CN207047931U - A kind of hydraulic engineering desilting dredger - Google Patents

A kind of hydraulic engineering desilting dredger Download PDF

Info

Publication number
CN207047931U
CN207047931U CN201720992230.XU CN201720992230U CN207047931U CN 207047931 U CN207047931 U CN 207047931U CN 201720992230 U CN201720992230 U CN 201720992230U CN 207047931 U CN207047931 U CN 207047931U
Authority
CN
China
Prior art keywords
fixedly connected
water proof
mud
water
cabin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720992230.XU
Other languages
Chinese (zh)
Inventor
曹荣第
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720992230.XU priority Critical patent/CN207047931U/en
Application granted granted Critical
Publication of CN207047931U publication Critical patent/CN207047931U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a kind of hydraulic engineering desilting dredger, including cabin, the bottom of the cabin at the top of SDC with being fixedly connected, the SDC front is fixedly connected with the side of water proof case, motor is socketed with the water proof case, the top of the motor at the top of water proof chamber interior wall with being fixedly connected, and the bottom of the motor is fixedly connected by water-stop sheet with the bottom of water proof chamber interior wall, and the output end of the motor is fixedly connected with one end of expansion link.The utility model effectively can be played a protective role by the use to water proof case and water-stop sheet to the motor in water proof case; pass through the use to telescopic rod; rotating disk and puddler is enabled to more to be deep into river bed; enable a device to the river course suitable for the different depths; by the use to sludge pump and mud pipe, the mud of agitation can be pumped into dispatch tube, the use of deflector and screen pack; the mud drawn up can be separated with water, so as to reach the purpose of desilting.

Description

A kind of hydraulic engineering desilting dredger
Technical field
Channel cleanout technical field is the utility model is related to, specially a kind of hydraulic engineering desilting dredger.
Background technology
Silt cleaning device clears up a kind of equipment of dredging primarily directed to the river course blocked by mud, and it will can be blocked River course in mud excavated and cleared up, the accumulation of mud to a certain extent when river course flood discharge reduce, so as to ensure River course it is unobstructed, ensure that the safety of the resident on river course both sides.
Over time, substantial amounts of mud can be deposited in river course, while have impact on water delivery, accelerates the evil of water quality Change, surrounding environment is had an impact, on river course, still clears up mud by the way of artificial spade, artificial work, work is by force Spend greatly, operating efficiency is low, and the current machinery that uses is worked, first, being taken away after mud is broken up by current, second, mud is dug Go out as on carrier, the former can aggravate the dirty digestion burden in river course, and the latter increases with the amount of digging out of mud, aggravates carrier Weight, influence the speed of construction in later period.
Utility model content
(One)The technical problem of solution
In view of the shortcomings of the prior art, the utility model provides a kind of hydraulic engineering desilting dredger, solves biography System excavate in can not more effectively by mud clean out with excavation speed it is slow the problem of.
(Two)Technical scheme
To achieve the above object, the utility model provides following technical scheme:A kind of hydraulic engineering desilting dredger, bag Cabin is included, with being fixedly connected at the top of SDC, the SDC front and the side of water proof case are fixed for the bottom of the cabin Connect, be socketed with motor in the water proof case, the top of the motor at the top of water proof chamber interior wall with being fixedly connected, the motor Bottom be fixedly connected by water-stop sheet with the bottom of water proof chamber interior wall, the output end of the motor and one end of expansion link are fixed Connection, the other end of the expansion link sequentially pass through the bottom of water-stop sheet and water proof chamber interior wall and extend to water proof case from top to bottom Lower section with being fixedly connected at the top of rotating disk, the top of the rotating disk is fixedly connected with the bottom of connecting rod, the connecting rod Side surface is fixedly connected with puddler, and the inner chamber of the cabin is socketed with mud container, the top of the cabin and support plate Bottom is fixedly connected, and sludge pump, the side of the sludge pump and the side surface of mud pipe are fixedly connected with the top of the support plate It is fixedly connected, the bottom of the mud pipe sequentially passes through the bottom of mud inner wall of container and the bottom of SDC inwall from top to bottom Portion and the lower section for extending to SDC, water proof circle, the top of the water proof circle and the bottom of SDC are socketed with the mud pipe Portion is fixedly connected, and the top of the mud pipe is fixedly connected with one end of dispatch tube, side and deflector at the top of the cabin The side of bottom is fixedly connected, and is socketed with screen pack in what the bottom of the deflector inwall opened up eat dishes without rice or wine, the deflector Side is overlapped on the side of mud container top, the bottom fixation company for passing on left support bar and deflector of the cabin Connect.
Preferably, the mud container lot is in the middle part of cabin inner chamber, and the bottom of sludge pump is located at the top of support plate Middle part.
Preferably, the side of the water proof case is located at the positive middle part of SDC, and the area and SDC of cabin bottom The area equation at top.
Preferably, the bottom of the motor is located at the middle part at the top of water-stop sheet, and the bottom of water-stop sheet is located in water proof case The middle part of wall bottom.
Preferably, the bottom of the expansion link is located at the middle part at the top of rotating disk, and the top of connecting rod is located at the top of rotating disk Middle part.
Preferably, the quantity of the puddler is three, and the equidistant side for being fixedly connected on connecting rod of three puddlers Surface.
(Three)Beneficial effect
The utility model provides a kind of hydraulic engineering desilting dredger.Possesses following beneficial effect:
(1), the utility model by the use to water proof case and water-stop sheet can effectively to the motor in water proof case rise To protective effect, by the use to telescopic rod, rotating disk and puddler is enabled to more to be deep into river bed so that equipment can Suitable for the river course of the different depths, puddler can be stirred the mud in river course.
(2), the utility model by the use to sludge pump and mud pipe, the mud of agitation can be pumped into dispatch tube In, the use of deflector and screen pack, the mud drawn up can be separated with water, so as to reach the purpose of desilting, be become silted up Mud container can be stored the mud of suction, so as to reach the purpose of convenience unloading.
Brief description of the drawings
Fig. 1 is the utility model structure front section view;
Fig. 2 is the utility model structure top view.
In figure:1 cabin, 2 SDCs, 3 water proof casees, 4 motors, 5 water-stop sheets, 6 expansion links, 7 rotating disks, 8 connecting rods, 9 stirrings Bar, 10 support bars, 11 deflectors, 12 screen packs, 13 dispatch tubes, 14 sludge pumps, 15 support plates, 16 mud containers, 17 mud pipes, 18 water proof circles.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in Figure 1-2, the utility model provides a kind of technical scheme:A kind of hydraulic engineering desilting dredger, including Cabin 1, the bottom of cabin 1 are fixedly connected with the top of SDC 2, and the area of the bottom of cabin 1 and the area at the top of SDC 2 Equal, the front of SDC 2 is fixedly connected with the side of water proof case 3, and the side of water proof case 3 is located at 2 positive middle part of SDC, every Motor 4 is socketed with water tank 3, with being fixedly connected at the top of the inwall of water proof case 3, the bottom of motor 4 passes through water proof at the top of motor 4 Plate 5 is fixedly connected with the bottom of the inwall of water proof case 3, and the bottom of motor 4 is located at the middle part at the top of water-stop sheet 5, and the bottom of water-stop sheet 5 Portion is located at the middle part of the inwall bottom of water proof case 3, by the way that the bottom of motor 4 to be located to the middle part at the top of water-stop sheet 5, and water-stop sheet 5 Bottom be located at the middle part of the inwall bottom of water proof case 3 so that water-stop sheet 5 can effectively carry out water proof, place water and enter water proof In case 3, so as to ensure that the safety of motor 4, the bottom of motor 4 is located to the middle part of water-stop sheet 5, and in water proof case 3 The surface of wall bottom, ensure the operation that motor 4 can be stablized in water proof case 3 of knowing clearly, so as to ensure that desilting work can It is effective to carry out, protection can effectively be played to the motor 4 in water proof case 3 by the use to water proof case 3 and water-stop sheet 5 and made With the output end of motor 4 is fixedly connected with one end of expansion link 6, and the other end of expansion link 6 sequentially passes through water-stop sheet from top to bottom 5 and the inwall of water proof case 3 bottom and extend to the lower section of water proof case 3 and be fixedly connected with the top of rotating disk 7, the top of rotating disk 7 with The bottom of connecting rod 8 is fixedly connected, and the bottom of expansion link 6 is located at the middle part at the top of rotating disk 7, and the top of connecting rod 8 is positioned at turning The middle part at the top of disk 7, by using rotating disk 7, it is therefore an objective to which the mud for stirring puddler 9 is broken up again so that mud moves about Scope become big, so as to ensure that equipment can quickly absorb, the side surface of connecting rod 8 is fixedly connected with puddler 9, stirring The quantity of bar 9 is three, and the equidistant side surface for being fixedly connected on connecting rod 8 of three puddlers 9, by by puddler 9 Quantity is arranged to three so that significantly more efficient to stir mud so that the mud that river bed is pushed for a long time is stirred, and improves silt The speed of mud dredging, by the use to telescopic rod 6, enables to rotating disk 7 and puddler 9 to be more deep into river bed so as to set The standby river course that can be applied to the different depths, puddler 9 can be stirred the mud in river course, the inner chamber socket of cabin 1 There is mud container 16, mud container 16 is located at the middle part of the inner chamber of cabin 1, and mud container 16 can enter the mud of suction Row storage, so as to reach the purpose of convenience unloading, the top of cabin 1 is fixedly connected with the bottom of support plate 15, the top of support plate 15 Portion is fixedly connected with sludge pump 14, and the bottom of sludge pump 14 is located at the middle part at the top of support plate 15, by by the bottom of sludge pump 14 Portion is located at the middle part at the top of support plate 15 so that the operation that sludge pump 14 can more be stablized, so as to accelerate the speed of sludge extraction Degree, the side of sludge pump 14 are fixedly connected with the side surface of mud pipe 17, and the bottom of mud pipe 17 sequentially passes through silt from top to bottom The bottom of the inwall of mud container 16 and the bottom of the inwall of SDC 2 simultaneously extend to the lower section of SDC 2, are socketed with mud pipe 17 Water proof circle 18, by being provided with water proof circle 18, drainage occurs for the place that mud pipe 17 can be avoided to be connected with SDC 2, Water proof circle 18 can prevent water enter SDC 2 inside, ensure that hull can stablize operation, the top of water proof circle 18 with The bottom of SDC 2 is fixedly connected, and the top of mud pipe 17 is fixedly connected with one end of dispatch tube 13, the side at the top of cabin 1 It is fixedly connected with the side of the bottom of deflector 11, is socketed with screen pack 12 in what the bottom of the inwall of deflector 11 opened up eat dishes without rice or wine, leads to The use to sludge pump 14 and mud pipe 17 is crossed, the mud of agitation can be pumped into dispatch tube 13, deflector 11 and screen pack 12 use, the mud drawn up can be separated with water, so as to reach the purpose of desilting, the side overlap joint of deflector 11 In the side at the top of mud container 16, the support bar 10 that passes on left of cabin 1 is fixedly connected with the bottom of deflector 11.
Operation principle:Motor 4 rotates so that expansion link 6 drives rotating disk 7 to rotate, and so as to which puddler 9 rotates, now stirs Bar 9 can be to where the mud accumulated be stirred, and sludge pump 14 can be extracted mud by mud pipe 17, and be passed through Mud is sent on deflector 11 by dispatch tube 13, and in the centrifugation of screen pack 12, water enters korneforos, mud from screen pack 12 Enter from deflector 11 in mud container 16.
The electric elements occurred in this article electrically connect with the main controller and 220V civil powers in the external world, and main controller can be meter Calculation machine etc. plays the conventionally known equipment of control.
It can to sum up obtain, the hydraulic engineering desilting dredger can be effective by the use to water proof case 3 and water-stop sheet 5 The motor 4 in water proof case 3 is played a protective role, by the use to telescopic rod 6, enable to rotating disk 7 and puddler 9 more Add and be deep into river bed so that equipment can be applied to the river course of the different depths, and puddler 9 can be stirred the mud in river course It is dynamic, by the use to sludge pump 14 and mud pipe 17, the mud of agitation can be pumped into dispatch tube 13, deflector 11 and mistake The use of filter screen 12, the mud drawn up can be separated with water, so as to reach the purpose of desilting, the energy of mud container 16 It is enough to be stored the mud of suction, so as to reach the purpose of convenience unloading, solve in traditional desilting and can not have so as to connect Effect mud is cleaned out with excavation speed it is slow the problem of.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of hydraulic engineering desilting dredger, including cabin(1), it is characterised in that:The cabin(1)Bottom and diving Cabin(2)Top be fixedly connected, the SDC(2)Front and water proof case(3)Side be fixedly connected, the water proof case(3) Inside it is socketed with motor(4), the motor(4)Top and water proof case(3)It is fixedly connected at the top of inwall, the motor(4)'s Bottom passes through water-stop sheet(5)With water proof case(3)The bottom of inwall is fixedly connected, the motor(4)Output end and expansion link(6) One end be fixedly connected, the expansion link(6)The other end sequentially pass through water-stop sheet from top to bottom(5)With water proof case(3)Inwall Bottom and extend to water proof case(3)Lower section and rotating disk(7)Top be fixedly connected, the rotating disk(7)Top and connection Bar(8)Bottom be fixedly connected, the connecting rod(8)Side surface be fixedly connected with puddler(9), the cabin(1)It is interior Chamber is socketed with mud container(16), the cabin(1)Top and support plate(15)Bottom be fixedly connected, the support plate(15) Top be fixedly connected with sludge pump(14), the sludge pump(14)Side and mud pipe(17)Side surface be fixedly connected, The mud pipe(17)Bottom sequentially pass through mud container from top to bottom(16)The bottom of inwall and SDC(2)Inwall Bottom simultaneously extends to SDC(2)Lower section, the mud pipe(17)On be socketed with water proof circle(18), the water proof circle(18)'s Top and SDC(2)Bottom be fixedly connected, the mud pipe(17)Top and dispatch tube(13)One end be fixedly connected, The cabin(1)The side at top and deflector(11)The side of bottom is fixedly connected, the deflector(11)The bottom of inwall Open up eat dishes without rice or wine in be socketed with screen pack(12), the deflector(11)Side be overlapped on mud container(16)The one of top Side, the cabin(1)Pass on left support bar(10)With deflector(11)Bottom be fixedly connected.
A kind of 2. hydraulic engineering desilting dredger according to claim 1, it is characterised in that:The mud container (16)Positioned at cabin(1)The middle part of inner chamber, and sludge pump(14)Bottom be located at support plate(15)The middle part at top.
A kind of 3. hydraulic engineering desilting dredger according to claim 1, it is characterised in that:The water proof case(3)'s Side is located at SDC(2)Positive middle part, and cabin(1)The area and SDC of bottom(2)The area equation at top.
A kind of 4. hydraulic engineering desilting dredger according to claim 1, it is characterised in that:The motor(4)Bottom Portion is located at water-stop sheet(5)The middle part at top, and water-stop sheet(5)Bottom be located at water proof case(3)The middle part of inwall bottom.
A kind of 5. hydraulic engineering desilting dredger according to claim 1, it is characterised in that:The expansion link(6)'s Bottom is located at rotating disk(7)The middle part at top, and connecting rod(8)Top be located at rotating disk(7)The middle part at top.
A kind of 6. hydraulic engineering desilting dredger according to claim 1, it is characterised in that:The puddler(9)'s Quantity is three, and three puddlers(9)It is equidistant to be fixedly connected on connecting rod(8)Side surface.
CN201720992230.XU 2017-08-09 2017-08-09 A kind of hydraulic engineering desilting dredger Expired - Fee Related CN207047931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720992230.XU CN207047931U (en) 2017-08-09 2017-08-09 A kind of hydraulic engineering desilting dredger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720992230.XU CN207047931U (en) 2017-08-09 2017-08-09 A kind of hydraulic engineering desilting dredger

Publications (1)

Publication Number Publication Date
CN207047931U true CN207047931U (en) 2018-02-27

Family

ID=61498484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720992230.XU Expired - Fee Related CN207047931U (en) 2017-08-09 2017-08-09 A kind of hydraulic engineering desilting dredger

Country Status (1)

Country Link
CN (1) CN207047931U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820834A (en) * 2019-12-02 2020-02-21 自然资源部第二海洋研究所 Structure and method for dredging ocean near-shore sludge
CN112302086A (en) * 2020-11-23 2021-02-02 王红艳 River silt cleaning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820834A (en) * 2019-12-02 2020-02-21 自然资源部第二海洋研究所 Structure and method for dredging ocean near-shore sludge
CN112302086A (en) * 2020-11-23 2021-02-02 王红艳 River silt cleaning device

Similar Documents

Publication Publication Date Title
CN206052818U (en) A kind of improved high-efficiency silt-cleaning vessel for river way
CN210946947U (en) River channel dredging device
CN206385585U (en) A kind of hydraulic engineering silt remover
CN109469140A (en) A kind of hydraulic engineering river bottom silt cleaning device
CN207047931U (en) A kind of hydraulic engineering desilting dredger
CN104988897B (en) River mud factorization solidification treatment method
CN205577003U (en) Dredging device for water conservancy project
CN104998813A (en) Automatic shellfish harvesting classifier
CN105926701A (en) Port sludge processing device and method
CN106120921A (en) A kind of lake, park underwater sludge cleaning system and method
CN107251704A (en) Automatic cycle, which is rotated, digs lotus root cleaning integrated ship
CN208121841U (en) A kind of quick Accrete clearing device of hydraulic engineering
CN213143168U (en) Soft and hard garbage isolation treatment resistance-reducing blockage-free dredging, digging and sucking integrated device
CN201704717U (en) Underwater silt remover
CN206621845U (en) Pond sludge cleaning plant
CN210766937U (en) River and lake bed surface layer dredging system
CN203821473U (en) Efficient channel dredging and cleaning device
CN212772549U (en) Water conservancy construction is with submarine silt cleaning device
CN107362610B (en) Shield constructs quick-witted mud residue filtering system
CN206902012U (en) A kind of sludge handling device
CN212294807U (en) Dredging device for hydraulic engineering
CN209339206U (en) A kind of device for the cleaning of tunnel Central drain
CN211200626U (en) U-shaped communication pipeline for drainage of adverse slope in construction site
CN106948395A (en) A kind of negative pressure transportation formula dredging robot
CN211498990U (en) Hydraulic engineering channel silt clearance structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

Termination date: 20180809