CN109505412A - Large girder is vertical to spell anti-dumping coating method - Google Patents

Large girder is vertical to spell anti-dumping coating method Download PDF

Info

Publication number
CN109505412A
CN109505412A CN201811451929.0A CN201811451929A CN109505412A CN 109505412 A CN109505412 A CN 109505412A CN 201811451929 A CN201811451929 A CN 201811451929A CN 109505412 A CN109505412 A CN 109505412A
Authority
CN
China
Prior art keywords
large girder
flexible support
vertical
girder
linking beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811451929.0A
Other languages
Chinese (zh)
Other versions
CN109505412B (en
Inventor
黄伟
焦建东
刘豪
白海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201811451929.0A priority Critical patent/CN109505412B/en
Publication of CN109505412A publication Critical patent/CN109505412A/en
Application granted granted Critical
Publication of CN109505412B publication Critical patent/CN109505412B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • E04G21/145Means in or on the elements for connecting same to handling apparatus specific for hollow plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/26Strutting means for wall parts; Supports or the like, e.g. for holding in position prefabricated walls

Abstract

The present invention relates to Steel Structure Installation field, specifically a kind of large girder is vertical to spell anti-dumping coating method;It is characterized in that: including preparing bracket;The vertical end two for spelling large girder, intermediate two positions as installation flexible support are chosen, flexible support is installed, turnbuckle is tensioned;The linking beam and flexible support for installing the large girder of end two make the large girder of end two form a stable structural system;With the vertical increase for spelling large girder quantity, linking beam and local flexible support are successively installed, making entire more large girders side by side is always a stable structural system;When hanging large girder, linking beam and flexible support are removed one by one, so that entire large girder system is always stable structural system before hanging last two large girders.Bracket in this anti-dumping coating method is the standard component in factory process, be may be reused, and waste of material is avoided;Meanwhile large girder is connected by this method, overturn-preventing effect is good.

Description

Large girder is vertical to spell anti-dumping coating method
Technical field
The present invention relates to Steel Structure Installation field, specifically a kind of large girder is vertical to spell anti-dumping coating method.
Background technique
In recent years, with the development of national economy and construction industry, height is larger, the biggish real abdomen large girder of span is in industry Build in (especially power plant, steel mill, boiler factory etc.) and civil buildings (large span spatial structure) using more and more, large girder Segmental machining is generally carried out by factory, then is installed to the mode that construction site carries out integral assembling lifting, large girder is segmented Stood during spelling at the construction field (site), due to highly higher, there is a very big risk of toppling, especially at the construction field (site) working space by When limit, it is likely that can have more large girders close to the case where vertical spelling, this just more exacerbates the analysis continuously toppled, mesh The preceding measure generally taken mainly is welded fashioned iron between large girder and is reinforced, and the deficiency of this reinforcing mode is can be to finished product Steel member forms local failure, influences component presentation quality even safe mass, while the structural stability after its fixation It is insufficient.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, providing one kind can also protect while not having an impact to steel member Hold the stable anti-dumping coating method of ruggedized construction.
In order to achieve the above object, the present invention is implemented as follows:
A kind of vertical spelling anti-dumping coating method of large girder, including
Step 1 prepares bracket: the bracket includes linking beam, fastener, turnbuckle, flexible support and bolt;
Step 2 completes linking beam in factory process according to the vertical flange dimensions for spelling large girder in scene, and linking beam uses H profile steel, work Word steel and fastener, turnbuckle and plain bolt purchase finished parts, and flexible support is completed by live reinforcement fabrication;
Step 3 chooses the vertical end two for spelling large girder, intermediate two positions as installation flexible support, installs flexible branch Support is tensioned turnbuckle;
Step 4, the linking beam and flexible support for installing the large girder of end two, make two large girders in end formed one it is stable Structural system;
Step 5, with the vertical increase for spelling large girder quantity, linking beam and local flexible support are successively installed, make it is entire side by side More large girders are always a stable structural system;
Step 6, when hanging large girder, remove linking beam and flexible support one by one, thus before hanging last two large girders, Entire large girder system is always stable structural system.
The kind large girder is vertical to spell anti-dumping coating method, and the specific structure of bracket is: two linking beams are arranged in parallel and lead to It crosses fastener and the upper lower flange of large girder is connect with two linking beams and passes through live reinforcing bar and two linking beams are intersected It tenses.
Bracket in this anti-dumping coating method is the standard component in factory process, be may be reused, and waste of material is avoided;Together When, large girder is connected by this method, and overturn-preventing effect is good, can be formed always in vertical spell of large girder with during hanging one by one Stable structural system;Further, the bracket in this anti-dumping coating method, it is adaptable, can according to vertical spelling large girder height, Quantity is adjusted;To not will cause damage to steel member;And remove, install it is also all very convenient quick.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of bracket in this method.
Fig. 2 is the structural schematic diagram after formation system in this method.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, the vertical spelling anti-dumping coating method of a kind of large girder, including
Step 1 prepares bracket: the bracket includes linking beam 1, fastener 2, turnbuckle, flexible support 3 and bolt;
Step 2 completes linking beam 1 in factory process according to the vertical flange dimensions for spelling large girder 4 in scene, and linking beam 1 uses H-type Steel, I-steel and fastener, turnbuckle and plain bolt purchase finished parts, and flexible support 3 is completed by live reinforcement fabrication;
Step 3 chooses the vertical end two for spelling large girder 4, intermediate two positions as installation flexible support 3, and installation is flexible Support 3 is tensioned turnbuckle;
Step 4, the linking beam 1 and flexible support 3 for installing two large girders 4 in end make the large girder 4 of end two form one surely Fixed structural system;
Step 5, with the vertical increase for spelling large girder quantity, linking beam and local flexible support are successively installed, make it is entire side by side More large girders are always a stable structural system;
Step 6, when hanging large girder, remove linking beam and flexible support one by one, thus before hanging last two large girders, Entire large girder system is always stable structural system.
The kind large girder is vertical to spell anti-dumping coating method, and the specific structure of bracket is: two linking beams are arranged in parallel and lead to It crosses fastener and the upper lower flange of large girder is connect with two linking beams and passes through live reinforcing bar and two linking beams are intersected It tenses.
Bracket in this anti-dumping coating method is the standard component in factory process, be may be reused, and waste of material is avoided;Together When, large girder is connected by this method, and overturn-preventing effect is good, can be formed always in vertical spell of large girder with during hanging one by one Stable structural system;Further, the bracket in this anti-dumping coating method, it is adaptable, can according to vertical spelling large girder height, Quantity is adjusted;To not will cause damage to steel member;And remove, install it is also all very convenient quick.

Claims (2)

1. a kind of large girder is vertical to spell anti-dumping coating method, it is characterized in that: including
Step 1 prepares bracket: the bracket includes linking beam, fastener, turnbuckle, flexible support and bolt;
Step 2 completes linking beam in factory process according to the vertical flange dimensions for spelling large girder in scene, and linking beam uses H profile steel, work Word steel and fastener, turnbuckle and plain bolt purchase finished parts, and flexible support is completed by live reinforcement fabrication;
Step 3 chooses the vertical end two for spelling large girder, intermediate two positions as installation flexible support, installs flexible branch Support is tensioned turnbuckle;
Step 4, the linking beam and flexible support for installing the large girder of end two, make two large girders in end formed one it is stable Structural system;
Step 5, with the vertical increase for spelling large girder quantity, linking beam and local flexible support are successively installed, make it is entire side by side More large girders are always a stable structural system;
Step 6, when hanging large girder, remove linking beam and flexible support one by one, thus before hanging last two large girders, Entire large girder system is always stable structural system.
2. according to claim a kind of large girder is vertical to spell anti-dumping coating method, it is characterized in that: the specific structure of bracket is: two Root linking beam is arranged in parallel and passes through the reinforcing bar that the upper lower flange of large girder connect with two linking beams and passes through scene by fastener Intersection tension is carried out to two linking beams.
CN201811451929.0A 2018-11-30 2018-11-30 Vertical splicing and overturn preventing method for large plate girder Active CN109505412B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811451929.0A CN109505412B (en) 2018-11-30 2018-11-30 Vertical splicing and overturn preventing method for large plate girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811451929.0A CN109505412B (en) 2018-11-30 2018-11-30 Vertical splicing and overturn preventing method for large plate girder

Publications (2)

Publication Number Publication Date
CN109505412A true CN109505412A (en) 2019-03-22
CN109505412B CN109505412B (en) 2021-03-26

Family

ID=65749777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811451929.0A Active CN109505412B (en) 2018-11-30 2018-11-30 Vertical splicing and overturn preventing method for large plate girder

Country Status (1)

Country Link
CN (1) CN109505412B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112894743A (en) * 2021-01-15 2021-06-04 山东大学 Concrete precast T roof beam antidumping device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2057234C1 (en) * 1994-05-27 1996-03-27 НПП "Энергоперспектива" Suspended trestle and method for installing wall enclosure
CN103225411A (en) * 2013-05-08 2013-07-31 中铁十局集团西北工程有限公司 Existing line protective shed
CN104846734A (en) * 2015-06-02 2015-08-19 中建四局第六建筑工程有限公司 Unit-assembly type steel trestle
CN105926855A (en) * 2016-06-30 2016-09-07 浙江东南网架股份有限公司 Super-high-rise core tube suspended steel rib column and construction method thereof
CN205954904U (en) * 2016-08-10 2017-02-15 中国建筑第八工程局有限公司 Board house prevent overtum equipment
CN207061642U (en) * 2017-06-18 2018-03-02 中国能源建设集团东北电力第一工程有限公司 A kind of boiler girder lifts interim lengthening beam
CN207160539U (en) * 2017-09-08 2018-03-30 中核华泰建设有限公司 A kind of easy-to-dismount overhanging scaffold of high-mechanic

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2057234C1 (en) * 1994-05-27 1996-03-27 НПП "Энергоперспектива" Suspended trestle and method for installing wall enclosure
CN103225411A (en) * 2013-05-08 2013-07-31 中铁十局集团西北工程有限公司 Existing line protective shed
CN104846734A (en) * 2015-06-02 2015-08-19 中建四局第六建筑工程有限公司 Unit-assembly type steel trestle
CN105926855A (en) * 2016-06-30 2016-09-07 浙江东南网架股份有限公司 Super-high-rise core tube suspended steel rib column and construction method thereof
CN205954904U (en) * 2016-08-10 2017-02-15 中国建筑第八工程局有限公司 Board house prevent overtum equipment
CN207061642U (en) * 2017-06-18 2018-03-02 中国能源建设集团东北电力第一工程有限公司 A kind of boiler girder lifts interim lengthening beam
CN207160539U (en) * 2017-09-08 2018-03-30 中核华泰建设有限公司 A kind of easy-to-dismount overhanging scaffold of high-mechanic

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112894743A (en) * 2021-01-15 2021-06-04 山东大学 Concrete precast T roof beam antidumping device
CN112894743B (en) * 2021-01-15 2022-07-12 山东大学 Concrete prefabricated T roof beam antidumping device

Also Published As

Publication number Publication date
CN109505412B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN103806660B (en) Structural Steel Reinforced Concrete beam-column joint construction method
CN102535642B (en) Assembling type node of spatial freeform curved latticed shell steel structure and assembling method of assembling type node
CN101100902A (en) Inclined drawing steel truss high-supported formwork structure system and construction method thereof
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN113982280A (en) Construction method of complex space truss integral hoisting system
CN115467421B (en) Hoisting construction method for complex large-span steel roof
CN208965714U (en) A kind of prefabricated piping lane main frame structure of assembly concrete
CN106284838B (en) A kind of lattice honeycomb girder segment and large span lattice girder steel and its fabrication and installation method
CN108842954A (en) A kind of huge different section Honeycomb Beam structural system construction method of installation of aerofoil profile roofing
CN109505412A (en) Large girder is vertical to spell anti-dumping coating method
CN207714108U (en) A kind of support system of the more arcading arched aqueducts of large span or bridge
CN111519544A (en) Bridge flange plate construction formwork support system
CN208249704U (en) A kind of townhouse carrying pole type hoisting frame being mounted laterally based on concrete isolated beam
CN103993739A (en) Method for constructing stiff beam of spraying layer of prilling tower
CN106049286A (en) Integral lifting and installation construction method for prefabricated temporary steel pipe brackets
CN102913007B (en) Steel reinforcement processing shed and construction method therefor
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology
CN107355003B (en) Modular construction method of large-span ultra-wide overweight truss
Tarasenko et al. Justification of a method for complete lifting of a tank to repair its base and foundation
CN214143343U (en) Detachable guide beam device capable of ensuring pushing in limited space
CN104196153A (en) Thick L-shaped steel plate shear wall column and manufacturing method thereof
CN103591597B (en) A kind of temporary chimney of detachable recycling
CN103132462A (en) Combination tool for controlling down-warping of components and installation and usage method of combination tool
CN207376809U (en) Temporary reinforcing device is installed without support in a kind of large overhanging steel structure high-altitude
CN220431975U (en) Super-high adhesion structure of construction elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant