CN207092119U - A kind of assembled tower crane blinding layer - Google Patents

A kind of assembled tower crane blinding layer Download PDF

Info

Publication number
CN207092119U
CN207092119U CN201721097899.9U CN201721097899U CN207092119U CN 207092119 U CN207092119 U CN 207092119U CN 201721097899 U CN201721097899 U CN 201721097899U CN 207092119 U CN207092119 U CN 207092119U
Authority
CN
China
Prior art keywords
concrete cushion
tower crane
assembled tower
blinding layer
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721097899.9U
Other languages
Chinese (zh)
Inventor
于广涛
邓堃
马昊翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201721097899.9U priority Critical patent/CN207092119U/en
Application granted granted Critical
Publication of CN207092119U publication Critical patent/CN207092119U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

A kind of assembled tower crane blinding layer, including concrete cushion, multi-layer biaxially oriented reinforcing bar is provided with concrete cushion, fixed anchor ring is respectively equipped with the corner of concrete cushion, concrete cushion is provided with the cross Yi Zao areas that concrete cushion is uniformly divided into four pieces of lifting concrete cushions, every piece of lifting concrete cushion is respectively equipped with pre-buried hole for hoist on three angles in cross Yi Zao areas, screw rod can be installed in each pre-buried hole for hoist, screw rod lower end is fixed by pad and double nut with lifting concrete cushion, it has reasonable in design, remove and install conveniently, lifting is safe and reliable, the advantages that structural strength is high.

Description

A kind of assembled tower crane blinding layer
Technical field:
It the utility model is related to tower crane technical field, and in particular to a kind of assembled tower crane blinding layer.
Background technology:
At present, tower crane is the essential instrument in skyscraper field, in order to ensure safe to use, the tower crane of tower crane Must be solid reliable, wherein tower crane bed course is the first step for establishing tower crane, and existing tower crane bed course is typically directly Poured and formed with concrete and reinforcing bar, after the completion of tower crane use, directly blinding layer is stayed in foundation ditch, not recycled, no The waste of resource is only caused, and is unfavorable for energy-conserving and environment-protective, increase construction cost.
Utility model content:
The purpose of this utility model is exactly to make up the deficiencies in the prior art, there is provided a kind of assembled tower crane base mat Layer, it have the advantages that it is reasonable in design, remove and install conveniently, lifting is safe and reliable, structural strength is high, solve existing skill Problem present in art.
The utility model is that technical scheme is used by solving above-mentioned technical problem:
A kind of assembled tower crane blinding layer, including concrete cushion, concrete cushion is interior to be provided with multi-layer biaxially oriented reinforcing bar, mixes Fixed anchor ring is respectively equipped with the corner of solidifying soil padding, concrete cushion, which is provided with, is uniformly divided into concrete cushion four pieces of liftings The cross Yi Zao areas of concrete cushion, every piece of lifting concrete cushion are respectively equipped with three angles in cross Yi Zao areas Pre-buried hole for hoist, can each install screw rod in pre-buried hole for hoist, screw rod lower end passes through pad and double nut and lifting concrete mats Layer is fixed.
The concrete cushion is rectangular parallelepiped structure, and the upper surface of concrete cushion is square.
The flatness of the concrete cushion is 4mm.
The reinforcing bar double-layer double-direction is arranged in concrete cushion.
200mm is smaller than between the two adjacent reinforcing bars.
It is provided with above the concrete cushion and slides layer of sand.
The concrete cushion is surrounded by gutter.
The concrete cushion surrounding has built retaining wall by laying bricks or stones.
The screw rod is made up of round steel thread.
The pad is made up of angle steel.
The utility model uses such scheme, for technical problem existing for existing tower crane bed course, devises one kind Assembled tower crane blinding layer, by the way that concrete cushion is divided into four pieces, fixed anchor ring and pre-buried is designed on concrete cushion Hole for hoist, realize after the completion of working as bed course use, carry out picking chisel along cross Yi Zao areas, by bar cutting, and then by concrete mats Layer is divided into four pieces, then installs screw rod in pre-buried hole for hoist, and concrete cushion is lifted by every piece by fixed anchor ring and screw rod Transport is sling respectively, when needing to reuse, four pieces are stitched together, and rebar junction is welded using overlap joint, then to ten C25 concrete is poured in font Yi Zao areas, and then completes splicing, realizes that bed course is recycled, it is necessary to which that illustrate is the application Concrete cushion is an entirety in first time pouring molding, just carries out picking chisel along cross Yi Zao areas when only recycling, Cross Yi Zao areas herein equivalent to post-cast strip, the tower crane bed course of the application have remove and install conveniently, it is cost-effective The advantages that.
Brief description of the drawings:
Fig. 1 is the top view of the utility model concrete cushion;
Fig. 2 is the front view of the utility model concrete cushion;
Fig. 3 is the structural representation of the utility model lifting concrete cushion;
Fig. 4 is the structural representation that the utility model fixes anchor ring;
Fig. 5 is the utility model overall structure diagram;
Wherein, 1, concrete cushion, 2, reinforcing bar, 3, fixed anchor ring, 4, cross Yi Zao areas, 5, pre-buried hole for hoist, 6, spiral shell Bar, 7, pad, 8, double nut, 9, slide layer of sand, 10, gutter, 11, retaining wall.
Embodiment:
The utility model is described further with embodiment below in conjunction with the accompanying drawings:
As Figure 1-5, a kind of assembled tower crane blinding layer, including concrete cushion 1, it is provided with concrete cushion 1 Multi-layer biaxially oriented reinforcing bar 2, fixed anchor ring 3 is respectively equipped with the corner of concrete cushion 1, and concrete cushion 1 is provided with concrete Bed course 1 is uniformly divided into the cross Yi Zao areas 4 of four pieces of lifting concrete cushions 12, and every piece of lifting concrete cushion 12 is close to cross Pre-buried hole for hoist 5 is respectively equipped with three angles in Xing Yizao areas 4, screw rod 6 can be installed in pre-buried hole for hoist 5, the lower end of screw rod 6 passes through Pad 7 and double nut 8 are fixed with lifting concrete cushion 12, by the way that concrete cushion 1 is divided into four pieces, in concrete cushion 1 Anchor ring 3 and pre-buried hole for hoist 5 are fixed in upper design, are realized after the completion of working as bed course use, are carried out picking chisel along cross Yi Zao areas 4, will Reinforcing bar 2 is cut off, and then concrete cushion 1 is divided into four pieces, then the installation screw rod 6 in pre-buried hole for hoist 5, passes through fixed anchor ring 3 and screw rod 6 by every piece lifting concrete cushion sling transport respectively, when needing to reuse, four pieces are stitched together, reinforcing bar 2 junctions are welded using overlap joint, and C25 concrete is then poured into cross Yi Zao areas 4, and then complete splicing, realize bed course Recycle, the tower crane bed course of the application have the advantages that to remove and install conveniently, it is cost-effective.
Concrete cushion 1 is rectangular parallelepiped structure, and the upper surface of concrete cushion 1 is square, the length and width of concrete cushion A height of 8000mm × 8000mm × 150mm, dismantle, be easy for installation.
Concrete cushion is by C20 concretings.
The width in cross Yi Zao areas is 800mm.
A diameter of 25mm of pre-buried hole for hoist 5.
The flatness of concrete cushion 1 is 4mm, to ensure that the stationarity of tower crane lays the first stone.
The double-layer double-direction of reinforcing bar 2 is arranged in concrete cushion 1, on the premise of structural strength is ensured, saves material.
A diameter of 12mm of reinforcing bar 2,200mm is smaller than between two adjacent reinforcing bars 2, it is ensured that the structure of concrete cushion 1 Intensity.
The top of concrete cushion 1, which is provided with, slides layer of sand 9, and the thickness for sliding layer of sand 9 is 50-100mm, facilitates component spelling.
Concrete cushion 1 is surrounded by gutter 10, prevents foundation for tower crane ponding.
The surrounding of concrete cushion 1 has built retaining wall 11 by laying bricks or stones, and the thickness of retaining wall 11 is 240mm, is highly 1000mm, prevents The soil on foundation ditch periphery, which slides to cave in, influences the normal use of foundation for tower crane.
Screw rod 6 by20 round steel threads are made, and structural strength is high, easy to process.
Pad 7 is made up of the angle steel of ∠ 75, and intensity is high.
It is of the present utility model to use process:
Initial tower crane bed course is an entirety, is respectively equipped with fixed anchor ring 3 at 1 four jiaos of concrete cushion, every piece Lift and be respectively equipped with pre-buried hole for hoist 5 on three angles of concrete cushion 12, after the completion of initial tower crane bed course use, edge Cross Yi Zao areas 4 on concrete cushion 1 are dug, and reinforcing bar 2 therein is cut off, and whole concrete cushion 1 is divided Into four pieces, what ameristic words integral hoisting was difficult to, every piece is lifted respectively, before being lifted respectively to every piece, pre- Installation screw rod 6 in hole for hoist 5 is buried, the lower end of screw rod 6 is by pad 7 and double nut 8 and lifts the fixation of concrete cushion 12, so Lifting concrete cushion 12 is lifted and transported by fixed anchor ring 3 and screw rod 6 afterwards, when it is desired to be used, then by four pieces Lifting concrete cushion 12 is stitched together, and the reinforcing bar 2 of stitching portion carries out firm welding by overlapping welding manner, then in cross C25 concrete is poured in Xing Yizao areas 4, and then completes the splicing of whole concrete cushion 1, the tower crane bed course tool of the application It is high, cost-effective to remove and install convenience, structural strength.
Above-mentioned embodiment cannot function as the limitation to scope of protection of the utility model, for the skill of the art For art personnel, any alternate modification or conversion made to the utility model embodiment all fall within guarantor of the present utility model In the range of shield.
Part is not described in detail for the utility model, is the known technology of those skilled in the art of the present technique.

Claims (9)

  1. A kind of 1. assembled tower crane blinding layer, it is characterised in that:It is double that multilayer is provided with including concrete cushion, in concrete cushion To reinforcing bar, fixed anchor ring is respectively equipped with the corner of concrete cushion, concrete cushion, which is provided with, uniformly divides concrete cushion Into the cross Yi Zao areas of four pieces of lifting concrete cushions, every piece of lifting concrete cushion is close to three angles in cross Yi Zao areas On be respectively equipped with pre-buried hole for hoist, screw rod can be installed in each pre-buried hole for hoist, screw rod lower end is by pad and double nut with hanging Dress concrete cushion is fixed.
  2. A kind of 2. assembled tower crane blinding layer according to claim 1, it is characterised in that:The concrete cushion is length Cube structure, the upper surface of concrete cushion is square.
  3. A kind of 3. assembled tower crane blinding layer according to claim 1, it is characterised in that:The concrete cushion is put down Whole degree is 4mm.
  4. A kind of 4. assembled tower crane blinding layer according to claim 1, it is characterised in that:The reinforcing bar double-layer double-direction is set Put in concrete cushion, 200mm is smaller than between two adjacent reinforcing bars.
  5. A kind of 5. assembled tower crane blinding layer according to claim 1, it is characterised in that:Above the concrete cushion Provided with slip layer of sand.
  6. A kind of 6. assembled tower crane blinding layer according to claim 1, it is characterised in that:The concrete cushion surrounding Provided with gutter.
  7. A kind of 7. assembled tower crane blinding layer according to claim 1, it is characterised in that:The concrete cushion surrounding Retaining wall is built by laying bricks or stones.
  8. A kind of 8. assembled tower crane blinding layer according to claim 1, it is characterised in that:The screw rod is by round steel thread It is made.
  9. A kind of 9. assembled tower crane blinding layer according to claim 1, it is characterised in that:The pad is by angle steel system Into.
CN201721097899.9U 2017-08-29 2017-08-29 A kind of assembled tower crane blinding layer Expired - Fee Related CN207092119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721097899.9U CN207092119U (en) 2017-08-29 2017-08-29 A kind of assembled tower crane blinding layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721097899.9U CN207092119U (en) 2017-08-29 2017-08-29 A kind of assembled tower crane blinding layer

Publications (1)

Publication Number Publication Date
CN207092119U true CN207092119U (en) 2018-03-13

Family

ID=61539762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721097899.9U Expired - Fee Related CN207092119U (en) 2017-08-29 2017-08-29 A kind of assembled tower crane blinding layer

Country Status (1)

Country Link
CN (1) CN207092119U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109109151A (en) * 2018-09-20 2019-01-01 上海宝冶建筑工程有限公司 A kind of assembled architecture gate strengthening member method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109109151A (en) * 2018-09-20 2019-01-01 上海宝冶建筑工程有限公司 A kind of assembled architecture gate strengthening member method

Similar Documents

Publication Publication Date Title
CN102619152A (en) Split mounting type prefabricated reinforced concrete construction temporary road
CN105544587B (en) The construction method of tower crane is fixed using combined type foundation for tower crane
CN105603843A (en) Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN201962932U (en) Building construction segmented overhung outer scaffold
CN108130837A (en) A kind of prefabricated road plate and its construction method
CN104153579B (en) A kind of formwork for placing structure of non-standard layers structure and construction method
CN105133754A (en) Prefabricated concrete shear wallboard counterbore guide type mounting device and method
CN202730579U (en) Recyclable prefabricated concrete block for hardening construction plant
CN204571288U (en) Floor slab preformed hole mould
CN207092119U (en) A kind of assembled tower crane blinding layer
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN104711991A (en) Foundation near foundation pit slope and reinforcement method thereof
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN201883746U (en) Base of movable high-voltage wire pole
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN210288002U (en) But reuse is construction way temporarily
CN202866261U (en) Operation hanging rack for civil construction
TWM643266U (en) Pavement unit barrier structure
CN201915420U (en) Foundation of temporary gate building
CN202466352U (en) Spliced prefabricated reinforced concrete construction temporary road
CN205654063U (en) Tower crane concrete cap's safety protection platform is demolishd in high altitude
CN204875849U (en) Board -like barricade of uniting of stake keeps off native board unilateral formwork reinforced structure
CN204059943U (en) A kind of formwork for placing structure of non-standard layers structure
CN211341606U (en) Operating platform for structural light well part
CN105804087A (en) Installation method for steel structure below large deep foundation pit supporting beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313