CN207062676U - Temporary road pad - Google Patents
Temporary road pad Download PDFInfo
- Publication number
- CN207062676U CN207062676U CN201720871091.5U CN201720871091U CN207062676U CN 207062676 U CN207062676 U CN 207062676U CN 201720871091 U CN201720871091 U CN 201720871091U CN 207062676 U CN207062676 U CN 207062676U
- Authority
- CN
- China
- Prior art keywords
- cushion block
- road
- airborne dust
- flexible pipe
- connecting line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a kind of temporary road pad, including road cushion block, road cushion block connecting line and airborne dust flexible pipe, connected two-by-two between adjacent road cushion block by road cushion block connecting line, the airborne dust flexible pipe is fastened on the more road cushion block connecting lines, the airborne dust flexible pipe along its length on be provided with multiple hole for water sprayings, the airborne dust flexible pipe is also connected with water source.The utility model assembling is simple, and it can recycle and reuse, in construction operation, it can also play a part of suppressing airborne dust, reduce construction harmful effect to caused by environment, so as to meet building site civilized construction needs, reduce the watering operation intensity of worker, so as to reduce the labor intensity of worker.
Description
Technical field
Building civilized construction technical field is the utility model is related to, more specifically, is related to a kind of job site temporary road
Mat formation on road.
Background technology
At this stage in municipal construction, a variety of arrange also is taken at the requirement more and more higher of resident and government to Civilization Worksite, scene
Apply, reduce influence of the airborne dust to environment, and put into considerable manpower and ensured civilized construction needs.Temporary road is mated formation mesh
It is preceding mainly to have following several ways:First way is mated formation using iron plate, and this mode lease expenses is higher, and enters to appear on the scene
Necessary mechanical engagement handling, and because iron plate is heavier, piece is more difficult, usually extrudes the soil body in iron plate gap in vehicle traveling,
Airborne dust is caused, iron plate bottom soil body is watered into dust suppression, iron plate sinking, tire belt mud occurs, difficulty is rinsed in increase;The second way
It is that stone of mating formation serves as temporary road, this mode is put into greatly, and recovery difficult is big, causes the significant wastage of resource.Therefore, it is necessary to
Developing a kind of can improve efficiency, reduce labor intensity and can be effectively ensured the temporary road of civilized construction.
Utility model content
In view of the above problems, the purpose of this utility model is to provide a kind of temporary road pad, to solve existing temporary road
The problem of airborne dust caused by road is mated formation is with recovery is costly and difficult to.
The utility model is realized by following technical scheme:
A kind of temporary road pad, including road cushion block, road cushion block connecting line and airborne dust flexible pipe, two-by-two adjacent road
Connected between cushion block by road cushion block connecting line, the airborne dust flexible pipe is fastened on the more road cushion block connecting lines, institute
State airborne dust flexible pipe along its length on be provided with multiple hole for water sprayings, the airborne dust flexible pipe is also connected with water source.
Preferably, connected between the adjacent road cushion block two-by-two by two road cushion block connecting lines, described two
There is difference in height in root road cushion block connecting line, the airborne dust flexible pipe is fastened between multiple two roads cushion block connecting lines
In gap.
Preferably, the road cushion block is the square formed by concreting or the iron block being fabricated from iron.
Preferably, the road cushion block connecting line is made up of flexible strand.
Preferably, the road cushion block connecting line is steel wire rope.
The utility model comprises at least following beneficial effect:The utility model assembling is simple, and can recycle and reuse,
Cost is reduced, it also avoid the waste of resource;In construction operation, the temporary road pad can be laid immediately on ground,
Play a part of temporary road, vehicle can travel thereon, when vehicle produces airborne dust in the process of moving, open water source, water
Enter in airborne dust flexible pipe, sprayed from hole for water spraying, so as to play a part of suppressing airborne dust, reduce construction and environment is caused
Harmful effect, so as to meet building site civilized construction needs, reduce the watering operation intensity of worker, so as to reduce worker
Labor intensity.
Brief description of the drawings
By reference to the description below in conjunction with accompanying drawing, and with being more fully understood to of the present utility model, this reality
It will be more apparent and should be readily appreciated that with new other purposes and result.In the accompanying drawings:
Fig. 1 is the planar structure schematic diagram of embodiment 1;
Fig. 2 is Fig. 1 sectional view.
Identical label indicates similar or corresponding feature or function in all of the figs.
Wherein, road cushion block 1, road cushion block connecting line 2, airborne dust flexible pipe 3, hole for water spraying 30.
Embodiment
Specific embodiment of the utility model is described in detail below with reference to accompanying drawing.
Embodiment 1:
See Fig. 1 and Fig. 2, present embodiments provide a kind of temporary road pad, including road cushion block 1, road cushion block connecting line
2nd, airborne dust flexible pipe 3, road cushion block 1 are the squares formed by concreting, and road cushion block connecting line 2 is that intensity meets what is required
Flexible strand, such as steel wire rope.Concrete blocks 1 are connected by two steel wire ropes 2 two-by-two, two steel wire ropes 2 exist difference in height with
So that two steel wire ropes 2 have gap in vertical direction, airborne dust flexible pipe 3 is fastened on multiple similar two steel wire ropes 2 and formed
Gap in.In use, on the temporary road for needing to construct, multiple road cushion blocks 1 are connected by more steel wire ropes 2 to be formed
The one temporary road pad for meeting the requirements size is laid on construction section, and penetrates airborne dust in the gap that steel wire rope 2 is formed
Flexible pipe 3.Airborne dust flexible pipe 3 is connected by joint with water source, and the upper side wall of airborne dust flexible pipe 3 is provided with multiple hole for water sprayings along its length
30.During construction operation, the temporary road pad is laid immediately on ground, plays a part of temporary road, and vehicle travels thereon,
When vehicle produces airborne dust in the process of moving, water source is opened, water is entered in airborne dust flexible pipe 3, sprayed from hole for water spraying 30, from
And play a part of suppressing airborne dust, reduce construction harmful effect to caused by environment.The utility model can meet building site
The needs of civilized construction, reduce the watering operation intensity of worker, so as to reduce the labor intensity of worker.The utility model group
Dress is simple, and can recycle and reuse, and reduces cost, it also avoid the waste of resource.
Embodiment 2:
Road cushion block 1 can be that concrete blocks are alternatively iron block, and difference from Example 1 is, two-by-two road pad
Connected between block 1 by a road cushion block connecting line 2, airborne dust flexible pipe 3 is interspersed in multiple row road pad connecting line 2, specifically
Interspersed method is:Airborne dust flexible pipe 3 is from the upper surface of first road cushion block connecting line 2 through again from second road cushion block connection
The lower surface of line 2 passes, then from the upper surface of the 3rd road cushion block connecting line 2 through again from the 4th road cushion block connection
The lower surface of line 2 passes, the like, fixed by road pad connecting line 2, play a part of suppressing airborne dust and not allowing in construction
Easily it is shifted over.
Described in an illustrative manner above with reference to accompanying drawing according to temporary road pad of the present utility model.But this area skill
Art personnel should be appreciated that the temporary road pad proposed for above-mentioned the utility model, can also not depart from the utility model
Various improvement are made on the basis of content.Therefore, the scope of protection of the utility model should be by appended claims
Hold and determine.
Claims (5)
1. a kind of temporary road pad, it is characterised in that including road cushion block, road cushion block connecting line and airborne dust flexible pipe, two-by-two
Connected between adjacent road cushion block by road cushion block connecting line, the airborne dust flexible pipe is fastened on the more road cushion blocks and connected
In wiring, the airborne dust flexible pipe along its length on be provided with multiple hole for water sprayings, the airborne dust flexible pipe is also connected with water source.
2. temporary road pad as claimed in claim 1, it is characterised in that pass through two between the adjacent road cushion block two-by-two
Root road cushion block connecting line connects, and two roads cushion block connecting line has difference in height, and the airborne dust flexible pipe is fastened on multiple
In gap between two roads cushion block connecting line.
3. temporary road pad as claimed in claim 1, it is characterised in that the road cushion block is formed by concreting
Square or the iron block being fabricated from iron.
4. temporary road pad as claimed in claim 1, it is characterised in that the road cushion block connecting line is made up of flexible strand.
5. temporary road pad as claimed in claim 4, it is characterised in that the road cushion block connecting line is steel wire rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720871091.5U CN207062676U (en) | 2017-07-18 | 2017-07-18 | Temporary road pad |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720871091.5U CN207062676U (en) | 2017-07-18 | 2017-07-18 | Temporary road pad |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207062676U true CN207062676U (en) | 2018-03-02 |
Family
ID=61511951
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720871091.5U Active CN207062676U (en) | 2017-07-18 | 2017-07-18 | Temporary road pad |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207062676U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111254773A (en) * | 2019-11-24 | 2020-06-09 | 张媛淇 | Temporary road structure for constructional engineering |
-
2017
- 2017-07-18 CN CN201720871091.5U patent/CN207062676U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111254773A (en) * | 2019-11-24 | 2020-06-09 | 张媛淇 | Temporary road structure for constructional engineering |
CN111254773B (en) * | 2019-11-24 | 2022-01-25 | 深圳市诚宇建设集团有限公司 | Temporary road structure for constructional engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SG181210A1 (en) | Reusable paving slab for temporary road andmethod for paving temporary road with the same | |
CN108130837A (en) | A kind of prefabricated road plate and its construction method | |
CN105672353B (en) | A kind of cast-in-place diaphram wall and assembled metro station construction integral method | |
CN206233102U (en) | A kind of packaged type faces side operation work platform | |
CN104453229A (en) | Novel large-span load-bearing prestress double-T plate construction method | |
CN107938520B (en) | Using the method for vertical drag-line construction steel reinforced concrete combination beam | |
CN204263314U (en) | Multifunction combined adjustable type T plate template system | |
CN204000830U (en) | Merogenesis take-over type sand drain machine | |
CN207062676U (en) | Temporary road pad | |
CN205712571U (en) | Prefabricated shear wall horizontal piece channel-section steel is welded to connect device | |
CN108166395B (en) | A kind of construction method for building beam bridge across Business Line | |
CN104975563B (en) | A kind of steel bridge deck deck installation structure and its method for paving | |
CN203878436U (en) | Steel plate box road | |
CN1423020A (en) | Multiple-story building construction method and its special lifting equipment | |
CN106677207A (en) | Staggered type underground traffic pipe gallery car entrance and exit structure | |
CN205348214U (en) | Column formula reinforced concrete and shaped steel hybrid portal crane basis | |
CN207672616U (en) | A kind of outdoor cable penetration pipe is passed by one's way laying structure | |
TWM643266U (en) | Pavement unit barrier structure | |
CN102776950A (en) | Construction method of concrete packing light pipeline | |
CN104963344B (en) | The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out | |
CN102852063B (en) | concrete block and construction method for road construction | |
CN105133740B (en) | Isolation structure and its construction method applied to country building | |
CN204495064U (en) | A kind of sintering engineering internal flue mounting structure | |
CN210117622U (en) | Concrete surface course and approach bridge abutment connection structure | |
CN109958456B (en) | Advanced reinforcement construction method for building tunnel in stratum without self-stability capability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |