CN207061642U - A kind of boiler girder lifts interim lengthening beam - Google Patents

A kind of boiler girder lifts interim lengthening beam Download PDF

Info

Publication number
CN207061642U
CN207061642U CN201720706154.1U CN201720706154U CN207061642U CN 207061642 U CN207061642 U CN 207061642U CN 201720706154 U CN201720706154 U CN 201720706154U CN 207061642 U CN207061642 U CN 207061642U
Authority
CN
China
Prior art keywords
channel
section steel
support
diagonal brace
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720706154.1U
Other languages
Chinese (zh)
Inventor
周凤利
张国新
王晓强
关强
王英军
张晓南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Northeast Electric Power Engineering Co Ltd
Original Assignee
First Northeast Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Northeast Electric Power Engineering Co Ltd filed Critical First Northeast Electric Power Engineering Co Ltd
Priority to CN201720706154.1U priority Critical patent/CN207061642U/en
Application granted granted Critical
Publication of CN207061642U publication Critical patent/CN207061642U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

It the utility model is related to a kind of boiler girder and lift interim lengthening beam, including main beam and raker beam, the main beam includes one group of symmetrically arranged model [36a support channel-section steel, corresponding support kelly is connected with rear side of the lower end of the support channel-section steel, corresponding support mounting plate is connected with front side of the support channel-section steel;The raker beam includes one group of symmetrical tilts and is fixed in the model of the support channel-section steel [14a diagonal brace channel-section steel, one end that the diagonal brace channel-section steel is not secured to the support channel-section steel are connected with corresponding diagonal brace installing plate;The support mounting plate and the diagonal brace installing plate are respectively by corresponding bolt through the bolt hole location and installation that it is provided with to corresponding boiler girder.The utility model, which realizes, saves big machinery cost of use, improves efficiency of construction, shortens the activity duration.

Description

A kind of boiler girder lifts interim lengthening beam
Technical field
It the utility model is related to a kind of interim lengthening beam, in particular to a kind of boiler girder lift interim lengthening beam.
Background technology
When boiler girder lifts, typically individually lifted by an independent attached arm, due to part large girder Quality exceeds, and rate of load condensate exceeds 100% when causing the attached arm individually to be lifted, and generally, can all use 1 lifting of increase Machinery combine lifting.Increase the problem of 1 hoisting machinery does not increase machinery expenses still, but also to take others and apply Workshop, it is delayed the installation period of sundry item, will certainly be so delayed integral construction progress.Simultaneously as using two not With the hoisting machinery of performance, the safety coefficient of board roof hoisting is greatly reduced again and improves operation difficulty.Therefore, pass through Arrangement, large girder concrete structure and the attached arm lifting performance of boiler steel structure are studied, is not surpassed in the attached arm lifting rate of load condensate of guarantee On the premise of crossing 100%, design is a to be safely completed the board roof hoisting task that quality exceeds within the shorter duration Boiler girder to lift interim lengthening beam be research purpose of the present utility model.
Utility model content
For in place of above-mentioned the shortcomings of the prior art, the utility model is that providing a kind of boiler girder lifting faces When lengthening beam, the boiler girder lifts interim lengthening beam and can effectively solve the problem that the above-mentioned problems of the prior art.
The technical solution of the utility model is:A kind of boiler girder lifts interim lengthening beam, including main beam and diagonal brace Beam, the main beam includes one group of symmetrically arranged model, and [36a support channel-section steel, one group of support channel-section steel pass through some Corresponding first connection channel-section steel progress assembly connection formation is overall, and the lower end rear side for supporting channel-section steel is connected with corresponding branch Kelly is supportted, corresponding support mounting plate is connected with front side of the support channel-section steel, 4 phases is set respectively in the support mounting plate The bolt hole answered;The raker beam includes one group of symmetrical tilts and is fixed in model [the 14a diagonal brace groove for supporting channel-section steel Steel, one group of diagonal brace channel-section steel carry out assembled connection by some corresponding second connection channel-section steels and form overall, the diagonal brace groove One end that steel is not secured to the support channel-section steel is connected with corresponding diagonal brace installing plate, and 4 are set respectively on the diagonal brace installing plate Individual corresponding bolt hole;The support mounting plate and the diagonal brace installing plate are provided with by corresponding bolt through it respectively Bolt hole location and installation on corresponding boiler girder.
One group of support channel-section steel by two corresponding first connection channel-section steels carry out assembled welding formed it is overall, described the One connection channel-section steel uses model [14a channel-section steel.
One group of diagonal brace channel-section steel by two corresponding second connection channel-section steels carry out assembled welding formed it is overall, described the Two connection channel-section steels use model [14a channel-section steel.
The bolt is the high-strength bolt of M24 × 130.
The advantages of the utility model:By the way that the utility model to be installed in the large girder other end temporarily, board roof hoisting is just During position, first on the utility model let-down to steelframe abacus, then drawn using chain block, attached arm is hung by slow It is in place to return the action completion board roof hoisting such as hook, luffing, lift hook.It is achieved thereby that saving big machinery cost of use, improve Efficiency of construction, shorten the activity duration;Other bid section normal constructions are not influenceed, can ensure integral construction progress;And improve Hoisting Security coefficient.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is use state figure of the present utility model.
Embodiment
To improve those skilled in the art to understanding of the present utility model, now by embodiment combination accompanying drawing further to this reality Illustrated with new.
With reference to figure 1-2, a kind of boiler girder lifts interim lengthening beam, including main beam and raker beam, the main beam Comprising one group of symmetrically arranged model, [36a support channel-section steel 1, one group of support channel-section steel 1 connect by some corresponding first Access slot steel 3 carries out assembled connection and forms entirety, and corresponding support kelly 4, institute are connected with rear side of the lower end of the support channel-section steel 1 The front side for stating support channel-section steel 1 is connected with corresponding support mounting plate 5, sets 4 corresponding spiral shells in the support mounting plate 5 respectively Keyhole;The raker beam includes one group of symmetrical tilts and is fixed in model [14a diagonal brace channel-section steel 2, the institute for supporting channel-section steel 1 State one group of diagonal brace channel-section steel 2 and carry out assembled connection formation entirety, the diagonal brace channel-section steel 2 by some corresponding second connection channel-section steels 6 The one end for not being secured to the support channel-section steel 1 is connected with corresponding diagonal brace installing plate 7, and 4 are set respectively on the diagonal brace installing plate 7 Individual corresponding bolt hole;The support mounting plate 5 and the diagonal brace installing plate 7 pass through its institute by corresponding bolt 8 respectively The bolt hole location and installation being provided with is on corresponding boiler girder 9.
One group of support channel-section steel 1 carries out assembled welding by two corresponding first connection channel-section steels 3 and forms entirety, described First connection channel-section steel 3 uses model [14a channel-section steel.One group of diagonal brace channel-section steel 2 passes through two corresponding second connection channel-section steels 6, which carry out assembled welding, forms entirety, and the second connection channel-section steel 6 uses model [14a channel-section steel.The bolt 8 be M24 × 130 high-strength bolt.
By the way that the utility model to be installed in the other end of large girder 9 temporarily, when large girder 9 lifts in place, this reality first With on new let-down to steelframe abacus, then drawn using chain block, attached arm is hung by slowly returning hook, luffing, lift It is in place that board roof hoisting is completed in the actions such as hook.
The foregoing is only preferred embodiment of the present utility model, it is all done according to present utility model application the scope of the claims it is equal Deng change and modification, it should all belong to covering scope of the present utility model.

