CN109505412A - Large girder is vertical to spell anti-dumping coating method - Google Patents
Large girder is vertical to spell anti-dumping coating method Download PDFInfo
- Publication number
- CN109505412A CN109505412A CN201811451929.0A CN201811451929A CN109505412A CN 109505412 A CN109505412 A CN 109505412A CN 201811451929 A CN201811451929 A CN 201811451929A CN 109505412 A CN109505412 A CN 109505412A
- Authority
- CN
- China
- Prior art keywords
- large girder
- flexible support
- vertical
- girder
- linking beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
- E04G21/145—Means in or on the elements for connecting same to handling apparatus specific for hollow plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/26—Strutting means for wall parts; Supports or the like, e.g. for holding in position prefabricated walls
Abstract
The present invention relates to Steel Structure Installation field, specifically a kind of large girder is vertical to spell anti-dumping coating method;It is characterized in that: including preparing bracket;The vertical end two for spelling large girder, intermediate two positions as installation flexible support are chosen, flexible support is installed, turnbuckle is tensioned;The linking beam and flexible support for installing the large girder of end two make the large girder of end two form a stable structural system;With the vertical increase for spelling large girder quantity, linking beam and local flexible support are successively installed, making entire more large girders side by side is always a stable structural system;When hanging large girder, linking beam and flexible support are removed one by one, so that entire large girder system is always stable structural system before hanging last two large girders.Bracket in this anti-dumping coating method is the standard component in factory process, be may be reused, and waste of material is avoided;Meanwhile large girder is connected by this method, overturn-preventing effect is good.
Description
Technical field
The present invention relates to Steel Structure Installation field, specifically a kind of large girder is vertical to spell anti-dumping coating method.
Background technique
In recent years, with the development of national economy and construction industry, height is larger, the biggish real abdomen large girder of span is in industry
Build in (especially power plant, steel mill, boiler factory etc.) and civil buildings (large span spatial structure) using more and more, large girder
Segmental machining is generally carried out by factory, then is installed to the mode that construction site carries out integral assembling lifting, large girder is segmented
Stood during spelling at the construction field (site), due to highly higher, there is a very big risk of toppling, especially at the construction field (site) working space by
When limit, it is likely that can have more large girders close to the case where vertical spelling, this just more exacerbates the analysis continuously toppled, mesh
The preceding measure generally taken mainly is welded fashioned iron between large girder and is reinforced, and the deficiency of this reinforcing mode is can be to finished product
Steel member forms local failure, influences component presentation quality even safe mass, while the structural stability after its fixation
It is insufficient.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, providing one kind can also protect while not having an impact to steel member
Hold the stable anti-dumping coating method of ruggedized construction.
In order to achieve the above object, the present invention is implemented as follows:
A kind of vertical spelling anti-dumping coating method of large girder, including
Step 1 prepares bracket: the bracket includes linking beam, fastener, turnbuckle, flexible support and bolt;
Step 2 completes linking beam in factory process according to the vertical flange dimensions for spelling large girder in scene, and linking beam uses H profile steel, work
Word steel and fastener, turnbuckle and plain bolt purchase finished parts, and flexible support is completed by live reinforcement fabrication;
Step 3 chooses the vertical end two for spelling large girder, intermediate two positions as installation flexible support, installs flexible branch
Support is tensioned turnbuckle;
Step 4, the linking beam and flexible support for installing the large girder of end two, make two large girders in end formed one it is stable
Structural system;
Step 5, with the vertical increase for spelling large girder quantity, linking beam and local flexible support are successively installed, make it is entire side by side
More large girders are always a stable structural system;
Step 6, when hanging large girder, remove linking beam and flexible support one by one, thus before hanging last two large girders,
Entire large girder system is always stable structural system.
The kind large girder is vertical to spell anti-dumping coating method, and the specific structure of bracket is: two linking beams are arranged in parallel and lead to
It crosses fastener and the upper lower flange of large girder is connect with two linking beams and passes through live reinforcing bar and two linking beams are intersected
It tenses.
Bracket in this anti-dumping coating method is the standard component in factory process, be may be reused, and waste of material is avoided;Together
When, large girder is connected by this method, and overturn-preventing effect is good, can be formed always in vertical spell of large girder with during hanging one by one
Stable structural system;Further, the bracket in this anti-dumping coating method, it is adaptable, can according to vertical spelling large girder height,
Quantity is adjusted;To not will cause damage to steel member;And remove, install it is also all very convenient quick.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of bracket in this method.
Fig. 2 is the structural schematic diagram after formation system in this method.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, the vertical spelling anti-dumping coating method of a kind of large girder, including
Step 1 prepares bracket: the bracket includes linking beam 1, fastener 2, turnbuckle, flexible support 3 and bolt;
Step 2 completes linking beam 1 in factory process according to the vertical flange dimensions for spelling large girder 4 in scene, and linking beam 1 uses H-type
Steel, I-steel and fastener, turnbuckle and plain bolt purchase finished parts, and flexible support 3 is completed by live reinforcement fabrication;
Step 3 chooses the vertical end two for spelling large girder 4, intermediate two positions as installation flexible support 3, and installation is flexible
Support 3 is tensioned turnbuckle;
Step 4, the linking beam 1 and flexible support 3 for installing two large girders 4 in end make the large girder 4 of end two form one surely
Fixed structural system;
Step 5, with the vertical increase for spelling large girder quantity, linking beam and local flexible support are successively installed, make it is entire side by side
More large girders are always a stable structural system;
Step 6, when hanging large girder, remove linking beam and flexible support one by one, thus before hanging last two large girders,
Entire large girder system is always stable structural system.
The kind large girder is vertical to spell anti-dumping coating method, and the specific structure of bracket is: two linking beams are arranged in parallel and lead to
It crosses fastener and the upper lower flange of large girder is connect with two linking beams and passes through live reinforcing bar and two linking beams are intersected
It tenses.
Bracket in this anti-dumping coating method is the standard component in factory process, be may be reused, and waste of material is avoided;Together
When, large girder is connected by this method, and overturn-preventing effect is good, can be formed always in vertical spell of large girder with during hanging one by one
Stable structural system;Further, the bracket in this anti-dumping coating method, it is adaptable, can according to vertical spelling large girder height,
Quantity is adjusted;To not will cause damage to steel member;And remove, install it is also all very convenient quick.
Claims (2)
1. a kind of large girder is vertical to spell anti-dumping coating method, it is characterized in that: including
Step 1 prepares bracket: the bracket includes linking beam, fastener, turnbuckle, flexible support and bolt;
Step 2 completes linking beam in factory process according to the vertical flange dimensions for spelling large girder in scene, and linking beam uses H profile steel, work
Word steel and fastener, turnbuckle and plain bolt purchase finished parts, and flexible support is completed by live reinforcement fabrication;
Step 3 chooses the vertical end two for spelling large girder, intermediate two positions as installation flexible support, installs flexible branch
Support is tensioned turnbuckle;
Step 4, the linking beam and flexible support for installing the large girder of end two, make two large girders in end formed one it is stable
Structural system;
Step 5, with the vertical increase for spelling large girder quantity, linking beam and local flexible support are successively installed, make it is entire side by side
More large girders are always a stable structural system;
Step 6, when hanging large girder, remove linking beam and flexible support one by one, thus before hanging last two large girders,
Entire large girder system is always stable structural system.
2. according to claim a kind of large girder is vertical to spell anti-dumping coating method, it is characterized in that: the specific structure of bracket is: two
Root linking beam is arranged in parallel and passes through the reinforcing bar that the upper lower flange of large girder connect with two linking beams and passes through scene by fastener
Intersection tension is carried out to two linking beams.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811451929.0A CN109505412B (en) | 2018-11-30 | 2018-11-30 | Vertical splicing and overturn preventing method for large plate girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811451929.0A CN109505412B (en) | 2018-11-30 | 2018-11-30 | Vertical splicing and overturn preventing method for large plate girder |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109505412A true CN109505412A (en) | 2019-03-22 |
CN109505412B CN109505412B (en) | 2021-03-26 |
Family
ID=65749777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811451929.0A Active CN109505412B (en) | 2018-11-30 | 2018-11-30 | Vertical splicing and overturn preventing method for large plate girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109505412B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112894743A (en) * | 2021-01-15 | 2021-06-04 | 山东大学 | Concrete precast T roof beam antidumping device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2057234C1 (en) * | 1994-05-27 | 1996-03-27 | НПП "Энергоперспектива" | Suspended trestle and method for installing wall enclosure |
