and method in excavation models experiment

Similar Documents

Publication Publication Date Title
CN201650298U (en) Plane strain type model testing device capable of simulating the tunnel full-face excavation
CN107367598A (en) By instructing the support pile experimental rig destroyed and method in excavation models experiment
CN108387461A (en) A kind of drop hammer type dynamic impact testing machine and test method
CN103835324A (en) Seismic response control test device of frame anchor rod slope anchoring structure and construction method
CN102374950B (en) Test device for service performance of reinforced column under load and environment coupled action
CN107123447B (en) A kind of nuclear power plant's reinforced concrete containment explosion-proof decompression device
Fu et al. Stress state and failure path of a tension tower in a transmission line under multiple loading conditions
CN113803083A (en) Underground engineering surrounding rock strength-energy support design method
CN107036917A (en) The Experimental Method in Laboratory of deep wall rock rock burst Burst Tendency
CN106407552B (en) A kind of design method promoting the anti-collapse ability of RC frame core wall structure
CN103149091A (en) Anti-pulling vertical tension loading test device of building pile
WO2022042761A1 (en) Npr anchor rod monitoring and control system and method for rock slope collapse disaster
Zheng et al. Experimental study on progressive collapse mechanism in braced and tied-back retaining systems of deep excavations
CN207148105U (en) By instructing the support pile experimental rig destroyed in excavation models experiment
Zhou et al. Development of a novel resilient anchor cable and its large shear deformation performance
CN106555787B (en) A kind of wedge structure hydraulic pressure support displacement control system and its application method
CN115081302A (en) Simulation method and system for contact and interaction between supporting member and surrounding rock of chamber
CN208183816U (en) A kind of default section support pile experimental rig for simulating different bending strengths
CN105672192B (en) Dam body moment unstability is burst under extreme loading condition analogue means and operation method
CN112881190A (en) Indoor slope instability dynamic evolution device capable of simulating multiple slip-causing factors
CN107761785A (en) A kind of default section support pile experimental rig for simulating different bending strengths
CN109404019B (en) Cave surrounding rock pre-supporting system and cave structure
CN205976598U (en) Reinforced (rfd) digital display support column is used for speedily carrying out rescue work
CN114993818A (en) Comprehensive evaluation method and design method for underground engineering support system
CN208621279U (en) A kind of oil-gas pipeline impact disaster simulation experiment porch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant