CN207047883U - Big plate basis for coal mine gob ultra-high-tension power transmission line - Google Patents
Big plate basis for coal mine gob ultra-high-tension power transmission line Download PDFInfo
- Publication number
- CN207047883U CN207047883U CN201720562570.9U CN201720562570U CN207047883U CN 207047883 U CN207047883 U CN 207047883U CN 201720562570 U CN201720562570 U CN 201720562570U CN 207047883 U CN207047883 U CN 207047883U
- Authority
- CN
- China
- Prior art keywords
- big plate
- transmission line
- ultra
- power transmission
- coal mine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model discloses the basis of the big plate for coal mine gob ultra-high-tension power transmission line, including big plate base matrix and communicating pipe, cement cylinder is installed with above the big plate base matrix, the inside bottom side of the cement cylinder is provided with lower disc, and the top of lower disc and the bottom of connecting rod are by being welded and fixed installation.In the utility model, one bottom plate is provided with by connecting pole in the bottom on big plate basis, the bottom plate in depth bottom, and on buried lower soil layer closeer in ground end soil property and larger hardness is smaller due to being influenceed for the relatively upper soil layer of lower soil layer by the subsidence of foundations and deformation;The inside on the big plate basis is provided with a connecting pipe, and the both ends of communicating pipe are mounted on observation column, both sides observation column liquid level is identical during installation, when causing big plate basic slope due to the subsidence of foundations and deformation, both sides observation column liquid level changes, so as to remind staff to be handled accordingly.
Description
Technical field
It the utility model is related to ultra-high-tension power transmission line technical field of construction equipment, more particularly, to coal mine gob high pressure
The big plate basis of transmission line of electricity.
Background technology
The electricity that power plant is sent, it is not only for neighbouring people's use, is also transferred to far place, meet more
Needs.These electricity can not be transferred out directly by common electric wire, but transmitted with ultra-high-tension power transmission line.When electricity is defeated
After being sent to the place of electricity consumption, voltage drop could lowly be used.Ultra-high-tension power transmission line is divided into cable transmission line and maked somebody a mere figurehead defeated
Electric line.Cable transmission line:By cable burial in underground, do not take up space, but construct and safeguard it is inconvenient, be used in more city and
In across rivers circuits.Overhead transmission line:Using transmission tower by wire and ground wire suspension in the air, make wire and wire it
Between, between wire and ground wire, between wire and shaft tower, between wire and ground obstacle keep certain safe distance, complete
Transmission of electricity task.
But it is existing still suffer from weak point when in use for coal mine gob ultra-high-tension power transmission line, due to ground
Depression and deformation can occur in the course of time for base, so as to be impacted to the normal use of ultra-high-tension power transmission line, existing high pressure
Transmission line of electricity is provided with big plate basis mostly, although somewhat improve some subsidences of foundations and deformation, but still not
The problem can be fully solved.
Utility model content
The purpose of this utility model is to solve shortcoming present in prior art, and what is proposed is used for coal mine gob
The big plate basis of ultra-high-tension power transmission line.
To achieve these goals, the utility model employs following technical scheme:For coal mine gob high voltage power transmission
The big plate of circuit is basic, including big plate base matrix and communicating pipe, and cement is installed with above the big plate base matrix
Cylinder, the inside bottom side of the cement cylinder is provided with lower disc, and the top of lower disc and the bottom of connecting rod pass through welding
It is fixedly mounted, the top of the connecting rod is welded with mounting disc, the communicating pipe is arranged on the inside of big plate base matrix, institute
State and observation column is welded with above the both ends of communicating pipe, the preceding surface of the observation column is provided with liquid level observation meter, the communicating pipe
Outside be provided with metal level, soft cushion is installed, and be provided with the inside of soft cushion on the inside of the metal level
Ceramic layer, the lower section of the big plate base matrix are installed with bottom plate by connecting pole, and the bottom plate is arranged on lower soil layer
Top.
As further describing for above-mentioned technical proposal:
Graduation apparatus is provided with the liquid level observation meter.
As further describing for above-mentioned technical proposal:
The observation column is provided with two altogether, and two observation columns are located in same level.
As further describing for above-mentioned technical proposal:
Filling protective layer is installed on the outside of the communicating pipe.
As further describing for above-mentioned technical proposal:
Soil layer is provided with above the lower soil layer.
As further describing for above-mentioned technical proposal:
The lower disc, upper mounting disc and connecting rod institute's composition mechanism section are the shape and structure of falling I-shaped.
In the utility model, first, on the basis of original, one bottom is provided with by connecting pole in the bottom on big plate basis
Plate, the bottom plate in depth bottom, and on buried lower soil layer closeer in ground end soil property and larger hardness, due to the relatively upper soil layer of lower soil layer
For influenceed by the subsidence of foundations and deformation it is smaller, thus can more high quality the colliery installed of guarantee big plate basis top
The work safety on goaf high voltage power transmission road;Secondly, the inside on the big plate basis is provided with a connecting pipe, and the both ends of communicating pipe
It is mounted on observation column, both sides observation column liquid level is identical during installation, when causing big plate base due to the subsidence of foundations and deformation
When plinth tilts, both sides observation column liquid level changes, and so as to remind staff to be handled accordingly, use is more convenient;
Finally, triple layer designs are divided into the communicating pipe, outer layer is the higher metal level of intensity, and internal layer is the strong ceramic layer of corrosion resistance,
Centre is provided with soft cushion, internal metal layer can be prevented to be hit under the protection of soft cushion and damaged.
Brief description of the drawings
Fig. 1 be the utility model proposes the basic structural representation of the big plate for being used for coal mine gob ultra-high-tension power transmission line
Figure;
Fig. 2 is side view of the present utility model;
Fig. 3 is internal structure schematic diagram of the present utility model.
Marginal data:
Soil under the big plate base matrix of 1- observation columns, 2-, 3- connecting poles, 4- bottom plates, 5- fillings protective layer, 6- communicating pipes, 7-
Layer, the upper soil layers of 8-, 9- lower discs, the upper mounting discs of 10-, 11- connecting rods, 12- cement cylinder, 13- metal levels, the soft bufferings of 14-
Layer, 15- ceramic layers, 16- liquid levels observation meter, 17- graduation apparatus.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-3, for the big plate basis of coal mine gob ultra-high-tension power transmission line, including big plate base matrix 2 and company
Siphunculus 6, the top of big plate base matrix 2 are installed with cement cylinder 12, and the inside bottom side of cement cylinder 12 is provided with lower circle
Disk 9, and the top of lower disc 9 and the bottom of connecting rod 11 are installed by being welded and fixed, the top of connecting rod 11 is welded with peace
Sabot 10, it is arranged on the inside of big plate base matrix 2 communicating pipe 6, observation column 1, observation column is welded with above the both ends of communicating pipe 6
1 preceding surface is provided with liquid level observation meter 16, and the outside of communicating pipe 6 is provided with metal level 13, and the inner side of metal level 13 is provided with
Soft cushion 14, and the inner side of soft cushion 14 is provided with ceramic layer 15, the lower section of big plate base matrix 2 passes through connecting pole
3 are installed with bottom plate 4, and bottom plate 4 is arranged on the top of lower soil layer 7.
Graduation apparatus 17 is provided with liquid level observation meter 16, observation column 1 is provided with two altogether, and two observation columns 1 are positioned at same
On one horizontal plane, the outside of communicating pipe 6 is provided with filling protective layer 5, and the top of lower soil layer 7 is provided with soil layer 8, lower disc 9,
11 composition mechanism sections of upper mounting disc 10 and connecting rod are the shape and structure of falling I-shaped.
By observing the liquid level in both sides observation column 1 in liquid level observation meter 16, can get information about because ground sinks
Fall into and deformation influence degree, bottom plate 4 to caused by ultra-high-tension power transmission line is directly installed on lower soil layer 7, it is ensured that big plate base
Plinth body 2 receives the subsidence of foundations and the influence of deformation is as small as possible, and soft cushion 5 is used to protect internal communicating pipe 6, prevents its quilt
Extruding rupture, upper mounting disc 10 are used to install ultra-high-tension power transmission line, and lower mounting disc 9 is directly embedded in cement cylinder 12 and can ensured
The stability of upper mounting disc 10, soft cushion 14 are used to protect ceramic layer 15, prevent it to be hit and cause fragmentation.
Operation principle:In use, by observing the liquid level in both sides observation column 1 in liquid level observation meter 16, Ke Yizhi
Because of the subsidence of foundations and deformation, influence degree, bottom plate 4 caused by ultra-high-tension power transmission line are directly installed on lower soil layer 7 for the understanding of sight
On, it is ensured that plate base matrix 2 receives the subsidence of foundations greatly and the influence of deformation is as small as possible, and filling protective layer 5 is in protecting
Portion's communicating pipe 6, it is prevented to be extruded rupture, upper mounting disc 10 is used to install ultra-high-tension power transmission line, and lower mounting disc 9 is directly embedded in water
The stability of upper mounting disc 10 can be ensured in mud cylinder 12, the cooperation of metal level 13 and ceramic layer 15 can cause communicating pipe 6
Existing certain compression strength, having has higher corrosion resistance, and soft cushion 14 is used to protect ceramic layer 15, prevents it from being rushed
Hit and cause fragmentation.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (6)
1. for the big plate basis of coal mine gob ultra-high-tension power transmission line, including big plate base matrix(2)And communicating pipe(6), its
It is characterised by, the big plate base matrix(2)Top be installed with cement cylinder(12), the cement cylinder(12)It is interior
Portion bottom side is provided with lower disc(9), and lower disc(9)Top and connecting rod(11)Bottom by be welded and fixed installation, institute
State connecting rod(11)Top be welded with mounting disc(10), the communicating pipe(6)Installed in big plate base matrix(2)It is interior
Portion, the communicating pipe(6)Both ends above be welded with observation column(1), the observation column(1)Preceding surface be provided with liquid level observation
Meter(16), the communicating pipe(6)Outside be provided with metal level(13), the metal level(13)Inner side soft buffering is installed
Layer(14), and soft cushion(14)Inner side ceramic layer is installed(15), the big plate base matrix(2)Lower section pass through company
Connect post(3)It is installed with bottom plate(4), the bottom plate(4)Installed in lower soil layer(7)Top.
2. the big plate basis according to claim 1 for coal mine gob ultra-high-tension power transmission line, it is characterised in that described
Liquid level observation meter(16)On be provided with graduation apparatus(17).
3. the big plate basis according to claim 1 for coal mine gob ultra-high-tension power transmission line, it is characterised in that described
Observation column(1)Two, and two observation columns are installed altogether(1)In same level.
4. the big plate basis according to claim 1 for coal mine gob ultra-high-tension power transmission line, it is characterised in that described
Communicating pipe(6)Outside filling protective layer is installed(5).
5. the big plate basis according to claim 1 for coal mine gob ultra-high-tension power transmission line, it is characterised in that described
Lower soil layer(7)Top be provided with soil layer(8).
6. the big plate basis according to claim 1 for coal mine gob ultra-high-tension power transmission line, it is characterised in that described
Lower disc(9), upper mounting disc(10)And connecting rod(11)Institute's composition mechanism section is the shape and structure of falling I-shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720562570.9U CN207047883U (en) | 2017-05-19 | 2017-05-19 | Big plate basis for coal mine gob ultra-high-tension power transmission line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720562570.9U CN207047883U (en) | 2017-05-19 | 2017-05-19 | Big plate basis for coal mine gob ultra-high-tension power transmission line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207047883U true CN207047883U (en) | 2018-02-27 |
Family
ID=61490907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720562570.9U Expired - Fee Related CN207047883U (en) | 2017-05-19 | 2017-05-19 | Big plate basis for coal mine gob ultra-high-tension power transmission line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207047883U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108894243A (en) * | 2018-06-14 | 2018-11-27 | 中国化学工程第六建设有限公司 | Steel structural concrete outer-enwraped type suspension column |
-
2017
- 2017-05-19 CN CN201720562570.9U patent/CN207047883U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108894243A (en) * | 2018-06-14 | 2018-11-27 | 中国化学工程第六建设有限公司 | Steel structural concrete outer-enwraped type suspension column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206173785U (en) | Public road bridge roof beam buffering damping device | |
CN207047883U (en) | Big plate basis for coal mine gob ultra-high-tension power transmission line | |
CN110055980B (en) | Thermoelectric refrigeration slide-resistant pile and construction method | |
CN206668278U (en) | One kind is used for mine laneway safety support device | |
CN108240002A (en) | A kind of foundation pile defroster and method | |
CN106952579A (en) | A kind of ultra-high-tension power transmission line auxiliary safety warning-panel of fishing | |
CN107288061A (en) | A kind of simple barrier gate bar for being used to prevent from damaging car body | |
CN105755918B (en) | A kind of block stone layer roadbed for slope protection having sunshade and aeration-cooling effect | |
CN103741708B (en) | Prefabricated concrete rod sleeve basis | |
CN102636207A (en) | Long-term monitoring auxiliary system suitable for perennial frozen areas in plateau | |
CN206815217U (en) | A kind of municipal works road indicating device | |
CN216551392U (en) | Composite roadbed based on hot bar geogrid and block stone revetment | |
CN201198666Y (en) | Ultra low temperature liquefied natural gas underground gas storage warehouse | |
CN207034414U (en) | A kind of urban discharging pipeline is pre-buried to use tube support arrangement | |
CN106088773B (en) | A kind of electric power facility protector | |
CN206726662U (en) | A kind of ultra-high-tension power transmission line auxiliary safety warning-panel of fishing | |
CN207115705U (en) | A kind of pressure type debris flow early-warning device | |
CN202416222U (en) | Outdoor power line tube rod protection device | |
CN110725342B (en) | Three-dimensional multi-defense line double-raft shock insulation structure suitable for nuclear power station in soft soil area | |
JPH06983B2 (en) | Protective method of underground structure in sand ground that is easily liquefied | |
CN206670622U (en) | A kind of shallow-depth-excavation tunnel settlement monitoring structure | |
CN203684258U (en) | Prefabricated concrete rod sleeve foundation | |
CN206721703U (en) | Bang Shan highways with top protection structure | |
CN208056130U (en) | Power transmission tower foundation protective device in mud-rock flow raceway groove | |
CN207779513U (en) | A kind of hydraulic engineering water level monitor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180227 Termination date: 20190519 |