CN208183816U - A kind of default section support pile experimental rig for simulating different bending strengths - Google Patents
A kind of default section support pile experimental rig for simulating different bending strengths Download PDFInfo
- Publication number
- CN208183816U CN208183816U CN201721141061.5U CN201721141061U CN208183816U CN 208183816 U CN208183816 U CN 208183816U CN 201721141061 U CN201721141061 U CN 201721141061U CN 208183816 U CN208183816 U CN 208183816U
- Authority
- CN
- China
- Prior art keywords
- pile
- foundation pit
- hinge
- stake
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005452 bending Methods 0.000 title claims abstract description 14
- 238000000034 method Methods 0.000 claims abstract description 30
- 238000012360 testing method Methods 0.000 claims abstract description 27
- 239000004677 Nylon Substances 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 229920001778 nylon Polymers 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 3
- 229910052782 aluminium Inorganic materials 0.000 claims description 3
- 229910001220 stainless steel Inorganic materials 0.000 claims description 2
- 239000010935 stainless steel Substances 0.000 claims description 2
- -1 irony Inorganic materials 0.000 claims 1
- 239000000463 material Substances 0.000 claims 1
- 230000000149 penetrating effect Effects 0.000 claims 1
- 230000006378 damage Effects 0.000 abstract description 25
- 238000009412 basement excavation Methods 0.000 abstract description 6
- 230000000750 progressive effect Effects 0.000 description 7
- 238000011160 research Methods 0.000 description 6
- 230000006835 compression Effects 0.000 description 5
- 238000007906 compression Methods 0.000 description 5
- 239000002689 soil Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000004088 simulation Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009795 derivation Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000004800 polyvinyl chloride Substances 0.000 description 1
- 238000011158 quantitative evaluation Methods 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种模拟不同抗弯强度的预设断面支护桩试验装置,用于模拟基坑支护桩连续破坏的过程,包括预制断桩、垫片、螺母、带眼尼龙螺栓、铰链紧固件、铰链和钢丝绳,所述预制断桩中部通过预设桩断面分为上半截桩和下半截桩,位于基坑内侧的上半截桩和下半截桩之间通过所述铰链紧固件和铰链相连接,位于基坑外侧的上半截桩和下半截桩上分别安装所述带眼尼龙螺栓,所述钢丝绳穿过所述带眼尼龙螺栓的螺栓眼并通过所述垫片和螺母固定。本实用新型发明能够在基坑开挖阶段作为普通支护桩正常工作,在预设的可断支护桩断裂后能模拟基坑连续破坏的过程。
The utility model discloses a preset cross-section support pile test device for simulating different bending strengths, which is used for simulating the continuous damage process of foundation pit support piles, including prefabricated broken piles, gaskets, nuts, nylon bolts with eyes, Hinge fasteners, hinges and steel wire ropes, the middle part of the prefabricated broken pile is divided into the upper half pile and the lower half pile through the preset pile section, and the upper half pile and the lower half pile located inside the foundation pit are fastened by the hinge The eyelet nylon bolts are respectively installed on the upper half pile and the lower half pile outside the foundation pit, and the steel wire rope passes through the bolt eye of the eye nylon bolt and passes through the washer and nut fixed. The invention of the utility model can work normally as a common support pile in the excavation stage of the foundation pit, and can simulate the process of continuous destruction of the foundation pit after the preset breakable support pile breaks.
Description
技术领域technical field
本实用新型涉及岩土工程中的一种试验装置,具体地,为一种模拟基坑中若干根支护桩破坏造成基坑连续垮塌的装置,通过此装置可以得出基坑连续破坏的传递机理。The utility model relates to a test device in geotechnical engineering, in particular, it is a device for simulating the continuous collapse of the foundation pit caused by the damage of several supporting piles in the foundation pit, through which the transmission of the continuous damage of the foundation pit can be obtained mechanism.
背景技术Background technique
近些年国内外发生了大量重大的基坑垮塌事故,例如新加坡、杭州、科隆等地,造成了非常严重的损失。根据这些事故发现,基坑的失稳破坏是一个非常复杂的过程,尤其在基坑深、大、平面形状不规则或支护结构复杂的情况下,其破坏则可能是由某一种局部破坏引起,进而发展演变为多种破坏的模式,也可能是由局部支护结构破坏或局部土体失稳引起,进而引起周边支护结构直至大范围倒塌的模式,即深基坑的垮塌过程是一个连续破坏过程。In recent years, a large number of major foundation pit collapse accidents have occurred at home and abroad, such as Singapore, Hangzhou, Cologne and other places, causing very serious losses. According to these accidents, the instability and failure of foundation pits is a very complicated process, especially in the case of deep and large foundation pits with irregular plane shapes or complex support structures, the damage may be caused by a certain local failure It may also be caused by the failure of local support structures or local soil instability, and then cause the surrounding support structures to collapse in a large scale, that is, the collapse process of deep foundation pits is A continuous destruction process.
根据新加坡Nicoll Highway地铁基坑事故破坏过程的记录可以发现,长近百米的基坑垮塌是从局部最薄弱的位置(即66kV电缆通过处地连墙存在缺口的位置)开始的。事发当天,地连墙缺口处第九道撑(S335)的围檩和支撑首先脱开,并导致此处地连墙发生垮塌,破坏停止2分钟后,坍塌开始沿基坑长度方向发展,直至垮塌至100m之外。大量基坑事故发生后,许多事故的调查和总结仍然会忽略事故的连续破坏机理。According to the records of the destruction process of the Nicoll Highway subway foundation pit accident in Singapore, it can be found that the collapse of the foundation pit with a length of nearly 100 meters started from the weakest position in the local area (that is, the position where the 66kV cable passes through and there is a gap in the ground connection wall). On the day of the incident, the purlins and supports of the ninth brace (S335) at the gap in the ground connection wall were first disengaged, which caused the ground connection wall to collapse. Two minutes after the damage stopped, the collapse began to develop along the length of the foundation pit. Until it collapses to 100m away. After a large number of foundation pit accidents, the investigation and summary of many accidents still ignore the continuous failure mechanism of the accidents.
在结构工程领域,针对多高层建筑、大跨结构以及桥梁等建构筑物在爆炸、地震、火灾、撞击等突发情况下的连续倒塌研究已经较为成熟,研究手段也很丰富,包括理论推导、模型试验及数值模拟等,同时很多国家和地区均对上部结构的抗连续倒塌设计制定了相关的规范和指导性文件。与结构工程中连续破坏问题的研究已经取得显著进展相比,目前岩土工程领域连续破坏的研究还很少,并且还未引起应有的重视。In the field of structural engineering, research on the progressive collapse of multi-tall buildings, long-span structures, and bridges under unexpected conditions such as explosions, earthquakes, fires, and impacts has been relatively mature, and the research methods are also very rich, including theoretical derivation, models, etc. At the same time, many countries and regions have formulated relevant specifications and guidance documents for the progressive collapse resistance design of superstructures. Compared with the remarkable progress in the study of progressive failure in structural engineering, the research on progressive failure in the field of geotechnical engineering is still rare and has not attracted due attention.
目前的基坑稳定破坏模式(整体稳定破坏、倾覆破坏、坑底隆起破坏和踢脚破坏等)显然已经无法反映深基坑连续破坏的特点与机理,同时也无法为其控制方法的研究提供足够的支撑,因此,对深基坑连续破坏这种重大地下工程灾害的产生与演变机理进行深入研究极为有必要,只有揭示了局部破坏引发的破坏沿基坑深度、宽度、长度方向的传递发展机理和自然终止机理,并建立评价基坑连续倒塌可能性的量化评价指标和评价方法,才能提出防止基坑支护结构抗连续倒塌的理论和设计方法。The current stable failure modes of foundation pits (overall stability failure, overturning failure, pit bottom heave failure and kicking failure, etc.) obviously cannot reflect the characteristics and mechanism of continuous failure of deep foundation pits, and at the same time cannot provide sufficient information for the study of its control methods. Therefore, it is extremely necessary to conduct an in-depth study on the generation and evolution mechanism of such a major underground engineering disaster as the continuous failure of deep foundation pits. And the mechanism of natural termination, and the establishment of quantitative evaluation index and evaluation method to evaluate the possibility of progressive collapse of foundation pit, can put forward the theory and design method of preventing progressive collapse of foundation pit support structure.
由于深基坑的连续破坏是一个大变形、非线性、多场耦合的问题,现有的极限平衡法、极限分析法、常规弹塑性有限元法及强度折减法等方法大都只能涉及到基坑即将破坏的临界状态,至于破坏开始后的发展与演变,这些传统方法就很难模拟和描述了。因此,为了研究深基坑的连续破坏,合理的大变形计算方法与模型试验等连续破坏研究手段也急需探索。Since the continuous failure of deep foundation pit is a problem of large deformation, nonlinearity and multi-field coupling, most of the existing methods such as limit equilibrium method, limit analysis method, conventional elastoplastic finite element method and strength reduction method can only involve The critical state of pits that are about to be destroyed, as for the development and evolution after the destruction begins, these traditional methods are difficult to simulate and describe. Therefore, in order to study the continuous failure of deep foundation pits, reasonable large deformation calculation methods and model tests and other continuous failure research methods are urgently needed to be explored.
目前已通过大型物理模型试验、数值模拟的研究,以及通过设置可断的支护桩模拟了基坑局部垮塌的过程,发现基坑局部垮塌会引起相邻支护桩弯矩一定倍数的增长,但前期试验所用的矩形PVC桩强度太大,无法模拟基坑连续倒塌的过程,需进一步探索试验方法,以模拟基坑连续倒塌的过程。At present, the process of partial collapse of foundation pit has been simulated through large-scale physical model tests, numerical simulation research, and setting breakable support piles. It is found that local collapse of foundation pits will cause a certain multiple of adjacent support piles to increase the bending moment. However, the rectangular PVC piles used in previous tests were too strong to simulate the process of progressive collapse of the foundation pit. Further exploration of test methods is needed to simulate the process of continuous collapse of the foundation pit.
实用新型内容Utility model content
本实用新型的目的是为了克服现有技术中的不足,解决模型试验中模拟由基坑局部支护桩破坏而引发基坑支护桩沿长度方向连续破坏的问题,提供一种模拟不同抗弯强度的预设断面支护桩试验装置,本实用新型能够在基坑开挖阶段作为普通支护桩正常工作,在预设的可断支护桩断裂后能模拟基坑连续破坏的过程。The purpose of the utility model is to overcome the deficiencies in the prior art, to solve the problem of continuous failure of the foundation pit support piles along the length direction caused by the partial damage of the foundation pit support piles in the model test, and to provide a method for simulating different bending resistance. The strength preset section support pile test device, the utility model can work normally as a common support pile in the excavation stage of the foundation pit, and can simulate the continuous damage process of the foundation pit after the preset breakable support pile breaks.
本实用新型的目的是通过以下技术方案实现的:The purpose of this utility model is achieved by the following technical solutions:
一种模拟不同抗弯强度的预设断面支护桩试验装置,用于模拟基坑支护桩连续破坏的过程,包括预制断桩、垫片、螺母、带眼尼龙螺栓、铰链紧固件、铰链和钢丝绳,所述预制断桩中部通过预设桩断面分为上半截桩和下半截桩,位于基坑内侧的上半截桩和下半截桩之间通过所述铰链紧固件和铰链相连接,位于基坑外侧的上半截桩和下半截桩上分别安装所述带眼尼龙螺栓,所述钢丝绳穿过所述带眼尼龙螺栓的螺栓眼并通过所述垫片和螺母固定。A prefabricated cross-section support pile test device for simulating different bending strengths, used to simulate the process of continuous failure of foundation pit support piles, including prefabricated broken piles, gaskets, nuts, nylon bolts with eyes, hinge fasteners, Hinge and steel wire rope, the middle part of the prefabricated broken pile is divided into the upper half pile and the lower half pile through the preset pile section, and the upper half pile and the lower half pile located inside the foundation pit are connected by the hinge fastener and the hinge The nylon bolts with eyes are respectively installed on the upper half pile and the lower half pile outside the foundation pit, and the steel wire rope passes through the bolt eye of the nylon bolt with eyes and is fixed by the gasket and the nut.
进一步的,通过预制断桩在基坑内侧和基坑外侧的受力不同分别分为受压侧和受拉侧。Further, the prefabricated broken piles are divided into the compression side and the tension side according to the difference in stress on the inner side of the foundation pit and the outer side of the foundation pit.
进一步的,通过调整所述试验装置数量可模拟不同数目支护桩的同时破坏试验。Further, simultaneous failure tests of different numbers of support piles can be simulated by adjusting the number of test devices.
进一步的,所述预制断桩是由铝质、铁质、不锈钢或PVC其中的任何一种材料构成的矩形结构。Further, the prefabricated broken pile is a rectangular structure made of any one of aluminum, iron, stainless steel or PVC.
与现有技术相比,本实用新型的技术方案所带来的有益效果是:Compared with the prior art, the beneficial effects brought by the technical solution of the utility model are:
1.通过预设截断面,并将两截断桩的受压侧利用铰链连接,而受拉侧利用细钢丝绳连接,模拟了排桩支护结构在初始局部支护桩破坏引发临近支护桩的破坏,实现了连续破坏的模拟。1. By presetting the sectional surface and connecting the compression side of the two truncated piles with a hinge, while the tension side is connected with a thin steel wire rope, the damage of the adjacent support pile caused by the initial partial support pile failure of the row pile support structure is simulated. Destruction, realizing the simulation of continuous destruction.
2.通过调节钢丝绳的抗拉强度模拟支护桩的极限抗拉强度,可结合实际工况并根据实验需求调节支护桩的强度,并实现支护桩在水平土拱效应下由局部破坏引发的连续破坏。2. By adjusting the tensile strength of the wire rope to simulate the ultimate tensile strength of the support pile, the strength of the support pile can be adjusted according to the actual working conditions and according to the experimental requirements, and the support pile can be caused by local failure under the horizontal soil arch effect continuous destruction.
3.将预制断桩受压侧用铰链连接,铰链既可承担此预设断面处的剪力,防止受剪破坏,又可以在此断面达到极限弯矩、产生破坏时自由转动,模拟桩折断;3. Connect the pressure side of the prefabricated broken pile with a hinge. The hinge can not only bear the shear force at the preset section to prevent shear damage, but also can freely rotate when the section reaches the limit bending moment and damage occurs, simulating the pile breaking ;
4.实现了支护桩在弯矩控制下由于加荷作用和卸荷作用发生破坏的模拟。4. The simulation of the failure of the support pile due to the loading and unloading under the control of the bending moment is realized.
5.本实用新型装置整体结构简单,实用可靠,便于操作且易于实现,对于模拟基坑开挖及支护桩局部破坏引发连续破坏的模型试验研究具有重要的意义。5. The overall structure of the utility model device is simple, practical and reliable, easy to operate and easy to realize, and it is of great significance for the model test research of simulating foundation pit excavation and local failure of supporting piles causing continuous failure.
附图说明Description of drawings
图1为本实用新型示意图及其局部放大剖视结构示意图;Fig. 1 is a schematic diagram of the utility model and a schematic diagram of a partially enlarged cross-sectional structure thereof;
图2-1和图2-2分别为本实用新型装置受拉侧、受压侧的正视结构示意图;Figure 2-1 and Figure 2-2 are schematic diagrams of the front structure of the tension side and the pressure side of the device of the present invention respectively;
图3为本实用新型在试验时的基坑示意图。Fig. 3 is the schematic diagram of the foundation pit of the utility model during the test.
图中各装置为:1、垫片,2、螺母,3、带眼尼龙螺栓,4、铰链紧固件,5、铰链,6、钢丝绳、7、上半截桩,8、下半截桩Each device in the figure is: 1, gasket, 2, nut, 3, nylon bolt with eye, 4, hinge fastener, 5, hinge, 6, steel wire rope, 7, upper half pile, 8, lower half pile
具体实施方式Detailed ways
下面结合附图对本实用新型作进一步的描述。Below in conjunction with accompanying drawing, the utility model is further described.
