CN109083008A - A kind of walking Coping Construction job platform and its packaging technology - Google Patents

A kind of walking Coping Construction job platform and its packaging technology Download PDF

Info

Publication number
CN109083008A
CN109083008A CN201810590563.9A CN201810590563A CN109083008A CN 109083008 A CN109083008 A CN 109083008A CN 201810590563 A CN201810590563 A CN 201810590563A CN 109083008 A CN109083008 A CN 109083008A
Authority
CN
China
Prior art keywords
frame structure
cage
horizontal frame
overhanging
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810590563.9A
Other languages
Chinese (zh)
Inventor
安秀山
任智辉
王宇
钟志坚
孙作华
高志楼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201810590563.9A priority Critical patent/CN109083008A/en
Publication of CN109083008A publication Critical patent/CN109083008A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of walking Coping Construction job platform and its packaging technologies.Including the overhanging frame structure being made of upper horizontal frame and lower connection frame between horizontal frame and the two, ladder access is set between upper horizontal frame and lower horizontal frame, operating platform is set in upper horizontal frame, in lower horizontal frame quadrangle, idler wheel is set, vertical cage is arranged in connection below the outer end of upper horizontal frame, in the inner end of lower horizontal frame, clump weight is set, in overhanging frame structure upper surface, guard rail is set, it is the bottom basket of operating platform in the lower end of cage connection bottom surface, the bottom of at, basket is arranged operating platform with cage connection, overhanging frame structure, cage, bottom basket constitutes " Qian " character form structure toppled over, two symmetrical sunpenders are connected between overhanging frame structure and bottom basket or between bent cap top surface and bottom basket.The present invention provides the walking Coping Construction job platform and its packaging technology of a kind of realization cost efficiency that operating platform is provided for second of steel Shu Zhangla mud jacking operation of bent cap.

Description

A kind of walking Coping Construction job platform and its packaging technology
Technical field
The present invention relates to technical field of bridge construction more particularly to a kind of walking Coping Construction job platform and its assemblings Technique.
Background technique
Small box girder 11 can be arranged in the top of bent cap 10 in bridge structure figure as shown in Figure 1, and Prestressed Slab Beams 10 are small Before box beam 11 is installed, the construction of first steel Shu Zhangla mud jacking is carried out on 10 operating platform of bent cap;It is installed in small box girder 11 Afterwards, then the construction of second batch steel Shu Zhangla mud jacking carrying out, 10 operating platform of bent cap has been removed at this time or even two sides are through lane, Without second of steel Shu Zhangla mud jacking Job Operations platform of bent cap, very big difficulty is brought to bent cap 10.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and providing one kind does not influence two sides through lane traffic and is bent cap Second of steel Shu Zhangla mud jacking operation provide operating platform realization cost efficiency walking Coping Construction job platform and its Packaging technology.
The present invention to achieve the above object, using following technical scheme: a kind of walking Coping Construction job platform, including The overhanging frame structure being made of upper horizontal frame and lower connection frame between horizontal frame and the two, in upper horizontal frame and lower level frame Ladder access is set between body, operating platform is set in upper horizontal frame, idler wheel is set in lower horizontal frame quadrangle, in upper level frame Vertical cage is arranged in connection below the outer end of body, clump weight is arranged in the inner end of lower horizontal frame, in overhanging frame structure upper surface Guard rail is set, is the bottom basket of operating platform in the lower end of cage connection bottom surface, basket is arranged with cage connection the bottom of at Operating platform, overhanging frame structure, cage, bottom basket constitute " Qian " character form structure for toppling over, between overhanging frame structure and bottom basket or bent cap Two symmetrical sunpenders are connected between top surface and bottom basket.
Preferably: the shoulder pole girder parallel with overhanging frame structure width direction be set on overhanging frame structure bottom surface, sunpender with it is flat Spreader beam connection.
Preferably: aforesaid operations platform is 3mm checkered steel plate.
The present invention to achieve the above object, using following technical scheme: a kind of group of walking Coping Construction job platform Dress technique, including following operating procedure,
1) truck crane lifts overhanging frame structures to small box girder top face, in overhanging frame structure bottom surface using 4 lifting modes Outer end applies counterweight, a reinforcing bar is inserted between the wet seam reinforcing bar of small box girder, and connect overhanging frame structure and reinforcing bar using 2 wirerope It connects, and is anchored;
2) truck crane lifting cage above mentions, and reduces upward strain speed when close to overhanging frame structure bottom, and be finely adjusted contraposition, people Overhanging frame structure and cage are bolted by work;
3) truck crane lifts bottom basket with electric block simultaneously and above mentions, and electric block is placed on the wet seam crossing of small box girder, adjusts Electric block rate is extremely consistent with truck crane upper body rate, reduces upward strain speed when close to cage bottom, is finely adjusted contraposition, people Bottom basket is bolted by work with cage, finally discharges wirerope;
4) downrod lower end is anchored on the basket of bottom, upper end is anchored at overhanging frame structure or bent cap top surface at, install overhanging frame structure top The guard rail in face hangs safety signs, using operating instruction, limit for tonnage board, examination board on operation platform.
Preferably: reinforcing bar isReinforcing bar.
Preferably: sunpender usesFining twisted steel.
The beneficial effects of the present invention are: job platform of the present invention directly acts on small box girder bridge floor, two sides road is not hindered Traffic, can be directly mobile in bridge floor by hoist engine, is not required to repeat installing and dismounting;Coping Construction job platform is settable to be hung Cage adjusts the bent cap type that pier is suitable for different height, and construction safety is reliable, easy for assemble or unload;The construction technology is also effective Saving steel reduces the investment of mechanical equipment and operating personnel, reduces engineering cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram after job platform of the present invention assembling;
Fig. 2 is the operation chart of packaging technology step 1) of the present invention;
Fig. 3 is the operation chart of packaging technology step 2) of the present invention;
Fig. 4 is the operation chart of packaging technology step 3) of the present invention.
In figure: 1- guard rail;2- overhanging frame structure;3- cage;4- sunpender;The bottom 5- basket;6- idler wheel;7- shoulder pole girder;8- ladder Road;9- clump weight;10- bent cap;11- small box girder.
Specific embodiment
Below with reference to embodiment, the invention will be further described:
The embodiment of the present invention 1
Referring to Fig. 1, job platform of the present invention includes by upper horizontal frame and lower connection framework between horizontal frame and the two At overhanging frame structure 2, ladder access 8 is set between upper horizontal frame and lower horizontal frame, and setting operation is flat in upper horizontal frame Idler wheel 6 is arranged in lower horizontal frame quadrangle in platform, and vertical cage 3 is arranged in connection below the outer end of upper horizontal frame, is being lauched Clump weight 9 is arranged in the inner end of flatrack body, and guard rail 1 is arranged in 2 upper surface of overhanging frame structure, connects bottom surface in the lower end of cage 3 For the bottom basket 5 of operating platform, the bottom of at, basket 5 is arranged operating platform, overhanging frame structure 2, cage 3, bottom basket 5 with 3 connection of cage It constitutes " Qian " character form structure toppled over, bent cap 10 and small box girder 11 to penetrate from " Qian " font open-position-side, in overhanging frame structure 2 and bottom basket Two symmetrical sunpenders 4 are connected between 5 or between 10 top surface of bent cap and bottom basket 5, sunpender 4 is located at the two sides of overhanging frame structure 2.
Referring to fig. 2, Fig. 3 and Fig. 4 is the packaging technology of job platform of the present invention,
Including following operating procedure:
1) truck crane lifts overhanging frame structures 2 to 11 top face of small box girder, at 2 bottom of overhanging frame structure using 4 lifting modes The outer end in face applies counterweight, a reinforcing bar is inserted between the wet seam reinforcing bar of small box girder 11, and use 2 wirerope by overhanging frame structure 2 It is connect with reinforcing bar, guarantees wet seam reinforcing bar uniform stressed, do not deform, and anchored;
2) truck crane lifting cage 3 above mentions, and reduces upward strain speed when close to 2 bottom of overhanging frame structure, and be finely adjusted contraposition, Manually overhanging frame structure 2 and cage 3 are bolted, guarantee that each bolt reaches tight condition;
3) truck crane lifts bottom basket 5 with electric block simultaneously and above mentions, and electric block is placed on the wet seam crossing of small box girder 11, adjusts Section electric cucurbit rate reduces upward strain speed when close to 3 bottom of cage to consistent with truck crane upper body rate, is finely adjusted pair Bottom basket 5 and cage 3, are manually bolted, guarantee that each bolt reaches tight condition by position, finally release anchoring steel wire Rope;
4) 4 anchoring lower ends of sunpender on bottom basket 5, upper end be anchored at 10 top surface of overhanging frame structure 2 or bent cap, platform group installs Cheng Hou, install 2 top surface of overhanging frame structure guard rail 1, on operation platform hang safety signs, using operating instruction, Limit for tonnage board, check and accept board, can be carried out after acceptance(check) using.
The embodiment of the present invention 2
Job platform of the present invention includes the overhanging being made of upper horizontal frame and lower connection frame between horizontal frame and the two Ladder access 8 is arranged between upper horizontal frame and lower horizontal frame, operating platform is arranged in upper horizontal frame, is being lauched for frame 2 Idler wheel 6 is arranged in flatrack body quadrangle, and vertical cage 3 is arranged in connection below the outer end of upper horizontal frame, in lower horizontal frame Clump weight 9 is arranged in inner end, and guard rail 1 is arranged in 2 upper surface of overhanging frame structure, is that operation is flat in the lower end of cage 3 connection bottom surface The bottom basket 5 of platform, the bottom of at basket 5 with 3 connection of cage be arranged operating platform, overhanging frame structure 2, cage 3, bottom basket 5 composition topples over " Qian " character form structure, bent cap 10 and small box girder 11 penetrate from " Qian " font open-position-side, connect between overhanging frame structure 2 and bottom basket 5 Connect two symmetricallyThe sunpender 4 of fining twisted steel is arranged equal with 2 width direction of overhanging frame structure on 2 bottom surface of overhanging frame structure Capable shoulder pole girder 7, sunpender 4 are connect with shoulder pole girder 7, and for 4 anchoring lower ends of sunpender on 5 crossbeam of bottom basket, upper end is anchored at shoulder pole girder 7 On.
The packaging technology of job platform of the present invention,
Including following operating procedure:
1) 25t truck crane lifts overhanging frame structures 2 to 11 top face of small box girder, in overhanging frame structure using 4 lifting modes The outer end of 2 bottom surfaces applies 1200kg counterweight, is inserted into one between the wet seam reinforcing bar of small box girder 11Reinforcing bar, and use 2 wirerope By overhanging frame structure 2 withReinforcing bar connection, guarantees wet seamReinforcing bar uniform stressed, does not deform, and is anchored;
2) 25t truck crane lifting cage 3 above mentions, and reduces upward strain speed when close to 2 bottom of overhanging frame structure, and be finely adjusted pair Overhanging frame structure 2 and cage 3, are manually bolted, guarantee that each bolt reaches tight condition by position;
3) 25t truck crane lifts bottom basket 5 with electric block simultaneously and above mentions, and electric block is placed on the wet seam of small box girder 11 Place adjusts electric block rate to consistent with truck crane upper body rate, and upward strain speed is reduced when close to 3 bottom of cage, and progress is micro- Contraposition is adjusted, manually bottom basket 5 and cage 3 are bolted, guarantee that each bolt reaches tight condition, finally release anchoring steel Cord;
4) 4 anchoring lower ends of sunpender on bottom basket 5, upper end be anchored on overhanging frame structure 2, after platform is completed, installation is outstanding The guard rail 1 for choosing 2 top surface of frame hangs safety signs, using operating instruction, limit for tonnage board, examination on operation platform Board, can be carried out after acceptance(check) using.
In the present embodiment, aforesaid operations platform is 3mm checkered steel plate.
Overhanging frame structure 2 in the present invention, cage 3, bottom basket 5 are completed the process and through project management department, total in processing factory by single processing Prison can agree to that transport to construction site is installed after doing acceptance(check).Installation is using 25t truck crane respectively by overhanging frame structure 2, cage 3, the lifting assembling of bottom basket 5, in the process using ladder truck cooperates that the artificial bolt for carrying out node connects.
Advantage of the invention are as follows:
1) walking Coping Construction job platform achieves ideal effect in practical applications, and job platform directly acts on In small box girder bridge floor, two sides road traffic is not hindered;Can be directly mobile in bridge floor by hoist engine, it is not required to repeat to install to tear open It unloads;
2) the settable cage of Coping Construction job platform adjusts the bent cap type that pier is suitable for different height, and construction safety can It leans on, it is easy for assemble or unload.
3) the also effective saving steel of the construction technology, reduce mechanical equipment and operating personnel investment, reduce engineering at This.
The present invention is exemplarily described above, it is clear that present invention specific implementation is not subject to the restrictions described above, As long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved directly apply to other fields It closes, it is within the scope of the present invention.

Claims (6)

1. a kind of walking Coping Construction job platform, it is characterised in that: including by upper horizontal frame and lower horizontal frame and two The overhanging frame structure (2) that connection frame between person is constituted, is arranged ladder access (8) between upper horizontal frame and lower horizontal frame, in Shang Shui Operating platform is set on flatrack body, idler wheel (6) are set in lower horizontal frame quadrangle, connects and sets below the outer end of upper horizontal frame Vertical cage (3) are set, clump weight (9) are set in the inner end of lower horizontal frame, protective fence is set in overhanging frame structure (2) upper surface Bar (1), cage (3) lower end connection bottom surface be operating platform bottom basket (5), the bottom of at basket (5) with cage (3) connection Operating platform is set, and overhanging frame structure (2), cage (3), bottom basket (5) constitute " Qian " character form structure toppled over, in overhanging frame structure (2) Two symmetrical sunpenders (4) are connected between bottom basket (5) or between bent cap (10) top surface and bottom basket (5).
2. walking Coping Construction job platform according to claim 1, it is characterised in that: in overhanging frame structure (2) bottom surface The upper setting shoulder pole girder (7) parallel with overhanging frame structure (2) width direction, sunpender (4) are connect with shoulder pole girder (7).
3. walking Coping Construction job platform according to claim 1, it is characterised in that: aforesaid operations platform is 3mm Checkered steel plate.
4. a kind of packaging technology of walking Coping Construction job platform according to claim 1, it is characterised in that: including Following operating procedure,
1) truck crane lifts overhanging frame structure (2) to small box girder (11) top face using 4 lifting modes, in overhanging frame structure (2) The outer end of bottom surface applies counterweight, a reinforcing bar is inserted between the wet seam reinforcing bar of small box girder (11), and will overhang frame using 2 wirerope Frame (2) is connect with reinforcing bar, and is anchored;
2) truck crane lifting cage (3) above mentions, and reduces upward strain speed when close to overhanging frame structure (2) bottom, and be finely adjusted contraposition, Manually overhanging frame structure (2) and cage (3) are bolted;
3) truck crane lifts bottom basket (5) simultaneously with electric block and above mentions, and electric block is placed on small box girder (11) wet seam crossing, adjusts Section electric cucurbit rate reduces upward strain speed when close to cage (3) bottom to consistent with truck crane upper body rate, is finely adjusted pair Bottom basket (5) and cage (3), are manually bolted, finally discharge wirerope by position;
4) sunpender (4) anchoring lower ends on bottom basket (5), upper end be anchored at overhanging frame structure (2) or bent cap (10) top surface, installation is outstanding The guard rail (1) for choosing frame (2) top surface, on operation platform hang safety signs, using operating instruction, limit for tonnage board, Check and accept board.
5. the packaging technology of walking Coping Construction job platform according to claim 4, it is characterised in that: reinforcing bar isReinforcing bar.
6. the packaging technology of walking Coping Construction job platform according to claim 4, it is characterised in that: sunpender (4) UsingFining twisted steel.
CN201810590563.9A 2018-06-09 2018-06-09 A kind of walking Coping Construction job platform and its packaging technology Pending CN109083008A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810590563.9A CN109083008A (en) 2018-06-09 2018-06-09 A kind of walking Coping Construction job platform and its packaging technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810590563.9A CN109083008A (en) 2018-06-09 2018-06-09 A kind of walking Coping Construction job platform and its packaging technology

Publications (1)

Publication Number Publication Date
CN109083008A true CN109083008A (en) 2018-12-25

Family

ID=64839862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810590563.9A Pending CN109083008A (en) 2018-06-09 2018-06-09 A kind of walking Coping Construction job platform and its packaging technology

Country Status (1)

Country Link
CN (1) CN109083008A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067201A (en) * 2019-03-15 2019-07-30 上海建工七建集团有限公司 A kind of movable type tensioning platform and its application method
CN110700104A (en) * 2019-10-17 2020-01-17 中国十七冶集团有限公司 Construction platform of suspension bridge suspender tensioning equipment and use method
CN111827124A (en) * 2020-07-29 2020-10-27 中铁二局集团有限公司 T-beam transverse prestress tensioning auxiliary device, mounting method and using method
CN112030749A (en) * 2020-07-15 2020-12-04 中交第一航务工程局有限公司 Construction method of walking type bent cap operation platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009235687A (en) * 2008-03-26 2009-10-15 Ps Mitsubishi Construction Co Ltd Form supporting device for constructing pc (prestressed concrete) bridge overhang
CN101672018A (en) * 2009-08-27 2010-03-17 孙广喜 Trackless hanging bracket with traveling truss
CN206328678U (en) * 2016-12-21 2017-07-14 中建三局安装工程有限公司 Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform
CN208563122U (en) * 2018-06-09 2019-03-01 中交一航局第一工程有限公司 A kind of " walking " Coping Construction job platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009235687A (en) * 2008-03-26 2009-10-15 Ps Mitsubishi Construction Co Ltd Form supporting device for constructing pc (prestressed concrete) bridge overhang
CN101672018A (en) * 2009-08-27 2010-03-17 孙广喜 Trackless hanging bracket with traveling truss
CN206328678U (en) * 2016-12-21 2017-07-14 中建三局安装工程有限公司 Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform
CN208563122U (en) * 2018-06-09 2019-03-01 中交一航局第一工程有限公司 A kind of " walking " Coping Construction job platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067201A (en) * 2019-03-15 2019-07-30 上海建工七建集团有限公司 A kind of movable type tensioning platform and its application method
CN110700104A (en) * 2019-10-17 2020-01-17 中国十七冶集团有限公司 Construction platform of suspension bridge suspender tensioning equipment and use method
CN110700104B (en) * 2019-10-17 2021-02-26 中国十七冶集团有限公司 Construction platform of suspension bridge suspender tensioning equipment and use method
CN112030749A (en) * 2020-07-15 2020-12-04 中交第一航务工程局有限公司 Construction method of walking type bent cap operation platform
CN111827124A (en) * 2020-07-29 2020-10-27 中铁二局集团有限公司 T-beam transverse prestress tensioning auxiliary device, mounting method and using method

Similar Documents

Publication Publication Date Title
CN109083008A (en) A kind of walking Coping Construction job platform and its packaging technology
CN101672102B (en) Steel structural overhead ceiling construction platform
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN106759845B (en) A kind of construction method of Steel corridor
CN106012852B (en) Support integrally falls frame construction method
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN104989111B (en) Steel construction high level construction method for hanging
CN109881590A (en) Bridge steel box girder high altitude operation operating platform and building method
CN208563122U (en) A kind of " walking " Coping Construction job platform
CN205934735U (en) A operation platform for stretch -draw of cantilever bent cap
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN207749417U (en) A kind of concrete king-post internal model stiff skeleton
CN219280494U (en) Tower beam temporary consolidation supporting structure for bridge tower stability control
CN212404859U (en) Auxiliary device for falling of bottom die of bent cap
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN213653209U (en) Integrated construction movable platform for bridge flange plate
CN209260561U (en) A kind of integration Bridge Erector
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN110359756A (en) 750kV booster stations framework installation method
CN110886225A (en) Construction method of cable tower stay cable installation system
CN215801070U (en) Open bridge hoist and mount track platform
CN215164722U (en) A construction platform for steel landing stage superstructure installation
CN217537795U (en) Steel structure air welding operation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: An Xiushan

Inventor after: Ren Zhihui

Inventor after: Wang Yu

Inventor after: Zhong Zhijian

Inventor after: Sun Zuohua

Inventor after: Gao Zhilou

Inventor before: An Xiushan

Inventor before: Ren Zhihui

Inventor before: Wang Yu

Inventor before: Zhong Zhijian

Inventor before: Sun Zuohua

Inventor before: Gao Zhilou

SE01 Entry into force of request for substantive examination