CN207140045U - Short sleeper steam curing pond - Google Patents
Short sleeper steam curing pond Download PDFInfo
- Publication number
- CN207140045U CN207140045U CN201721106728.8U CN201721106728U CN207140045U CN 207140045 U CN207140045 U CN 207140045U CN 201721106728 U CN201721106728 U CN 201721106728U CN 207140045 U CN207140045 U CN 207140045U
- Authority
- CN
- China
- Prior art keywords
- pond
- pond body
- short sleeper
- jet chimney
- steam curing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)
Abstract
The utility model provides a kind of short sleeper steam curing pond, can both shorten the curing cycle of short sleeper, improve the turnover rate of punching block, can also control the temperature in steam-cured pond and increase steam into curing pool at any time, effectively maintain the temperature of curing pool.A kind of short sleeper steam curing pond, including several interval setting pond bodies, it is maintenance chamber inside pond body, maintenance intracavitary is provided with temperature sensor, the top of four side walls of each pond body is equipped with back-shaped water sealed tank, a Chi Gai for being used to cover pond body is equipped with each pond body, each Chi Gai edge is equipped with the cover rim extended downwardly into back-shaped water sealed tank, pond body bottom is provided with jet chimney along longitudinal direction, jet chimney is connected on total jet chimney outside pond body through branch pipe(tube), magnetic valve and pneumatic control valve are set on each branch pipe(tube), master control valve is set on total jet chimney.
Description
Technical field
It the utility model is related to a kind of steam curing pond, and in particular to a kind of short sleeper steam curing pond, belong to concrete
Production of articles technical field.
Background technology
At present, with the rapid development of China's subway cause, it is gradually increased for the demand of Novel sleeper, to its quality
Requirement it is also increasingly stricter, while in order to accelerate the setting rate of concrete prefabricated product, shorten the production cycle, typically can be mixed
Solidifying native prefabrication carries out a long-term maintenance, generally use natural curing.The natural curing cycle is longer, and productivity ratio is relatively low;With
This simultaneously, control of the common steam-cured mode of kiln formula to steam-cured time and temperature is manual control, it is impossible to preferably accurate control
Steam-cured time and temperature, the quality of production of short sleeper is influenceed indirectly.
Utility model content
The utility model purpose is to provide a kind of short sleeper steam curing pond, can both shorten the curing cycle of short sleeper,
The turnover rate of punching block is improved, the temperature in steam-cured pond can also be controlled and increase steam into curing pool at any time, effectively maintained
The temperature of curing pool.
To achieve these goals, the utility model uses following technical scheme:
A kind of short sleeper steam curing pond, including several interval setting pond bodies, pond body inside are maintenance chamber, conserve chamber
Interior to be provided with temperature sensor, the top of four side walls of each pond body is equipped with back-shaped water sealed tank, one is equipped with each pond body
For covering the Chi Gai of pond body, each Chi Gai edge is equipped with the cover rim extended downwardly into back-shaped water sealed tank, pond body bottom
Jet chimney is provided with along longitudinal direction, jet chimney is connected on total jet chimney outside pond body through branch pipe(tube), each branch pipe(tube)
It is upper that magnetic valve and pneumatic control valve are set, master control valve is set on total jet chimney.
Preferably, the accent edge of Chi Gai top inner surface and cover rim inner surface and maintenance chamber all sets reserved seam
Gap.
Preferably, pond body bottom is provided with the support beam for supporting short sleeper steel mould, and support beam is located on jet chimney
Side.
Preferably, pond body is piled up using stone brick and formed, and mortar joint fills up mortar, and pond body is externally provided with heat-insulation layer.
Preferably, back-shaped water sealed tank is welded by four channel-section steels, and the bottom land of hollow water sealed tank is provided with osculum.
Preferably, pond body is four and horizontal cross-section is rectangle, and adjacent pond body shares a side wall, and two neighboring time
Shape water sealed tank is interconnected.
Preferably, pond tops are provided with 6 suspension centres.
The beneficial effects of the utility model are:The hollow water sealed tank sealing means of use, can farthest be reduced foster
Protect the thermal loss of chamber;The temperature sensor of use can preferably detect the temperature of maintenance intracavitary, and by controlling magnetic valve
On-off control valve door to intracavitary convey steam, be effectively guaranteed maintenance intracavitary temperature.
Brief description of the drawings
Fig. 1 is the structural representation of short sleeper steam curing pond;
Fig. 2 is the sectional view in short sleeper steam curing pond B-B faces;
Fig. 3 is the sectional view in the A-A faces of short sleeper steam curing pond;
Fig. 4 is the pond lid schematic diagram of short sleeper steam curing pond;
1 in figure, steam curing pond body, 2, hollow water sealed tank, 3, Chi Gai, 4, support beam, 5, branch pipe(tube), 6, pneumatic control
Valve, 7, hand control valve, 8, magnetic valve, 9, maintenance chamber, 10, temperature sensor, 11, gutter, 12, jet chimney 13, total steam
Steam pipe road 301, suspension centre.
Embodiment
For the purpose of this utility model, technical scheme and advantage is more clearly understood, develop simultaneously implementation referring to the drawings
Example, the utility model is further described.
With reference to figure 1, Fig. 2 and the short sleeper steam curing ponds of Fig. 3, including several are arranged at intervals pond bodies 1, inside pond body 1
To conserve chamber 9, temperature sensor 10 is provided with maintenance chamber 9, the top of four side walls of each pond body 1 is equipped with back-shaped water sealed tank
2, be equipped with a pond lid 3 for being used to cover pond body 1 in each pond body 1, the edge of each pond lid 3 be equipped with extend downwardly into it is back-shaped
Cover rim in water sealed tank 2, the bottom of pond body 1 are provided with jet chimney 12 along longitudinal direction, and jet chimney 12 is connected to through branch pipe(tube) 5 to be located at
On total jet chimney 13 outside pond body 1, magnetic valve 8 and pneumatic control valve 6, total jet chimney 13 are set on each branch pipe(tube) 5
Upper setting master control valve 7.
The present embodiment, the top inner surface and cover rim inner surface of pond lid 3 and the accent edge of maintenance chamber 9 all set reserved
Gap, the water for realizing the maintenance heat of chamber 9 and back-shaped water sealed tank 2 carry out heat exchange, are advantageous to conserve temperature cycles in chamber 9 and adjust
Section.
The present embodiment, the bottom of pond body 1 is provided with the support beam 4 for supporting short sleeper steel mould, and support beam 4 is located at steam
The top of pipeline 12.
The present embodiment, pond body 1 are piled up and formed using stone brick, and mortar joint fills up mortar, and pond body 1 is externally provided with heat-insulation layer, can be with
The loss of steam is farthest avoided, reduces the consumption of steam.
The present embodiment, back-shaped water sealed tank 2 are welded by four channel-section steels, and the bottom land of hollow water sealed tank 2 is provided with osculum.
The present embodiment, pond body 1 is four and horizontal cross-section is rectangle, and adjacent pond body 1 shares a side wall, and adjacent
Two back-shaped water sealed tanks 2 are interconnected.
The present embodiment, the top of pond lid 3 are provided with 6 suspension centres 301, the lifting of square urinal cover 3.
The present embodiment, the bottom of pond body 1 are arranged to slight slope, gutter 11 are provided with bottom, are passed through through overcooled water
Cross gutter 11 and flow into sink and determine pond, then proceed to utilize, reduce energy loss.
The present embodiment, jet chimney 12, to maintenance intracavitary conveying steam, make steam diffusion more by the way of dropper injection
Uniformly, the maintenance of short sleeper is advantageous to.
The course of work is as follows:Short sleeper complete pour after, through herringbone closing slope is quiet stop after, hang in pond body 1, each pond body
It can be disposably superimposed in 1 and stack three row's punching blocks, the steam-cured of short sleeper can be completed using limited space to greatest extent, complete to hang
After dress, by pond lid 3, curing pool lid 3 is sealed preferably with back-shaped water sealed tank 2, and water is filled in back-shaped water sealed tank 2;Connect steam, temperature
The temperature spent in the chamber 9 of monitoring maintenance in real time of sensor 10, is then communicated to temperature outside control system PC ends and carries out data processing
And temperature in real-time display maintenance chamber 9, when conserving that temperature is less than the temperature set in chamber 9, PC ends output control signal is by electricity
Magnet valve 8 starts, and pneumatic control valve 6 is opened in corresponding maintenance chamber 9, toward intracavitary injection steam, keeps its corresponding temperature;When foster
When temperature in shield chamber 9 is higher than setting value, magnetic valve 8 obtains control signal closing, and corresponding pneumatic control valve 6 is closed.
Above-mentioned embodiment is only specific case of the present utility model, is not to make other forms to the utility model
Limitation, any person skilled in the art is changed or is modified as possibly also with the technology contents of the disclosure above equivalent
The equivalent implementations of change.But it is every without departing from the utility model technical principle on the premise of, according to of the present utility model
Any simple modification, equivalent variations and the remodeling that technical spirit is made to embodiment of above, should all fall into of the present utility model
Scope of patent protection.
Claims (7)
1. a kind of short sleeper steam curing pond, including several interval setting pond bodies(1), pond body(1)Inside is maintenance chamber, and it is special
Sign is:Maintenance intracavitary is provided with temperature sensor(10), each pond body(1)The tops of four side walls be equipped with back-shaped water sealed tank
(2), each pond body(1)On be equipped with one be used for cover pond body(1)Chi Gai(3), each Chi Gai(3)Edge be equipped with downwards
Extend to back-shaped water sealed tank(2)Interior cover rim, pond body(1)Bottom is provided with jet chimney along longitudinal direction(12), jet chimney(12)Through
Branch pipe(tube) (5) is connected to positioned at pond body(1)On outer total jet chimney, each branch pipe(tube)(5)Upper setting magnetic valve(8)With it is pneumatic
Control valve(6), master control valve is set on total jet chimney(7).
2. short sleeper steam curing pond according to claim 1, it is characterised in that:Chi Gai(3)Top inner surface and cover rim
The accent edge of inner surface and maintenance chamber all sets reserved gap.
3. short sleeper steam curing pond according to claim 1, it is characterised in that:Pond body(1)Bottom, which is provided with, supports short sleeper
The support beam of punching block(4), and support beam(4)Above jet chimney (12).
4. short sleeper steam curing pond according to claim 1, it is characterised in that:Pond body(1)Piled up and formed using stone brick, ash
Seam fills up mortar, and pond body(1)It is externally provided with heat-insulation layer.
5. short sleeper steam curing pond according to claim 1, it is characterised in that:Back-shaped water sealed tank(2)Welded by four channel-section steels
Connect and form, and hollow water sealed tank(2)Bottom land be provided with osculum.
6. short sleeper steam curing pond according to claim 1, it is characterised in that:Pond body(1)It is for four and horizontal cross-section
Rectangle, adjacent pond body(1)Share a side wall, and two neighboring back-shaped water sealed tank(2)It is interconnected.
7. according to any one of claim 1 to the 6 short sleeper steam curing pond, it is characterised in that:Chi Gai(3)Top is provided with
6 suspension centres(301).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721106728.8U CN207140045U (en) | 2017-08-31 | 2017-08-31 | Short sleeper steam curing pond |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721106728.8U CN207140045U (en) | 2017-08-31 | 2017-08-31 | Short sleeper steam curing pond |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207140045U true CN207140045U (en) | 2018-03-27 |
Family
ID=61670786
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721106728.8U Active CN207140045U (en) | 2017-08-31 | 2017-08-31 | Short sleeper steam curing pond |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207140045U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109435037A (en) * | 2018-12-28 | 2019-03-08 | 湖南中路华程桥梁科技股份有限公司 | A kind of steam pipe system automatically controlling steam curing temperature |
CN113433159A (en) * | 2021-06-23 | 2021-09-24 | 温州信达交通工程试验检测有限公司 | Boiling box for cement test block |
-
2017
- 2017-08-31 CN CN201721106728.8U patent/CN207140045U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109435037A (en) * | 2018-12-28 | 2019-03-08 | 湖南中路华程桥梁科技股份有限公司 | A kind of steam pipe system automatically controlling steam curing temperature |
CN109435037B (en) * | 2018-12-28 | 2024-02-02 | 湖南中路华程桥梁科技股份有限公司 | Steam pipeline system capable of automatically controlling steam curing temperature |
CN113433159A (en) * | 2021-06-23 | 2021-09-24 | 温州信达交通工程试验检测有限公司 | Boiling box for cement test block |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201729826U (en) | Gas pushing type mixing conjoined biogas generator | |
CN108049525A (en) | Heat insulation prefabricated wall | |
CN207140045U (en) | Short sleeper steam curing pond | |
CN208415968U (en) | Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system | |
CN104073431B (en) | A kind of methane-generating pit of new structure | |
CN203331204U (en) | Steam curing device for concrete prefabricated part | |
CN208052240U (en) | A kind of concrete prefabricated element integrated production line | |
CN205917974U (en) | Novel fire prevention heat preservation wallboard | |
CN107901242A (en) | A kind of mechanized production system of steam pressurized brick | |
CN103074954B (en) | Earthenware brick assembly and prepare the heat-insulation unit of mould, earthenware brick stone wall and earthenware brick assembly | |
CN104453236B (en) | Circulating water natural cooling system for controlling large-volume concrete cracks and construction method | |
CN207110024U (en) | A kind of building energy conservation can cultivate green plant balcony | |
CN206791414U (en) | Full-automatic industrial aquaculture device | |
CN109057101A (en) | The method of construction and exterior wall of support construction and exterior wall | |
CN103739214B (en) | A kind of environment-friendly and energy-efficient limestone kiln | |
CN204529849U (en) | A kind of 50 cubic metres of methane-generating pits | |
CN208008791U (en) | A kind of biogas anaerobic reactor aeration plug-flow pipe | |
CN206674830U (en) | A kind of circulating water cultivation pond water inlet system | |
CN201551139U (en) | Prefabricated assembled ceramic zinc boiler with inner bevel | |
CN202401053U (en) | Sunlight temperature-increasing and temperature-preserving methane pit pond | |
CN201700355U (en) | Computer temperature control fermented soya bean fermenting pool | |
CN201416006Y (en) | Steel mesh cement methane tank | |
CN204402049U (en) | A kind of circulating water natural cooling system controlling Volume Concrete Cracks | |
CN217556836U (en) | Rectangular water delivery channel structure | |
CN208308851U (en) | Half biomass pool built from glass fiber reinforced plastic |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 271222 Dongdu Town, Xintai City, Tai'an City, Shandong Province Patentee after: China Electric Power Construction Group Shandong Power Pipeline Engineering Co., Ltd. Address before: 271222 New Second Road, Dongdu Town, Xintai City, Tai'an City, Shandong Province Patentee before: Shandong Electric Power Pipeline Engineering Co., Ltd. |