如图1至图3所示,一种模拟不同抗弯强度的预设断面支护桩试验装置,用于模拟基坑支护桩连续破坏的过程,包括预制断桩、垫片1、螺母2、带眼尼龙螺栓3、铰链紧固件4、铰链5和钢丝绳6,预制断桩中部通过预设桩断面分为上半截桩7和下半截桩8,位于基坑内侧的上半截桩7和下半截桩8之间通过铰链紧固件4和铰链5相连接,位于基坑外侧的上半截桩7和下半截桩8上分别安装带眼尼龙螺栓3,钢丝绳6穿过带眼尼龙螺栓3的螺栓眼并通过垫片1和螺母2固定。As shown in Figures 1 to 3, a test device for simulating different bending strengths of preset section support piles is used to simulate the process of continuous failure of foundation pit support piles, including prefabricated broken piles, gasket 1, and nut 2 , eyelet nylon bolt 3, hinge fastener 4, hinge 5 and steel wire rope 6, the middle part of the prefabricated broken pile is divided into the upper half pile 7 and the lower half pile 8 through the preset pile section, and the upper half pile 7 and the lower half pile located inside the foundation pit The lower half piles 8 are connected by hinge fasteners 4 and hinges 5, and eyelet nylon bolts 3 are respectively installed on the upper half pile 7 and the lower half pile 8 outside the foundation pit, and the steel wire rope 6 passes through the eyelet nylon bolts 3. bolt eye and fix it with washer 1 and nut 2.
本实用新型装置在试验过程中的使用方法如下:The method of use of the utility model device in the test process is as follows:
1.将上、下半截桩对接在一起,用铰链与铰链紧固件连接住上、下半截桩的受压侧,用一定强度的钢丝绳穿过带眼尼龙螺栓的螺丝眼,拧紧螺母,形成一根完整的本实用新型具体实施装置。1. Butt the upper and lower half piles together, connect the pressure side of the upper and lower half piles with hinges and hinge fasteners, use a steel wire rope of a certain strength to pass through the screw eyes of the nylon bolts with eyes, and tighten the nuts to form A complete concrete implementing device of the utility model.
2.再将一定数目的本实用新型放置在预定位置处,制备模型试验土体。2. Place a certain number of the utility model at a predetermined position to prepare a model test soil.
3.调试、架设试验监测设备后,进行试验正常开挖,此时本实用新型装置与其余支护桩一起构成悬臂型排桩支护,正常开挖到预定深度后停止开挖,并对各项检测指标进行检测。3. After debugging and erecting the test monitoring equipment, carry out the test and excavate normally. At this time, the device of the utility model and the rest of the support piles form a cantilever-type pile row support. After the normal excavation reaches the predetermined depth, the excavation is stopped, and each Item detection indicators are detected.
4.控制预设的初始破坏桩发生破坏,模拟基坑局部支护桩倒塌,引发若干根本实用新型装置断裂,直至连续倒塌停止。4. Control the failure of the preset initial failure piles, simulate the collapse of the partial support piles in the foundation pit, and cause some basic utility model devices to break until the continuous collapse stops.
具体实施过程中,本实用新型按一定的刚度相似比选用矩形PVC桩,预设支护桩断面,并按桩身受力定义预制断桩位于基坑内侧、外侧分别为受压侧、受拉侧,在基坑试验的正常开挖阶段,受拉侧由钢丝绳传递上下断桩间的轴力,受压侧由铰链传递上下断桩间的轴力与剪力,将一定数目的本实用新型放置在邻近预设局部破坏位置处,即与其余完好的支护桩一同构成了悬臂型排桩支护结构;正常开挖阶段结束后,通过控制可断的支护桩断裂对基坑局部支护桩破坏进行模拟,由此引发破坏邻近位置本实用新型桩身受力的增长,受拉侧钢丝绳拉断,本实用新型上半截桩向基坑内倒塌,由局部支护桩破坏引发了基坑支护桩的连续倒塌,直至倒塌最终停止。In the specific implementation process, the utility model selects rectangular PVC piles according to a certain rigidity similarity ratio, presets the cross section of the supporting piles, and defines the prefabricated broken piles on the inner side and outer side of the foundation pit according to the force of the pile body, which are respectively the compression side and the tension side. side, in the normal excavation stage of the foundation pit test, the axial force between the upper and lower broken piles is transmitted by the wire rope on the tension side, and the axial force and shear force between the upper and lower broken piles are transmitted by the hinge on the compression side, and a certain amount of the utility model Placed near the preset local failure position, that is, together with the rest of the intact support piles, it constitutes a cantilever-type pile row support structure; The damage of the protection pile is simulated, which causes the increase of the force on the pile body of the utility model adjacent to the damage, the steel wire rope on the tension side is broken, the upper half of the pile of the utility model collapses into the foundation pit, and the foundation pit is caused by the destruction of the local support pile. The continuous collapse of the support piles until the collapse finally stops.
以上为该试验装置模拟基坑局部破坏的使用方法,通过在本实用新型上粘贴应变片可以用于测量桩身弯矩;通过本实用新型与试验中监测桩、土压力盒、预设可断的支护桩共同使用,可以成功模拟基坑连续破坏的传递和终止,得出基坑连续破坏时荷载传递的机理。The above is the use method of the test device for simulating the local damage of the foundation pit. By pasting the strain gauge on the utility model, it can be used to measure the bending moment of the pile body; The joint use of supporting piles can successfully simulate the transmission and termination of the continuous failure of the foundation pit, and obtain the load transfer mechanism of the continuous failure of the foundation pit.
本实用新型与现有试验装置相比,其不同点在于:Compared with the existing test device, the utility model differs in that:
通过预设桩断面,并将两段桩即上、下半截桩的受拉侧利用细钢丝绳连接,可结合实际工况并根据实验需求调节支护桩的强度,钢丝绳在桩断面两侧利用螺母牢固地固定在桩表面,可避免在受拉时滑移。而预制断桩的受压侧用铰链连接,铰链既可承担此预设桩断面处的剪力,防止受剪破坏,又可以在此断面达到极限弯矩、产生破坏时自由转动,模拟桩折断,这是已有模型支护桩所不能实现的。现有基坑试验常用的支护桩常用铝制或硬质PVC矩形管模拟,但完整的PVC模型桩强度较高,无法在排桩支护基坑连续破坏模型试验中所受到的荷载范围内发生破坏。而本实用新型可以实现初始局部支护桩破坏引发邻近支护桩的破坏,即实现连续破坏模拟,并可以实现支护桩在水平土拱效应下由局部破坏引发的连续破坏。By presetting the section of the pile and connecting the tension sides of the two sections of pile, that is, the upper and lower sections of the pile, with a thin steel wire rope, the strength of the supporting pile can be adjusted according to the actual working conditions and according to the experimental requirements. The steel wire rope uses nuts on both sides of the pile section. Firmly anchored to the pile surface to avoid slipping when under tension. The compression side of the prefabricated broken pile is connected by a hinge. The hinge can not only bear the shear force at the preset pile section to prevent shear damage, but also can freely rotate when the section reaches the limit bending moment and damage occurs, simulating the pile breaking , which cannot be realized by existing model support piles. The support piles commonly used in existing foundation pit tests are often simulated by aluminum or rigid PVC rectangular pipes, but the complete PVC model piles have high strength and cannot withstand the load range in the continuous failure model test of pile row support foundation pits. Destruction occurs. However, the utility model can realize the destruction of adjacent support piles caused by initial local support pile failure, that is, realize continuous failure simulation, and can realize the continuous failure of support piles caused by local failure under the horizontal soil arch effect.
