CN205153126U - Fixed steel construction - Google Patents

Fixed steel construction Download PDF

Info

Publication number
CN205153126U
CN205153126U CN201520981512.0U CN201520981512U CN205153126U CN 205153126 U CN205153126 U CN 205153126U CN 201520981512 U CN201520981512 U CN 201520981512U CN 205153126 U CN205153126 U CN 205153126U
Authority
CN
China
Prior art keywords
steel plate
bar
mount pin
fixation
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520981512.0U
Other languages
Chinese (zh)
Inventor
朱云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
World Suzhou Color Steel Making Co Ltd
Original Assignee
World Suzhou Color Steel Making Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by World Suzhou Color Steel Making Co Ltd filed Critical World Suzhou Color Steel Making Co Ltd
Priority to CN201520981512.0U priority Critical patent/CN205153126U/en
Application granted granted Critical
Publication of CN205153126U publication Critical patent/CN205153126U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a fixed steel construction, its include vertical setting first pole, with first pole parallel arrangement's second pole, set up at the first mount pin of first pole bottom, set up the second mount pin in second pole bottom, first mount pin and second mount pin are used for installation to ground. First fixed steel sheet and the fixed steel sheet of second that the level of still installing on the first pole set up, first fixed steel sheet is located the below of the fixed steel sheet of second for fixed steel construction's intensity is stronger.

Description

Fixing steel work
Technical field
The utility model relates to a kind of fixing steel work, particularly relates to the fixing steel work that a kind of intensity is large.
Background technology
Fixing steel work is the structure primarily of steel material composition, is one of main building construction types.The component such as girder steel, steel column, the steel truss composition that structure is made primarily of shaped steel and steel plate etc., adopts weld seam, bolt or rivet interlacement between each component or parts usually.Because its deadweight is comparatively light, and easy construction, be widely used in the fields such as large-sized workshop, venue, Super High.
The feature of steel is that intensity is high, from heavy and light, integral rigidity is good, deformability is strong, thus for building large span and superelevation, extra-duty building is suitable especially; Material homogeneity and isotropism good, belong to perfect elastic body, meet the basic assumption of common engineering mechanics most; Material plasticity, good toughness, can have moderate finite deformation, can bear dynamic loading well; Construction period is short; Its industrialization degree is high, can carry out the high Virtual production of mechanization degree.Fixing steel work should study high strength steel, greatly improves its yield point strength; In addition want the shaped steel of rolling new varieties, such as H profile steel (also known as wide width wing edge shaped steel) and T steel and profiled sheet etc. are to adapt to the needs of longspan structure and super highrise building.
Also gently fix steel structure system with or without heat bridge in addition, building itself is not energy-conservation, and this technology uses special joining part cleverly to solve the cold-heat bridge problem of building; Jack truss structure makes cable and upper and lower conduit road pass through from wall, and construction finishing is all convenient.
Existing steel work insufficient strength is large.
Utility model content
Technical problem to be solved in the utility model is: provide the fixing steel work that a kind of intensity is large.
For solving the problems of the technologies described above, the technical solution of the utility model is:
A kind of fixing steel work, it is characterized in that: comprise the first bar vertically arranged, the second bar be arranged in parallel with the first bar, be arranged on the first mount pin bottom the first bar, be arranged on the second mount pin bottom the second bar, described first mount pin and the second mount pin are used for being mounted to ground, described first bar is also provided with horizontally disposed first fixation steel plate and the second fixation steel plate, and described first fixation steel plate is positioned at the below of the second fixation steel plate.
Compared with prior art, the utility model beneficial effect is as follows: described first bar is also provided with horizontally disposed first fixation steel plate and the second fixation steel plate, described first fixation steel plate is positioned at the below of the second fixation steel plate, makes the intensity of fixing steel work stronger.
The utility model further improves as follows:
Further, described first mount pin comprises pars intermedia, is connected to the horizontal part on pars intermedia top and is arranged on the wedge type block of horizontal part two end opposite.
Further, described second mount pin comprises pars intermedia, is connected to the horizontal part on pars intermedia top and is arranged on the wedge type block of horizontal part two end opposite.
Further, described pars intermedia vertically extends, and described horizontal part is perpendicular to pars intermedia.
Further: described wedge type block extends along vertical direction.
Further, the length of described first fixation steel plate is greater than the length of the second steel plate.
Further, described second bar is also provided with horizontally disposed 3rd fixation steel plate and the 4th fixation steel plate, described 3rd fixation steel plate is positioned at the below of the 4th fixation steel plate.
Further, the length of described 3rd fixation steel plate is greater than the length of the 4th steel plate.
Further, described second bar is also provided with the 5th fixed head be positioned at above the 4th fixed head, the length of described 5th fixed head is greater than the length of the 4th fixed head.
Accompanying drawing explanation
Fig. 1 meets the schematic diagram that the utility model fixes steel work.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As shown in Figure 1, steel work 100 is fixed for meeting one of the present utility model, it comprises the first bar 11 vertically arranged, the second bar 12 be arranged in parallel with the first bar 11, is arranged on the first mount pin 13 bottom the first bar 11, is arranged on the second mount pin 14 bottom the second bar 12, and described first mount pin 13 and the second mount pin 14 are for being mounted to ground.
Described first mount pin 13 comprises pars intermedia 131, is connected to the horizontal part 132 on pars intermedia 131 top and is arranged on the wedge type block 133 of horizontal part 132 liang of end opposite.Described second mount pin 14 comprises pars intermedia 141, is connected to the horizontal part 142 on pars intermedia 141 top and is arranged on the wedge type block 143 of horizontal part 142 liang of end opposite.Described pars intermedia 131,141 vertically extends, and described horizontal part 132,142 is perpendicular to pars intermedia 131,141.Described wedge type block 133 extends along vertical direction.
Described first bar 11 is also provided with horizontally disposed first fixation steel plate 15 and the second fixation steel plate 16, described first fixation steel plate 15 is positioned at the below of the second fixation steel plate 16.The length of described first fixation steel plate 15 is greater than the length of the second steel plate 16.
Described second bar 12 is also provided with horizontally disposed 3rd fixation steel plate 17 and the 4th fixation steel plate 18, and described 3rd fixation steel plate 17 is positioned at the below of the 4th fixation steel plate 18.The length of described 3rd fixation steel plate 17 is greater than the length of the 4th steel plate 18.
Described second bar 12 is also provided with the 5th fixed head 19 be positioned at above the 4th fixed head 18, the length of described 5th fixed head 19 is greater than the length of the 4th fixed head 18.
Compared with prior art, the utility model beneficial effect is as follows: owing to being provided with the second bar 12 be arranged in parallel with the first bar 11, and the first mount pin 13 and the second mount pin 14, makes fixing steel work 100 more stable.
The utility model is not limited to above-mentioned concrete embodiment, and those of ordinary skill in the art is from above-mentioned design, and without performing creative labour, done all conversion, all drop within protection domain of the present utility model.

Claims (9)

1. a fixing steel work, it is characterized in that: comprise the first bar vertically arranged, the second bar be arranged in parallel with the first bar, be arranged on the first mount pin bottom the first bar, be arranged on the second mount pin bottom the second bar, described first mount pin and the second mount pin are used for being mounted to ground, described first bar is also provided with horizontally disposed first fixation steel plate and the second fixation steel plate, and described first fixation steel plate is positioned at the below of the second fixation steel plate.
2. fixing steel work as claimed in claim 1, is characterized in that: described first mount pin comprises pars intermedia, is connected to the horizontal part on pars intermedia top and is arranged on the wedge type block of horizontal part two end opposite.
3. fixing steel work as claimed in claim 1, is characterized in that: described second mount pin comprises pars intermedia, is connected to the horizontal part on pars intermedia top and is arranged on the wedge type block of horizontal part two end opposite.
4. the fixing steel work as described in claim 2 or 3, is characterized in that: described pars intermedia vertically extends, and described horizontal part is perpendicular to pars intermedia.
5. fixing steel work as claimed in claim 4, is characterized in that: described wedge type block extends along vertical direction.
6. fixing steel work as claimed in claim 1, is characterized in that: the length of described first fixation steel plate is greater than the length of the second steel plate.
7. fixing steel work as claimed in claim 6, is characterized in that: described second bar is also provided with horizontally disposed 3rd fixation steel plate and the 4th fixation steel plate, described 3rd fixation steel plate is positioned at the below of the 4th fixation steel plate.
8. fixing steel work as claimed in claim 7, is characterized in that: the length of described 3rd fixation steel plate is greater than the length of the 4th steel plate.
9. fixing steel work as claimed in claim 8, it is characterized in that: described second bar is also provided with the 5th fixed head be positioned at above the 4th fixed head, the length of described 5th fixed head is greater than the length of the 4th fixed head.
CN201520981512.0U 2015-12-02 2015-12-02 Fixed steel construction Expired - Fee Related CN205153126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520981512.0U CN205153126U (en) 2015-12-02 2015-12-02 Fixed steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520981512.0U CN205153126U (en) 2015-12-02 2015-12-02 Fixed steel construction

Publications (1)

Publication Number Publication Date
CN205153126U true CN205153126U (en) 2016-04-13

Family

ID=55688838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520981512.0U Expired - Fee Related CN205153126U (en) 2015-12-02 2015-12-02 Fixed steel construction

Country Status (1)

Country Link
CN (1) CN205153126U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525680A (en) * 2015-12-02 2016-04-27 苏州天地彩钢制造有限公司 Fixing steel structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525680A (en) * 2015-12-02 2016-04-27 苏州天地彩钢制造有限公司 Fixing steel structure

Similar Documents

Publication Publication Date Title
CN205421695U (en) Steel structure plate
CN205153126U (en) Fixed steel construction
CN205242647U (en) Connected node of girder steel and steel column
CN205444459U (en) Biconjugate position steel construction
CN205153127U (en) Stabilize steel construction
CN204850389U (en) Wedge draw -in groove formula steel pipe scaffold
CN205421538U (en) Novel steel construction
CN208072731U (en) A kind of building curtain wall
CN205153118U (en) Steel construction
CN205224263U (en) Symmetry steel construction
CN205663282U (en) Light -duty lattice formula steel column of large capacity
CN105525680A (en) Fixing steel structure
CN105401693A (en) Symmetrical steel structure
CN206916937U (en) A kind of new steel construction
CN105544722A (en) Stable steel structure
CN105544723A (en) Dual counterpoint steel structure
CN204898982U (en) Steel construction factory building ridge structure
CN205421553U (en) Steel structure connecting piece
CN105401653A (en) Steel structure
CN205421709U (en) Novel angle steel structure
CN205082338U (en) Steel construction big -arch shelter
CN205088996U (en) Steel construction workshop
CN206110737U (en) Steel construction bicycle shed
CN106351402A (en) Arch steel frame
CN106368448A (en) Hydraulic steel frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413