Claims (4)

1. a kind of boiler girder lifts interim lengthening beam, including main beam and raker beam, it is characterised in that:The main beam bag Support channel-section steel containing one group of symmetrically arranged model 36a, one group of support channel-section steel pass through some corresponding first link slots Steel carries out assembled connection and forms entirety, and corresponding support kelly, the support are connected with rear side of the lower end of the support channel-section steel Corresponding support mounting plate is connected with front side of channel-section steel, 4 corresponding bolts hole are set respectively in the support mounting plate;It is described Raker beam includes one group of symmetrical diagonal brace channel-section steel for tilting the model 14a for being fixed in the support channel-section steel, one group of diagonal brace groove Steel is overall by some corresponding assembled connection formation of second connection channel-section steels progress, and the diagonal brace channel-section steel is not secured to the support One end of channel-section steel is connected with corresponding diagonal brace installing plate, sets 4 corresponding bolts hole on the diagonal brace installing plate respectively;It is described Support mounting plate and the diagonal brace installing plate are arrived by corresponding bolt through its bolt hole location and installation being provided with respectively On corresponding boiler girder.
2. a kind of boiler girder according to claim 1 lifts interim lengthening beam, it is characterised in that:One group of support Channel-section steel is overall by two corresponding assembled welding formation of first connection channel-section steels progress, and described first, which connects channel-section steel, uses model 14a channel-section steel.
3. a kind of boiler girder according to claim 1 lifts interim lengthening beam, it is characterised in that:One group of diagonal brace Channel-section steel is overall by two corresponding assembled welding formation of second connection channel-section steels progress, and described second, which connects channel-section steel, uses model 14a channel-section steel.
4. a kind of boiler girder according to claim 1 lifts interim lengthening beam, it is characterised in that:The bolt is The high-strength bolt of M24 × 130.
CN201720706154.1U 2017-06-18 2017-06-18 A kind of boiler girder lifts interim lengthening beam Active CN207061642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720706154.1U CN207061642U (en) 2017-06-18 2017-06-18 A kind of boiler girder lifts interim lengthening beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720706154.1U CN207061642U (en) 2017-06-18 2017-06-18 A kind of boiler girder lifts interim lengthening beam

Publications (1)

Publication Number Publication Date
CN207061642U true CN207061642U (en) 2018-03-02

Family

ID=61508219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720706154.1U Active CN207061642U (en) 2017-06-18 2017-06-18 A kind of boiler girder lifts interim lengthening beam

Country Status (1)

Country Link
CN (1) CN207061642U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505412A (en) * 2018-11-30 2019-03-22 上海宝冶集团有限公司 Large girder is vertical to spell anti-dumping coating method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505412A (en) * 2018-11-30 2019-03-22 上海宝冶集团有限公司 Large girder is vertical to spell anti-dumping coating method
CN109505412B (en) * 2018-11-30 2021-03-26 上海宝冶集团有限公司 Vertical splicing and overturn preventing method for large plate girder

Similar Documents

Publication Publication Date Title
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN207192616U (en) A kind of gantry crane for preventing that goods from rocking
CN203497959U (en) Support structure without inclined rod for tower crane
CN207061642U (en) A kind of boiler girder lifts interim lengthening beam
CN204342297U (en) A kind of transfer crane with jib structure
CN206088728U (en) Novel large -scale gallows of taking a trial run
CN204416960U (en) A kind of bipod mast Lift-on/Lift-off System being convenient to movement
CN104098018A (en) Reusable multistage balance beam combination system
CN209082340U (en) Large-span steel girder lifting device
CN208294101U (en) A kind of large-span steel girder mounting slip and promote coupling apparatus
CN205023729U (en) Gallows frame
CN109778720A (en) Bridge construction construction method based on cradle construction
CN208308252U (en) A kind of suspender of integral hoisting precast beam roof steel bar skeleton
CN102398863A (en) Support structure capable of improving jib bearing capacity and crane with the support structure
CN104609318A (en) Herringbone mast hoisting system convenient to move
CN207404743U (en) A kind of floating crane bearing stiffening device
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN111847218A (en) Bottom plate balance lifting appliance for precast concrete composite slab and manufacturing method thereof
CN205892550U (en) Flexible hoist and mount system of suspension bridge stiffening beam
CN203474313U (en) Single-boom type crane
CN204873626U (en) Caterpillar crane of integration installation, transportation becomes width of cloth auxiliary
CN205575373U (en) Improved generation 1000MW unit generator stator hoist device
CN203845661U (en) Recyclable multi-stage balance beam combination system
CN203452056U (en) Diversion tunnel gate lifting device
CN212450290U (en) Crane hook

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant