CN109778720A - Bridge construction construction method based on cradle construction - Google Patents
Bridge construction construction method based on cradle construction Download PDFInfo
- Publication number
- CN109778720A CN109778720A CN201910203445.2A CN201910203445A CN109778720A CN 109778720 A CN109778720 A CN 109778720A CN 201910203445 A CN201910203445 A CN 201910203445A CN 109778720 A CN109778720 A CN 109778720A
- Authority
- CN
- China
- Prior art keywords
- construction
- hanging basket
- hanging
- box beam
- cradle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
Bridge construction construction method based on cradle construction, bridge construction construction site is equipped with two Hanging Baskets, two Hanging Baskets are arranged back-to-back, the direction that two cradle constructions advance is to be away from each other, the Hanging Basket includes Rhombic Truss, include the following steps, the weight for the box beam for needing to lift by crane in this construction is first determined before selection Hanging Basket;Hanging Basket is selected according to the weight of box beam, when selecting Hanging Basket, the loading force of two Hanging Baskets is less than the weight of box beam, and the loading force of four Hanging Baskets is greater than the weight of box beam.
Description
Technical field
The present invention relates to the bridge construction construction methods based on cradle construction.
Background technique
The construction method that technology is new, speed is fast, easy for construction and economic is constantly searched in bridge construction.Box beam is in work
The construction method for arriving construction site assembly after factory is prefabricated again is widely adopted therewith, and this construction technology reduces bridge construction pair
The influence of urban transportation improves the technical level of overpass engineering.The bridge construction construction method is needed by erection crane,
It needs to build erection crane on construction ground, is removed again after the completion of lifting.
The prestressed concrete continuous beam of Long span is widely used Hanging Basket and carries out cantilever pouring construction.So-called cradle construction,
Refer to when pouring cantilever glider bridge, using basket method, is segmented cantilever operation on the spot.It does not need erect bracket and without using large size
Loop wheel machine.Cradle construction compared with other methods, have many advantages, such as structure is light, it is simple and convenient to spell system, without ballast.
When above-mentioned form of construction work occurs simultaneously, needs first to tear open Hanging Basket and need two sets of equipment in assembled erection crane, and come
It is relatively complicated to return dismounting.
Summary of the invention
It is an object of the invention to overcome the shortcomings of the prior art, Hanging Basket realization lifting can be efficiently used by providing one kind
The bridge construction construction method based on cradle construction.
Bridge construction construction method of the present invention based on cradle construction, bridge construction construction site are equipped with two Hanging Baskets,
Two Hanging Baskets are arranged back-to-back, and the direction that two cradle constructions advance is to be away from each other, and the Hanging Basket includes Rhombic Truss, including walks as follows
Suddenly, the weight for the box beam for needing to lift by crane in this construction is first determined before selection Hanging Basket;Hanging Basket, selection are selected according to the weight of box beam
When Hanging Basket, the loading force of two Hanging Baskets is less than the weight of box beam, and the loading force of four Hanging Baskets is greater than the weight of box beam.
Wherein, when needing to lift by crane box beam, wherein side Hanging Basket and other side Hanging Basket positioned at same construction area are combined, and two
The Rhombic Truss of Hanging Basket overlaps setting;The wherein side Hanging Basket of another construction area is combined with other side Hanging Basket, the water chestnut of two Hanging Baskets
The overlapping setting of shape truss;Hanging Basket after recombination lifts by crane the box beam between adjacent two construction area.
Wherein, Rhombic Truss side is equipped with a mounting disc, and mounting disc is equipped with open-work, when two Rhombic Truss combine, two water chestnuts
Mounting disc on shape truss overlaps and fastener is used to fix.
Solution in compared with the prior art, the invention has the advantages that: the present invention can remove erection crane from when implementing
Equipment can be used Hanging Basket equipment as erection crane equipment, to reduce construction equipment spending, can make full use of original extension
Basket improves construction efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Hanging Basket normal service condition of the present invention.
Fig. 2 is structural schematic diagram when Hanging Basket of the present invention is used as erection crane.
Specific embodiment
With reference to the accompanying drawing and the invention is further illustrated by the examples.
Referring to Fig. 1 to Fig. 2, the bridge construction construction method based on cradle construction described in the present embodiment, bridge construction construction
Place is equipped with two Hanging Baskets 1, and two settings back-to-back of Hanging Basket 1, the direction that the construction of two Hanging Baskets 1 is advanced is to be away from each other, and the Hanging Basket 1 includes
Rhombic Truss further includes following steps, and the weight for the box beam 2 for needing to lift by crane in this construction, box beam are first determined before selection Hanging Basket 1
2 be the prefabricated component of bridge construction;Hanging Basket 1 is selected according to the weight of box beam 2, when selecting Hanging Basket 1, the loading force of two Hanging Baskets 1 is small
In the weight of box beam 2, the loading force of four Hanging Baskets 1 is greater than the weight of box beam 2.Although original Hanging Basket 1 can not be hung in the mechanism
Box beam 2 is played, but the Hanging Basket 1 ' after combination can be used as erection crane using capable of hoisting box beam 2, this method compares traditional construction mode
It is more convenient.
When needing to lift by crane box beam 2, wherein side Hanging Basket 1 and other side Hanging Basket 1 positioned at same construction area are combined, and two hang
The Rhombic Truss of basket 1 overlaps setting;Wherein side Hanging Basket 1 and the other side Hanging Basket 1 of another construction area are combined, two Hanging Baskets 1
Rhombic Truss overlapping setting;Hanging Basket 1 ' after combination lifts by crane the box beam 2 between adjacent two construction area.
In the specific implementation, the construction of Hanging Basket 1 is usually to extend to construct from bridge pier center to two sides to the present embodiment, Hanging Basket
After 1 cantilever casting construction certain distance, the side Hanging Basket 1 on same bridge pier is removed, by the Hanging Basket of Hanging Basket 1 component and the other side of dismounting
The loading force of 1 split, former Hanging Basket 1 enhances, and the Hanging Basket 1 on another bridge pier does same processing, and the Hanging Basket 1 after split is hung as bridge floor
Machine it is practical by prefabricated box beam 2 sling complete bridge floor close up.
Rhombic Truss side is equipped with a mounting disc, and mounting disc is equipped with open-work, when two Rhombic Truss combine, two Rhombic Truss
On mounting disc overlap and fastener used to fix.Bolt tightens through hole using nut.
The above is only a preferred embodiment of the present invention, it should be understood that for the ordinary skill people of the art
For member, under the premise of not departing from the principle of the present invention, other improvements and modification can also be made, it all should be by claims
In identified protection scope.
Claims (3)
1. the bridge construction construction method based on cradle construction, bridge construction construction site is equipped with two Hanging Baskets, and two Hanging Baskets are back-to-back
Setting, the direction that two cradle constructions advance is to be away from each other, and the Hanging Basket includes Rhombic Truss, characterized in that includes the following steps,
The weight for the box beam for needing to lift by crane in this construction is first determined before selection Hanging Basket;Hanging Basket is selected according to the weight of box beam, selection is hung
When basket, the loading force of two Hanging Baskets is less than the weight of box beam, and the loading force of four Hanging Baskets is greater than the weight of box beam.
2. the bridge construction construction method based on cradle construction as described in claim 1, characterized in that need to lift by crane box beam
When, wherein side Hanging Basket and other side Hanging Basket positioned at same construction area are combined, and the Rhombic Truss of two Hanging Baskets overlaps setting;Separately
The wherein side Hanging Basket of one construction area is combined with other side Hanging Basket, and the Rhombic Truss of two Hanging Baskets overlaps setting;Extension after recombination
Basket lifts by crane the box beam between adjacent two construction area.
3. the bridge construction construction method based on cradle construction as claimed in claim 2, characterized in that Rhombic Truss side is set
There is a mounting disc, mounting disc is equipped with open-work, and when two Rhombic Truss combine, the mounting disc on two Rhombic Truss is overlapped and used tight
Firmware is fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910203445.2A CN109778720B (en) | 2019-03-18 | 2019-03-18 | Bridge construction method based on cradle construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910203445.2A CN109778720B (en) | 2019-03-18 | 2019-03-18 | Bridge construction method based on cradle construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109778720A true CN109778720A (en) | 2019-05-21 |
CN109778720B CN109778720B (en) | 2020-11-06 |
Family
ID=66488365
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910203445.2A Active CN109778720B (en) | 2019-03-18 | 2019-03-18 | Bridge construction method based on cradle construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109778720B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609577A (en) * | 2020-11-23 | 2021-04-06 | 中国水利水电第四工程局有限公司 | Continuous beam segment prefabrication and assembly method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013149771A1 (en) * | 2012-04-02 | 2013-10-10 | Ulma C Y E, S. Coop | Movable structure suitable for supporting a formwork of a new bridge section in cantilever |
CN104074145A (en) * | 2014-06-30 | 2014-10-01 | 广东省基础工程公司 | Closure-section refit construction method for hanging basket |
CN105088971A (en) * | 2015-09-09 | 2015-11-25 | 上海城建市政工程(集团)有限公司 | Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge |
CN204940131U (en) * | 2015-09-09 | 2016-01-06 | 上海城建市政工程(集团)有限公司 | A kind of hanging basket device of Wavelike steel webplate parts |
WO2018133045A1 (en) * | 2017-01-20 | 2018-07-26 | 中国铁建大桥工程局集团有限公司 | Method for mounting self-anchored suspension bridge |
CN108547223A (en) * | 2018-03-12 | 2018-09-18 | 中交第二航务工程局有限公司 | The hybrid beam bridge construction method of steel reinforced concrete overlapping |
-
2019
- 2019-03-18 CN CN201910203445.2A patent/CN109778720B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013149771A1 (en) * | 2012-04-02 | 2013-10-10 | Ulma C Y E, S. Coop | Movable structure suitable for supporting a formwork of a new bridge section in cantilever |
CN104074145A (en) * | 2014-06-30 | 2014-10-01 | 广东省基础工程公司 | Closure-section refit construction method for hanging basket |
CN105088971A (en) * | 2015-09-09 | 2015-11-25 | 上海城建市政工程(集团)有限公司 | Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge |
CN204940131U (en) * | 2015-09-09 | 2016-01-06 | 上海城建市政工程(集团)有限公司 | A kind of hanging basket device of Wavelike steel webplate parts |
WO2018133045A1 (en) * | 2017-01-20 | 2018-07-26 | 中国铁建大桥工程局集团有限公司 | Method for mounting self-anchored suspension bridge |
CN108547223A (en) * | 2018-03-12 | 2018-09-18 | 中交第二航务工程局有限公司 | The hybrid beam bridge construction method of steel reinforced concrete overlapping |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609577A (en) * | 2020-11-23 | 2021-04-06 | 中国水利水电第四工程局有限公司 | Continuous beam segment prefabrication and assembly method |
Also Published As
Publication number | Publication date |
---|---|
CN109778720B (en) | 2020-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100543235C (en) | The method and system of erecting steel trusses by stay cable auxiliary complete cantilever | |
CN103911956B (en) | A kind of large span stayed-cable bridge steel truss girder mounting method | |
CN201943007U (en) | Constant amplitude frame beam crane capable of being used in combination with movable support frame | |
CN105604334A (en) | Rapid-construction method used for overall installation of large-span steel truss | |
CN108547223A (en) | The hybrid beam bridge construction method of steel reinforced concrete overlapping | |
CN102561191A (en) | Integral lifting system and construction method for arch bridge ribs | |
CN103882812B (en) | Across the construction method of girder in stayed-cable bridge | |
CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
CN201106155Y (en) | Inclined guy cable auxiliary full cantaliver crane trussed steel beam device | |
CN203296361U (en) | Long-span steel structure cross assembling hoisting platform | |
CN102154990B (en) | Electing method for side span overhang-middle span cable-stayed three-tower self-anchored type combination suspension bridge | |
CN105200923B (en) | A kind of steel truss girder cable-stayed bridge steel truss girder segment handling apparatus and its handling method | |
CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
CN208088097U (en) | A kind of three-tower suspension bridge erection of main beam constructing structure | |
CN107761573B (en) | Crossing bridge bottom Bailey beam falsework jacks transportation by driving method for dismounting | |
CN106759909B (en) | Bearing structure system and its construction method are hung up under one kind | |
CN103216103A (en) | Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof | |
CN109083008A (en) | A kind of walking Coping Construction job platform and its packaging technology | |
CN208932821U (en) | A kind of erecting beam construction height leg gantry crane | |
CN202658590U (en) | Integral assembled drilling platform | |
CN110182682A (en) | A kind of suspender for the lifting of big segment steel truss girder | |
CN109778720A (en) | Bridge construction construction method based on cradle construction | |
CN104775363B (en) | The spelling method of upper king-post strut reinforcing bar sections | |
CN204126297U (en) | A kind of temporary support of steel truss roof | |
CN205171343U (en) | Combination beam self anchored suspension bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |