CN207063689U - A kind of sunshade - Google Patents
A kind of sunshade Download PDFInfo
- Publication number
- CN207063689U CN207063689U CN201720734526.1U CN201720734526U CN207063689U CN 207063689 U CN207063689 U CN 207063689U CN 201720734526 U CN201720734526 U CN 201720734526U CN 207063689 U CN207063689 U CN 207063689U
- Authority
- CN
- China
- Prior art keywords
- main support
- base
- ceiling
- crossbeam
- sunshade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a kind of sunshade, aim to provide a kind of simple in construction but Stability Analysis of Structures, the high sunshade of structural strength, its drip irrigation device is a kind of sunshade, including ceiling, main support and base, main support one end is connected with ceiling, the main support other end is connected with base, the main support is two and is respectively placed in ceiling both sides, the camber beam being connected with ceiling is equipped with two main supports, main support is provided with the first brace being connected with camber beam, the second brace being connected with camber beam is additionally provided with main support, first crossbeam is provided between two main supports, second cross beam is provided between two camber beams, main support is provided with the support bar being connected with base, the utility model is applied to sunshade technical field.
Description
Technical field
It the utility model is related to a kind of sunshade technical field.
Background technology
Sunshade is a kind of new builing structure form, is by necessarily connecting by stiffener (steelframe, steel column or cable wire)
The mode of connecing forms certain spatial form, then by the use of refractory slab or canopy cloth as covering, but sunshade is dissolved in since it is desired that use out of doors
Strong wind weather is run into, therefore the structural strength of sunshade needs to improve, and existing sunshade is to improve structural strength, generally
Need to be used as support by large-scale sheet metal component, but weight is larger, cost is high.
Utility model content
In view of the deficienciess of the prior art, to be to provide a kind of simple in construction but structure steady for the purpose of this utility model
Sunshade fixed, structural strength is high.
To achieve the above object, the utility model provides following technical scheme:A kind of sunshade, including ceiling, main branch
Frame and base, main support one end are connected with ceiling, and the main support other end is connected with base, it is characterized in that:The main support is two
It is individual and be respectively placed in ceiling both sides, the camber beam being connected with ceiling is equipped with two main supports, main support is provided with and is connected with camber beam
The first brace, be additionally provided with the second brace being connected with camber beam on main support, be provided with first crossbeam between two main supports, two
Second cross beam is provided between camber beam, main support is provided with the support bar being connected with base.
By using above-mentioned technical proposal, base can be fixed on ground by screw, increase the stability of sunshade, curved
Beam one end can be inserted in main support by way of clamping, and the camber beam other end is bolted with ceiling, the arc of camber beam
Structure, there is higher pressure-bearing effect, and structure triangular in shape is connected between main support, camber beam and ceiling three, improve structure
Intensity and its structural stability, the first brace and the second brace also make to form between above-mentioned brace, main support and camber beam
Triangular structure, improve structural strength and its structural stability between it, composite family between above-mentioned brace, main support and camber beam
It is connected by bolt, first crossbeam can increase the structural stability between two stands, and second cross beam can increase between two camber beams
Structural stability, support bar can increase the bonding strength between main support and base, while support bar, main support and base
Also acute triangle structure is formed between three, uniform force, structural strength and stability are more preferable.
The utility model is further arranged to:The main support is provided with the first stiffener plate being connected with first crossbeam, the
One stiffener plate includes the first connecting plate and the second connecting plate that are connected, the first connecting plate be placed in the lower section of first crossbeam and with
Main support connects, and the second connecting plate is connected with the side of first crossbeam.
By using above-mentioned technical proposal, main support is connected with first crossbeam by the first stiffener plate, the first connecting plate
It is connected by screw with main support, the first connecting plate is placed in below first crossbeam and support conflict effect is played to first crossbeam, the
Two connecting plates are placed in the side of first crossbeam and are connected by screw with first crossbeam, are further fixed, and increase main support
Connective stability between first crossbeam.
The utility model is further arranged to:The main support is additionally provided with the second stiffener plate being connected with base, and second
Stiffener plate is respectively placed in the both sides of main support, and the second stiffener plate includes first connecting portion and the base being connected with main support
The second connecting portion of connection, the side wall of first connecting portion and the side wall of base connect to form arc reinforced wall.
By using above-mentioned technical proposal, connected between main support and base by the second stiffener plate, first connecting portion
It is connected by multiple screws with main support, second connecting portion is connected by multiple screws with base, and first connecting portion and second connects
Socket part integrally connected, increase the bonding strength of main support and base, the side wall of first connecting portion and the side wall of base connect to be formed
Arc reinforced wall, arcuate structure uniform force, stress intensity is high, therefore further the structure of increase the second stiffener plate itself is strong
Degree.
The utility model is further arranged to:The ceiling includes frame and refractory slab, and refractory slab is fixed on frame, on frame
Provided with some support bars for being placed in below refractory slab and being contradicted with refractory slab.
By using above-mentioned technical proposal, frame edge can open up neck, and refractory slab can be sticked in frame, convenient dismounting,
Support bar plays support reinforcing effect to refractory slab.
Brief description of the drawings
Fig. 1 is a kind of structural representation of sunshade embodiment of the utility model.
Fig. 2 is the structural representation in A portions in a kind of sunshade embodiment Fig. 1 of the utility model.
Embodiment
It is described further referring to figs. 1 to a kind of sunshade embodiment of 2 pairs of the utility model.
A kind of sunshade, including ceiling 1, main support 2 and base 3, the one end of main support 2 are connected with ceiling 1, and main support 2 is another
One end is connected with base 3, it is characterized in that:The main support 2 is two and is respectively placed in the both sides of ceiling 1, is all provided with two main supports 2
Have a camber beam 4 being connected with ceiling 1, main support 2 is provided with the first brace 5 be connected with camber beam 4, be additionally provided with main support 2 and
The second brace 6 that camber beam 4 connects, be provided with first crossbeam 8 between two main supports 2, second cross beam 9 is provided between two camber beams 4, lead
Support 2 is provided with the support bar 10 being connected with base 3.
By using above-mentioned technical proposal, base 3 can be fixed on ground by screw, increase the stability of sunshade,
The one end of camber beam 4 can be inserted in main support 2 by way of clamping, and the other end of camber beam 4 is bolted with ceiling 1, camber beam 4
Arcuate structure, there is higher pressure-bearing effect, and structure triangular in shape is connected between main support 2, camber beam 4 and the three of ceiling 1,
Improve structural strength and its structural stability, the first brace 5 and the second brace 6 also make above-mentioned brace, main support 2 and curved
Triangle structure between beam 4, improve structural strength and its structural stability between it, above-mentioned brace, the and of main support 2
Composite family is connected by bolt between camber beam 4, and first crossbeam 8 can increase the structural stability between two stands, and second cross beam 9 can
Increase the structural stability between two camber beams 4, support bar 10 can increase the bonding strength between main support 2 and base 3, simultaneously
Acute triangle structure, uniform force, structural strength and stability are also formed between support bar 10, main support 2 and the three of base 3
It is more preferable.
The utility model is further arranged to:The main support 2 is provided with the first stiffener plate being connected with first crossbeam 8
11, the first stiffener plate 11 includes the first connecting plate 12 and the second connecting plate 13 being connected, and the first connecting plate 12 is placed in first
The lower section of crossbeam 8 and it is connected with main support 2, the second connecting plate 13 is connected with the side of first crossbeam 8.
By using above-mentioned technical proposal, main support 2 and first crossbeam 8 are connected by the first stiffener plate 11, and first connects
Fishplate bar 12 is connected by screw with main support 2, and the first connecting plate 12 is placed in the lower section of first crossbeam 8 and plays support to first crossbeam 8
Conflict acts on, and the second connecting plate 13 is placed in the side of first crossbeam 8 and is connected by screw with first crossbeam 8, carries out further
It is fixed, increase the connective stability between main support 2 and first crossbeam 8.
The utility model is further arranged to:The main support 2 is additionally provided with the second stiffener plate 20 being connected with base 3,
Second stiffener plate 20 is respectively placed in the both sides of main support 2, and the second stiffener plate 20 includes the first connection being connected with main support 2
Portion 21, the second connecting portion 22 being connected with base 3, the side wall of first connecting portion 21 is connected with the side wall of base 3 to be formed arc and adds
Strong wall 23.
By using above-mentioned technical proposal, connected between main support 2 and base 3 by the second stiffener plate 20, first connects
Socket part 21 is connected by multiple screws with main support 2, and second connecting portion 22 is connected by multiple screws with base 3, the first connection
Portion 21 and the integrally connected of second connecting portion 22, the bonding strength of increase main support 2 and base 3, the side wall of first connecting portion 21 with
The side wall of base 3 connects to form arc reinforced wall 23, arcuate structure uniform force, and stress intensity is high, therefore further increases by second
The structural strength of itself of stiffener plate 20.
The utility model is further arranged to:The ceiling 1 includes frame 24 and refractory slab 25, and refractory slab 25 is fixed on frame 24
On, frame 24 is provided with some support bars 10 for being placed in the lower section of refractory slab 25 and being contradicted with refractory slab 25.
By using above-mentioned technical proposal, the edge of frame 24 can open up neck, and refractory slab 25 can be sticked in frame 24, convenient
Dismounting, support bar 10 play support reinforcing effect to refractory slab 25.
It can be connected between above-mentioned each part by removablies such as bolt, screws, the assembly and disassembly speed of sunshade
Rate greatly improves, and each part is small rod or pipe fitting, and without large-scale sheet metal component, weight also mitigates significantly.
Preferred embodiment of the present utility model is the foregoing is only, not limiting the utility model, the skill of this area
Art personnel carry out common variations and alternatives in the range of technical solutions of the utility model should all be included in guarantor of the present utility model
In the range of shield.
Claims (4)
1. a kind of sunshade, including ceiling, main support and base, main support one end are connected with ceiling, the main support other end and bottom
Seat connection, it is characterized in that:The main support is two and is respectively placed in ceiling both sides, is equipped with two main supports and is connected with ceiling
Camber beam, main support is provided with the first brace for being connected with camber beam, the second oblique pull being connected with camber beam is additionally provided with main support
Bar, first crossbeam being provided between two main supports, second cross beam being provided between two camber beams, main support is provided with the branch being connected with base
Strut.
2. a kind of sunshade according to claim 1, it is characterized in that:The main support is provided with the be connected with first crossbeam
One stiffener plate, the first stiffener plate include the first connecting plate and the second connecting plate being connected, and the first connecting plate is placed in first
The lower section of crossbeam and it is connected with main support, the second connecting plate is connected with the side of first crossbeam.
3. a kind of sunshade according to claim 1, it is characterized in that:The main support is additionally provided with second be connected with base
Stiffener plate, the second stiffener plate are respectively placed in the both sides of main support, and the second stiffener plate includes first be connected with main support
Connecting portion, the second connecting portion being connected with base, the side wall of first connecting portion and the side wall of base connect to form arc reinforced wall.
4. a kind of sunshade according to claim 1, it is characterized in that:The ceiling includes frame and refractory slab, and refractory slab is fixed
In on frame, frame is provided with some support bars for being placed in below refractory slab and being contradicted with refractory slab.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720734526.1U CN207063689U (en) | 2017-06-22 | 2017-06-22 | A kind of sunshade |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720734526.1U CN207063689U (en) | 2017-06-22 | 2017-06-22 | A kind of sunshade |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207063689U true CN207063689U (en) | 2018-03-02 |
Family
ID=61509326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720734526.1U Expired - Fee Related CN207063689U (en) | 2017-06-22 | 2017-06-22 | A kind of sunshade |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207063689U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978487A (en) * | 2018-09-19 | 2018-12-11 | 孙伟峰 | It is a kind of easily to set up quick detachable protecting canopy frame for bridge construction |
-
2017
- 2017-06-22 CN CN201720734526.1U patent/CN207063689U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978487A (en) * | 2018-09-19 | 2018-12-11 | 孙伟峰 | It is a kind of easily to set up quick detachable protecting canopy frame for bridge construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205316525U (en) | Novel outer quick -witted suspension support structure of air conditioner | |
CN204139322U (en) | A kind of glass sunlight house | |
CN207063689U (en) | A kind of sunshade | |
CN107492848B (en) | A kind of cable testing bridge of almag lifting installation | |
CN207846810U (en) | A kind of novel ceiling applied on steel construction ceiling framework | |
CN205783700U (en) | Novel air conditioner outer machine supporting construction | |
CN203066591U (en) | Tent | |
CN206302857U (en) | A kind of beam-to-column joint structure for warmhouse booth | |
CN109841162A (en) | A kind of outdoor electronic advertisement screen mounting rack | |
CN210659379U (en) | Fixing device for embedded part of inclined strut support of aluminum template | |
CN105594513A (en) | Steel structure greenhouse | |
CN202466898U (en) | Holohyaline self-balance glass curtain wall | |
CN201434476Y (en) | Mounting bracket of out-door air-conditioner | |
CN203947753U (en) | A kind of hanging-type construction support | |
CN205591506U (en) | Scaffold | |
CN205444459U (en) | Biconjugate position steel construction | |
CN205153127U (en) | Stabilize steel construction | |
CN204510614U (en) | A kind of M type roof truss | |
CN218952560U (en) | Locate inside modularization spatial structure of building | |
CN219137993U (en) | Steel structure beam | |
CN109025331A (en) | Combinable disk button prefabricated panel support construction | |
CN205132979U (en) | Removable tower crane stock | |
CN212897607U (en) | Tower type supporting truss | |
CN104727493B (en) | Supporting, pulling and bonding system of wood paike with oversized volume and construction method thereof | |
CN219528082U (en) | Open stone curtain wall construction system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180302 Termination date: 20190622 |