本实用新型装置设计巧妙,简单但却功能强大,便于操作,试验过程的可重复性好,能够满足各种砂土类基坑模型试验的需要。The device of the utility model is ingenious in design, simple but powerful in function, easy to operate, good in repeatability of the test process, and can meet the needs of various sandy soil foundation pit model tests.
尽管上面对本实用新型的试验过程进行了描述,但是本实用新型使用功能并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨和权利要求所保护的范围情况下,还可以将其用于其它支护结构基坑连续破坏的模型试验,这些均属于本实用新型的保护范围。Although the test process of the present utility model has been described above, the use function of the present utility model is not limited to the above-mentioned specific embodiments, and the above-mentioned specific embodiments are only illustrative and not restrictive. Under the enlightenment of the utility model, personnel can also use it for the model test of continuous failure of foundation pits of other supporting structures without departing from the purpose of the utility model and the scope protected by the claims, all of which belong to the utility model scope of protection.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721141061.5U CN208183816U (en) | 2017-09-07 | 2017-09-07 | A kind of default section support pile experimental rig for simulating different bending strengths |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721141061.5U CN208183816U (en) | 2017-09-07 | 2017-09-07 | A kind of default section support pile experimental rig for simulating different bending strengths |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208183816U true CN208183816U (en) | 2018-12-04 |
Family
ID=64441572
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721141061.5U Active CN208183816U (en) | 2017-09-07 | 2017-09-07 | A kind of default section support pile experimental rig for simulating different bending strengths |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208183816U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107761785A (en) * | 2017-09-07 | 2018-03-06 | 天津大学 | A kind of default section support pile experimental rig for simulating different bending strengths |
-
2017
- 2017-09-07 CN CN201721141061.5U patent/CN208183816U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107761785A (en) * | 2017-09-07 | 2018-03-06 | 天津大学 | A kind of default section support pile experimental rig for simulating different bending strengths |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Fu et al. | Stress state and failure path of a tension tower in a transmission line under multiple loading conditions | |
| CN113803083A (en) | Underground engineering surrounding rock strength-energy support design method | |
| CN105064358B (en) | Compensation adjustment method for prestress loss of anchor cable | |
| CN103485374B (en) | Static load test anchor pile connecting structure | |
| CN201902703U (en) | Suspension protective device for underground pipeline | |
| CN107326817B (en) | Energy-consuming type rolling stone protection system and design method thereof | |
| He et al. | Temperature tracer method in structural health monitoring: A review | |
| CN208106468U (en) | A kind of device of anchor stress monitoring integrated with deformation | |
| Wang et al. | Development of multi-functional anchorage support dynamic-static coupling performance test system and its application | |
| CN209927122U (en) | A device for measuring the amount of expansion and deformation of a long-distance protected layer and the amount of separation of the top and bottom plates | |
| CN208183816U (en) | A kind of default section support pile experimental rig for simulating different bending strengths | |
| CN202266277U (en) | Contractible strut for U-shaped shed support | |
| Yue et al. | Seismic performance of joints of prefabricated corrugated steel utility tunnels Part (I)–Experimental analysis | |
| CN208415124U (en) | A kind of railway bridge protective scaffolding structure | |
| CN107367598A (en) | By instructing the support pile experimental rig destroyed and method in excavation models experiment | |
| CN107035395A (en) | Pressure-relieving achor bar pallet and application method with alarm function | |
| CN212612521U (en) | Tension-compression type fabricated beam string steel supporting system | |
| CN204514516U (en) | Device for monitoring dam foundation stress | |
| CN206233943U (en) | A kind of novel anchor rod for showing pulling force size suffered by anchor pole afterbody | |
| Long et al. | Results of lateral load tests on micropiles | |
| CN210737631U (en) | Hinge type anchor cable frame beam reinforced soil slope power model device | |
| CN218373892U (en) | Distributed monitoring device for foundation pit anchor rod | |
| CN209368908U (en) | A horizontal and uplift combined loading device for pile foundation model test | |
| CN207148105U (en) | By instructing the support pile experimental rig destroyed in excavation models experiment | |
| CN216899889U (en) | Model test device for simulating continuous damage of pile-anchor support foundation pit caused by anchor rod failure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |