CN207143890U - A kind of improved structure of trash rack groove - Google Patents

A kind of improved structure of trash rack groove Download PDF

Info

Publication number
CN207143890U
CN207143890U CN201721107873.8U CN201721107873U CN207143890U CN 207143890 U CN207143890 U CN 207143890U CN 201721107873 U CN201721107873 U CN 201721107873U CN 207143890 U CN207143890 U CN 207143890U
Authority
CN
China
Prior art keywords
trash rack
rack groove
steel slab
embedded steel
upstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721107873.8U
Other languages
Chinese (zh)
Inventor
王兴恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201721107873.8U priority Critical patent/CN207143890U/en
Application granted granted Critical
Publication of CN207143890U publication Critical patent/CN207143890U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of improved structure of trash rack groove, the technical scheme includes pier and slusher track of removing contamination in trash rack groove, the side of pier is reserved with vertical straight hole in the trash rack groove, the vertical straight hole upstream and downstream both sides and the equal pre-embedded steel slab in bottom, the both sides and bottom of the slusher track of removing contamination are welded and fixed with pre-embedded steel slab.The utility model is by cancelling the concrete side wall in trash rack groove between pier second stage concrete installation backbone and the anti-rail of second stage concrete installation, pier current direction thickness is larger in trash rack groove, the welding space of upstream and downstream pre-embedded steel slab and lock wall reinforcing bar is big, welding is easy, therefore, the installation accuracy of pre-embedded steel slab is higher, and slusher track installation precision of removing contamination is higher;In addition, slusher track of removing contamination is integrated steel-structure, bearing strength is larger, and required sectional dimension is smaller, pier concrete thickness in can reducing, reduces the amount of pouring of concrete, is advantageous to reduce investment outlay.

Description

A kind of improved structure of trash rack groove
Technical field
It the utility model is related to Hydraulic and Hydro-Power Engineering metal structure technical field, more particularly to a kind of improvement of trash rack groove Structure.
Background technology
Trash rack as hydraulic engineering it is a kind of compared with frequently with block dirty facility, be divided to fixed and movable two kinds of structural shapes, it is right In movable, its grid groove generally sets twice, before be together guide groove of removing contamination, behind place trash rack together.
Water inlet to setting twice and above movable trash rack, slusher track generally use angle steel of removing contamination are welded and fixed On side wall pre-embedded steel slab, because the slusher track of removing contamination of trash rack groove generally considers to reduce the loss of flood peak and construction investment, dirt is blocked Pier thinner thickness in grid groove, the phase of Zhong Dun both sides one fixation pre-embedded steel slab difficulty is too big, and precision is difficult to control, and error is larger, makes On-site cutting angle steel and part slusher track are needed into installation slusher track of removing contamination, cumbersome, in-site installation difficulty is also larger, because This, prior art also Shortcomings, up for further perfect.
Utility model content
The purpose of this utility model be in order to solve in the prior art the phase of Zhong Dun both sides one fix pre-embedded steel slab difficulty it is too big, And precision is difficult to control, error is larger, causes installation slusher track of removing contamination to need on-site cutting angle steel and part slusher track, scene The problem of installation difficulty is larger, and a kind of improved structure of the trash rack groove proposed.
To achieve these goals, the utility model employs following technical scheme:
A kind of improved structure of trash rack groove, including pier and removed contamination slusher track in trash rack groove, in the trash rack groove The side of pier is reserved with vertical straight hole, the vertical straight hole upstream and downstream both sides and the equal pre-embedded steel slab in bottom, the slusher rail of removing contamination The both sides and bottom in road are fixed with pre-embedded steel slab and welded;The both sides of pier, which are filled out, in the trash rack groove is inoculated with fist stage concrete, institute It is convex shape to state fist stage concrete and the end face of vertical straight hole upstream and downstream both sides position correspondence.
Preferably, second stage concrete installation backbone, the vertical straight hole upstream two are reserved in the vertical straight hole downstream both sides Reserve second stage concrete and anti-rail is installed in side.
Preferably, the convex shape end of the fist stage concrete between the two neighboring installation backbone second stage concrete is set It is equipped with the downstream face pre-embedded steel slab flushed with installation backbone second stage concrete face, the two neighboring anti-rail second stage concrete of installation Between the convex shape end set of fist stage concrete have the upstream face pre-buried steel flushed with installing anti-rail second stage concrete face Plate.
Preferably, the downstream face pre-embedded steel slab sets cross pre-embedded steel slab with upstream face pre-embedded steel slab bottom.
Preferably, the slusher rail base of removing contamination is fixed with cross pre-embedded steel slab welds, the downstream face pre-buried steel Plate and upstream face pre-embedded steel slab are welded and fixed by angle steel.
Preferably, the slusher track of removing contamination is cross, and it connects web body by closed box, upstream and downstream connects Connect web body composition, the upstream connection web body and downstream connection web bodily form web structure in pairs.
Preferably, dividing plate is set between the closed box and double web structures.
Preferably, it is provided with passage on the dividing plate.
Preferably, the closed box, upstream connection web body and downstream connection web body top are symmetrical oblique.
Compared with prior art, the utility model has the advantages that:Cancel pier backbone and anti-rail in trash rack groove Between concrete side wall, trash rack groove Zhong Dun reserves side vertical straight hole, vertical straight hole upstream and downstream both sides fist stage concrete end Face is convex shape, and second stage concrete installation backbone is reserved in downstream both sides, and upstream both sides reserve second stage concrete and install anti-rail, The downstream face pre-embedded steel slab flushed with backbone face is set on the fist stage concrete between the adjacent backbone in downstream, it is adjacent in upstream The upstream face pre-embedded steel slab flushed with anti-rail level, downstream face pre-embedded steel slab and upstream face are set on the fist stage concrete between anti-rail Pre-embedded steel slab bottom sets cross pre-embedded steel slab, and slusher rail base of removing contamination is welded and fixed with cross pre-embedded steel slab, upper and lower Trip is welded and fixed by angle steel, because pier current direction thickness is larger in trash rack groove, the weldering of upstream and downstream pre-embedded steel slab and lock wall reinforcing bar It is big to connect space, welding is easy, and therefore, the installation accuracy of pre-embedded steel slab is higher, and slusher track installation precision of removing contamination is higher;In addition, Slusher track of removing contamination is integrated steel-structure, and bearing strength is larger, and required sectional dimension is smaller, pier concrete thickness in can reducing, Reduce the amount of pouring of concrete, be advantageous to reduce investment outlay.
Brief description of the drawings
Fig. 1 is the structural representation of pier in the utility model trash rack groove;
Fig. 2 is Fig. 1 A-A sectional views;
Fig. 3 is Fig. 1 B-B sectional views;
Fig. 4 is Fig. 2 C-C sectional views;
Fig. 5 is Fig. 2 D-D sectional views;
Fig. 6 is Fig. 4 E-E sectional views;
Fig. 7 is that pier is not provided with the structural representation under track condition in the utility model trash rack groove;
Fig. 8 is Fig. 7 F-F sectional views;
Fig. 9 is Fig. 7 G-G sectional views;
Figure 10 is Fig. 8 H-H sectional views;
Figure 11 is Fig. 8 I-I sectional views;
Figure 12 is that pier is removed contamination the structural representation of slusher track in the utility model trash rack groove;
Figure 13 is Figure 12 J-J sectional views.
Description of reference numerals:Pier in 1- trash rack grooves, the vertical straight holes of 2-, 3- pre-embedded steel slabs, 4- remove contamination slusher track, and 5- is convex Type structure, 6- second stage concretes installation backbone, the anti-rail of 7- second stage concretes installation, 8- downstream face pre-embedded steel slabs, 9- upstream faces are pre- Bury steel plate, the cross pre-embedded steel slabs of 10-, 11- angle steel, 12- closed boxes, 13- upstreams connection web body, 14- downstream connection abdomens Plate body, 15- dividing plates, 16- passages.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.
In description of the present utility model, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", The orientation or position relationship of the instruction such as " top ", " bottom ", " interior ", " outer " are based on orientation shown in the drawings or position relationship, are only Described for the ease of description the utility model and simplifying, rather than instruction or imply signified device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.
Reference picture 1-13, a kind of improved structure of trash rack groove, including pier 1 and slusher track 4 of removing contamination in trash rack groove, are blocked The side of pier 1 is reserved with vertical straight hole 2, the equal pre-embedded steel slab 3 in the vertical upstream and downstream both sides of straight hole 2 and bottom, rack take in dirty grid groove The both sides and bottom of bucket track 4 are welded and fixed with pre-embedded steel slab 3.
The both sides of pier 1 are coated with fist stage concrete, fist stage concrete and the vertical upstream and downstream both sides of straight hole 2 in trash rack groove The end face of position correspondence is convex shape 5;
Second stage concrete installation backbone 6 is reserved in the vertical downstream both sides of straight hole 2, and the vertical upstream both sides of the straight hole 2 reserved second phase is mixed Solidifying soil installs anti-rail 7;
The end set of convex shape 5 of fist stage concrete between the two neighboring installation second stage concrete of backbone 6 has and pacified The downstream face pre-embedded steel slab 8 that dress backbone 6 second stage concrete face flushes, the adjacent phase installed between the anti-second stage concrete of rail 7 mix Coagulating the end set of convex shape 5 of soil has the upstream face pre-embedded steel slab 9 flushed with installing the anti-second stage concrete face of rail 7;
Downstream face pre-embedded steel slab 8 sets cross pre-embedded steel slab 10 with the bottom of upstream face pre-embedded steel slab 9;
The bottom of slusher track 4 of removing contamination is welded and fixed with cross pre-embedded steel slab 10, and downstream face pre-embedded steel slab 8 and upstream face are pre- Steel plate 9 is buried to be welded and fixed by angle steel 11;
Slusher track 4 of removing contamination is cross, and it connects web body 13 and downstream connection web by closed box 12, upstream Body 14 forms, and upstream connection web body 13 and downstream connection web body 14 form double web structures;
Dividing plate 15 is set between closed box 12 and double web structures;
Passage 16 is provided with dividing plate 15;
Closed box 12, upstream connection web body 13 and the top of downstream connection web body 14 are symmetrical oblique.
In the utility model, the second stage concrete of backbone 6 is installed with installing the anti-second phase of rail 7 by cancelling pier 1 in trash rack groove Concrete side wall between concrete, vertical straight hole 2, the vertical phase of 2 upstream and downstream both sides of straight hole one are reserved in the side of pier 1 in trash rack groove Concrete end face is convex shape 5, and second stage concrete installation backbone 6, the vertical upstream of straight hole 2 are reserved in the vertical downstream both sides of straight hole 2 Both sides reserve second stage concrete and install anti-rail 7, and one between the adjacent installation second stage concrete of backbone 6 in the vertical downstream of straight hole 2 The downstream face pre-embedded steel slab 8 flushed with installation backbone 6 second stage concrete face is set on phase concrete, in the vertical upstream phase of straight hole 2 Setting flushes upper with the anti-second stage concrete face of rail 7 of installation on fist stage concrete between the adjacent anti-second stage concrete of rail 7 of installation Trip face pre-embedded steel slab 9, downstream face pre-embedded steel slab 8 set cross pre-embedded steel slab 10, rack take with the bottom of upstream face pre-embedded steel slab 9 The bucket bottom of track 4 is welded and fixed with cross pre-embedded steel slab 10, and upstream face pre-embedded steel slab 9 and downstream face pre-embedded steel slab 8 pass through angle Steel 11 is welded and fixed, because the current direction thickness of pier 1 is larger in trash rack groove, upstream pre-embedded steel slab 9, downstream pre-embedded steel slab 8 and lock wall The welding space of reinforcing bar is big, and welding is easy, and therefore, the installation accuracy of pre-embedded steel slab 3 is higher, the installation accuracy of slusher track 4 of removing contamination It is higher;In addition, slusher track 4 of removing contamination is integrated steel-structure, bearing strength is larger, and required sectional dimension is smaller, pier in can reducing Concrete thickness, reduce the amount of pouring of concrete, be advantageous to reduce investment outlay.
Certainly, it is above concrete application example of the present utility model, the utility model also has other embodiments, all The technical scheme formed using equivalent substitution or equivalent transformation, all fall within the protection domain required by the utility model.

Claims (9)

1. a kind of improved structure of trash rack groove, including pier (1) and slusher track (4) of removing contamination in trash rack groove, it is characterised in that The side of pier (1) is reserved with vertical straight hole (2) in the trash rack groove, and vertical straight hole (2) the upstream and downstream both sides and bottom are equal Pre-embedded steel slab (3), the both sides and bottom of the slusher track (4) of removing contamination are welded and fixed with pre-embedded steel slab (3);The trash rack groove The both sides of middle pier (1), which are filled out, is inoculated with fist stage concrete, the fist stage concrete and vertical straight hole (2) upstream and downstream both sides position correspondence End face be convex shape (5).
2. the improved structure of a kind of trash rack groove according to claim 1, it is characterised in that under the vertical straight hole (2) Swim both sides and reserve second stage concrete installation backbone (6), described vertical straight hole (2) upstream both sides reserve second stage concrete and install anti-rail (7)。
3. the improved structure of a kind of trash rack groove according to claim 2, it is characterised in that the two neighboring second phase is mixed Convex shape (5) end set of fist stage concrete between solidifying soil installation backbone (6) has and second stage concrete installation backbone (6) The downstream face pre-embedded steel slab (8) that face flushes, the adjacent second stage concrete install the convex of the fist stage concrete between anti-rail (7) Structure (5) end set has the upstream face pre-embedded steel slab (9) flushed with anti-rail (7) face of second stage concrete installation.
A kind of 4. improved structure of trash rack groove according to claim 3, it is characterised in that the downstream face pre-embedded steel slab (8) cross pre-embedded steel slab (10) is set with upstream face pre-embedded steel slab (9) bottom.
A kind of 5. improved structure of trash rack groove according to claim 4, it is characterised in that the slusher track of removing contamination (4) bottom is welded and fixed with cross pre-embedded steel slab (10), the downstream face pre-embedded steel slab (8) and upstream face pre-embedded steel slab (9) It is welded and fixed by angle steel (11).
A kind of 6. improved structure of trash rack groove according to claim 1, it is characterised in that the slusher track of removing contamination (4) to be cross, and it connects web body (13) by closed box (12), upstream and downstream connection web body (14) forms, institute State upstream connection web body (13) and downstream connection web body (14) forms double web structures.
A kind of 7. improved structure of trash rack groove according to claim 6, it is characterised in that the closed box (12) with Dividing plate (15) is set between double web structures.
8. the improved structure of a kind of trash rack groove according to claim 7, it is characterised in that set on the dividing plate (15) There is passage (16).
A kind of 9. improved structure of trash rack groove according to claim 6, it is characterised in that the closed box (12), Upstream connection web body (13) and downstream connection web body (14) top is symmetrical oblique.
CN201721107873.8U 2017-08-31 2017-08-31 A kind of improved structure of trash rack groove Active CN207143890U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721107873.8U CN207143890U (en) 2017-08-31 2017-08-31 A kind of improved structure of trash rack groove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721107873.8U CN207143890U (en) 2017-08-31 2017-08-31 A kind of improved structure of trash rack groove

Publications (1)

Publication Number Publication Date
CN207143890U true CN207143890U (en) 2018-03-27

Family

ID=61669371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721107873.8U Active CN207143890U (en) 2017-08-31 2017-08-31 A kind of improved structure of trash rack groove

Country Status (1)

Country Link
CN (1) CN207143890U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386224A (en) * 2017-08-31 2017-11-24 中国电建集团贵阳勘测设计研究院有限公司 A kind of improved method and structure of trash rack groove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386224A (en) * 2017-08-31 2017-11-24 中国电建集团贵阳勘测设计研究院有限公司 A kind of improved method and structure of trash rack groove

Similar Documents

Publication Publication Date Title
CN207143890U (en) A kind of improved structure of trash rack groove
CN206529653U (en) A kind of underground railway track construction
CN208072390U (en) A kind of connection structure of the stake of bridge support and underwater binder
CN107386224A (en) A kind of improved method and structure of trash rack groove
CN105442457B (en) Construction structure and method for extending bridge floor plate bridge filled with fine sand
CN208152105U (en) A kind of walls concrete horizontal construction joint steel plate for sealing water fixed structure
CN110374214A (en) Finished product post-cast strip
CN114164745B (en) Porous sluice and river-crossing bridge separated type connecting structure and connecting method thereof
CN110552331A (en) Composite energy dissipater suitable for long-distance and complex-terrain slope surface drainage
CN209675906U (en) A kind of prefabricated cable tank systems
CN206503160U (en) A kind of continuous underground wall structure with measure of anti float
CN205676902U (en) Arched framework slope protection construction typified form
CN210827381U (en) Composite energy dissipater suitable for long-distance and complex-terrain slope surface drainage
CN205348002U (en) Adopt extension bridge floor slab bridge construction structures of fine sand packing
CN208415089U (en) A kind of fashioned iron-cell compartment bridge expanssion joint
CN212714296U (en) Box type roadbed and bridge transition structure
CN208309792U (en) A kind of template combining short girder construction for bolumn cap
CN209538245U (en) A kind of late poured band structure of basement bottom board
CN205976148U (en) Side fascia installation node
CN112900366A (en) Geomembrane connecting structure and construction method thereof
CN206309016U (en) A kind of post-cast strip side form and waterproof construction
CN214423421U (en) Main body and auxiliary waterproof structure of subway open cut station
CN207919643U (en) Water intaking header structure for the diversion in river
CN205976151U (en) Side fascia installation node
CN205976144U (en) Side fascia installation node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant