CN207131412U CN201720416099.2U CN201720416099U CN207131412U CN 207131412 U CN207131412 U CN 207131412U CN 201720416099 U CN201720416099 U CN 201720416099U CN 207131412 U CN207131412 U CN 207131412U
Authority
CN
China
Prior art keywords
tunnel
pile foundation
side pile
building
crossings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720416099.2U
Other languages
Chinese (zh)
Inventor
杨建民
谯啸海
余大龙
王志杰
李现宾
张涵
徐怀仁
周林峰
舒东利
何韬
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201720416099.2U priority Critical patent/CN207131412U/en
Application granted granted Critical
Publication of CN207131412U publication Critical patent/CN207131412U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Under wear the crossings on different level tunnel construction of building, effectively to control the sedimentation in upper strata tunnel and existing building and deformation, avoid twice disturbing influence of the two space crossed constructing tunnels to building, it is ensured that the reliability and security of building are worn under crossings on different level tunnel.Including existing building and the upper strata tunnel, the lower floor tunnel that are disposed below being formed crossings on different level in stratum.Structure base slab left side pile foundation arranged below, the right side pile foundation in the upper strata tunnel, left side pile foundation, the top of right side pile foundation are fixedly connected with liner structure bottom plate, and lower floor tunnel passes through between left side pile foundation, right side pile foundation.

Description

Under wear the crossings on different level tunnel construction of building
Technical field
It the utility model is related to Tunnel Engineering, the crossings on different level tunnel construction of building worn under more particularly to a kind of
Background technology
With the rapid development of China railways tunnel construction, there is increasing crossings on different level tunnel, i.e., in space Upper parallel, oblique, the tunnel of square crossing, and earth's surface building is worn under crossings on different level tunnel because the problems such as route selection, policy is present The situation of thing.It is strict to requirement of settlement control that existing building construction is worn under crossings on different level tunnel, and upper and lower two constructing tunnels Country rock can be produced compared with large disturbances, so as to which the sedimentation to surface buildingses, skew have an impact, bring certain safety hidden Suffer from.If processing is bad, surface structures subsidence crack will be made, upper tunnel subsidence deformation, earth's surface building is destroyed and upper tunnel destroys Larger economic loss will be caused.How to reduce influence of the lower constructing tunnel to upper tunnel and surface buildingses is to ensure solid The key of architecture construction safety, and current urgent problem are worn under cross tunnel.
At present, it is more to the construction technologies such as tunnel underbridge beam, railway, building construction and safety control measures research, but The research that surface buildingses are worn under crossings on different level tunnel is blank out, and this design and construction to three-dimensional cross tunnel is brought Larger difficulty.
Utility model content
Technical problem to be solved in the utility model be to provide it is a kind of under wear the crossings on different level tunnel construction of building, with Effectively control upper strata tunnel and existing building sedimentation and deformation, avoid two space crossed constructing tunnels to building twice Disturbing influence, it is ensured that the reliability and security of building are worn under crossings on different level tunnel.
Technical scheme is as follows used by the utility model solves its technical problem:
Wear the crossings on different level tunnel construction of building under of the present utility model, including existing building and be disposed below ground Upper strata tunnel, the lower floor tunnel of crossings on different level are formed in layer, it is characterized in that:The structure base slab left side arranged below in the upper strata tunnel Side pile foundation, right side pile foundation, left side pile foundation, the top of right side pile foundation are fixedly connected with liner structure bottom plate, and lower floor tunnel is in left side Passed through between pile foundation, right side pile foundation.
The beneficial effects of the utility model are effectively to control the sedimentation and deformation of upper strata tunnel and existing building, keep away Exempted from twice disturbing influence of the two space crossed constructing tunnels to building, ensure that wear building under crossings on different level tunnel can By property and security, reduce the risk of structure destruction, make to wear under crossings on different level tunnel the design of building more rationally, safety, Reliably.
Brief description of the drawings
This specification includes following three width accompanying drawing:
Fig. 1 is sectional drawing (the face upper strata Under-cross tunnel for the crossings on different level tunnel construction that building is worn under the utility model Section);
Fig. 2 is sectional drawing (the face lower floor Under-cross tunnel for the crossings on different level tunnel construction that building is worn under the utility model Section);
Fig. 3 is the plan for the crossings on different level tunnel construction that building is worn under the utility model.
Component and corresponding mark are shown in figure:Existing building 10, upper strata tunnel 20, left side pile foundation 21, right side pile foundation 22, structure base slab 23, lower floor tunnel 30.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
Referring to Figures 1 and 2, the crossings on different level tunnel construction of building, including existing building are worn under of the present utility model 10 and it is disposed below upper strata tunnel 20, the lower floor tunnel 30 of formation crossings on different level on the stratum in.The structure in the upper strata tunnel 20 The left side pile foundation 21 arranged below of bottom plate 23, right side pile foundation 22, left side pile foundation 21, the top of right side pile foundation 22 and liner structure bottom plate 23 are fixedly connected, and lower floor tunnel 30 passes through between left side pile foundation 21, right side pile foundation 22.
Reference picture 1, left side pile foundation 21, right side pile foundation 22 are reinforced to upper strata tunnel 20, avoid constructing tunnel to existing Building 10 causes to disturb twice.Using the construction of middle-wall method (CRD) method is intersected, left side excavation with guide pit supporting is complete in upper strata tunnel 20 Left side pile foundation 21 is applied after, right side base tunnel applies right side pile foundation 22 after the completion of applying.
Reference picture 3, the left side pile foundation 21, right side pile foundation 22 are respectively arranged at intervals two along the bearing of trend in lower floor tunnel 30 Root, the outside of lower floor's tunnel-liner 30 is arranged in, is applied from the liner structure bottom plate 23 in upper strata tunnel 20 to lower floor tunnel inverted arch bottom Below portion, reduce lower floor tunnel 30 and excavate the influences such as sedimentation on upper strata tunnel 20 and existing building 10, skew.Lower floor's tunnel Excavated again after the completion of the excavation supporting of upper strata tunnel 20, left side pile foundation 21, right side pile foundation 22 reach some strength in road 30.
Some the of the present utility model principles described above that simply explain through diagrams, are not intended to the utility model being confined to In shown and described concrete structure and the scope of application, therefore every corresponding modification for being possible to be utilized and equivalent, Belong to the apllied the scope of the claims of the utility model.

Claims (3)

  1. Wear the crossings on different level tunnel construction of building under 1., including existing building (10) and being disposed below formed in stratum it is vertical Upper strata tunnel (20), lower floor tunnel (30) of body intersection, it is characterized in that:The structure base slab (23) of the upper strata tunnel (20) is below Left side pile foundation (21), right side pile foundation (22), left side pile foundation (21), the top of right side pile foundation (22) and liner structure bottom plate are set (23) it is fixedly connected, lower floor tunnel (30) pass through in left side pile foundation (21), right side pile foundation between (22).
  2. 2. the crossings on different level tunnel construction of building is worn under as claimed in claim 1, it is characterized in that:The left side pile foundation (21), right side pile foundation (22) is respectively arranged at intervals two along the bearing of trend of lower floor tunnel (30).
  3. 3. the crossings on different level tunnel construction of building is worn under as claimed in claim 1 or 2, it is characterized in that:The left side pile foundation (21), right side pile foundation (22) is extended downward into below lower floor tunnel (30) inverted arch bottom.
CN201720416099.2U 2017-04-19 2017-04-19 Under wear the crossings on different level tunnel construction of building Active CN207131412U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720416099.2U CN207131412U (en) 2017-04-19 2017-04-19 Under wear the crossings on different level tunnel construction of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720416099.2U CN207131412U (en) 2017-04-19 2017-04-19 Under wear the crossings on different level tunnel construction of building

Publications (1)

Publication Number Publication Date
CN207131412U true CN207131412U (en) 2018-03-23

Family

ID=61630885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720416099.2U Active CN207131412U (en) 2017-04-19 2017-04-19 Under wear the crossings on different level tunnel construction of building

Country Status (1)

Country Link
CN (1) CN207131412U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255476A (en) * 2020-01-19 2020-06-09 中交一公局第四工程有限公司 Tunnel multi-section three-dimensional intersection construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255476A (en) * 2020-01-19 2020-06-09 中交一公局第四工程有限公司 Tunnel multi-section three-dimensional intersection construction method
CN111255476B (en) * 2020-01-19 2021-10-22 中交一公局第四工程有限公司 Tunnel multi-section three-dimensional intersection construction method

Similar Documents

Publication Publication Date Title
Peng et al. A proposed solution to the ground fissure encountered in urban metro construction in Xi’an, China
CN110985058B (en) Grouting reinforcement method for fault fracture zone of coal face
CN105696427B (en) The construction method and its road structure of a kind of consolidation process newly built railway karst foundation
CN103821060B (en) A kind of construction method of existing highway soft foundation Treating technology
CN102691302B (en) Concrete structure for supporting deep foundation pit
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN108150190A (en) Unevenly-pressured shallow tunnel rock crusher section excavates safeguard structure and construction method
CN111997084A (en) Frame-structure type pile wall structure embedded with retaining plates and construction method thereof
CN109441456A (en) A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN206706479U (en) A kind of light-duty embankment suitable for deep soft soil foundation
CN102146676A (en) High-steep side slope subgrade structure for mountain area
CN108222060A (en) High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure
CN203097900U (en) Municipal grade separation tunnel
CN207131412U (en) Under wear the crossings on different level tunnel construction of building
CN204435407U (en) A kind of batter post group anchor formula rock foundation
CN201714426U (en) Coal seam gob tunnel initial-stage reinforcing and supporting system
CN207525567U (en) A kind of pile plate composite structure suitable for Steep Slope Embankment
CN205662796U (en) Highway medium -and -large -sized solution cavity punishment structure that underlies
CN103104264B (en) Urban interchange tunnel
CN107152281A (en) The construction method of fractured rock tunnel Xia Chuan abrupt slopes high pier
CN104594371A (en) Reinforcing structure of existing foundation bottom plate and construction method thereof
CN209195412U (en) A kind of tunnel structure suitable for weak Facility-sliding strata
CN107190630A (en) Road changes the new cap excavation method of stealthy bridge type
CN207297017U (en) Small spacing under-traverse tunnel structure and tunnel cross structure
CN201705364U (en) Full-closed integral type lining structure of tunnel in coal-seam gob area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant