CN207144470U - A kind of post-cast strip early-dismantling device - Google Patents

A kind of post-cast strip early-dismantling device Download PDF

Info

Publication number
CN207144470U
CN207144470U CN201720879234.7U CN201720879234U CN207144470U CN 207144470 U CN207144470 U CN 207144470U CN 201720879234 U CN201720879234 U CN 201720879234U CN 207144470 U CN207144470 U CN 207144470U
Authority
CN
China
Prior art keywords
vertical rod
post
jackscrew
cast strip
dismantling device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720879234.7U
Other languages
Chinese (zh)
Inventor
南晨旭
刘立新
王建
李明
秦肖军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201720879234.7U priority Critical patent/CN207144470U/en
Application granted granted Critical
Publication of CN207144470U publication Critical patent/CN207144470U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of post-cast strip early-dismantling device, including column fork vertical rod(2), and it is arranged on column fork vertical rod(2)The jackscrew cushion block at top(5)With the bottom gasket of bottom(1);The column fork vertical rod(2)Top is provided with height regulation fastener.The utility model is using vertical rod as main stressed member, and top is process using latch and shoe regulation jackscrew position and fixed jackscrew, whole batch production customizations.Compared with the full hall brace type scaffold of tradition, the utility model is simple in construction, easy to operate, dependable performance, and has saved the usage amount of steel pipe, improves all transfer efficients of steel pipe, accelerates construction speed, increase operating efficiency.

Description

A kind of post-cast strip early-dismantling device
Technical field
Construction apparatus field is the utility model is related to, specially a kind of post-cast strip formwork way, is poured after can early tearing open Band template, prevents the post-cast strip early-dismantling device that post-cast strip returns back to top.
Background technology
With flourishing for building trade, the requirement more and more higher of construction unit operating efficiency.In building construction process In, it is mostly the lumps of wood and steel pipe scaffold framed bent for what is played a supportive role;And with environmental requirement, and lumps of wood use during The increase of cost and the deficiencies of be easily deformed, is gradually substituted by steel pipe scaffold framed bent;Although and steel pipe scaffold framed bent Good supporting function can be played, but installing/dismounting is very cumbersome, consumptive material work consuming is time-consuming to measure very big, substantial amounts of button especially The use of part and steel pipe, unit in charge of construction need to pay substantial amounts of lease expenses, even own equipment, it is also desirable to provide larger Space is laid in, and the turnover of this substantial amounts of part is cumbersome, greatly increases the construction cost of enterprise, reduces the market of enterprise Competitiveness.
Therefore it provides a kind of i.e. convenience for using and having enough to meet the need with the lumps of wood, is easy to storage to transport again, and have enough to meet the need convenient Building-supporting device, it has been a good problem to study.
The content of the invention
In order to overcome above-mentioned deficiency of the prior art, the utility model, which provides one kind turnover can be repeated several times, to be made With, and steel pipe scaffold bent-frame bracing can be substituted, the turnover rates such as template are greatly improved, have saved resource, and repeatedly week After turning, reconstruction can also be melted down, avoids the pollution to environment, the post-cast strip early-dismantling device with green construction benefit.
What the purpose of this utility model was realized in:
A kind of post-cast strip early-dismantling device, including column fork vertical rod 2, and it is arranged on the top at the top of column fork vertical rod 2 Silk pad 5 and the bottom gasket 1 of bottom;The top of column fork vertical rod 2 is provided with height regulation fastener;
Described column fork vertical rod 2 includes the underlying main stress body of rod, and with main stress body of rod one-step casting Headtree of more of shaping above the main stress body of rod;Described height regulation fastener is arranged on headtree;
Described bottom gasket 1 and the bottom of column fork vertical rod 2 are welded and fixed;
Described height regulation fastener includes being arranged on the latch fastening shoe 4 above headtree, and interior Widow bolts fasten the latch 3 of shoe 4;The top of latch fastening shoe 4 connects jackscrew simultaneously, and top is provided with the top of jackscrew Silk pad 5.
Positive beneficial effect:The utility model is using vertical rod as main stressed member, and top is adjusted using latch and shoe Jackscrew position and fixed jackscrew are saved, whole batch production customizations are process.Compared with the full hall brace type scaffold of tradition, this practicality New structure is simple, easy to operate, dependable performance, and has saved the usage amount of steel pipe, improves all transfer efficients of steel pipe, adds Fast construction speed, increases operating efficiency.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 uses structural representation to be of the present utility model;
It is in figure:Bottom gasket 1, the vertical rod 2 of column fork, latch 3, latch fastening shoe 4, jackscrew pad 5.
Embodiment
Below in conjunction with the accompanying drawings, the utility model is described further:
As shown in Figure 1 and Figure 2, a kind of post-cast strip early-dismantling device, including column fork vertical rod 2, and it is arranged on column fork The jackscrew pad 5 at the top of vertical rod 2 and the bottom gasket 1 of bottom;The top of column fork vertical rod 2 is provided with height regulation fastening Device;
Described column fork vertical rod 2 includes the underlying main stress body of rod, and with main stress body of rod one-step casting Headtree of more of shaping above the main stress body of rod;Described height regulation fastener is arranged on headtree;
Described bottom gasket 1 and the bottom of column fork vertical rod 2 are welded and fixed;
Described height regulation fastener includes being arranged on the latch fastening shoe 4 above headtree, and interior Widow bolts fasten the latch 3 of shoe 4;The top of latch fastening shoe 4 connects jackscrew simultaneously, and top is provided with the top of jackscrew Silk pad 5.
Embodiment
As shown in figure 1, a kind of post-cast strip early-dismantling device includes:
Bottom gasket 1, for long 100mm, wide 100mm, thick 20mm iron plate;The column fork vertical rod 2 of vertical rod 2, is φ 60x4.0 steel pipes;Latch 3 is diameter 16mm into structural section;Latch shoe 4 be and the supporting anti-skid fastener of latch;Jackscrew pad Piece 5 is to be supported the use with jackscrew.
The utility model form removal instrument mainly diverges vertical rod 2 as main supporting member with column, is prevented using latch 3 and latch Sliding device 4 adjusts jackscrew height and fixed jackscrew, so as to which template be fixed.Column fork vertical rod 2 uses φ 60x4.0 steel pipes, by force Degree is high, can reduce the supporting bars such as bar of sweeping the floor in common support system, cross bar, bridging.Both sides are symmetrically placed, prevented mould Plate returns back to top phenomenon, while solves the problems, such as the support stress of post-cast strip middle part.
The utility model is using vertical rod as main stressed member, and top is using latch and shoe regulation jackscrew position and admittedly Determine jackscrew, whole batch production customizations are process.Compared with the full hall brace type scaffold of tradition, the utility model is simple in construction, It is easy to operate, dependable performance, and the usage amount of steel pipe has been saved, all transfer efficients of steel pipe are improved, accelerate construction speed, Increase operating efficiency.
Embodiment of above is merely to illustrate preferred embodiment of the present utility model, but the utility model is not limited to State embodiment, in the field those of ordinary skill possessed knowledge, the spirit and principles of the utility model it Interior made any modification, equivalent substitute and improvement etc., it all should cover in the claimed technical scheme model of the utility model Within enclosing.

Claims (5)

  1. A kind of 1. post-cast strip early-dismantling device, it is characterised in that:Including column fork vertical rod(2), and be arranged on column fork and stand Bar(2)The jackscrew pad at top(5)With the bottom gasket of bottom(1);The column fork vertical rod(2)Top is provided with height and adjusted Save fastener.
  2. A kind of 2. post-cast strip early-dismantling device according to claim 1, it is characterised in that:Described column fork vertical rod(2) It is located at including the underlying main stress body of rod, and with more of main stress body of rod one-step casting shaping above the main stress body of rod Headtree.
  3. A kind of 3. post-cast strip early-dismantling device according to claim 1, it is characterised in that:Described height regulation fastener It is arranged on headtree.
  4. A kind of 4. post-cast strip early-dismantling device according to claim 1, it is characterised in that:Described bottom gasket(1)With post Shape fork vertical rod(2)Bottom be welded and fixed.
  5. A kind of 5. post-cast strip early-dismantling device according to claim 1 or 3, it is characterised in that:Described height regulation fastening Device includes being arranged on the latch fastening shoe above headtree(4), and interior widow bolts fastening shoe(4)Insert Pin(3);Latch fastens shoe(4)Top connects jackscrew simultaneously, and jackscrew pad is provided with the top of jackscrew(5).
CN201720879234.7U 2017-07-19 2017-07-19 A kind of post-cast strip early-dismantling device Expired - Fee Related CN207144470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720879234.7U CN207144470U (en) 2017-07-19 2017-07-19 A kind of post-cast strip early-dismantling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720879234.7U CN207144470U (en) 2017-07-19 2017-07-19 A kind of post-cast strip early-dismantling device

Publications (1)

Publication Number Publication Date
CN207144470U true CN207144470U (en) 2018-03-27

Family

ID=61675997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720879234.7U Expired - Fee Related CN207144470U (en) 2017-07-19 2017-07-19 A kind of post-cast strip early-dismantling device

Country Status (1)

Country Link
CN (1) CN207144470U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852020A (en) * 2020-08-14 2020-10-30 中建八局第二建设有限公司 Construction method and system of building core tube

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852020A (en) * 2020-08-14 2020-10-30 中建八局第二建设有限公司 Construction method and system of building core tube

Similar Documents

Publication Publication Date Title
CN206646813U (en) A kind of template system for casting concrete post
CN207568180U (en) Water stopping thresholds formwork ruggedized construction
CN207144470U (en) A kind of post-cast strip early-dismantling device
CN205998870U (en) A kind of Portable jack bracket fixing device
CN206458083U (en) A kind of adjustable building template
CN201362959Y (en) Floor slab preformed hole device
CN202073313U (en) Beam fixture
CN204662369U (en) A kind of slope cantilever large form
CN207469744U (en) Platform constructing device
CN206562765U (en) For the alter-pouring strips mould plate and ahead of time branch stake tool of dismantling concrete framework template
CN207260636U (en) Pipe die reinforced column supporting member
CN206467577U (en) Cast-in-place box beam bracket
CN204252403U (en) A kind of positioning stool for Bars In Poured Concrete Slab negative bending moment rib
CN212715942U (en) Template positioning device
CN202359816U (en) Layering reinforcing and supporting device for on-situ concrete casting template
CN205116716U (en) Roof beam formwork support device
CN201424811Y (en) Special die for reserving opening on concrete cast-in-situ slab pipeline
CN213359377U (en) Building templates support frame
CN210105278U (en) Straight insertion type wheel buckle type steel pipe support
CN209156967U (en) A kind of reinforcing bar bending device
CN208267865U (en) A kind of backform trolley
CN207420027U (en) A kind of device for fixing concrete flange template
CN207420029U (en) A kind of building structural post formwork fastener
CN207904931U (en) A kind of turnover type excavation slope stable supporting device
CN207700688U (en) A kind of linking beam formwork structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327