CN207092089U - A kind of pile foundation pile crown auxiliary cuts device - Google Patents

A kind of pile foundation pile crown auxiliary cuts device Download PDF

Info

Publication number
CN207092089U
CN207092089U CN201720910347.9U CN201720910347U CN207092089U CN 207092089 U CN207092089 U CN 207092089U CN 201720910347 U CN201720910347 U CN 201720910347U CN 207092089 U CN207092089 U CN 207092089U
Authority
CN
China
Prior art keywords
pile foundation
sleeve pipes
pvc sleeve
cage
pile crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720910347.9U
Other languages
Chinese (zh)
Inventor
崔龙
张春洪
赵绍鹏
黄炳营
龚有贵
高雪亮
张伟峰
洪绵家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201720910347.9U priority Critical patent/CN207092089U/en
Application granted granted Critical
Publication of CN207092089U publication Critical patent/CN207092089U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of pile foundation pile crown auxiliary and cut device, belong to Bridge Construction technical field.The device includes PVC sleeve pipes and reinforcing bar suspension ring, and described PVC casing inner diameters are more than the external diameter of steel reinforcement cage cage bar, and the number of PVC sleeve pipes is not less than the number of steel reinforcement cage cage bar, and the length of PVC sleeve pipes is not less than the height of pile foundation pile crown;Described reinforcing bar suspension ring have multiple, and two neighboring reinforcing bar suspension ring are connected using steel wire rope;Also include plugged zone, bottom of the described plugged zone in PVC sleeve pipes.The utility model pile foundation pile crown aids in the use for cutting device to reduce artificial chisel and removes pile foundation steel bar cage cage bar periphery concrete link, improve efficiency of construction, while reduce and break after bar bending cage cage bar straightening link again, accelerate construction speed, the duration is saved, there is great use value.

Description

A kind of pile foundation pile crown auxiliary cuts device
Technical field
The utility model belongs to Bridge Construction technical field, and in particular to a kind of pile foundation pile crown auxiliary cuts device.
Background technology
At present, with the development of engineering construction, pile foundation concrete is widely applied, because underwater concrete is to fill from lower to upper Note, to ensure pile foundation quality, it is necessary in concrete high perfusion 0.5m~1.0m more(The raised area is mingled with mud, rock ballast etc.), Cut in next step bearing platform construction.
The currently used method that cuts is:As shown in FIG. 1 to 3, first reinforcing bar is dug out along pile foundation periphery man-hour manually hand-held pneumatic pick Cage cage bar, then a circle concrete is dug out along Pile Foundations Design height of pile top, steel reinforcement cage cage bar is broken out, recycles anti-shear concrete poor The characteristics of, concrete block need to be cut by hammering to dismantle for 1~2 time to cutting part from side.Because the concrete for needing to cut carries Reinforcing bar, it is difficult to cut, spend artificial more, low construction efficiency, and pile foundation cage bar breaks curved rear straightening again, construction is repeatedly.Therefore such as The problem of what overcome the deficiencies in the prior art is current Bridge Construction technical field urgent need to resolve.
Utility model content
The purpose of this utility model is during being cut based on above-mentioned bridge pile foundation pile crown, caused by spend it is artificial it is more, Low construction efficiency and cage bar break the problems such as curved straightening again, there is provided a kind of pile crown auxiliary cuts device, there is great use value.
To achieve the above object, the technical solution adopted in the utility model is as follows:
A kind of pile foundation pile crown auxiliary cuts device, including PVC sleeve pipes and reinforcing bar suspension ring, and described PVC casing inner diameters are more than The external diameter of steel reinforcement cage cage bar, and the number of PVC sleeve pipes is not less than the number of steel reinforcement cage cage bar, the length of PVC sleeve pipes is not less than stake The height of foundation pile head;Described reinforcing bar suspension ring have multiple, and two neighboring reinforcing bar suspension ring are connected using steel wire rope;Also include closure Layer, bottom of the described plugged zone in PVC sleeve pipes.
It is further preferred that the length of described PVC sleeve pipes is highly bigger 10~20cm than pile foundation pile crown.
It is further preferred that a diameter of 100mm of described PVC sleeve pipes
It is further preferred that the material of described plugged zone is adhesive tape, waste and old gunnysack, polybag or bag of cement.
It is further preferred that described reinforcing bar suspension ring have two.
It is further preferred that described reinforcing bar suspension ring are made up of a diameter of 12mm of use HRB400 reinforcing bars.
Compared with prior art, its advantage is the utility model:
The utility model pile foundation pile crown aids in the use for cutting device to reduce artificial chisel and removes pile foundation steel bar cage cage bar periphery Concrete link, improves efficiency of construction, while reduces and break after bar bending cage cage bar straightening link again, accelerates construction speed, The duration is saved, there is great use value.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is that traditional pile crown cuts schematic cross-section
Fig. 2 is that traditional pile crown cuts diagrammatic cross-section.
Fig. 3 cuts steel reinforcement cage cage bar for traditional pile crown and breaks curved schematic diagram.
Fig. 4 is to cut schematic cross-section using the utility model device pile crown.
Fig. 5 is to cut diagrammatic cross-section using the utility model device pile crown.
Fig. 6 is structural representation when PVC sleeve pipes use.
In figure, 1-pile foundation concrete, 2-steel reinforcement cage cage bar, 3-cut position, 4-cushion cap, 5-steel reinforcement cage spiral hoop Muscle, 6-Pile Foundations Design cope level cut line, 7-PVC sleeve pipes, 8-reinforcing bar suspension ring, 9- steel wire ropes, 10-plugged zone, 11- Above-ground route.
Embodiment
The utility model is described in further detail with reference to embodiment.
It will be understood to those of skill in the art that the following example is merely to illustrate the utility model, and should not be regarded as limiting The scope of the utility model.Unreceipted particular technique, annexation or condition person in embodiment, according to document institute in the art The technology of description, annexation, condition are carried out according to product description.Material therefor, instrument or the unreceipted production of equipment Manufacturer person, being can be by buying the conventional products obtained.
As shown in Fig. 4~Fig. 6, a kind of pile foundation pile crown auxiliary cuts device, including PVC sleeve pipes 7 and reinforcing bar suspension ring 8, described The internal diameter of PVC sleeve pipes 7 be more than steel reinforcement cage cage bar 2 external diameter, preferably PVC sleeve pipes 7 a diameter of 100mm, and PVC sleeve pipes 7 Number is not less than the number of steel reinforcement cage cage bar 2, and the length of PVC sleeve pipes 7 is not less than the height of pile foundation pile crown, preferably described PVC sets The length of pipe 7 is highly bigger 10~20cm than pile foundation pile crown;Described reinforcing bar suspension ring 8 have it is multiple, preferably two, and two neighboring The use steel wire rope 9 of reinforcing bar suspension ring 8 is connected, and preferably described reinforcing bar suspension ring 8 are made up of a diameter of 12mm of use HRB400 reinforcing bars. Also include plugged zone 10, bottom of the described plugged zone 10 in PVC sleeve pipes 7.It is preferred that the material of plugged zone 10 is adhesive tape, given up Used Gunny Bag, polybag or bag of cement.
It is the PVC sleeve pipes of Φ 100, the reinforcing bar suspension ring of HRB400 Φ 12 that pile foundation pile crown auxiliary of the present utility model, which cuts device, The simple and practical construction auxiliary device of construction is cut for pile crown, its construction method is as follows:
The pile foundation pile crown for needing to cut is calculated according to this engineering stake top design altitude pile foundation perfusion depth displacement actual with scene Length, the length of PVC sleeve pipes suitably lengthens 10~20cm according to pile foundation pile crown length, in pile foundation filling concrete to design of pile top Before elevation, it is enclosed on pvc pipe in steel reinforcement cage cage bar, is blocked, prevented by plugged zone between PVC sleeve bottoms and steel reinforcement cage cage bar Concrete enters in PVC sleeve pipes.After the completion of filling concrete, two reinforcing bars of HRB400 Φ 12 of insertion are hung in stake top concrete Ring.
After the completion of cushion cap excavation of foundation pit, one circle groove is dug out using pneumatic pick along pile foundation periphery in design of pile top elevation face, Depth 20cm or so, then pile crown is hammered from side(The characteristics of using anti-shear concrete difference)1 ~ 2 time, you can cut pile crown. Using the steel wire rope tied up on reinforcing bar suspension ring, the concrete block dismantled is hung out from steel reinforcement cage.
Steel reinforcement cage cage bar is opened with concrete separating using PVC sleeve pipes in pile foundation pile crown, substantially reduces pile crown flexural capacity, Beneficial to fractureing.Reinforcing bar suspension ring are inserted before pile foundation pile crown concrete setting, are easy to take out the concrete block to fracture(Pile crown).The pile crown is auxiliary Help and cut that device material is simple, and operating method is simple, greatly save manpower, improve efficiency of construction conscientiously, accelerate construction speed, The duration is saved, there is great use value.
The advantages of general principle of the present utility model, principal character and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (6)

1. a kind of pile foundation pile crown auxiliary cuts device, it is characterised in that including PVC sleeve pipes and reinforcing bar suspension ring, described PVC sleeve pipes Internal diameter is more than the external diameter of steel reinforcement cage cage bar, and the number of PVC sleeve pipes is not less than the number of steel reinforcement cage cage bar, the length of PVC sleeve pipes Not less than the height of pile foundation pile crown;Described reinforcing bar suspension ring have multiple, and two neighboring reinforcing bar suspension ring are connected using steel wire rope;Also Including plugged zone, bottom of the described plugged zone in PVC sleeve pipes.
2. pile foundation pile crown auxiliary according to claim 1 cuts device, it is characterised in that the length of described PVC sleeve pipes It is highly bigger 10~20cm than pile foundation pile crown.
3. pile foundation pile crown auxiliary according to claim 1 cuts device, it is characterised in that the diameter of described PVC sleeve pipes For 100mm.
4. pile foundation pile crown according to claim 1 auxiliary cuts device, it is characterised in that the material of described plugged zone is Adhesive tape, waste and old gunnysack, polybag or bag of cement.
5. pile foundation pile crown auxiliary according to claim 1 cuts device, it is characterised in that described reinforcing bar suspension ring have two It is individual.
6. pile foundation pile crown auxiliary according to claim 1 cuts device, it is characterised in that described reinforcing bar suspension ring are use A diameter of 12mm HRB400 reinforcing bars are made.
CN201720910347.9U 2017-07-26 2017-07-26 A kind of pile foundation pile crown auxiliary cuts device Active CN207092089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720910347.9U CN207092089U (en) 2017-07-26 2017-07-26 A kind of pile foundation pile crown auxiliary cuts device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720910347.9U CN207092089U (en) 2017-07-26 2017-07-26 A kind of pile foundation pile crown auxiliary cuts device

Publications (1)

Publication Number Publication Date
CN207092089U true CN207092089U (en) 2018-03-13

Family

ID=61546335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720910347.9U Active CN207092089U (en) 2017-07-26 2017-07-26 A kind of pile foundation pile crown auxiliary cuts device

Country Status (1)

Country Link
CN (1) CN207092089U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109385999A (en) * 2018-09-20 2019-02-26 哈尔滨理工大学 A kind of shovel pawl adjustable hydraulic crushing stake machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109385999A (en) * 2018-09-20 2019-02-26 哈尔滨理工大学 A kind of shovel pawl adjustable hydraulic crushing stake machine

Similar Documents

Publication Publication Date Title
CN102312429B (en) Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN106400802B (en) A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills
CN105569560B (en) A full set of tubular type long auger stake machine and the method for utilizing the ram machine construction
CN106351670A (en) Closed pre-support tunnel structure
CN106400803A (en) Integral cast-in-situ bored pile head breaking process
CN105442605B (en) Extract PHC and be reused in deep foundation pit supporting construction method
CN103993598A (en) Crashed stone grouting pile with lead holes implanted in cloth bag and construction method
CN106121689A (en) A kind of excavation method of non-coal mine underground large stable chamber
CN107604920A (en) A kind of quick construction method for abolishing filling pile head
CN101634147B (en) Method for demolishing ultra high cast-in-place pile head
CN104480931B (en) Fast file head removing method for mechanical pore forming pouring pile
CN207092089U (en) A kind of pile foundation pile crown auxiliary cuts device
CN114232628A (en) Cutting hoop for integrally breaking pile head of cast-in-situ bored pile and construction method
CN209211459U (en) Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA
CN105370306B (en) The massif tunnel excavation construction method of vertical pre-reinforcement processing
CN109944238A (en) Pile construction method is rammed in full-sleeve full-rotation
CN206220114U (en) A kind of eight High-Rise Pile Cap Foundations
CN206144569U (en) Confined is advance in advance and is protected tunnel structure
CN206667234U (en) Concrete pile head breaking supplementary structure
CN212866008U (en) Single pile reinforcing device
CN206928296U (en) Pile pulling system
CN205875146U (en) Broken pile's reinforced structure
CN209523770U (en) A kind of slip casting combination of steel rope device
CN108086309B (en) Mini pile reinforcement cage installation method