CN207099802U - A kind of overhead viaduct bridge guardrail greening flowerpot structure - Google Patents

A kind of overhead viaduct bridge guardrail greening flowerpot structure Download PDF

Info

Publication number
CN207099802U
CN207099802U CN201720720793.3U CN201720720793U CN207099802U CN 207099802 U CN207099802 U CN 207099802U CN 201720720793 U CN201720720793 U CN 201720720793U CN 207099802 U CN207099802 U CN 207099802U
Authority
CN
China
Prior art keywords
water
basin body
bridge guardrail
viaduct bridge
storage box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720720793.3U
Other languages
Chinese (zh)
Inventor
林永汉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Free Creation Forest Landscape Planning And Design Co Ltd
Original Assignee
Wenzhou Boyuan Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Boyuan Industrial Design Co Ltd filed Critical Wenzhou Boyuan Industrial Design Co Ltd
Priority to CN201720720793.3U priority Critical patent/CN207099802U/en
Application granted granted Critical
Publication of CN207099802U publication Critical patent/CN207099802U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses a kind of overhead viaduct bridge guardrail greening flowerpot structure, mounting bracket including basin body and Qian shape, basin bottom is provided with permeable hole, the mounting bracket includes bottom plate and a pair of risers, the water storage box of a upper end open is provided with the bottom plate, horizontal symmetrical is provided with a pair of water distributors on the inside of two risers, and water distributor is provided with water distributing pore close to basin body side, and water distributor connects with water storage box and is provided with water pump;The basin body side wall is provided with the groove for water distributor insertion, and the water inlet with water distributing pore docking is provided with groove.The purpose of this utility model is to provide a kind of overhead viaduct bridge guardrail greening flowerpot structure, and it can increase the moisture in flowerpot automatically, improves the survival rate of plant.

Description

A kind of overhead viaduct bridge guardrail greening flowerpot structure
Technical field
A kind of flowerpot is the utility model is related to, more particularly to a kind of overhead viaduct bridge guardrail greening flowerpot structure.
Background technology
With the fast development of urban highway traffic, overpass has been built up in many big and medium-sized cities, and in viaduct two Side is provided with jardiniere, to increase green coverage, beautifying city, improves urban environment.Current overhead flowerpot on both sides of the road is all outstanding Hang on the outside of viaduct bridge guardrail, seldom flowerpot is arranged on viaduct bridge guardrail top, its arrangement is dull, and flowerpot is suspended on On the outside of viaduct bridge guardrail, the plant planted on flowerpot is not easily accessible the visual field of people.
Notification number is that CN201805762U Chinese patent discloses a kind of overhead viaduct bridge guardrail greening flowerpot, including Basin body and mounting bracket, the mounting bracket are cell body, and several fixed plates are provided with mounting bracket, and the both ends of fixed plate are connected to On the two side of mounting bracket, mounting bracket is separated into several grid by the fixed plate, the basin body be arranged on two fixed plates it Between, several groove ports are respectively arranged with two side of the basin body towards fixed plate, groove port is interior inserted with connecting plate, connection The other end of plate is fixed in fixed plate.
This overhead viaduct bridge guardrail greening flowerpot has the following disadvantages:Basin body is fixed on by overpass by mounting bracket Guardrail on, allow kind of plant to be easier the visual field into people, but because the moisture that soil retains in flowerpot is seldom, by flowerpot Top set, kind of a plant can be caused to be fully exposed under sunlight, add the evaporation of moisture.
Utility model content
The purpose of this utility model is to provide a kind of overhead viaduct bridge guardrail greening flowerpot structure, and it can increase automatically Moisture in flowerpot, improve the survival rate of plant.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of overhead viaduct bridge guardrail greening flowerpot structure, including basin body and the mounting bracket of Qian shape, basin bottom are set There is permeable hole, the mounting bracket includes bottom plate and a pair of risers, is provided with the water storage box of a upper end open on the bottom plate, two Horizontal symmetrical is provided with a pair of water distributors on the inside of riser, and water distributor is provided with water distributing pore, water distributor and water storage close to basin body side Case connects and is provided with water pump;The basin body side wall is provided with the groove for water distributor insertion, and be provided with groove and The water inlet of water distributing pore docking.
By such scheme, water storage box is set on bottom plate, during the rainy day, sky rainfall falls into basin body, and a part is by plant And soil absorption, rainwater more than needed are passed through to fall into water storage box and preserved from the permeable hole of basin bottom.Under hot weather, lead to Cross water pump and the rainwater of storage is transported to water distributor, then rainwater enters in basin body from water distributing pore and water inlet and plant is carried out Pour.Water resource has not only been saved, has also improved the survival rate of plant in basin body.Further, the groove and water distributor of basin body side wall Between clamping engagement, there is fixation to basin body, avoid basin body depart from mounting bracket.
Further, the water pump is electrically connected with PLC, and electronic thermometer is connected with the PLC.
By such scheme, electronic thermometer monitors the temperature on bridge floor in real time, when temperature reaches design temperature, electronics temperature Signal is fed back to PLC by degree meter, and PLC will control water pump to pour basin body, realize automation Spray irrigation function.
Further, the uniform some support chips of the water storage box opening.
By such scheme, support chip is used to support basin body, so as to allow basin body to be stably mounted to the top of water storage box.
Further, the riser and bottom plate are hinged, and are consolidated between two risers by the Stud connection located at basin body both sides It is fixed.
By such scheme, due to the clamping engagement between water distributor and groove, the installation of basin body can only be horizontally inserted peace To shelve, dismounting is cumbersome, so, riser and bottom plate are hinged, during installation, fixed two risers by stud, so as to will Basin body is fixedly clamped;During dismounting, riser is flipped over, is easy to take out basin body.
Further, the water distributor is connected with water storage box by bellows.
By such scheme, riser, which is overturn, causes the position relationship between water distributor and water pump to change, bellows energy Enough facilitate the rotation of riser and water distributor.
Further, the basin bottom is provided with the stopper slot for support chip insertion.
By such scheme, support chip and stopper slot are engaged by clamping so that the connection between basin body and water storage box is more It is firm.
Further, it is provided with the bottom plate for the mounting hole installed in viaduct bridge guardrail.
By such scheme, mounting hole is used for the guardrail that mounting bracket is arranged on to overpass.
In summary, the utility model has the advantages that:
1st, rainy day rainfall falls into basin body, and a part is by plant and soil absorption, and rainwater more than needed is from the permeable of basin bottom Pass through to fall into water storage box in hole and preserve.Under hot weather, the rainwater of storage is transported to by water distributor, Ran Houyu by water pump Water enters in basin body from water distributing pore and water inlet and plant is poured, and has not only saved water resource, also improves in basin body The survival rate of plant;
2nd, the clamping engagement between the groove and water distributor of basin body side wall, has fixation to basin body, avoids basin body from taking off From mounting bracket;Riser and bottom plate are hinged, during installation, fixed two risers by stud, so as to which basin body be fixedly clamped;Tear open When unloading, riser is flipped over, is easy to take out basin body.
Brief description of the drawings
Fig. 1 is that the present embodiment is used to embody the attachment structure schematic diagram between mounting bracket and basin body;
Fig. 2 is the schematic diagram that the present embodiment is used to embody PLC and water pump annexation.
In figure, 1, mounting bracket;11st, riser;111st, stud;12nd, bottom plate;121st, mounting hole;13rd, water distributor;131st, water distribution Hole;2nd, water storage box;21st, support chip;22nd, water pump;221st, bellows;23rd, PLC;231st, electronic thermometer;3rd, basin body; 31st, permeable hole;32nd, stopper slot;33rd, groove;331st, water inlet.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
A kind of overhead viaduct bridge guardrail greening flowerpot structure, as illustrated in fig. 1 and 2, include the mounting bracket 1 of U-shaped, the installation Frame 1 includes one piece of bottom plate 12 and a pair of symmetrical risers 11 being hinged on the side of bottom plate 12.
Installation settings has a water storage box 2 on bottom plate 12, and the upper opening of water storage box 2 is uniformly some in the opening of water storage box 2 Support chip 21, lays a basin body 3 on support chip 21, and the bottom of basin body 3 is provided with permeable hole 31, the bottom of basin body 3 be provided with and The stopper slot 32 that support chip 21 is engaged by clamping;The inner side of riser 11 is horizontally disposed water distributor 13, and water distributor 13 is close to basin body 3 one Side is provided with water distributing pore 131, and the side wall of basin body 3 is provided with the groove 33 being engaged by clamping with water distributor 13, and in groove 33 It is provided with the water inlet 331 docked with water distributing pore 131.Connected between water distributor 13 and water storage box 2 by a water pump 22, water pump 22 It is upper to be connected between water distributor 13 by bellows 221.PLC 23 is electrically connected with water pump 22, is gone back in PLC 23 It is connected to electronic thermometer 231.The stud 111 with the both sides of basin body 3 is set to be connected by a pair between two bottom plates 12, and And it is additionally provided with bottom plate 12 for the mounting hole 121 installed in viaduct bridge guardrail.
Specific implementation is described as follows:
During installation, two panels riser 11 is flipped over, then the basin body 3 for having planted plant is placed on water storage box 2, and So that support chip 21 is embedded into stopper slot 32.Then, riser 11 is overturn to vertical state, and causes water distributor 13 and groove It is engaged by clamping between 33, then two risers 11 is connected by stud 111.
During rainy weather, rainwater enters basin body 3, and a part of rainwater is by plant and soil absorption, and most rainwater will It can leak and be entered in water storage box 2 under the permeable hole 31 of the bottom of basin body 3 and preserve.When weather is more hot, electronic thermometer 231 Detect that temperature reaches setting value, signal is fed back into PLC 23, PLC 23 receives signal Pneumatic water pump 22 Rainwater in water storage box 2 is transported in water distributor 13, and then entered out of permeable hole 31 and water inlet 331 in basin body 3 to planting Thing is poured.
If phenomena such as withered death occurs for the plant in basin body 3 needs to change, stud 111 is dismantled, then will be vertical Plate 11 downwardly turns over, and is changed so as to which basin body 3 be taken out.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (7)

1. a kind of overhead viaduct bridge guardrail greening flowerpot structure, including basin body (3) and the mounting bracket (1) of Qian shape, basin body (3) bottom Portion is provided with permeable hole (31), and the mounting bracket (1) includes bottom plate (12) and a pair of risers (11), it is characterized in that:The bottom plate (12) water storage box (2) of a upper end open is provided with, horizontal symmetrical is provided with a pair of water distributors on the inside of two risers (11) (13), water distributor (13) is provided with water distributing pore (131) close to basin body (3) side, and water distributor (13) and water storage box (2) are connected and set It is equipped with water pump (22);Basin body (3) side wall is provided with for the embedded groove (33) of water distributor (13), and in groove (33) It is provided with the water inlet (331) with water distributing pore (131) docking.
2. a kind of overhead viaduct bridge guardrail greening flowerpot structure according to claim 1, it is characterized in that:The water pump (22) PLC (23) is electrically connected with, electronic thermometer (231) is connected with the PLC (23).
3. a kind of overhead viaduct bridge guardrail greening flowerpot structure according to claim 1, it is characterized in that:The water storage box (2) the uniform some support chips (21) of opening.
4. a kind of overhead viaduct bridge guardrail greening flowerpot structure according to claim 3, it is characterized in that:The riser (11) and bottom plate (12) is be hinged, is connected between two risers (11) by the stud (111) located at basin body (3) both sides.
5. a kind of overhead viaduct bridge guardrail greening flowerpot structure according to claim 4, it is characterized in that:The water distributor (13) connected with water storage box (2) by bellows (221).
6. a kind of overhead viaduct bridge guardrail greening flowerpot structure according to claim 3, it is characterized in that:The basin body (3) bottom is provided with for the embedded stopper slot (32) of support chip (21).
7. a kind of overhead viaduct bridge guardrail greening flowerpot structure according to claim 1, it is characterized in that:The bottom plate (12) it is provided with for the mounting hole (121) installed in viaduct bridge guardrail.
CN201720720793.3U 2017-06-20 2017-06-20 A kind of overhead viaduct bridge guardrail greening flowerpot structure Expired - Fee Related CN207099802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720720793.3U CN207099802U (en) 2017-06-20 2017-06-20 A kind of overhead viaduct bridge guardrail greening flowerpot structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720720793.3U CN207099802U (en) 2017-06-20 2017-06-20 A kind of overhead viaduct bridge guardrail greening flowerpot structure

Publications (1)

Publication Number Publication Date
CN207099802U true CN207099802U (en) 2018-03-16

Family

ID=61588592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720720793.3U Expired - Fee Related CN207099802U (en) 2017-06-20 2017-06-20 A kind of overhead viaduct bridge guardrail greening flowerpot structure

Country Status (1)

Country Link
CN (1) CN207099802U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108849040A (en) * 2018-06-20 2018-11-23 宁波市政工程建设集团股份有限公司 A kind of the overhead type plant setting device and construction method of overhead side guardrail
CN113273401A (en) * 2021-05-14 2021-08-20 中国二十冶集团有限公司 Method for planting vegetation by arranging viaduct auxiliary structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108849040A (en) * 2018-06-20 2018-11-23 宁波市政工程建设集团股份有限公司 A kind of the overhead type plant setting device and construction method of overhead side guardrail
CN113273401A (en) * 2021-05-14 2021-08-20 中国二十冶集团有限公司 Method for planting vegetation by arranging viaduct auxiliary structure
CN113273401B (en) * 2021-05-14 2022-09-16 中国二十冶集团有限公司 Method for planting vegetation by arranging viaduct auxiliary structure

Similar Documents

Publication Publication Date Title
CN207099802U (en) A kind of overhead viaduct bridge guardrail greening flowerpot structure
CN108828693B (en) Intelligent rainfall detection equipment based on computer vision
CN207749614U (en) A kind of pavement of road drainage arrangement
CN207121912U (en) A kind of side slope water and soil conservation device
CN203716414U (en) Straight double-layer drainage device
CN107421577A (en) The experimental rig of biological delaying basin comprehensive effectiveness under the conditions of a kind of simulation natural precipitation
CN103392567A (en) Irrigation system for three-dimensional greening walls
CN203182197U (en) Landscape umbrella frame
CN205922295U (en) Overpass virescence irrigation drainage device convenient to installation
CN209234394U (en) A kind of vegetable planting box
CN104594364B (en) A kind of heavy grade rock side-slope nursing structure based on inclined plate from plant wastes
CN207597997U (en) A kind of envelope road device of traffic engineering maintenance
CN207318759U (en) A kind of precipitation sensor based on meteorological observatory's observation rainfall
CN209251192U (en) A kind of wall body vertical greening system
CN208752229U (en) Integrated stainless steel rainfall gauge
KR100953277B1 (en) Landscape architecture apparatus for a wall mounting
CN220493724U (en) Roof greening protection frame
CN207004097U (en) It is a kind of that there is the bus shelter for collecting rainwater and greening environment function
CN102246667B (en) Hook blanket type plant basal disc
CN207730809U (en) A kind of electric power metering device mounting bracket
CN205922294U (en) Overpass afforestation brightening integral type device
CN204370443U (en) A kind of nursing structure for heavy grade rock side-slope
CN104563134A (en) Protecting structure for big-gradient stone slope
CN205502697U (en) Embedded single -pipe tower communication base station mounting bracket of split
CN204370450U (en) A kind of nursing structure for heavy grade rock side-slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200724

Address after: Room 2061, B north, building 2, No.5, Xueyuan Road, Haidian District, Beijing 100089

Patentee after: Beijing free creation forest landscape planning and Design Co., Ltd

Address before: Chashan village Yongning road Dasan street of Ouhai District 325006 in Zhejiang province Wenzhou City No. 30 second floor

Patentee before: WENZHOU BOYUAN INDUSTRIAL DESIGN Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180316

Termination date: 20210620

CF01 Termination of patent right due to non-payment of annual fee