CN103225411A (en) * | 2013-05-08 | 2013-07-31 | 中铁十局集团西北工程有限公司 | Existing line protective shed |
CN104846734A (en) * | 2015-06-02 | 2015-08-19 | 中建四局第六建筑工程有限公司 | Unit-assembly type steel trestle |
CN105926855A (en) * | 2016-06-30 | 2016-09-07 | 浙江东南网架股份有限公司 | Super-high-rise core tube suspended steel rib column and construction method thereof |
CN205954904U (en) * | 2016-08-10 | 2017-02-15 | 中国建筑第八工程局有限公司 | Board house prevent overtum equipment |
CN207061642U (en) * | 2017-06-18 | 2018-03-02 | 中国能源建设集团东北电力第一工程有限公司 | A kind of boiler girder lifts interim lengthening beam |
CN207160539U (en) * | 2017-09-08 | 2018-03-30 | 中核华泰建设有限公司 | A kind of easy-to-dismount overhanging scaffold of high-mechanic |
-
2018
- 2018-11-30 CN CN201811451929.0A patent/CN109505412B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2057234C1 (en) * | 1994-05-27 | 1996-03-27 | НПП "Энергоперспектива" | Suspended trestle and method for installing wall enclosure |
CN103225411A (en) * | 2013-05-08 | 2013-07-31 | 中铁十局集团西北工程有限公司 | Existing line protective shed |
CN104846734A (en) * | 2015-06-02 | 2015-08-19 | 中建四局第六建筑工程有限公司 | Unit-assembly type steel trestle |
CN105926855A (en) * | 2016-06-30 | 2016-09-07 | 浙江东南网架股份有限公司 | Super-high-rise core tube suspended steel rib column and construction method thereof |
CN205954904U (en) * | 2016-08-10 | 2017-02-15 | 中国建筑第八工程局有限公司 | Board house prevent overtum equipment |
CN207061642U (en) * | 2017-06-18 | 2018-03-02 | 中国能源建设集团东北电力第一工程有限公司 | A kind of boiler girder lifts interim lengthening beam |
CN207160539U (en) * | 2017-09-08 | 2018-03-30 | 中核华泰建设有限公司 | A kind of easy-to-dismount overhanging scaffold of high-mechanic |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112894743A (en) * | 2021-01-15 | 2021-06-04 | 山东大学 | Concrete precast T roof beam antidumping device |
CN112894743B (en) * | 2021-01-15 | 2022-07-12 | 山东大学 | Concrete prefabricated T roof beam antidumping device |
Also Published As
Publication number | Publication date |
---|---|
CN109505412B (en) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103806660B (en) | Structural Steel Reinforced Concrete beam-column joint construction method | |
CN102535642B (en) | Assembling type node of spatial freeform curved latticed shell steel structure and assembling method of assembling type node | |
CN101100902A (en) | Inclined drawing steel truss high-supported formwork structure system and construction method thereof | |
CN103352428A (en) | Suspension bridge cable bent tower beam non-support construction method | |
CN113982280A (en) | Construction method of complex space truss integral hoisting system | |
CN115467421B (en) | Hoisting construction method for complex large-span steel roof | |
CN208965714U (en) | A kind of prefabricated piping lane main frame structure of assembly concrete | |
CN106284838B (en) | A kind of lattice honeycomb girder segment and large span lattice girder steel and its fabrication and installation method | |
CN108842954A (en) | A kind of huge different section Honeycomb Beam structural system construction method of installation of aerofoil profile roofing | |
CN109505412A (en) | Large girder is vertical to spell anti-dumping coating method | |
CN207714108U (en) | A kind of support system of the more arcading arched aqueducts of large span or bridge | |
CN111519544A (en) | Bridge flange plate construction formwork support system | |
CN208249704U (en) | A kind of townhouse carrying pole type hoisting frame being mounted laterally based on concrete isolated beam | |
CN103993739A (en) | Method for constructing stiff beam of spraying layer of prilling tower | |
CN106049286A (en) | Integral lifting and installation construction method for prefabricated temporary steel pipe brackets | |
CN102913007B (en) | Steel reinforcement processing shed and construction method therefor | |
CN109252526A (en) | Assembled support construction technique based on prestressing force fish belly sill support technology | |
CN107355003B (en) | Modular construction method of large-span ultra-wide overweight truss | |
Tarasenko et al. | Justification of a method for complete lifting of a tank to repair its base and foundation | |
CN214143343U (en) | Detachable guide beam device capable of ensuring pushing in limited space | |
CN104196153A (en) | Thick L-shaped steel plate shear wall column and manufacturing method thereof | |
CN103591597B (en) | A kind of temporary chimney of detachable recycling | |
CN103132462A (en) | Combination tool for controlling down-warping of components and installation and usage method of combination tool | |
CN207376809U (en) | Temporary reinforcing device is installed without support in a kind of large overhanging steel structure high-altitude | |
CN220431975U (en) | Super-high adhesion structure of construction elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |