CN206681484U - A kind of fast assembling temporary construction fence - Google Patents
A kind of fast assembling temporary construction fence Download PDFInfo
- Publication number
- CN206681484U CN206681484U CN201720442282.XU CN201720442282U CN206681484U CN 206681484 U CN206681484 U CN 206681484U CN 201720442282 U CN201720442282 U CN 201720442282U CN 206681484 U CN206681484 U CN 206681484U
- Authority
- CN
- China
- Prior art keywords
- support frame
- frame
- push rod
- connection frame
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 239000000203 mixture Substances 0.000 claims description 2
- 239000000463 material Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Fencing (AREA)
Abstract
The utility model discloses a kind of fast assembling temporary construction fence, it is made up of the connecting rod of at least two groups of support frames and several connection two adjacent groups support frames, support frame as described above includes push rod, is fixed on the supporting leg at the push rod both ends and at least one hollow upper connection frame being rotatably installed on the push rod, the connection frame surrounds it and the tie point of the push rod freely rotates, and adjusts its opening direction;The both ends of the connecting rod respectively penetrate the connection inframe at the top of two adjacent groups support frame, connect two support frames, and two support frames are supportted and stood on the ground.Temporary construction fence structure of the present utility model and making are very simple, it is made up of the support frame and connecting rod of inverted U, assembling is convenient to, fast, when needing to use, by support frame placement spaced apart, again by connecting rod through in the upper connection frame at the top of two support frames, you can complete assembling, realize the functions such as the placing of material region division of job site, warning, easy enclosing.
Description
Technical field
A kind of construction instrument is the utility model is related to, specifically a kind of provisional protection of job site, warning, region
Dividing tool.
Background technology
In order to avoid the material of construction site, instrument leave about everywhere, it will usually build interim enclosing at the scene, rise
To the effect of region division, warning and provisional protection.
Existing temporary construction fence common practice is set up using steel tube fastener, is removed again after use, installation and
It is inconvenient to remove, for provisional protection, it is clear that compare waste, add construction cost.
The content of the invention
Goal of the invention:The utility model purpose is in view of the shortcomings of the prior art, there is provided one kind assembling is quick, user
Just temporary construction fence.
Technical scheme:Fast assembling temporary construction fence described in the utility model, by least two groups of support frames and several
Connect two adjacent groups support frame connecting rod composition, support frame as described above include push rod, be fixed on the push rod both ends supporting leg and
At least one hollow upper connection frame being rotatably installed on the push rod, the connection frame surround its connection with the push rod
Point freely rotates, and adjusts its opening direction;The both ends of the connecting rod respectively penetrate the connection frame at the top of two adjacent groups support frame
It is interior, two support frames are connected, and two support frames are supportted and stood on the ground.
Further preferably technical scheme is the utility model, and a bottom is additionally provided between two supporting legs of support frame as described above
Bar, the both ends of the bottom bar are separately fixed at the bottom of two supporting legs, are provided with the bottom bar and the upper company on the push rod
The consistent lower connection frame of mount structure is connect, the lower connection frame of two adjacent groups support frame is connected by connecting rod.
Preferably, the quantity of the lower connection frame is consistent with the quantity of the upper connection frame.
Preferably, support frame as described above is more than three groups, and the quantity of the upper connection frame at the top of support frame as described above is two, wherein
One connection frame is connected by the support frame of connecting rod and homonymy, another connection support of the frame by another connecting rod and opposite side
Frame connects.
Preferably, the bottom of the connection frame is welded with bolt, and the connection frame is rotatably installed in the top by bolt
On bar, and pass through nut check.
Beneficial effect:(1)Temporary construction fence structure of the present utility model and making are very simple, by the support frame of inverted U
Being formed with connecting rod, assembling is convenient to, fast, when needing to use, by support frame placement spaced apart, then will even
Extension bar is through in the upper connection frame at the top of two support frames, you can complete assembling, realize job site placing of material region division,
The functions such as warning, easy enclosing;For the ease of the assembling of multigroup support frame, connection frame is rotatably installed on push rod, can be free
Regulation angle, by opening towards another group of support frame direction;
(2)Support frame is also provided with bottom bar in the utility model, is provided with bottom bar identical with upper connection mount structure, quantity
Lower connection frame, connected again by connecting rod between the lower connection frame of the support frame of adjacent sets, so both can guarantee that support frame
Between connection and stand steadiness, and can enhancing protection effect;
(3)Support frame can be more than three groups in the utility model, can freely increase and decrease support frame according to being actually needed
Quantity, the enclosing of arbitrary shape is assembled into, built flexible, conveniently.
Brief description of the drawings
Fig. 1 is the structural representation of support frame described in the utility model embodiment;
Fig. 2 is the structural representation of temporary construction fence described in the utility model embodiment;
In figure, 1- push rods, 2- supporting legs, 3- bottom bars, 4- connections frame, 5- connecting rods.
Embodiment
Technical solutions of the utility model are described in detail below by accompanying drawing, but the scope of protection of the utility model
It is not limited to the embodiment.
Embodiment:A kind of fast assembling temporary construction fence, by four groups of support frames and several connection two adjacent groups supports
The connecting rod 5 of frame forms.
Support frame as described above includes push rod 1, the supporting leg 2 for being fixed on the both ends of push rod 1, the bottom between two supporting legs 2
Bar 3.
Two hollow connection frames 4 are respectively arranged with push rod and bottom bar, the bottom of the connection frame 4 is welded with spiral shell
Bolt, the connection frame 4 be rotatably installed on the push rod 1 or bottom bar 3 by bolt, around it with the push rod 1 or bottom bar 3
Tie point freely rotates, and adjusts its opening direction, and pass through nut check.
The upper and lower two connections frame 4 of the homonymy of every group of support frame passes through connecting rod 5 corresponding with adjacent side stand component two respectively
Connection frame 4 is connected, and two connection frames 4 of opposite side are connect by the two connections frame 4 corresponding with another adjacent supports frame of connecting rod 5.
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, but it must not
It is construed to the limitation to the utility model itself.In the spirit and scope of the present utility model for not departing from appended claims and defining
Under the premise of, can various changes can be made in the form and details to it.
Claims (5)
1. a kind of fast assembling temporary construction fence, it is characterised in that by least two groups of support frames and several connections adjacent two
The connecting rod composition of group support frame, support frame as described above include push rod, are fixed on the supporting leg at the push rod both ends and are rotatably installed in
At least one hollow upper connection frame on the push rod, the connection frame surrounds it and the tie point of the push rod freely turns
It is dynamic, adjust its opening direction;The both ends of the connecting rod respectively penetrate the connection inframe at the top of two adjacent groups support frame, connection two
Support frame, and two support frames are supportted and stood on the ground.
2. fast assembling temporary construction fence according to claim 1, it is characterised in that two supporting legs of support frame as described above it
Between be additionally provided with a bottom bar, the both ends of the bottom bar are separately fixed at the bottom of two supporting legs, are provided with the bottom bar and institute
The lower connection frame of upper connection mount structure unanimously on push rod is stated, the lower connection frame of two adjacent groups support frame is connected by connecting rod.
3. fast assembling temporary construction fence according to claim 2, it is characterised in that the quantity of the lower connection frame and institute
The quantity for stating connection frame is consistent.
4. the fast assembling temporary construction fence according to any one of claim 1 ~ 3, it is characterised in that support frame as described above three
More than group, the quantity of the upper connection frame at the top of support frame as described above is two, and one of connection frame passes through connecting rod and homonymy
Support frame is connected, and another connection frame is connected by the support frame of another connecting rod and opposite side.
5. the fast assembling temporary construction fence according to any one of claim 1 ~ 3, it is characterised in that the bottom of the connection frame
Portion is welded with bolt, and the connection frame is rotatably installed on the push rod by bolt, and passes through nut check.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720442282.XU CN206681484U (en) | 2017-04-25 | 2017-04-25 | A kind of fast assembling temporary construction fence |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720442282.XU CN206681484U (en) | 2017-04-25 | 2017-04-25 | A kind of fast assembling temporary construction fence |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206681484U true CN206681484U (en) | 2017-11-28 |
Family
ID=60403311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720442282.XU Expired - Fee Related CN206681484U (en) | 2017-04-25 | 2017-04-25 | A kind of fast assembling temporary construction fence |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206681484U (en) |
-
2017
- 2017-04-25 CN CN201720442282.XU patent/CN206681484U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208073095U (en) | Mobile falling-proof bracket | |
CN208718393U (en) | A kind of building overlapping plate bracing frame | |
CN205663284U (en) | Electric power transportation hydraulic stretching bracing piece | |
CN201438607U (en) | Steel structure bracket of transformation equipment | |
CN204157372U (en) | Bamboo frame wind-resistant device of greenhouse | |
CN203865934U (en) | Temporary suspension device of pulley lifting mechanism for electric pole | |
CN206681484U (en) | A kind of fast assembling temporary construction fence | |
CN207046733U (en) | A kind of post supporting device for cantilever crane | |
CN205132955U (en) | Hoist and mount operation of electric power industry low latitude is with hoist and mount frame | |
CN207714760U (en) | A kind of quick access frame that stability easy to disassemble is strong | |
CN207749839U (en) | A kind of detachable five feet support jig | |
CN206769453U (en) | A kind of Hydraulic and Hydro-Power Engineering turn ladder | |
CN205164048U (en) | Multistage over -and -under type sports dancing barre of doing exercises | |
CN203748335U (en) | Folding grape planting greenhouse | |
CN206755920U (en) | A kind of suspension type sewage cooling tower | |
CN208731034U (en) | A kind of modified sterilizing cabinet frame work | |
CN208105278U (en) | A kind of foundation pit adjustable support frame | |
CN208718350U (en) | Inner guide type elevating scaffold attached wall support base | |
CN206864969U (en) | Full-insulation distribute-electricity transformer operating platform | |
CN207296333U (en) | A kind of scaffold device for building | |
CN205666020U (en) | Environmental protection profiled steel structure swiftly assembles trilateral bill -board of single -upright -column | |
CN105594513A (en) | Steel structure greenhouse | |
CN204071350U (en) | A kind of extension support for mosquito net | |
CN104905551A (en) | Foldable table | |
CN211047971U (en) | Warmhouse booth aluminum alloy support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171128 |
|
CF01 | Termination of patent right due to non-payment of annual fee |