Prior art keywords
anchor pole
active material
cloth bag
deep layer
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720717075.0U
Other languages
Chinese (zh)
Inventor
龚霞
彭卫东
向国强
尹红英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Communications Construction Group Co Ltd
Original Assignee
Sichuan Jiaotou Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jiaotou Construction Engineering Co Ltd filed Critical Sichuan Jiaotou Construction Engineering Co Ltd
Priority to CN201720717075.0U priority Critical patent/CN207109478U/en
Application granted granted Critical
Publication of CN207109478U publication Critical patent/CN207109478U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of embankment deep layer disease no-dig technique Comprehensive Treatment structure, including bituminous paving, roadbed, micro reinforcement stake, the material reinforced stake of Minitype active and full depth crack ruggedized construction;Micro reinforcement stake is made up of anchor pole and consolidation grouting body, and anchor pole is in consolidation grouting body;The material reinforced stake of Minitype active is made up of geotechnological cloth bag, ring-type GSZ and active material, and ring-type GSZ is arranged in geotechnological cloth bag, filling active material in geotechnological cloth bag;Full depth crack ruggedized construction is to pour into depth crack cement mortar by depth injected hole and set surface closure to be formed.The utility model has the advantages that construction efficiency is high, cheap.

Description

Embankment deep layer disease no-dig technique Comprehensive Treatment structure
Technical field
A kind of bituminous paving no-dig technique punishment Comprehensive Treatment structure is the utility model is related to, suitable for asphalt concrete pavement Defects Treatment construction.
Background technology
Asphalt surface course is a kind of flexible pavement being combined with mineral aggregate and pitch, has wear-resisting, anti-skidding, cracking resistance, noise low The advantages that.In China, either rural or city, low-grade highway or high-grade highway, it is obtained for relatively broad Using.But as the volume of traffic increasingly increased, traffic load also increase therewith, plus the broken of Natural Damage and human factor Bad, the time one is grown, and occurs as soon as a series of diseases such as different degrees of cracking, deformation.The appearance of these diseases, not only shorten drip The service life on blue or green road surface, and have impact on vehicle safety, quickly operation.The timely preventing and treating of highway distress is particularly important , it can extend the service life of road, reduce the road reformation cycle, not only cost-effective, moreover it is possible to give full play to road Social benefit.Thus, disease is correctly recognized, rational disease of punishing is very important.
Traditional bituminous paving handle measure mainly has:1. for crack mainly by the way of notch and fill slot, construct compared with For convenience, but poor durability, it is impossible to fundamentally solve crack disease;It is 2. local caused by settlement of subgrade Depression, if roadbed has been stablized, do not continuing to sink, then need to only repair surface layer, the bituminous concrete surface elder generation milling that need to will be punished Fall, brushing sticking layer oil after cleaning out, subsidize modified asphalt concrete surface layer again, this construction method wastes time and energy, effect Typically.
In summary, the Research Prospects of embankment deep layer disease no-dig technique Comprehensive Treatment are wide, have good economic technology Benefit, technical research is carried out in this regard, it will obtain good innovation achievement.
The content of the invention
The purpose of this utility model be to provide it is a kind of it is comprehensive using micro reinforcement stake, it is the material reinforced stake of Minitype active, complete The construction method of depth slurry injection technique, it can be widely applied to deep layer Defects Treatment and the transformation and upgrade construction of bituminous paving In.
To realize above-mentioned technical purpose, the utility model employs following technical scheme:
A kind of embankment deep layer disease no-dig technique Comprehensive Treatment structure, it is characterised in that miniature including bituminous paving, roadbed Reinforcing pile, the material reinforced stake of Minitype active and full depth crack ruggedized construction;Micro reinforcement stake is by anchor pole and consolidation grouting body group Into anchor pole is in consolidation grouting body;The material reinforced stake of Minitype active is by geotechnological cloth bag, ring-type GSZ and active material group Into ring-type GSZ is arranged in geotechnological cloth bag, filling active material in geotechnological cloth bag;Full depth crack ruggedized construction is logical Cross depth injected hole by cement mortar pour into depth crack and set surface block and formed.
Further, micro reinforcement stake leaves reaming in pile foundation boring, and anchor pole top is provided with jacking-up spacing end, anchor pole Three layers of expansible wing plate are provided with, expansible wing plate is connected by brute spring with anchor pole.
The material reinforced stake of Minitype active is provided with the precast pile tip for being used for fixing immersed tube.
The active material is quick lime or industrial slag.
The construction method of above-mentioned embankment deep layer disease no-dig technique Comprehensive Treatment structure, comprises the following steps:
1) preparation of construction:The required machinery of construction, material, personnel are arranged, and carry out the Defect inspection work of early stage;
2) micro reinforcement pile driving construction:First roadbed, bituminous paving are drilled, in expansible wing plate design attitude during drilling Carry out the construction of reaming, be subsequently inserted into anchor pole, anchor pole is provided with three layers of expansible wing plate, expansible wing plate by brute spring with Anchor pole connects, and expansible wing plate is in contraction state when transferring, and is slowly opened after complete under anchor pole, inserts in the reaming of both sides;Anchor Intend the top lifting height reached in the adjustable slip casting jacking-up spacing end of anchor pole upper weld, i.e. bituminous paving after the completion of bar positioning;Point Slip casting three times, grouting and reinforcing body is formed, until road surface reaches jacking-up spacing end position, subsequent anchor pole tensioning, sealing off and covering anchorage, formed miniature Reinforcing pile;
3) the material reinforced pile driving construction of Minitype active:Stake machine is in place and after confirming that stake position meets design requirement, by geotechnological cloth bag It is thrown into from the conveying mouth on piling machine immersed tube top, immersed tube is connected with precast pile tip, precast pile tip sets fixation with immersed tube lower end card, It is connected geotechnological cloth bag is suitable for reading simultaneously with active material conveying mouth;Immersed tube is got into projected depth, ring-type GSZ is poured into, fills Fill out on after active material to designing pile length and pull out immersed tube, geotechnological cloth bag is cut after pile, is pressed and sealed stake top;
4) depth crack reinforces:Accurate anchoring base slip casting is carried out using reinforcing pile to depression, area of coming to nothing, fracture uses Full depth micropore grouting and reinforcing, first drilling depth injected hole, it is in the milk with cement mortar from bottom, finally carries out applying for surface closure Work.
Further, the active material is quick lime or industrial slag.
The utility model is by the way that to ground and subgrade strengthening, using hole is drawn, the multiple high-pressure slip-casting micro reinforcement stake of multilayer is micro- The anchor pole top of type reinforcing pile sets adjustable slip casting jacking-up spacing end, and anchor pole sets three layers of expansible wing plate, set in wing plate Brute spring can be opened actively, as the impetus of anchoring, slip casting in three times, form reinforcing body;Depression, area of coming to nothing are utilized and added Gu stake carries out accurate anchoring base slip casting, fracture uses full depth micropore grouting and reinforcing, and first surface sealing off and covering anchorage is boxed out, and is filled from bottom Slurry;Part roadbed uses ring-type GSZ outsourcing cloth bag active material reinforcing pile, can absorb the moisture of roadbed and ground, prevents The pavement disease caused by ponding.
The utility model has the characteristics of following and beneficial effect:
(1) synthesis uses micro reinforcement stake, full depth micropore grouting and reinforcing, ring-type GSZ outsourcing cloth bag active material The construction methods such as reinforcing pile, depression caused by effectively solving subgrade strength deficiency, come to nothing, the disease such as crack, realize good Good technical benefits.
(2) hole, the multiple high-pressure slip-casting micro reinforcement stake of multilayer, its anchor pole top are drawn by being used to ground and subgrade strengthening Adjustable slip casting jacking-up spacing end is set, anchor pole sets three layers of expansible wing plate, sets brute spring actively to open in wing plate, As the impetus of anchoring, slip casting in three times forms reinforcing body, and consolidation effect is splendid.
(3) accurate anchoring base slip casting is carried out using reinforcing pile to depression, area of coming to nothing, fracture is noted using full depth micropore Slurry is reinforced, and first surface sealing off and covering anchorage is boxed out, and is in the milk from bottom.
(4) part roadbed fills ring-type GSZ+cloth bag active material water suction pile using hole is drawn, will be with using steel immersed tube The geotechnological cloth bag of precast pile tip connection is set to designed elevation, by lightweight active material hydration swelling, consolidation effect, is coordinated The geotechnological moulding pile of cloth bag hoop constraint, there is the mechanism effect to weak soil dewatering and drainage consolidation, the displacement of compacted and light material.
(5) hydration reaction occurs in geotechnological cloth bag for active material, and on the one hand inflatable cloth bag reaches the mesh of the densification soil body , ground water is on the other hand can absorb, reduces the moisture content of former soft soil foundation, simultaneously because the tensile strength of cloth bag is higher, Geotechnological cloth bag note lightweight active material stake can be made to play a part of reinforced earth body.
(6) ring-type GSZ outsourcing cloth bag active material reinforcing pile Immersed tunnel safe operation, maturation, and utilize activity Material has higher cost performance, the shorter engineering time, can save the duration, saves project total cost.
(7) compared to traditional asphalt pavement construction, for this technique without excavating, grouting amount is few, can reduce soil pollution, construction Environmental protection, there is preferable application value and wide market application foreground.
Brief description of the drawings
Fig. 1 is rockbolt installation schematic diagram;
Fig. 2 is expansible wing plate expanded schematic diagram;
Fig. 3 is expansible wing plate from being retracted to expanded schematic diagram;
Fig. 4 is to fill ring-type GSZ schematic diagram;
Fig. 5 is the utility model structure diagram;
Fig. 6 is full depth slip casting structural representation;
Fig. 7 is the utility model construction flow chart.
In figure:1- roadbeds, 2- bituminous pavings, 3- anchor poles, 4- jacking-up spacings end, the expansible wing plates of 5-, 6- reamings, 7- are miniature Reinforcing pile, 8- ring-type GSZs, 9- precast pile tips, 10- geotechnique's cloth bag, 11- immersed tube, 12- consolidation grouting bodies, the miniature work of 13- Property material reinforced stake, 14- cracks, 15- depth injected holes, 16- surfaces closure, 17- cement mortars, 18- brute springs.
Embodiment
Anchor pole, which makes, in present embodiment requires, reinforcement welding construction technology, and mortar depositing construction operational procedure etc. repeats no more, Emphasis illustrates the embodiment for the embankment deep layer disease no-dig technique punishment construction that the utility model is related to.
Fig. 1 is rockbolt installation schematic diagram;Fig. 2 is expansible wing plate expanded schematic diagram;Fig. 3 is expansible wing plate from being retracted to Expanded schematic diagram;Fig. 4 is to fill ring-type GSZ schematic diagram;Fig. 5 is the utility model structure diagram;Fig. 6 is full depth note Starch structural representation.
Micro reinforcement stake as shown in Figure 1, Figure 2, Figure 3 shows, reaming 6 is left during pile foundation boring, pile body is provided with anchor pole 3, anchor The top of bar 3 is provided with jacking-up spacing end 4, and sets three layers of expansible wing plate 5, and expansible wing plate 5 passes through brute spring 18 and anchor Bar 3 connects.
The material reinforced stake of Minitype active as shown in Figure 4, Figure 5, including precast pile tip 9 and ring-type GSZ 8, during pile Need to drill using immersed tube 11, ring-type GSZ and active material are filled in geotechnological cloth bag 10.
Full depth crack ruggedized construction as shown in Figure 6, depth crack is poured into by depth injected hole 15 by cement mortar 17 In 14 and surface closure 16 is set and formed.
As shown in fig. 7, the construction procedure of embankment deep layer disease no-dig technique Comprehensive Treatment is as follows:
1) preparation of construction:The required machinery of construction, material, personnel are arranged, and carry out the Defect inspection work of early stage.
2) micro reinforcement pile driving construction:First roadbed 1, bituminous paving 2 are drilled, designed in expansible wing plate 5 during drilling Position carries out the construction of reaming 6, and the height of reaming is 30cm, radius 60cm;Anchor pole 3 is subsequently inserted into, anchor pole 3 isAnchor pole It is provided with three layers of expansible wing plate 5, expansible wing plate 5 long 50cm, wide 25cm, three expansible wing plates of each layer of setting, angle For 120 °, expansible wing plate 5 is connected by brute spring 18 with anchor pole 3.Expansible wing plate 5 is in contraction-like when anchor pole 3 is transferred State, slowly open, inserted in both sides reaming 6 after complete under anchor pole;In the adjustable note of anchor pole upper weld after the completion of anchor pole positioning Jacking-up spacing end 4 is starched, i.e. bituminous paving intends the top lifting height reached, and jacking-up spacing end uses and is welded to connect.Slip casting in three times, shape Into grouting and reinforcing body 12, until road surface reaches jacking-up spacing end position, subsequent anchor pole tensioning, sealing off and covering anchorage, micro reinforcement stake 7 is formed, Micro reinforcement stake stake footpath is 400mm.
3) the material reinforced pile driving construction of Minitype active:Stake machine is in place and after confirming that stake position meets design requirement, by geotechnological cloth bag 10 conveying mouth from the top of piling machine immersed tube 11 is thrown into, and is pulled out immersed tube and be connected with precast pile tip 9, precast pile tip 9 and piling The lower end card of machine immersed tube 11 sets fixation, while is connected geotechnological cloth bag 10 is suitable for reading with active material conveying mouth;Immersed tube 11 is got to and set Depth is counted, pours into ring-type GSZ 8, fills on after active material to designing pile length and pulls out immersed tube 11, geotextiles are cut after pile Bag, is pressed and sealed stake top, 13 footpaths of the material reinforced stake of Minitype active are 350mm.
4) depth crack reinforces:Accurate anchoring base slip casting is carried out using reinforcing pile to depression, area of coming to nothing, fracture 14 is adopted With full depth micropore grouting and reinforcing, drilling depth injected hole 15, aperture 50mm, it is in the milk from bottom with M15 cement mortars 17, is finally carried out The construction of surface closure 16.

Claims (4)

1. a kind of embankment deep layer disease no-dig technique Comprehensive Treatment structure, it is characterised in that including bituminous paving(2), roadbed(1), Reinforcing pile(7), active material reinforcing pile(13)With full depth crack ruggedized construction;Reinforcing pile(7)By anchor pole(3)And consolidation grouting Body(12)Composition, anchor pole(3)Located at consolidation grouting body(12)It is interior;Active material reinforcing pile(13)By geotechnological cloth bag(10), ring-type GSZ(8)Formed with active material, ring-type GSZ(8)It is arranged at geotechnological cloth bag(10)It is interior, geotechnological cloth bag(10)It is interior Fill active material;Full depth crack ruggedized construction is by depth injected hole(15)By cement mortar(17)Pour into depth crack (14)In and set surface block and formed.
2. embankment deep layer disease no-dig technique Comprehensive Treatment structure according to claim 1, it is characterised in that reinforcing pile(7) Reaming is left in pile foundation boring(6), anchor pole(3)Top is provided with jacking-up spacing end(4), anchor pole(3)Being provided with three layers can expand Spademan plate(5), expansible wing plate(5)Pass through brute spring(18)With anchor pole(3)Connection.
3. embankment deep layer disease no-dig technique Comprehensive Treatment structure according to claim 1, it is characterised in that active material adds Gu stake(13)Provided with for fixing immersed tube(11)Precast pile tip(9).
4. embankment deep layer disease no-dig technique Comprehensive Treatment structure according to claim 1, it is characterised in that the active material Material is quick lime or industrial slag.
CN201720717075.0U 2017-06-19 2017-06-19 Embankment deep layer disease no-dig technique Comprehensive Treatment structure Active CN207109478U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720717075.0U CN207109478U (en) 2017-06-19 2017-06-19 Embankment deep layer disease no-dig technique Comprehensive Treatment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720717075.0U CN207109478U (en) 2017-06-19 2017-06-19 Embankment deep layer disease no-dig technique Comprehensive Treatment structure

Publications (1)

Publication Number Publication Date
CN207109478U true CN207109478U (en) 2018-03-16

Family

ID=61578198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720717075.0U Active CN207109478U (en) 2017-06-19 2017-06-19 Embankment deep layer disease no-dig technique Comprehensive Treatment structure

Country Status (1)

Country Link
CN (1) CN207109478U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985071A (en) * 2019-12-31 2020-04-10 四川交投建设工程股份有限公司 Active highway tunnel disease comprehensive treatment structure and construction method
CN112252376A (en) * 2020-10-14 2021-01-22 中积兴业建设集团有限公司 Self-locking anti-floating anchor rod construction method in complex geological environment
CN112411288A (en) * 2020-11-17 2021-02-26 同济大学 Geotextile-containing light soil widened embankment anti-floating structure and construction method thereof
CN113216147A (en) * 2021-05-11 2021-08-06 中国科学院武汉岩土力学研究所 Soft rock roadbed longitudinal crack disease treatment method
CN113565144A (en) * 2021-07-29 2021-10-29 江西丰强科技发展有限公司 Surface water infiltration drainage guide and integral reinforcement structure for abandoned dreg site and construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985071A (en) * 2019-12-31 2020-04-10 四川交投建设工程股份有限公司 Active highway tunnel disease comprehensive treatment structure and construction method
CN110985071B (en) * 2019-12-31 2021-02-09 四川交投建设工程股份有限公司 Active highway tunnel disease comprehensive treatment structure and construction method
CN112252376A (en) * 2020-10-14 2021-01-22 中积兴业建设集团有限公司 Self-locking anti-floating anchor rod construction method in complex geological environment
CN112411288A (en) * 2020-11-17 2021-02-26 同济大学 Geotextile-containing light soil widened embankment anti-floating structure and construction method thereof
CN113216147A (en) * 2021-05-11 2021-08-06 中国科学院武汉岩土力学研究所 Soft rock roadbed longitudinal crack disease treatment method
CN113216147B (en) * 2021-05-11 2023-02-24 中国科学院武汉岩土力学研究所 Soft rock roadbed longitudinal crack disease treatment method
CN113565144A (en) * 2021-07-29 2021-10-29 江西丰强科技发展有限公司 Surface water infiltration drainage guide and integral reinforcement structure for abandoned dreg site and construction method
CN113565144B (en) * 2021-07-29 2023-03-03 江西丰强科技发展有限公司 Surface water infiltration drainage guide and integral reinforcement structure for abandoned dreg site and construction method

Similar Documents

Publication Publication Date Title
CN207109478U (en) Embankment deep layer disease no-dig technique Comprehensive Treatment structure
CN103184734B (en) A kind of construction method implanting slip casting compound pile
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN110965416B (en) Bamboo reinforcement system for reinforcing mountain area high-fill roadbed and construction method
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
CN106320120A (en) Construction process for pile slab type non-soil roadbed highway
CN107151972B (en) Embankment deep layer disease no-dig technique Comprehensive Treatment construction method
CN106676993B (en) Reinforced broken stone frame structure roadbed reinforcing system and reinforcing method thereof
CN110438858A (en) A kind of hard and soft is seamless Pavement Base Structure and its construction method
CN201358456Y (en) Plastic sleeve concrete pile
CN201395794Y (en) Foundation ditch with concealed columns and soil-nailing support
CN110965415A (en) Method for widening and transforming old concrete pavement
CN203213101U (en) Embedding grouting combined pile
CN206887664U (en) Widened structure is spliced based on assembled template new and old roadbed light soil
CN103046446A (en) Treatment structure at joint part of reconstruction and extension project of highway
CN104358202B (en) Road surface structare layer and its paving method
CN206625096U (en) A kind of reinforced rubble frame structure subgrade strengthening system
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN209307882U (en) It is a kind of for improving the cushion cap device on pile foundation reinforcement basis
CN104762956A (en) Method for forming novel pile based on construction waste recycled aggregate
CN109577121A (en) A kind of assembled self-balancing channel design system and its rapid constructing method
CN108589747A (en) EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method
CN109853624B (en) Extension construction method for existing highway rectangular culvert

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 610047 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province

Patentee after: Sichuan Communications Construction Group Co.,Ltd.

Address before: 610047 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province

Patentee before: SICHUAN JIAOTOU CONSTRUCTION ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 610047 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province

Patentee after: Sichuan Communications Construction Group Co.,Ltd.

Address before: 610047 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province

Patentee before: Sichuan Communications Construction Group Co.,Ltd.

CP01 Change in the name or title of a patent holder