CN108978487A - It is a kind of easily to set up quick detachable protecting canopy frame for bridge construction - Google Patents

It is a kind of easily to set up quick detachable protecting canopy frame for bridge construction Download PDF

Info

Publication number
CN108978487A
CN108978487A CN201811094360.7A CN201811094360A CN108978487A CN 108978487 A CN108978487 A CN 108978487A CN 201811094360 A CN201811094360 A CN 201811094360A CN 108978487 A CN108978487 A CN 108978487A
Authority
CN
China
Prior art keywords
support bar
screw hole
bridge construction
clamping plate
quick detachable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811094360.7A
Other languages
Chinese (zh)
Other versions
CN108978487B (en
Inventor
孙伟峰
薛晓颖
杨永生
李传超
姜磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811094360.7A priority Critical patent/CN108978487B/en
Publication of CN108978487A publication Critical patent/CN108978487A/en
Application granted granted Critical
Publication of CN108978487B publication Critical patent/CN108978487B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Quick detachable protecting canopy frame is easily set up for bridge construction the present invention provides a kind of, including pedestal and multiple brackets, the branch is provided with fixed plate, fixed plate is bolted to connection with pedestal, fixed plate is equipped with first support bar and second support bar, first support bar is two, second support bar is located between two first support bars, and it is fastened by bolts in first support bar lower end, first support bar upper end and second support bar are fastened by clamping plate, adjacent stent is connected by connecting rod, protective net is equipped between adjacent stent, network edge is protected to be equipped with multiple connection straps, and it is connect by connection strap with bracket.Provided by the present invention for bridge construction easily to set up quick detachable protecting canopy frame structure simple and firm, it is convenient for disassembly and assembly.

Description

It is a kind of easily to set up quick detachable protecting canopy frame for bridge construction
Technical field
A kind of quick detachable protection canopy is set up the present invention relates to a kind of protecting canopy frame more particularly to easily for bridge construction Frame.
Background technique
Protecting canopy frame is indispensable device in bridge construction.When building a bridge above passing road, it is easy to fall Construction material can cause damages to bridge bottom row people, therefore particularly important to the protection of the personnel just on passing road, existing Structure is complicated for some protecting canopy frames, not easy to install also not easy to disassemble.
Summary of the invention
Quick detachable protecting canopy frame is easily set up for bridge construction the purpose of the present invention is to provide a kind of, is solved existing Structure is complicated problem not easy to disassemble that technology is existing.
Technical scheme is as follows: a kind of easily to set up quick detachable protecting canopy frame, including bottom for bridge construction Seat and multiple brackets, the bracket includes fixed plate, and fixed plate is fixedly connected with pedestal, fixed plate be equipped with first support bar with Second support bar, first support bar are straight-bar, and are two, and first support bar lower end is equipped with screw hole, and second support bar includes connecting Section and extended segment are connect, linkage section (9) is arc, and linkage section bottom end is equipped with screw hole, and extended segment is straight-bar, and second support bar is located in Between two first support bars, and pass through screw hole bolt fastening with first support bar in linkage section lower end, in first support bar End is equipped with clamping plate, and clamping plate quantity is two pieces, and clamping plate quadrangle is equipped with screw hole, and clamping plate is equipped with groove, and two clamping plates groove is opposite to be set First support bar two sides are placed in, second support bar passes through the groove on two clamping plates, uses by the screw hole of the quadrangle of two clamping plates Bolt fastens first support bar and second support bar, and adjacent stent is connected by connecting rod, and protective net is equipped between adjacent stent.
Above-mentioned protection network edge is equipped with multiple connection straps, and is connect by connection strap with bracket.
The invention has the following beneficial effects:
Bridge construction provided by the invention easily sets up quick detachable protecting canopy frame, and support construction is by support rod and connecting rod structure At structure is very simple, sets up that process is also easy to operate, and adjacent stent is connected with each other with connecting rod, and stability is good, pedestal lower end Using cambered design, column Frame Design is changed, the installation of entire protecting canopy frame is not take up road surface, protects function playing While energy, it is ensured that the current safety of personnel, bracket side use open by design, and air can circulate naturally, compared to column The ventilation of formula Frame Design and daylighting effect are good, and entire bracket uses less steel relative to column Frame Design, save Vast resources, entire protecting canopy frame is simpler relative to column frame structure installation process, and disassembly process is also more time saving and energy saving.
Detailed description of the invention
Fig. 1 easily sets up quick detachable protecting canopy frame structural schematic diagram for bridge construction provided in an embodiment of the present invention;
Fig. 2 is the supporting structure schematic diagram of Fig. 1;
Fig. 3 is clamping plate schematic diagram provided in an embodiment of the present invention;
Fig. 4 is protective net schematic diagram provided in an embodiment of the present invention;
Fig. 5 is part-structure bottom view provided in an embodiment of the present invention;
Fig. 6 is part-structure top view provided in an embodiment of the present invention;
In figure, 1. pedestals, 2. brackets, 3. fixed plates, 4. first support bars, 5. second support bars, 6. clamping plates, 7. connecting rods, 8. protective net .9. linkage section, 10. extended segments, 11. grooves, 12. fixed strips.
Specific embodiment
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
It is a kind of easily to set up quick detachable protecting canopy frame for bridge construction, referring to Fig. 1-Fig. 6, including pedestal 1 and multiple Bracket 2, the bracket 2 include fixed plate 3, and fixed plate 3 is fixedly connected with pedestal 1, and fixed plate 3 is equipped with 4 He of first support bar Second support bar 5, first support bar 4 are straight-bar, and are two, and 4 lower end of first support bar is equipped with screw hole, and second support bar 5 is wrapped Linkage section 9 and extended segment 10 are included, linkage section 9 is arc, and 9 bottom end of linkage section is equipped with screw hole, and extended segment 10 is straight-bar, the second support Bar 5 is located between two first support bars 4, and passes through screw hole bolt fastening in 9 lower end of linkage section and first support bar 4, 4 upper end of first support bar is equipped with clamping plate 6, and 6 quantity of clamping plate is two pieces, and 6 four jiaos of clamping plate are equipped with screw hole, and clamping plate 6 is equipped with groove 11, 6 groove of two clamping plates is relatively arranged on 4 two sides of first support bar, and second support bar 5 passes through the groove on two clamping plates 6, passes through The screw hole bolt of the quadrangle of two clamping plates 6 fastens first support bar 4 and second support bar 5, and adjacent stent 2 passes through connecting rod 7 connect, and protective net 8 is equipped between adjacent stent 2.
In use, pedestal 1 to be arranged to the lower section of construction bridges, bracket 2 is fixed on pedestal 1 with bolt, by second Strut 5 is plugged between two first support bars 4, and is fastened by bolts in 9 lower end of linkage section and 4 lower end of first support bar, It adjusts 10 top of extended segment and is close to construction wall, 6 one pieces of grooves of two clamping plates are upward, and another piece of groove is set in downwards second On support rod 5, first support bar 4 and second support bar 5 are fastened by 6 four jiaos of clamping plate of screw hole bolt, by 7 liang of connecting rod End is connected in the second support bar 5 of adjacent stent 2 with right-angle coupler respectively, and protective net 8 is laid between adjacent stent 2, It is strapped on two side stands 2 with connection strap 12.
Bridge construction provided by the invention easily sets up quick detachable protecting canopy frame, and support construction is by support rod and connecting rod It constitutes, structure is very simple, sets up that process is also easy to operate, and adjacent stent is connected with each other with connecting rod, and stability is good, under bracket End uses cambered design, changes column Frame Design, and the installation of entire protecting canopy frame is not take up road surface, protects playing While function, it is ensured that the current safety of personnel, bracket side use open by design, and air can circulate naturally, compared to vertical The ventilation of pillar Frame Design and daylighting effect are good, and entire bracket uses less steel, section relative to column Frame Design Vast resources is saved, entire protecting canopy frame is simpler relative to column frame structure installation process, disassembly process also more time saving province Power.

Claims (2)

1. a kind of easily set up quick detachable protecting canopy frame for bridge construction, it is characterised in that: including pedestal (1) and multiple Frame (2), the bracket (2) include fixed plate (3), and the fixed plate (3) is fixedly connected with pedestal (1), on the fixed plate (3) Equipped with first support bar (4) and second support bar (5), the first support bar (4) is straight-bar, and is two, described first Strut (4) lower end is equipped with screw hole, and the second support bar (5) includes linkage section (9) and extended segment (10), the linkage section (9) For arc, linkage section (9) bottom end is equipped with screw hole, and the extended segment (10) is straight-bar, and the second support bar (5) is located in It is described between two first support bars (4), and in linkage section (9) lower end and first support bar (4) by screw hole bolt fastening First support bar (4) upper end is equipped with clamping plate (6), and clamping plate (6) quantity is two pieces, and clamping plate (6) quadrangle is equipped with screw hole, institute Clamping plate (6) are stated equipped with groove (11), two pieces of clamping plate (6) grooves are relatively arranged on first support bar (4) two sides, and described the Two support rods (5) pass through the groove on two clamping plates (6), by the screw hole bolt of the quadrangles of two clamping plates (6) by first Strut (4) and second support bar (5) fastening, the adjacent stent (2) are connected by connecting rod (7), and adjacent stent is equipped between (2) Protective net (8).
2. bridge construction as described in claim 1 easily sets up quick detachable protecting canopy frame, it is characterised in that: the protective net (8) edge is equipped with multiple connection straps (12), and is connect by connection strap (12) with bracket (2).
CN201811094360.7A 2018-09-19 2018-09-19 A easily set up quick detachable protection rack for bridge construction Expired - Fee Related CN108978487B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811094360.7A CN108978487B (en) 2018-09-19 2018-09-19 A easily set up quick detachable protection rack for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811094360.7A CN108978487B (en) 2018-09-19 2018-09-19 A easily set up quick detachable protection rack for bridge construction

Publications (2)

Publication Number Publication Date
CN108978487A true CN108978487A (en) 2018-12-11
CN108978487B CN108978487B (en) 2020-06-16

Family

ID=64546355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811094360.7A Expired - Fee Related CN108978487B (en) 2018-09-19 2018-09-19 A easily set up quick detachable protection rack for bridge construction

Country Status (1)

Country Link
CN (1) CN108978487B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455854A (en) * 2020-04-14 2020-07-28 浙江大学宁波理工学院 Semi-automatic protective shed frame used in construction of viaduct crossing railway and erection method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1240669A (en) * 1959-07-21 1960-09-09 Metal building system
CN201245816Y (en) * 2008-07-08 2009-05-27 中铁十一局集团有限公司 Movable awning of moving die carrier for bridge construction
CN201518820U (en) * 2009-06-02 2010-07-07 郭仁发 Novel multi-purpose sun and rain umbrella
US7913710B2 (en) * 2006-07-24 2011-03-29 Vasileios Bougioukos Shading systems
CN205857842U (en) * 2016-06-18 2017-01-04 新昌县兴旺轴承有限公司 A kind of steel structure car parking shed
CN206487185U (en) * 2017-01-23 2017-09-12 长安大学 A kind of device of sunshade rain-proof for public bicycles
CN207063689U (en) * 2017-06-22 2018-03-02 浙江欧斯朗遮阳科技有限公司 A kind of sunshade

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1240669A (en) * 1959-07-21 1960-09-09 Metal building system
US7913710B2 (en) * 2006-07-24 2011-03-29 Vasileios Bougioukos Shading systems
CN201245816Y (en) * 2008-07-08 2009-05-27 中铁十一局集团有限公司 Movable awning of moving die carrier for bridge construction
CN201518820U (en) * 2009-06-02 2010-07-07 郭仁发 Novel multi-purpose sun and rain umbrella
CN205857842U (en) * 2016-06-18 2017-01-04 新昌县兴旺轴承有限公司 A kind of steel structure car parking shed
CN206487185U (en) * 2017-01-23 2017-09-12 长安大学 A kind of device of sunshade rain-proof for public bicycles
CN207063689U (en) * 2017-06-22 2018-03-02 浙江欧斯朗遮阳科技有限公司 A kind of sunshade

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455854A (en) * 2020-04-14 2020-07-28 浙江大学宁波理工学院 Semi-automatic protective shed frame used in construction of viaduct crossing railway and erection method
CN111455854B (en) * 2020-04-14 2021-08-03 浙江大学宁波理工学院 Semi-automatic protective shed frame used in construction of viaduct crossing railway and erection method

Also Published As

Publication number Publication date
CN108978487B (en) 2020-06-16

Similar Documents

Publication Publication Date Title
CN104533135B (en) Rail device capable of being rapidly installed and detached
CN208718393U (en) A kind of building overlapping plate bracing frame
CN108978487A (en) It is a kind of easily to set up quick detachable protecting canopy frame for bridge construction
CN213710299U (en) Modular two-layer elevartor shaft integral lifting bracing operation platform
CN206628798U (en) A kind of street code device of angle rotatable
CN208604989U (en) A kind of moveable photovoltaic mat shelter
CN208763541U (en) A kind of safety protective fence for power engineering
CN108867474A (en) A kind of splicing guardrail of changeable protection height
CN211596431U (en) Railway bridge pad stone construction operation protector
CN208309462U (en) A kind of municipal works guardrail for being easily installed disassembly
CN209456451U (en) A kind of solar energy marsh gas fermentation tank
CN203487801U (en) Roof protection device
CN207319851U (en) Transformer rack
CN103422661A (en) Multifunctional triangular trapezoidal frame
CN105594513A (en) Steel structure greenhouse
CN206681484U (en) A kind of fast assembling temporary construction fence
CN207944783U (en) A kind of construction fixture type protective fence
CN203531346U (en) Multifunctional triangular trapezoid frame
CN221095940U (en) Construction elevator platform protector
CN216157328U (en) Outdoor rail convenient to installation
CN207553628U (en) Steel basketry sheet simple edge-facing protection device
CN211817811U (en) Optimally designed scaffold for outdoor construction of building
CN221297656U (en) Warning protection board for temporary construction of road
CN208112551U (en) A kind of outdoor simple solarization board mount of crystal silicon solar photovoltaic module
CN103255908B (en) A kind of main couple adjustable safety passage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200616

Termination date: 20210919

CF01 Termination of patent right due to non-payment of annual fee