CN207130789U CN201720870936.9U CN201720870936U CN207130789U CN 207130789 U CN207130789 U CN 207130789U CN 201720870936 U CN201720870936 U CN 201720870936U CN 207130789 U CN207130789 U CN 207130789U
Authority
CN
China
Prior art keywords
concrete
post
cast strip
basic unit
leakage prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720870936.9U
Other languages
Chinese (zh)
Inventor
汪诗敏
黄文平
周红梅
谢箭霄
郑继超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201720870936.9U priority Critical patent/CN207130789U/en
Application granted granted Critical
Publication of CN207130789U publication Critical patent/CN207130789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Building Environments (AREA)

Abstract

The utility model discloses a kind of basement basic unit mortar leakage prevention late poured band structure, including sandstone packed layer, concrete water-proof layer and the concrete base layer set gradually from bottom to up;The concrete water-proof layer is provided with water leg, and the concrete base layer is provided with the post-cast strip corresponding with the water leg, and the both sides of the post-cast strip are laciniation;The water leg and the joining place of post-cast strip are provided with concrete banquette.Its will not spillage, good waterproof performance, and structural strength is high.

Description

A kind of basement basic unit mortar leakage prevention late poured band structure
Technical field
The utility model belongs to building structure technology field, and in particular to a kind of basement basic unit mortar leakage prevention post-cast strip knot Structure.
Background technology
For large-sized reinforced concrete cast-in-place structural, when concrete base layer is poured into a mould, Temperature Joint, subsiding crack are reserved Deng movement joint (being referred to as post-cast strip in construction);Post-cast strip is blocked after concrete base layer stabilization, then with concrete, makes deformation Seam both sides connect with concrete base layer structure, to ensure the globality of concrete base layer and integrality.With concrete knot Structure engineering development, the implementation of more big construction items, the utilization of post-cast strip are more and more frequent;So that the construction of post-cast strip Quality will directly affect the security performance of main structural engineering.During main structure construction, if not controlling post empiricism matter strictly Amount, construction speed will be influenceed, increase construction cost, or even cause Structural Engineering quality dissatisfaction.In concrete base layer post-cast strip In reservation procedure, often spillage is serious by post-cast strip both sides Xia Kou, and cleaning is very cumbersome, i.e., time-consuming and take a lot of work, and traditional post-cast strip Section be quadrangle, in later stage casting process, concrete in post-cast strip can not good contract with both sides concrete base layer Close, cause easy leak, while have an effect on total intensity.
Utility model content
Based on this, in view of the above-mentioned problems, the utility model proposes a kind of basement basic unit mortar leakage prevention late poured band structure, it is not Meeting spillage, good waterproof performance, and structural strength is high.
The technical solution of the utility model is:A kind of basement basic unit mortar leakage prevention late poured band structure, including from bottom to up according to Sandstone packed layer, concrete water-proof layer and the concrete base layer of secondary setting;The concrete water-proof layer is provided with water leg, described Concrete base layer is provided with the post-cast strip corresponding with the water leg, and the both sides of the post-cast strip are laciniation;It is described Water leg and the joining place of post-cast strip are provided with concrete banquette.
In work progress, after the completion of sandstone packed layer and the construction of concrete water-proof layer, in the water leg of concrete water-proof layer Both sides cast concrete banquette, after concrete banquette drying distortions are stable, pour into a mould concrete base layer, pour into a mould concrete base layer When, reserve post-cast strip using zigzag concrete baffle plate well prepared in advance, due to the plugging action of concrete banquette, after pour Band two bottom sides are not in spillage phenomenon, have saved clearance time, that is, have saved the cost of labor of cleaning, accelerated construction again Progress, shorten the duration;After concrete base layer drying distortions are stable, zigzag concrete baffle plate is removed, is poured into post-cast strip Concrete is noted, because post-cast strip both sides are zigzag, during compacted concrete, the both sides of concrete and post-cast strip can be filled Divide stress, the mixed mud in post-cast strip is compacted closer, and make the concrete and both sides concrete base layer contract in post-cast strip Conjunction is closer, makes total intensity higher, and water proofing property is more preferable.
As further improvement of the utility model, the angle of each slot is 120 degree -150 in the zigzag structure Degree.
Slot is too small, can influence agreeing with for post-cast strip inner concrete and both sides concrete base layer on the contrary, it is necessary to assure slot It is sufficiently large, it is advisable with 120 degree of -150 degree.
It is provided with along its length as further improvement of the utility model, on the concrete banquette multiple flexible Stitch, the spacing between adjacent two expansion joint is 45m-55m.Temperature deformation influences banquette quality when avoiding concrete banquette long.
As further improvement of the utility model, the surface of the laciniation is adhesive with waterproofing protection film.
As further improvement of the utility model, the post-cast strip top open part is provided with sealing plate.Sealing plate is set Put, avoid debris from falling into post-cast strip, and play waterproof action.
As further improvement of the utility model, reinforcement is equipped with the concrete base layer and post-cast strip.Add The setting increase structural strength of strengthening tendons.
The beneficial effects of the utility model are:
(1) it is provided by the utility model go out basement basic unit mortar leakage prevention late poured band structure, its will not spillage, good waterproof performance, And structural strength is high;
(2) because the plugging action of concrete banquette, post-cast strip two bottom sides are not in spillage phenomenon, cleaning has been saved Time, that is, the cost of labor of cleaning is saved, construction speed has been accelerated again, shortens the duration;
(3) because post-cast strip both sides are zigzag, during compacted concrete, the both sides of concrete and post-cast strip can Abundant stress, the mixed mud in post-cast strip is compacted closer, and make the concrete and both sides concrete base layer in post-cast strip Agree with more closely, make total intensity higher, and water proofing property is more preferable;
(4) by rationally designing the size of post-cast strip both sides slot, post-cast strip inner concrete and both sides concrete base layer are made Preferably agree with, enhancing structure strength and stability.
Brief description of the drawings
Fig. 1 is the structural representation of basement basic unit mortar leakage prevention late poured band structure described in embodiment;
Fig. 2 is the top view of concrete banquette and concrete water-proof layer;
Fig. 3 is the construction schematic diagram of concrete base layer;
Fig. 4 is the mixed mud casting and constructing schematic diagram of post-cast strip;
Description of reference numerals:
10 sandstone packed layers, 20 concrete water-proof layers, 21 water legs, 30 concrete base layers, 31 post-cast strips, 40 coagulation earthen platforms Bank, 41 expansion joints, 50 zigzag concrete baffle plates, 60 waterproofing protection films, 70 sealing plates, 80 reinforcements, 90 concrete.
Embodiment
Embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings.
Embodiment:
As Figure 1-4, a kind of basement basic unit mortar leakage prevention late poured band structure, including the sandstone set gradually from bottom to up Packed layer 10, concrete water-proof layer 20 and concrete base layer 30;The concrete water-proof layer 20 is provided with water leg 21, described mixed Solidifying soil matrix layer 30 is provided with the post-cast strip 31 corresponding with the water leg 21, and the both sides of the post-cast strip 31 are zigzag knot Structure;The water leg 21 and the joining place of post-cast strip 31 are provided with concrete banquette 40.
In work progress, after the completion of sandstone packed layer 10 and the construction of concrete water-proof layer 20, in concrete water-proof layer 20 The both sides cast concrete banquette 40 of water leg 21, after the drying distortions of concrete banquette 40 are stable, pours into a mould concrete base layer 30, When pouring into a mould concrete base layer 30, post-cast strip is reserved using zigzag concrete baffle plate 50 well prepared in advance, due to concrete The plugging action of banquette 40, the two bottom sides of post-cast strip 31 are not in spillage phenomenon, have saved clearance time, that is, have saved cleaning Cost of labor, accelerate construction speed again, shorten the duration;After the drying distortions of concrete base layer 30 are stable, sawtooth is removed Shape concrete baffle plate 50, concrete is poured into a mould into post-cast strip 31, because the both sides of post-cast strip 31 are zigzag, in compacted concrete During, the both sides of concrete and post-cast strip 31 can abundant stress, the mixed mud in post-cast strip 31 is compacted closer, and make Concrete in post-cast strip 31 agrees with more closely with both sides concrete base layer 30, makes total intensity higher, and water proofing property is more It is good.
In another embodiment, in the zigzag structure each slot angle a be 120 degree, or 135 degree or It is 150 degree.
Slot is too small, can influence agreeing with for the inner concrete of post-cast strip 31 and both sides concrete base layer 30 on the contrary, it is necessary to assure Slot is sufficiently large, is advisable with 120 degree of -150 degree.
In another embodiment, multiple expansion joints 41 are provided with the concrete banquette 40 along its length, it is adjacent Spacing between two expansion joints 41 is 50m, or 45m or 55m.Temperature deformation influences when avoiding concrete banquette 40 long Banquette quality.
In another embodiment, the surface of the laciniation is adhesive with waterproofing protection film 60.
In another embodiment, the top open part of post-cast strip 31 is provided with sealing plate 70.The setting of sealing plate 70, keeps away Exempt from debris to fall into post-cast strip, and play waterproof action.
In another embodiment, it is equipped with reinforcement 80 in the concrete base layer 30 and post-cast strip 31.Reinforcement 80 setting increase structural strength.
Embodiment described above only expresses specific embodiment of the present utility model, and its description is more specific and detailed, But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area For technical staff, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to In the scope of protection of the utility model.

Claims (6)

  1. A kind of 1. basement basic unit mortar leakage prevention late poured band structure, it is characterised in that:Sandstone including setting gradually from bottom to up is filled out Fill layer, concrete water-proof layer and concrete base layer;The concrete water-proof layer is provided with water leg, is set on the concrete base layer There is the post-cast strip corresponding with the water leg, the both sides of the post-cast strip are laciniation;The water leg and post-cast strip Joining place be provided with concrete banquette.
  2. 2. basement basic unit mortar leakage prevention late poured band structure according to claim 1, it is characterised in that:The zigzag structure In the angle of each slot be 120 degree of -150 degree.
  3. 3. basement basic unit mortar leakage prevention late poured band structure according to claim 1, it is characterised in that:The concrete banquette On be provided with multiple expansion joints along its length, the spacing between adjacent two expansion joint is 45m-55m.
  4. 4. basement basic unit mortar leakage prevention late poured band structure according to claim 1, it is characterised in that:The laciniation Surface be adhesive with waterproofing protection film.
  5. 5. basement basic unit mortar leakage prevention late poured band structure according to claim 1, it is characterised in that:At the top of the post-cast strip Opening is provided with sealing plate.
  6. 6. basement basic unit mortar leakage prevention late poured band structure according to claim 1, it is characterised in that:The concrete base layer And reinforcement is equipped with post-cast strip.
CN201720870936.9U 2017-07-18 2017-07-18 A kind of basement basic unit mortar leakage prevention late poured band structure Expired - Fee Related CN207130789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720870936.9U CN207130789U (en) 2017-07-18 2017-07-18 A kind of basement basic unit mortar leakage prevention late poured band structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720870936.9U CN207130789U (en) 2017-07-18 2017-07-18 A kind of basement basic unit mortar leakage prevention late poured band structure

Publications (1)

Publication Number Publication Date
CN207130789U true CN207130789U (en) 2018-03-23

Family

ID=61639360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720870936.9U Expired - Fee Related CN207130789U (en) 2017-07-18 2017-07-18 A kind of basement basic unit mortar leakage prevention late poured band structure

Country Status (1)

Country Link
CN (1) CN207130789U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593629A (en) * 2019-10-15 2019-12-20 鞍钢集团工程技术有限公司 Construction method and structure for reinforcing and preventing leakage of old pool side wall through hole opening
CN112814040A (en) * 2021-01-04 2021-05-18 中国建筑第八工程局有限公司 Auxiliary device for forming concrete structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593629A (en) * 2019-10-15 2019-12-20 鞍钢集团工程技术有限公司 Construction method and structure for reinforcing and preventing leakage of old pool side wall through hole opening
CN112814040A (en) * 2021-01-04 2021-05-18 中国建筑第八工程局有限公司 Auxiliary device for forming concrete structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN206189455U (en) Piping lane
CN104532985B (en) Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof
CN207130789U (en) A kind of basement basic unit mortar leakage prevention late poured band structure
CN104652371B (en) The glue of crossing set up based on old dam coagulates rock-fill dams and construction method thereof
CN104631513A (en) Construction method for closing basement exterior wall post-cast strip
CN108166531A (en) Basic alter-pouring strips mould plate and the construction method for pouring post-cast strip
CN206220238U (en) Fully-prefabricated assembled structure
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN109826084A (en) A kind of aqueduct method for repairing seepage
CN106948504A (en) Assembled wallboard water seepage prevention vertical abutment joint structure and its construction method
CN205134717U (en) Take frame mould integration light antidetonation partition plate of architectural surface
CN207633546U (en) Toilet concrete sealing prefabricated components
CN110344844A (en) A kind of track engineering section of track well construction method
CN106639321A (en) Method and structure for controlling shrinkage cracks of ultra-long concrete structure
CN108240045A (en) A kind of compound late poured band structure of outer wall precast slab and its construction method
CN110218101A (en) A kind of cement base silt light road foundation building block, structure and construction method
CN207193688U (en) A kind of concrete slab
CN107905424A (en) Full prefabricated band splicing groove unidirectional harden structure, making and assembly method
CN207032323U (en) A kind of waterproof late poured band structure
CN106337530A (en) Construction method for plugging construction joint of frame beam
CN207525961U (en) A kind of full prefabricated band splicing unidirectional harden structure of groove
CN217150848U (en) Prefabricated fire-resistant concrete composite floor slab
CN109680722A (en) The construction method for setting external building access port is directly stayed on outer wall of basement body
CN209723051U (en) A kind of basement bottom plate rear pouring tape construction joint optimization processing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180323

Termination date: 20180718