CN205591506U - Scaffold - Google Patents
Scaffold Download PDFInfo
- Publication number
- CN205591506U CN205591506U CN201620357027.0U CN201620357027U CN205591506U CN 205591506 U CN205591506 U CN 205591506U CN 201620357027 U CN201620357027 U CN 201620357027U CN 205591506 U CN205591506 U CN 205591506U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- support bar
- vertical rod
- scaffold unit
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rehabilitation Tools (AREA)
Abstract
The utility model provides a scaffold, belongs to construction technical field, forms by several scaffold unit, the scaffold unit is the cuboid structure, and including pole setting, bracing piece with set up in the work platform on pole setting upper portion, little stepped structure big is set down to for hollow structure and its top to the pole setting, the bracing piece includes the horizontal bracing piece of several and draws the bracing piece to one side, and horizontal bracing piece sets up between two pole settings of preceding, the trailing flank of scaffold unit, and the upper and lower part preceding, the trailing flank of the scaffold unit compriseed the pole setting is provided with the foot rest lever, draws the bracing piece to set up on the left and right side of scaffold unit to one side. The utility model discloses work efficiency is torn, is removed conveniently, is improved open to simple structure, safe firmly, easily taking.
Description
Technical field
This utility model belongs to technical field of building construction, is specifically related to a kind of scaffold.
Background technology
Scaffold is for the construction of building, repair or maintenance has been well known, scaffold provides building safety to enter the work platforms in region (the most described region overhead Tai Gao or cannot enter from ground) for workpeople, safety curtain can also be formed, the possibility fallen down from scaffold with minimizing workman or unclassified stores, therefore guaranteeing the secure context in building site, it is important for using scaffold.
Although traditional scaffold can use various structure, but it generally includes the vertically and horizontally component of support platform.In the past, scaffolding structure is made up of timber, and in some country, the bamboo scaffolding including the bamboo being held together of various length is still using.
Modern scaffold generally includes and is linked together and is bonded to building to form the tubular metal guard system of total scaffold frame, the scaffolding board supported by the stull of scaffold frame provides work platforms, this system is referred to as modularity scaffold, there is single tubular metal pipe, connector and pull bar as basic module unit.
The scaffold of this prior art needs carefully to be assembled together to form scaffold by pipe fitting, connector and plate.Generally, decoration construction height, at below 6m, is also had exterior components by indoor, indoor need to, full scaffold will be taken, exterior components need to take double-pole scaffold, for these large scale structures, needs more skilled worker, time-consuming, and be not easy to take and tear open.
Utility model content
This utility model purpose be to provide a kind of easily take tear open, the scaffold of conveniently moving.
Based on object above, this utility model takes techniques below scheme:
A kind of scaffold, it is made up of several scaffold units, described scaffold unit is rectangular structure, including vertical rod, support bar and the job platform being arranged at vertical rod top, vertical rod is hollow-core construction, and its top is arranged to lower big little stepped construction, described support bar includes several transverse support bar and oblique pull support bar, before transverse support bar is arranged at scaffold unit, between two vertical rods of trailing flank, before the scaffold unit being made up of vertical rod, trailing flank upper, lower part is provided with foot-driven lever, oblique pull support bar is arranged at a left side for scaffold unit, on right flank.
Being connected by connecting tube between described scaffold unit, connecting tube is fixed on scaffold unit by connection fastener.
Also including guard rail, guard rail includes the vertical fixed hurdle being vertically connected to vertical rod top and the horizontal fixed hurdle composition being arranged between adjacent vertical fixed hurdle.
The vertical rod lower end of the described scaffold unit being positioned at lower section is provided with walking mechanism, and walking mechanism is provided with service brake brake.
Described vertical rod, support bar and connecting tube are made up of steel pipe.
Compared with prior art, this utility model has the advantages that
1) this utility model simple in construction, securely, rod end is arranged to stepped construction, when scaffold unit is vertically connected with, can directly after grafting, more vertical connect fixing;Connect about scaffold unit, directly lateral connection is fixed and can be played that prolongation is vertical and the purpose of lateral length, easily take tear open, conveniently moving, foot-driven lever and transverse support bar composition are foot-operated terraced, while playing the stability of the fixing vertical rod of auxiliary, it is simple to the upper and lower job platform of staff.
2) vertical rod top arranges guard rail, and safety when staff works is ensured, also enhances the intensity of scaffold;Walking mechanism is installed below scaffold, mobile flexible, improve work efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of embodiment 1;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the structural representation of embodiment 2.
Detailed description of the invention
Embodiment
1
nullA kind of scaffold,As illustrated in fig. 1 and 2,It is made up of two scaffold unit lateral connection,Connected by connecting tube 6 between described scaffold unit,Connecting tube 6 is fixed on scaffold unit by connection fastener 7,Described scaffold unit is rectangular structure,Including vertical rod 1、Support bar and the job platform 2 being arranged at vertical rod 1 top,Vertical rod 1 is hollow-core construction、And its top is arranged to lower big little stepped construction,Described support bar includes transverse support bar 3 and oblique pull support bar 4,Before transverse support bar 3 is arranged at scaffold unit、Between the vertical rod 1 of trailing flank,Before the scaffold unit being made up of vertical rod 1、Trailing flank upper、Lower part is provided with foot-driven lever 5,Oblique pull support bar 4 is arranged at a left side for scaffold unit、On right flank,Also include guard rail,Guard rail includes that the vertical fixed hurdle 10 being vertically connected to vertical rod 1 top and the horizontal fixed hurdle 8 being arranged between adjacent vertical fixed hurdle 10 form,Described vertical rod 1、Support bar and connecting tube 6 are made up of steel pipe,The vertical rod lower end of the described scaffold unit being positioned at lower section is provided with wheel 9,Service brake brake it is provided with on wheel 9.
Embodiment
2
A kind of scaffold, as shown in Figure 3, it is vertically connected with by two scaffold units and forms, following scaffold unit is entered in scaffold unit elder generation grafting above, vertically connect fixing with connecting tube 6 and connection fastener 7 again, vertical rod 1 top of scaffold unit above is fixed with vertical fixed hurdle 10, and other are with embodiment 1.
During use, according to job demand, can first by scaffold unit, up and down or left and right connects fixing;The not used time, pull down connecting tube 6 and connection fastener 7, take tear open easily, conveniently moving, safety good, this utility model simple in construction, securely, vertical rod 1 top is arranged to stepped construction, when scaffold unit is vertically connected with, can directly after grafting, more vertical connect fixing;Connecting about scaffold unit, direct lateral connection is fixed to play and is extended the vertical and purpose of lateral length, and oblique pull support bar 4 and transverse support bar 3 are beneficial to scaffold more stability, it is simple to the upper and lower job platform of staff.
Claims (5)
1. a scaffold, it is characterized in that, it is made up of several scaffold units, described scaffold unit is rectangular structure, including vertical rod, support bar and the job platform being arranged at vertical rod top, vertical rod is hollow-core construction, and its top is arranged to lower big little stepped construction, described support bar includes several transverse support bar and oblique pull support bar, before transverse support bar is arranged at scaffold unit, between two vertical rods of trailing flank, before the scaffold unit being made up of vertical rod, trailing flank upper, lower part is provided with foot-driven lever, oblique pull support bar is arranged at a left side for scaffold unit, on right flank.
2. scaffold as claimed in claim 1, it is characterised in that being connected by connecting tube between described scaffold unit, connecting tube is fixed on scaffold unit by connection fastener.
3. scaffold as claimed in claim 2, it is characterised in that also include guard rail, guard rail includes the vertical fixed hurdle being vertically connected to vertical rod top and the horizontal fixed hurdle composition being arranged between adjacent vertical fixed hurdle.
4. the scaffold as described in claim 1-3 is arbitrary, it is characterised in that described in be positioned at the vertical rod lower end of scaffold unit of lower section and be provided with walking mechanism, walking mechanism is provided with service brake brake.
5. scaffold as claimed in claim 4, it is characterised in that described vertical rod, support bar and connecting tube are made up of steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620357027.0U CN205591506U (en) | 2016-04-26 | 2016-04-26 | Scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620357027.0U CN205591506U (en) | 2016-04-26 | 2016-04-26 | Scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205591506U true CN205591506U (en) | 2016-09-21 |
Family
ID=56935869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620357027.0U Expired - Fee Related CN205591506U (en) | 2016-04-26 | 2016-04-26 | Scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205591506U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113978652A (en) * | 2021-11-10 | 2022-01-28 | 上海外高桥造船有限公司 | Assembled mobile platform and manufacturing method |
-
2016
- 2016-04-26 CN CN201620357027.0U patent/CN205591506U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113978652A (en) * | 2021-11-10 | 2022-01-28 | 上海外高桥造船有限公司 | Assembled mobile platform and manufacturing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201261942Y (en) | Stand platform for cantilevered concrete structure construction | |
CN103206074B (en) | Elevator shaft template construction method, platform and support | |
CN103104092B (en) | Support composite structure of beam and slab | |
CN101624871A (en) | Instrumental operation platform for shear wall formwork of elevator shaft | |
CN202416184U (en) | Construction device for formwork for longitudinal wet joint of box girder | |
CN105544984A (en) | Large-span steel structure jig frame integrity slip construction process | |
CN104631822A (en) | Construction Method of High-rise Reinforced Concrete Elevator Shaft | |
CN105863253A (en) | Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method | |
CN203238948U (en) | Hollow ultrahigh formwork profile steel platform | |
CN205591506U (en) | Scaffold | |
CN203846791U (en) | Beam-column joint reinforcing pipa bracket system used for archaistic buildings or historic building restoration | |
CN203759976U (en) | Detachable teaching model for overhead formwork construction | |
CN207228674U (en) | Movable municipal administration open caisson ramp-type platform | |
CN215907358U (en) | Auxiliary operation platform for bottom construction of high-altitude overhanging structure | |
CN201915630U (en) | Combined platform of fire control joint gallery form supporting steel beam | |
CN204781869U (en) | Scaffold suitable for building site | |
CN201447862U (en) | Instrumental operating platform used for elevator shaft shear wall shuttering erection | |
CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
CN205116776U (en) | Support access structure | |
CN212802428U (en) | Portable lifting scaffold | |
CN204212385U (en) | Scaffold strengthened by truss | |
CN106088564A (en) | Track climbing type monolithic architecture construction scaffolding | |
CN207143751U (en) | Splice pier top block Support bracket in upstriker section | |
CN203257080U (en) | Adjustable overhang supporting device for building construction | |
CN207063689U (en) | A kind of sunshade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160921 Termination date: 20210426 |
|
CF01 | Termination of patent right due to non-payment of annual fee |