CN109778720A - Bridge construction construction method based on cradle construction - Google Patents

Bridge construction construction method based on cradle construction Download PDF

Info

Publication number
CN109778720A
CN109778720A CN201910203445.2A CN201910203445A CN109778720A CN 109778720 A CN109778720 A CN 109778720A CN 201910203445 A CN201910203445 A CN 201910203445A CN 109778720 A CN109778720 A CN 109778720A
Authority
CN
China
Prior art keywords
construction
hanging basket
hanging
box beam
cradle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910203445.2A
Other languages
Chinese (zh)
Other versions
CN109778720B (en
Inventor
胡月明
孙有竹
汪乐晨
伏浩浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co Ltd filed Critical ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201910203445.2A priority Critical patent/CN109778720B/en
Publication of CN109778720A publication Critical patent/CN109778720A/en
Application granted granted Critical
Publication of CN109778720B publication Critical patent/CN109778720B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Bridge construction construction method based on cradle construction, bridge construction construction site is equipped with two Hanging Baskets, two Hanging Baskets are arranged back-to-back, the direction that two cradle constructions advance is to be away from each other, the Hanging Basket includes Rhombic Truss, include the following steps, the weight for the box beam for needing to lift by crane in this construction is first determined before selection Hanging Basket;Hanging Basket is selected according to the weight of box beam, when selecting Hanging Basket, the loading force of two Hanging Baskets is less than the weight of box beam, and the loading force of four Hanging Baskets is greater than the weight of box beam.

Description

Bridge construction construction method based on cradle construction
Technical field
The present invention relates to the bridge construction construction methods based on cradle construction.
Background technique
The construction method that technology is new, speed is fast, easy for construction and economic is constantly searched in bridge construction.Box beam is in work The construction method for arriving construction site assembly after factory is prefabricated again is widely adopted therewith, and this construction technology reduces bridge construction pair The influence of urban transportation improves the technical level of overpass engineering.The bridge construction construction method is needed by erection crane, It needs to build erection crane on construction ground, is removed again after the completion of lifting.
The prestressed concrete continuous beam of Long span is widely used Hanging Basket and carries out cantilever pouring construction.So-called cradle construction, Refer to when pouring cantilever glider bridge, using basket method, is segmented cantilever operation on the spot.It does not need erect bracket and without using large size Loop wheel machine.Cradle construction compared with other methods, have many advantages, such as structure is light, it is simple and convenient to spell system, without ballast.
When above-mentioned form of construction work occurs simultaneously, needs first to tear open Hanging Basket and need two sets of equipment in assembled erection crane, and come It is relatively complicated to return dismounting.
Summary of the invention
It is an object of the invention to overcome the shortcomings of the prior art, Hanging Basket realization lifting can be efficiently used by providing one kind The bridge construction construction method based on cradle construction.
Bridge construction construction method of the present invention based on cradle construction, bridge construction construction site are equipped with two Hanging Baskets, Two Hanging Baskets are arranged back-to-back, and the direction that two cradle constructions advance is to be away from each other, and the Hanging Basket includes Rhombic Truss, including walks as follows Suddenly, the weight for the box beam for needing to lift by crane in this construction is first determined before selection Hanging Basket;Hanging Basket, selection are selected according to the weight of box beam When Hanging Basket, the loading force of two Hanging Baskets is less than the weight of box beam, and the loading force of four Hanging Baskets is greater than the weight of box beam.
Wherein, when needing to lift by crane box beam, wherein side Hanging Basket and other side Hanging Basket positioned at same construction area are combined, and two The Rhombic Truss of Hanging Basket overlaps setting;The wherein side Hanging Basket of another construction area is combined with other side Hanging Basket, the water chestnut of two Hanging Baskets The overlapping setting of shape truss;Hanging Basket after recombination lifts by crane the box beam between adjacent two construction area.
Wherein, Rhombic Truss side is equipped with a mounting disc, and mounting disc is equipped with open-work, when two Rhombic Truss combine, two water chestnuts Mounting disc on shape truss overlaps and fastener is used to fix.
Solution in compared with the prior art, the invention has the advantages that: the present invention can remove erection crane from when implementing Equipment can be used Hanging Basket equipment as erection crane equipment, to reduce construction equipment spending, can make full use of original extension Basket improves construction efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Hanging Basket normal service condition of the present invention.
Fig. 2 is structural schematic diagram when Hanging Basket of the present invention is used as erection crane.
Specific embodiment
With reference to the accompanying drawing and the invention is further illustrated by the examples.
Referring to Fig. 1 to Fig. 2, the bridge construction construction method based on cradle construction described in the present embodiment, bridge construction construction Place is equipped with two Hanging Baskets 1, and two settings back-to-back of Hanging Basket 1, the direction that the construction of two Hanging Baskets 1 is advanced is to be away from each other, and the Hanging Basket 1 includes Rhombic Truss further includes following steps, and the weight for the box beam 2 for needing to lift by crane in this construction, box beam are first determined before selection Hanging Basket 1 2 be the prefabricated component of bridge construction;Hanging Basket 1 is selected according to the weight of box beam 2, when selecting Hanging Basket 1, the loading force of two Hanging Baskets 1 is small In the weight of box beam 2, the loading force of four Hanging Baskets 1 is greater than the weight of box beam 2.Although original Hanging Basket 1 can not be hung in the mechanism Box beam 2 is played, but the Hanging Basket 1 ' after combination can be used as erection crane using capable of hoisting box beam 2, this method compares traditional construction mode It is more convenient.
When needing to lift by crane box beam 2, wherein side Hanging Basket 1 and other side Hanging Basket 1 positioned at same construction area are combined, and two hang The Rhombic Truss of basket 1 overlaps setting;Wherein side Hanging Basket 1 and the other side Hanging Basket 1 of another construction area are combined, two Hanging Baskets 1 Rhombic Truss overlapping setting;Hanging Basket 1 ' after combination lifts by crane the box beam 2 between adjacent two construction area.
In the specific implementation, the construction of Hanging Basket 1 is usually to extend to construct from bridge pier center to two sides to the present embodiment, Hanging Basket After 1 cantilever casting construction certain distance, the side Hanging Basket 1 on same bridge pier is removed, by the Hanging Basket of Hanging Basket 1 component and the other side of dismounting The loading force of 1 split, former Hanging Basket 1 enhances, and the Hanging Basket 1 on another bridge pier does same processing, and the Hanging Basket 1 after split is hung as bridge floor Machine it is practical by prefabricated box beam 2 sling complete bridge floor close up.
Rhombic Truss side is equipped with a mounting disc, and mounting disc is equipped with open-work, when two Rhombic Truss combine, two Rhombic Truss On mounting disc overlap and fastener used to fix.Bolt tightens through hole using nut.
The above is only a preferred embodiment of the present invention, it should be understood that for the ordinary skill people of the art For member, under the premise of not departing from the principle of the present invention, other improvements and modification can also be made, it all should be by claims In identified protection scope.

Claims (3)

1. the bridge construction construction method based on cradle construction, bridge construction construction site is equipped with two Hanging Baskets, and two Hanging Baskets are back-to-back Setting, the direction that two cradle constructions advance is to be away from each other, and the Hanging Basket includes Rhombic Truss, characterized in that includes the following steps, The weight for the box beam for needing to lift by crane in this construction is first determined before selection Hanging Basket;Hanging Basket is selected according to the weight of box beam, selection is hung When basket, the loading force of two Hanging Baskets is less than the weight of box beam, and the loading force of four Hanging Baskets is greater than the weight of box beam.
2. the bridge construction construction method based on cradle construction as described in claim 1, characterized in that need to lift by crane box beam When, wherein side Hanging Basket and other side Hanging Basket positioned at same construction area are combined, and the Rhombic Truss of two Hanging Baskets overlaps setting;Separately The wherein side Hanging Basket of one construction area is combined with other side Hanging Basket, and the Rhombic Truss of two Hanging Baskets overlaps setting;Extension after recombination Basket lifts by crane the box beam between adjacent two construction area.
3. the bridge construction construction method based on cradle construction as claimed in claim 2, characterized in that Rhombic Truss side is set There is a mounting disc, mounting disc is equipped with open-work, and when two Rhombic Truss combine, the mounting disc on two Rhombic Truss is overlapped and used tight Firmware is fixed.
CN201910203445.2A 2019-03-18 2019-03-18 Bridge construction method based on cradle construction Active CN109778720B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910203445.2A CN109778720B (en) 2019-03-18 2019-03-18 Bridge construction method based on cradle construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910203445.2A CN109778720B (en) 2019-03-18 2019-03-18 Bridge construction method based on cradle construction

Publications (2)

Publication Number Publication Date
CN109778720A true CN109778720A (en) 2019-05-21
CN109778720B CN109778720B (en) 2020-11-06

Family

ID=66488365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910203445.2A Active CN109778720B (en) 2019-03-18 2019-03-18 Bridge construction method based on cradle construction

Country Status (1)

Country Link
CN (1) CN109778720B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609577A (en) * 2020-11-23 2021-04-06 中国水利水电第四工程局有限公司 Continuous beam segment prefabrication and assembly method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013149771A1 (en) * 2012-04-02 2013-10-10 Ulma C Y E, S. Coop Movable structure suitable for supporting a formwork of a new bridge section in cantilever
CN104074145A (en) * 2014-06-30 2014-10-01 广东省基础工程公司 Closure-section refit construction method for hanging basket
CN105088971A (en) * 2015-09-09 2015-11-25 上海城建市政工程(集团)有限公司 Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge
CN204940131U (en) * 2015-09-09 2016-01-06 上海城建市政工程(集团)有限公司 A kind of hanging basket device of Wavelike steel webplate parts
WO2018133045A1 (en) * 2017-01-20 2018-07-26 中国铁建大桥工程局集团有限公司 Method for mounting self-anchored suspension bridge
CN108547223A (en) * 2018-03-12 2018-09-18 中交第二航务工程局有限公司 The hybrid beam bridge construction method of steel reinforced concrete overlapping

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013149771A1 (en) * 2012-04-02 2013-10-10 Ulma C Y E, S. Coop Movable structure suitable for supporting a formwork of a new bridge section in cantilever
CN104074145A (en) * 2014-06-30 2014-10-01 广东省基础工程公司 Closure-section refit construction method for hanging basket
CN105088971A (en) * 2015-09-09 2015-11-25 上海城建市政工程(集团)有限公司 Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge
CN204940131U (en) * 2015-09-09 2016-01-06 上海城建市政工程(集团)有限公司 A kind of hanging basket device of Wavelike steel webplate parts
WO2018133045A1 (en) * 2017-01-20 2018-07-26 中国铁建大桥工程局集团有限公司 Method for mounting self-anchored suspension bridge
CN108547223A (en) * 2018-03-12 2018-09-18 中交第二航务工程局有限公司 The hybrid beam bridge construction method of steel reinforced concrete overlapping

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609577A (en) * 2020-11-23 2021-04-06 中国水利水电第四工程局有限公司 Continuous beam segment prefabrication and assembly method

Also Published As

Publication number Publication date
CN109778720B (en) 2020-11-06

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN103911956B (en) A kind of large span stayed-cable bridge steel truss girder mounting method
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN105604334A (en) Rapid-construction method used for overall installation of large-span steel truss
CN108547223A (en) The hybrid beam bridge construction method of steel reinforced concrete overlapping
CN102561191A (en) Integral lifting system and construction method for arch bridge ribs
CN103882812B (en) Across the construction method of girder in stayed-cable bridge
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN102154990B (en) Electing method for side span overhang-middle span cable-stayed three-tower self-anchored type combination suspension bridge
CN105200923B (en) A kind of steel truss girder cable-stayed bridge steel truss girder segment handling apparatus and its handling method
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN208088097U (en) A kind of three-tower suspension bridge erection of main beam constructing structure
CN107761573B (en) Crossing bridge bottom Bailey beam falsework jacks transportation by driving method for dismounting
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN103216103A (en) Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof
CN109083008A (en) A kind of walking Coping Construction job platform and its packaging technology
CN208932821U (en) A kind of erecting beam construction height leg gantry crane
CN202658590U (en) Integral assembled drilling platform
CN110182682A (en) A kind of suspender for the lifting of big segment steel truss girder
CN109778720A (en) Bridge construction construction method based on cradle construction
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN204126297U (en) A kind of temporary support of steel truss roof
CN205171343U (en) Combination beam self anchored suspension bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant