CN205153127U - Stabilize steel construction - Google Patents

Stabilize steel construction Download PDF

Info

Publication number
CN205153127U
CN205153127U CN201520982286.8U CN201520982286U CN205153127U CN 205153127 U CN205153127 U CN 205153127U CN 201520982286 U CN201520982286 U CN 201520982286U CN 205153127 U CN205153127 U CN 205153127U
Authority
CN
China
Prior art keywords
pitman
bar
steel structure
stabilized steel
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520982286.8U
Other languages
Chinese (zh)
Inventor
朱云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
World Suzhou Color Steel Making Co Ltd
Original Assignee
World Suzhou Color Steel Making Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by World Suzhou Color Steel Making Co Ltd filed Critical World Suzhou Color Steel Making Co Ltd
Priority to CN201520982286.8U priority Critical patent/CN205153127U/en
Application granted granted Critical
Publication of CN205153127U publication Critical patent/CN205153127U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a stabilize steel construction, its include vertical setting first pole, with first pole parallel arrangement's second pole, set up at the first mount pin of first pole bottom, set up the second mount pin in second pole bottom, first mount pin and second mount pin are used for installation to ground, stabilize steel construction is still including the first connective bar of connecting first pole and second pole. Owing to connect the first connective bar of first pole and second pole for the steel construction is more stable.

Description

Stabilized steel structure
Technical field
The utility model relates to a kind of steel work, particularly relates to a kind of constitutionally stable steel work.
Background technology
Stabilized steel structure is the structure primarily of steel material composition, is one of main building construction types.The component such as girder steel, steel column, the steel truss composition that structure is made primarily of shaped steel and steel plate etc., adopts weld seam, bolt or rivet interlacement between each component or parts usually.Because its deadweight is comparatively light, and easy construction, be widely used in the fields such as large-sized workshop, venue, Super High.
The feature of steel is that intensity is high, from heavy and light, integral rigidity is good, deformability is strong, thus for building large span and superelevation, extra-duty building is suitable especially; Material homogeneity and isotropism good, belong to perfect elastic body, meet the basic assumption of common engineering mechanics most; Material plasticity, good toughness, can have moderate finite deformation, can bear dynamic loading well; Construction period is short; Its industrialization degree is high, can carry out the high Virtual production of mechanization degree.Stabilized steel structure should study high strength steel, greatly improves its yield point strength; In addition want the shaped steel of rolling new varieties, such as H profile steel (also known as wide width wing edge shaped steel) and T steel and profiled sheet etc. are to adapt to the needs of longspan structure and super highrise building.
In addition also with or without the light stabilized steel structural system of heat bridge, building itself is not energy-conservation, and this technology uses special joining part cleverly to solve the cold-heat bridge problem of building; Jack truss structure makes cable and upper and lower conduit road pass through from wall, and construction finishing is all convenient.
Existing steel work structure is stable not.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of constitutionally stable steel work.
For solving the problems of the technologies described above, the technical solution of the utility model is:
A kind of stabilized steel structure, it comprises the first bar vertically arranged, the second bar be arranged in parallel with the first bar, is arranged on the first mount pin bottom the first bar, is arranged on the second mount pin bottom the second bar, described first mount pin and the second mount pin are used for being mounted to ground, and described stabilized steel structure also comprises the first pitman of connection first bar and the second bar.
Compared with prior art, the utility model beneficial effect is as follows: owing to connecting the first pitman of the first bar and the second bar, make steel work more stable.
The utility model further improves as follows:
Further, described stabilized steel structure also comprises the second pitman of connection first bar and the second bar, and described second pitman is positioned at the top of the first pitman.
Further, described stabilized steel structure also comprises the 3rd pitman of connection first bar and the second bar, and described 3rd pitman is positioned at the top of the second pitman.
Further, described first pitman is perpendicular to the first bar and the second bar.
Further, described second pitman and the first pitman be arranged in parallel.
Further, described 3rd pitman is obliquely installed, and the angle of described 3rd pitman and the first pitman is acute angle.
Further, the length of described first pitman is greater than the length of the second pitman.
Further, the length of described 3rd pitman is greater than the length of the first pitman.
Further, described first pitman has the left side extending beyond the first bar left and goes out portion.
Further, two free ends that described 3rd pitman has extend beyond the first bar and the second bar left and to the right respectively.
Accompanying drawing explanation
Fig. 1 is the schematic diagram meeting the utility model stabilized steel structure.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As shown in Figure 1, for meeting a kind of stabilized steel structure 100 of the present utility model, it comprises the first bar 11 vertically arranged, the second bar 12 be arranged in parallel with the first bar 11, is arranged on the first mount pin 13 bottom the first bar 11, is arranged on the second mount pin 14 bottom the second bar 12, described first mount pin 13 and the second mount pin 14 are for being mounted to ground, and described stabilized steel structure 100 also comprises the first pitman 15 of connection first bar 11 and the second bar 12.
Described stabilized steel structure 100 also comprises the second pitman 16 of connection first bar 11 and the second bar 12, and described second pitman 16 is positioned at the top of the first pitman 15.Described stabilized steel structure 100 also comprises the 3rd pitman 17 of connection first bar 11 and the second bar 12, and described 3rd pitman 17 is positioned at the top of the second pitman 16.
Described first pitman 14 is perpendicular to the first bar 11 and the second bar 12.Described second pitman 15 and the first pitman 14 be arranged in parallel.Described 3rd pitman 16 is obliquely installed, and the angle of described 3rd pitman 16 and the first pitman 14 is acute angle.
The length of described first pitman 14 is greater than the length of the second pitman 15.The length of described 3rd pitman 16 is greater than the length of the first pitman 14.Described first pitman 14 has the left side extending beyond the first bar left and goes out portion.Two free ends that described 3rd pitman 16 has extend beyond the first bar 11 and the second bar 12 respectively left and to the right.
Compared with prior art, the utility model beneficial effect is as follows: owing to connecting the first pitman 14 of the first bar 11 and the second bar 12, make steel work more stable.
The utility model is not limited to above-mentioned concrete embodiment, and those of ordinary skill in the art is from above-mentioned design, and without performing creative labour, done all conversion, all drop within protection domain of the present utility model.

Claims (10)

1. a stabilized steel structure, it is characterized in that: comprise the first bar vertically arranged, the second bar be arranged in parallel with the first bar, be arranged on the first mount pin bottom the first bar, be arranged on the second mount pin bottom the second bar, described first mount pin and the second mount pin are used for being mounted to ground, and described stabilized steel structure also comprises the first pitman of connection first bar and the second bar.
2. stabilized steel structure as claimed in claim 1, is characterized in that: described stabilized steel structure also comprises the second pitman of connection first bar and the second bar, and described second pitman is positioned at the top of the first pitman.
3. stabilized steel structure as claimed in claim 2, is characterized in that: described stabilized steel structure also comprises the 3rd pitman of connection first bar and the second bar, and described 3rd pitman is positioned at the top of the second pitman.
4. stabilized steel structure as claimed in claim 3, its feature exists: described first pitman is perpendicular to the first bar and the second bar.
5. stabilized steel structure as claimed in claim 4, is characterized in that: described second pitman and the first pitman be arranged in parallel.
6. stabilized steel structure as claimed in claim 5, it is characterized in that: described 3rd pitman is obliquely installed, the angle of described 3rd pitman and the first pitman is acute angle.
7. stabilized steel structure as claimed in claim 6, is characterized in that: the length of described first pitman is greater than the length of the second pitman.
8. stabilized steel structure as claimed in claim 7, is characterized in that: the length of described 3rd pitman is greater than the length of the first pitman.
9. stabilized steel structure as claimed in claim 8, is characterized in that: described first pitman has the left side extending beyond the first bar left and goes out portion.
10. stabilized steel structure as claimed in claim 9, is characterized in that: two free ends that described 3rd pitman has extend beyond the first bar and the second bar left and to the right respectively.
CN201520982286.8U 2015-12-02 2015-12-02 Stabilize steel construction Expired - Fee Related CN205153127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520982286.8U CN205153127U (en) 2015-12-02 2015-12-02 Stabilize steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520982286.8U CN205153127U (en) 2015-12-02 2015-12-02 Stabilize steel construction

Publications (1)

Publication Number Publication Date
CN205153127U true CN205153127U (en) 2016-04-13

Family

ID=55688839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520982286.8U Expired - Fee Related CN205153127U (en) 2015-12-02 2015-12-02 Stabilize steel construction

Country Status (1)

Country Link
CN (1) CN205153127U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544722A (en) * 2015-12-02 2016-05-04 苏州天地彩钢制造有限公司 Stable steel structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544722A (en) * 2015-12-02 2016-05-04 苏州天地彩钢制造有限公司 Stable steel structure

Similar Documents

Publication Publication Date Title
CN205421538U (en) Novel steel construction
CN205421695U (en) Steel structure plate
CN205153127U (en) Stabilize steel construction
CN205153126U (en) Fixed steel construction
CN206916937U (en) A kind of new steel construction
CN205444459U (en) Biconjugate position steel construction
CN106351402A (en) Arch steel frame
CN205153118U (en) Steel construction
CN205224263U (en) Symmetry steel construction
CN204898982U (en) Steel construction factory building ridge structure
CN205382632U (en) Steel structure beam
CN105544722A (en) Stable steel structure
CN206110737U (en) Steel construction bicycle shed
CN206916953U (en) A kind of steel construction of water proof type
CN203834686U (en) Corrugated web H-shaped steel beam and column connecting structure
CN208777676U (en) A kind of band iron drawknot structure of construction outrigger and structure sheaf
CN205421709U (en) Novel angle steel structure
CN105401693A (en) Symmetrical steel structure
CN105525680A (en) Fixing steel structure
CN205421553U (en) Steel structure connecting piece
CN206090825U (en) Steel construction girder steel connection structure
CN105544723A (en) Dual counterpoint steel structure
CN205224688U (en) Parking area of steel construction
CN204590617U (en) The universal connection boots of large form support system
CN204959980U (en) Simple to operate's floor connection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413

Termination date: 20191202

CF01 Termination of patent right due to non-payment of annual fee