CN207007632U - The multi-functional staight scissors simple shear test system of temperature suction stress coupling - Google Patents

The multi-functional staight scissors simple shear test system of temperature suction stress coupling Download PDF

Info

Publication number
CN207007632U
CN207007632U CN201720392470.6U CN201720392470U CN207007632U CN 207007632 U CN207007632 U CN 207007632U CN 201720392470 U CN201720392470 U CN 201720392470U CN 207007632 U CN207007632 U CN 207007632U
Authority
CN
China
Prior art keywords
simple shear
staight scissors
transmission lever
temperature
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720392470.6U
Other languages
Chinese (zh)
Inventor
季李通
韦昌富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tecchio Technology Co Ltd
Original Assignee
Nanjing Tecchio Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tecchio Technology Co Ltd filed Critical Nanjing Tecchio Technology Co Ltd
Priority to CN201720392470.6U priority Critical patent/CN207007632U/en
Application granted granted Critical
Publication of CN207007632U publication Critical patent/CN207007632U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a kind of multi-functional staight scissors simple shear test system of temperature suction stress coupling, it includes (5) five switch board (1), staight scissors simple shear apparatus (2), diffusion bubble flushing device (3), temperature control device (4) and computer parts, five described parts are attached by communications protocol, experiment process and data acquisition are controlled using computer (5), can also use switch board (1) to carry out Manual test control to staight scissors simple shear apparatus (2), diffusion bubble flushing device (3) and temperature control device (4).The utility model is applied to the soil shear strength experimental study under the effect of temperature suction stress coupling, the conventional consolidation, staight scissors, simple shear test of the soil body can not only be carried out, and can realize temperature, suction, stress and shearing wave multi- scenarios method effect under consolidation, staight scissors, simple shear test, soil shear strength, consolidation settlement characteristic and the soil-water characteristic curve under the conditions of varying environment can be studied.

Description

The multi-functional staight scissors simple shear test system of temperature-suction-stress coupling
Technical field
It the utility model is related to a kind of multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, more particularly to one Soil shear strength and the During Geotechnical Tests instrument of consolidation settlement characteristic under the conditions of kind test temperature-suction-stress multi- scenarios method.
Background technology
In Geotechnical Engineering, the shear behavior of earth working material embodies the ability of earth working material resistance failure by shear, to work Journey design, there is important meaning for research.Generally, the research method of earth working material shear behavior can be divided into two classes:Original position is surveyed Examination and laboratory test research, the former mainly includes static sounding, dynamic sounding, standard penetration test (SPT) and vane shear test Deng, the engineering mechanics performance of the engineering original position soil body can be accurately determined, it is representative strong, but in-situ test is simpler, it is more Establish on statistics experience and zonal relation, and obtained severity parameter value is mostly average value, it is difficult to show that material exists Mechanical property change in engineer applied.
Indoors in experimental study, the research to earth working material shear behavior uses triaxial (test) method and direct shear test more Method, stress state of the earth working material in Practical Project is simulated by shop test equipments such as triaxial apparatus and direct shear apparatuses as much as possible And failure mode, determine its stress-strain behavior and shear behavior, triaxial test fado based on compression failure, failure mechanics with Maximum shear stress is related, is an inclined plane, reflects the actual failure mode of the engineering soil body to a certain extent;Direct shear test method In, due to the limitation of shear box, it is impossible to strictly control drainage condition, the stress and strain skewness inside sample, and try The failure mechanics of sample are defined to the plane between upper and lower shear box, have larger limitation to the shear behavior for studying the soil body.
In Practical Project, the soil body such as embankment, side slope, ground is in simple shear state more, and triaxial (test) method and staight scissors try The limitation of method due to testing equipment in itself is tested, the simple shear characteristic for embodying the soil body is difficult to during experiment.Wroth et al. (1991) point out that simple shear test method is uniquely can appropriately to simulate the experiment, Airey D W et al. (1987 of Practical Project destruction Year) shear strength parameter that is waited until by contrasting triaxial (test) method, it is found that the result of the test that simple shear test method obtains is more nearly Vane shear test and back analysis result, wherein simple shear test method mainly carry out experimental study using simple shear apparatus.
Simple shear apparatus are mainly that the simple shear by upper and lower shear box and between upper and lower shear box folds ring group composition, are passed through Simple shear folds the mutual changing of the relative positions between ring group in shear history, simulates the simple shear environment residing for earth working material.It is generally domestic seldom Someone carries out the research of earth working material mechanical property, main cause using simple shear apparatus:First, simple shear mechanism is not perfect enough, second, existing Some simple shear equipment is difficult to the test requirements document for meeting some special earth working materials, third, can not meet multi- scenarios method experimental study Need, fourth, effective reception of shearing wave during simple shear test can not be realized, fifth, test efficiency is relatively low.
Utility model content
In view of the above-mentioned problems existing in the prior art, the purpose of this utility model is:A kind of temperature-suction-stress is provided Multi-functional staight scissors simple shear test system is coupled, can meet that the needs of multi- scenarios method experiment carry out the shearing strength of the soil body and consolidated to sink The experimental study of drop characteristic, water pipeline inside gas capacity produces to test measurement during being effectively reduced long term test Error, by setting different water passages to efficiently control draining and suction condition during experiment, and be extended to Multi-joint structure, the efficiency of experimental study is effectively improved, while shear box and the folded interannular frictional force of simple shear can be effectively reduced Influence, and sample deviates influence to test accuracy.
To achieve the above object, the utility model adopts the following technical scheme that:
A kind of multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it includes:Switch board, staight scissors simple shear Instrument, diffusion bubble flushing device, temperature control device and computer, described switch board and staight scissors simple shear apparatus, temperature control device and calculating Machine is connected, and staight scissors simple shear apparatus are connected with diffusion bubble flushing device and temperature control device.Can be to experiment process and number using computer It is controlled according to collection, staight scissors simple shear apparatus, diffusion bubble flushing device temperature control device can be also tried manually using switch board Test control.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described Staight scissors simple shear apparatus include axial loading system, be horizontal to cutting system, balancing gate pit and support;
Described level is installed on support to cutting system and balancing gate pit, described horizontal to pass through the to cutting system One transmission lever, the second transmission lever and the 3rd transmission lever are connected with balancing gate pit;
Described axial loading system is fixed on the top of balancing gate pit, by axial loading system to the sample in balancing gate pit Apply axial compressive force, sample is in stress state, described level enters water-filling to cutting system to the sample inside balancing gate pit Put down to shearing property.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described Axial loading system include center-pole, vertical load sensor, cylinder piston, cylinder, high-precision digital-display table, digital display meter fixture And cylinder frame;
Described cylinder is fixed on the top of cylinder frame, and cylinder interior is provided with cylinder piston, described cylinder piston, erected It is sequentially connected and connects to load sensor and center-pole;
Described high-precision digital-display table is fixed on digital display meter fixture, and described digital display meter fixture is arranged on the top of balancing gate pit Portion.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described It is horizontal to cutting system include turbine worm reducer, the first transmission lever, the second transmission lever, first level load sensor, Base, the first adjusting screw rod, the 3rd transmission lever, the second horizontal loading sensor and the second adjusting screw rod;
Described turbine worm reducer is connected by the first transmission lever with the side wall of down cut box;
On support, the upper and lower part of base is respectively arranged with the first adjusting screw rod and second and adjusted described floor installation Screw rod is saved, described first level load sensor is arranged between the first adjusting screw rod and the second transmission lever, and described second Horizontal loading sensor is arranged between the second adjusting screw rod and the 3rd transmission lever;
Described the 3rd transmission lever, the second horizontal loading sensor and the second adjusting screw rod is in same with the first transmission lever On axis;
Described the second transmission lever and the 3rd transmission lever is connected by L-type connector with upper shear box respectively.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described Balancing gate pit include pressure chamber upper cover, sealing side neck and pressure chamber base, described sealing side neck be located at pressure chamber upper cover and pressure Between the base of power room;
Track is provided with described pressure chamber base;
Described pressure chamber upper cover center is provided with the first seal receptacle, and is separately installed with described sealing side neck Two seal receptacles, the 3rd seal receptacle and the 4th seal receptacle;
(middle part is equipped with projection to described center-pole, the first transmission lever, the second transmission lever and the 3rd transmission lever, described Center-pole, the first transmission lever, the second transmission lever and the 3rd transmission lever be each passed through the first seal receptacle, the second seal receptacle, the 3rd Seal receptacle and the 4th seal receptacle;Projection point in the middle part of described center-pole, the first transmission lever, the second transmission lever and the 3rd transmission lever Sealing cavity is not formed between the first seal receptacle, the second seal receptacle, the 3rd seal receptacle and the 4th seal receptacle, described sealing is empty Chamber is connected by tracheae with the inside of balancing gate pit;
Bossing below center-pole is in contact with the sunk part of pressure cap.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described The second seal receptacle, the operation principle of the 3rd seal receptacle and the 4th seal receptacle be:Described sealing cavity internal pressure P1With pressure Power chamber internal pressure P2It is equal, due to sealing cavity internal pressure P1Effect, can offset pressure chamber internal pressure P2To center Bar, the first transmission lever, the active force of the second transmission lever and the 3rd transmission lever, realize during experiment that vertical direction is vertical and net just should The control of power and the measurement of the net shear stress of horizontal direction.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described Shear box include upper shear box, down cut box and simple shear fold ring group, described down cut box is placed on the top of track, simple shear Folded ring group is between down cut box and upper shear box;
In horizontal shear direction, down cut box, upper shear box and simple shear are folded the position that ring group three contacts with each other and are provided with Slideway, and some steel balls are placed in slideway;
In horizontal shear direction, the top of down cut box is fixed with orientation ball, and the sphere for orienting ball folds ring with simple shear respectively The side of group and upper shear box is in contact;
Transmitting flexure element, rectangle pottery clay plates and rectangular band are sequentially installed with inside described down cut box from center to border Hole permeable stone, described rectangle permeable stone with holes are fixedly arranged above tabletting, and described rectangle pottery clay plates and rectangle are with holes permeable Stone has been respectively arranged below spiral shape water passage and Rong Shui cavitys;Described spiral shape water passage and first passage and the Two passages are connected, and described appearance water cavity is connected with third channel, described first passage, second channel and third channel End be respectively arranged with the first high-pressure ball valve, the second high-pressure ball valve and the 3rd high-pressure ball valve.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described Sample be located at down cut box, upper shear box and simple shear fold the inside of ring group, the top of sample is sequentially placed permeable stone and pressure-bearing Lid, described specimen surface wrap up one layer of latex film, described latex film upper end, lower end be separately fixed at shear box, under cut Cut on box;
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, along The direction of motion of down cut box, described permeable stone bottom are provided with reception flexure element.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described Temperature control device include water bath, the first temperature sensor, second temperature sensor, water-bath circulation copper pipe and insulation material Material.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described Staight scissors simple shear apparatus can be replaced tetrad staight scissors simple shear apparatus or multi-joint staight scissors simple shear apparatus, described tetrad staight scissors simple shear apparatus include First staight scissors simple shear apparatus, the second staight scissors simple shear apparatus, the 3rd staight scissors simple shear apparatus and the 4th staight scissors simple shear apparatus, the first described staight scissors list Instrument, the second staight scissors simple shear apparatus, the 3rd staight scissors simple shear apparatus and the 4th staight scissors simple shear apparatus are cut between each other by the first worm screw, shaft coupling Device and the connection of the second worm screw.
Preferably, the operation of the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling Method, the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling can carry out saturated soil experiment and unsaturated soil examination Test, primary operational is:
When carrying out saturated soil staight scissors simple shear test, the first high-pressure ball valve and the second high-pressure ball valve are closed;
When carrying out unsaturated soil staight scissors simple shear test, the second high-pressure ball valve and the 3rd high-pressure ball valve are closed.
Preferably, the operation of the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling Method, the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling can utilize the circulating liquid in water-bath circulation copper pipe Temperature control is carried out to sample, heat preserving and insulating material is as balancing gate pit and extraneous heat-insulating heat-preserving material, the first temperature sensor The temperature in balancing gate pit and sample is monitored and fed back respectively with second temperature sensor, by feeding back obtained temperature value With experiment needed for temperature contrasted, controller unit operation.
Preferably, the operation of the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling Method, the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling can effectively carry out the transmitting and reception of shearing wave, Main operational steps are:
During simple shear test, computer or switch board will pass through the movement of the shear rate to experiment and down cut box Displacement voluntarily judges the position of transmitting flexure element, and flexure element is received when on same axis when launching flexure element and first, will Automatically turn on first and receive the reception that flexure element carries out shearing wave, when transmitting flexure element and second receive flexure element in same axle When on line, the reception that the second reception flexure element carries out shearing wave is would automatically turn on, it is other the like, can be according to the needs of experiment Setting receives the number of flexure element.
Preferably, the above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is described The multi-functional staight scissors simple shear test system of temperature-suction-stress coupling can carry out tests below operation:
A, conventional saturation soil body simple shear, staight scissors, circulation shear experiment;
B, conventional unsaturation soil body simple shear, staight scissors, circulation shear experiment;
B, under Temperature-Stress (suction s=0) coupling condition, the simple shear of saturated soil, staight scissors, circulation shear experiment;
C, under the conditions of temperature-suction-stress coupling, the simple shear of unsaturated soil, staight scissors, circulation shear experiment;
D, in the presence of shearing wave, saturated soil Temperature-Stress (suction s=0) coupling simple shear, staight scissors, circulation shear examination Test;
E, in the presence of shearing wave, unsaturated soil temperature-suction-stress coupling simple shear, staight scissors, circulation shear experiment;
F, under the conditions of temperature-suction-stress coupling, unsaturation consolidation moisture absorption dehumidification experiment, the measurement soil body is in different stress Soil―structure interaction under state;
G, under Temperature-Stress (suction s=0) coupling condition, saturated soil consolidation test:Graded loading test, strain rate The constant CRL consolidation tests of constant CRS consolidation tests, loading speed.
It is compared with the prior art, the beneficial effects of the utility model are:
1st, the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling described in the utility model uses special knot The axial pressure center-pole and level of structure have effectively canceled out pressure chamber internal pressure centering core bar and transmission to shear transfer bar The effect of bar so that test measurement obtains vertical net direct stress and the net shearing strength of horizontal direction, improves normal stress loading The accuracy measured with level to shearing force, while in view of the accuracy problem of test measurement, can be by vertical load sensor It is built-in load sensor with horizontal loading replacing sensor;
2nd, the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling described in the utility model sets diffusion gas Flushing device is steeped, ventilating water pipe inside gas capacity is to error caused by test measurement during significantly reducing long term test;
3rd, the upper shear box of the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling described in the utility model Flexure element and transmitting flexure element are received with being separately installed with down cut box, shearing wave can be effectively carried out in simple shear test Transmitting and reception;
4th, the down cut box of the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling described in the utility model Interior setting sets different water passages by the way of pottery clay plates and permeable stone are combined, and can efficiently control experiment During draining and suction condition;
5th, the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling described in the utility model in shear box and Using smart to experiment to reduce frictional force during simple shear or staight scissors by the way of slideway and steel ball are combined between the folded ring of simple shear The influence of degree, and the side wall setting orientation ball of ring is folded in shear box and simple shear, avoid the side of sample during simple shear and staight scissors To skew, the accuracy of test measurement is improved;
6th, the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling described in the utility model can expand to Tetrad staight scissors simple shear structure either multi-joint structure, and can be used as consolidation test equipment, can be changed without the bar of test chamber Under part, only by the direct shear test and consolidation test for replacing with shear box and down cut box and carrying out different size sample, effectively Ground improves the efficiency of experimental study and the utilization rate of testing equipment, reduces experimentation cost.
Brief description of the drawings
Fig. 1 is that the structure of the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling described in the utility model is shown It is intended to.
Fig. 2 is the structural representation of staight scissors simple shear test system described in the utility model.
Fig. 3 is the section of structure of staight scissors simple shear test system simple shear part described in the utility model.
Fig. 4 is the section of structure of staight scissors simple shear test system staight scissors part described in the utility model.
Fig. 5 is the front view of balancing gate pit described in the utility model.
Fig. 6 is the top view of balancing gate pit described in the utility model.
Fig. 7 is the A-A profiles of the balancing gate pit described in Fig. 5.
Fig. 8 is the B-B profiles of the balancing gate pit described in Fig. 6.
Fig. 9 is the III-III profiles described in Fig. 8.
Figure 10 is the structural representation of sample down cut box described in the utility model.
Figure 11 is simple shear steel loop structural representation described in the utility model.
Figure 12 is the structural representation of diffusion bubble flushing device described in the utility model.
Figure 13 is the top view of tetrad staight scissors simple shear test system described in the utility model.
Embodiment
Embodiment 1
As shown in figures 1-13, a kind of multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it includes control Cabinet 1, staight scissors simple shear apparatus 2, diffusion bubble flushing device 3, temperature control device 4 and computer 5, described switch board 1 and staight scissors simple shear Instrument 2, temperature control device 4 are connected with computer 5, and staight scissors simple shear apparatus 2 are connected with diffusion bubble flushing device 3 and temperature control device 4.
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, described staight scissors simple shear apparatus 2 Including axial loading system 2-1, horizontal to cutting system 2-2, balancing gate pit 2-3 and support 2-4;
Described level is installed on support 2-4 to cutting system 2-2 and balancing gate pit 2-3, and described is horizontal to shearing System 2-2 is connected by the first transmission lever 2-6, the second transmission lever 2-17 and the 3rd transmission lever 2-22 with balancing gate pit 2-3;
Described axial loading system 2-1 is fixed on balancing gate pit 2-3 top, by axial loading system 2-1 to pressure Sample 2-25 in the 2-3 of room applies axial compressive force, sample 2-25 is in stress state, and described is horizontal to cutting system 2-2 Horizontal direction shearing property is carried out to the sample 2-25 inside balancing gate pit 2-3.
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, described axial loading system 2-1 includes center-pole 2-9, vertical load sensor 2-10, cylinder piston 2-11, cylinder 2-12, high-precision digital-display table 2-13, number Aobvious table fixture 2-14 and cylinder frame 2-15;
Described cylinder 2-12 is fixed on cylinder frame 2-15 top, and cylinder piston 2-11 is provided with inside cylinder 2-12, Described cylinder piston 2-11, vertical load sensor 2-10 and center-pole 2-9 is sequentially connected and connect;
Described high-precision digital-display table 2-13 is fixed on digital display meter fixture 2-14, described digital display meter fixture 2-14 installations The 2-3 top in balancing gate pit.
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, described is horizontal to shearing system The 2-2 that unites includes turbine worm reducer 2-5, the first transmission lever 2-6, the second transmission lever 2-17, first level load sensor 2- 18th, base 2-19, the first adjusting screw rod 2-20, the 3rd transmission lever 2-22, the regulations of the second horizontal loading sensor 2-23 and second Screw rod 2-24;
Described turbine worm reducer 2-5 is connected by the first transmission lever 2-6 with down cut box 2-30 side wall;
Described base 2-19 is arranged on support 2-4, and base 2-19 upper and lower part is respectively arranged with the first regulation Screw rod 2-20 and the second adjusting screw rod 2-24, described first level load sensor 2-18 are arranged on the first adjusting screw rod 2-20 Between the second transmission lever 2-17, the second described horizontal loading sensor 2-23 is arranged on the second adjusting screw rod 2-24 and the 3rd Between transmission lever 2-22;
Described the 3rd transmission lever 2-22, the second horizontal loading sensor 2-23 and the second adjusting screw rod 2-24 and first are passed Bar 2-6 is passed to be on same axis;
The second described transmission lever 2-17 and the 3rd transmission lever 2-22 pass through L-type connector 2-47 and upper shear box 2- respectively 33 are connected.
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, described balancing gate pit's 2-3 bags Pressure chamber upper cover 2-26, sealing side neck 2-27 and pressure chamber base 2-28, described sealing side neck 2-27 is included to be located in balancing gate pit Cover between 2-26 and pressure chamber base 2-28;
Track 2-29 is provided with described pressure chamber base 2-28;
Described pressure chamber upper cover 2-26 centers are provided with the first seal receptacle 2-8, described sealing side neck 2-27 It is separately installed with the second seal receptacle 2-7, the 3rd seal receptacle 2-16 and the 4th seal receptacle 2-21;
Described center-pole 2-9, the first transmission lever 2-6, the second transmission lever 2-17 and the 3rd transmission lever 2-22 middle part are equal Provided with raised 2-51, described center-pole 2-9, the first transmission lever 2-6, the second transmission lever 2-17 and the 3rd transmission lever 2-22 difference Through the first seal receptacle 2-8, the second seal receptacle 2-7, the 3rd seal receptacle 2-16 and the 4th seal receptacle 2-21;Described center-pole 2- 9th, the raised 2-51 in the middle part of the first transmission lever 2-6, the second transmission lever 2-17 and the 3rd transmission lever 2-22 respectively with the first seal receptacle Sealing cavity 2-52 is formed between 2-8, the second seal receptacle 2-7, the 3rd seal receptacle 2-16 and the 4th seal receptacle 2-21, described is close Envelope cavity 2-52 is connected by tracheae 2-53 with balancing gate pit 2-3 inside;
Bossing below center-pole 2-9 is in contact with pressure cap 2-35 sunk part.
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, the second described seal receptacle 2- 7th, the 3rd seal receptacle 2-16 and the 4th seal receptacle 2-21 operation principle is:Described sealing cavity 2-52 internal pressures P1With pressure Power room 2-3 internal pressures P2It is equal, due to sealing cavity 2-52 internal pressures P1Effect, can offset pressure room 2-3 internal pressures P2To center-pole 2-9, the first transmission lever 2-6, the second transmission lever 2-17 and the 3rd transmission lever 2-22 active force, realization was tested The vertical direction vertically control of net direct stress and the measurement of the net shear stress of horizontal direction in journey.
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, described shear box include upper Shear box 2-33, down cut box 2-30 and simple shear fold ring group 2-32, described down cut box 2-30 and are placed on the upper of track 2-29 Side, simple shear are folded ring group 2-32 and are located between down cut box 2-30 and upper shear box 2-33;
In horizontal shear direction, down cut box 2-30, upper shear box 2-33 and simple shear are folded ring group 2-32 three and contacted with each other Position be provided with slideway 2-54, and some steel ball 2-31 are placed in slideway 2-54;
In horizontal shear direction, down cut box 2-30 top is fixed with orientation ball 2-61, orientation ball 2-61 sphere point The side for not folding ring group 2-32 and upper shear box 2-33 with simple shear is in contact;
Transmitting flexure element 2-55, rectangle pottery clay plates are sequentially installed with inside described down cut box 2-30 from center to border 2-38's and rectangle permeable stone 2-37 with holes, described rectangle permeable stone 2-37 with holes is fixedly arranged above tabletting 2-62, described Rectangle pottery clay plates 2-38's and rectangle permeable stone 2-37 with holes has been respectively arranged below spiral shape water passage 2-39 and Rong Shuikong Chamber 2-40;Described spiral shape water passage 2-39 and first passage 2-42 and second channel 2-43 are connected, described appearance water Cavity 2-40 is connected with third channel 2-41, described first passage 2-42, second channel 2-43 and third channel 2-41's End is respectively arranged with the first high-pressure ball valve 2-45, the second high-pressure ball valve 2-46 and the 3rd high-pressure ball valve 2-44.
Described sample 2-25 is located at down cut box 2-30, upper shear box 2-33 and simple shear folds ring group 2-32 inside, examination Sample 2-25 top is sequentially placed permeable stone 2-34 and pressure cap 2-35, and one layer of latex film 2- is wrapped up on described sample 2-25 surfaces 50, described latex film 2-50 upper ends, lower end are separately fixed on shear box 2-33, down cut box 2-30;
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, along down cut box 2-30's The direction of motion, described permeable stone 2-34 bottoms, which are provided with, receives flexure element 2-56.
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, described temperature control device 4 wrap Include water bath, the first temperature sensor 4-1, second temperature sensor 4-2, water-bath circulation copper pipe 4-3 and heat preserving and insulating material 4- 4。
The above-described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, described staight scissors simple shear apparatus 2 Tetrad staight scissors simple shear apparatus 6 or multi-joint staight scissors simple shear apparatus are can be replaced, described tetrad staight scissors simple shear apparatus 6 include the first staight scissors list Cut instrument 6-1, the second staight scissors simple shear apparatus 6-2, the 3rd staight scissors simple shear apparatus 6-3 and the 4th staight scissors simple shear apparatus 6-4, the first described staight scissors Simple shear apparatus 6-1, the second staight scissors simple shear apparatus 6-2, the 3rd staight scissors simple shear apparatus 6-3 and the 4th staight scissors simple shear apparatus 6-4 are logical between each other Cross the first worm screw 6-5, shaft coupling 6-6 and the second worm screw 6-7 connections.
Described diffusion bubble flushing device 3 can use the model TKA- of Nanjing Tyke Science and Technology Ltd. of Austria production DAF-1F diffusion bubble flushing device, described diffusion bubble flushing device 3 includes base 3-5, on base 3-5 Offered in bubble trap 3-2 and normally closed electronic valve 3-4, bubble trap 3-2 funnel cavity 3-1 and with funnel cavity 3-1 The connected funnel tubule 3-3 in bottom;Discharge outlet 3-6 and sensing are entered in described bubble trap 3-2 bottoms provided with bubble trap Device interface 3-7, sensor interface 3-7 are connected with accurate hydraulic pressure sensor 3-9;Described bubble trap enter discharge outlet 3-6 with Normally closed electronic valve 3-4 one end is connected, and the normally closed electronic valve 3-4 other ends are connected with pressure chamber base 2-28 discharge outlet of entering;It is described Sensor interface 3-7 with exhaust bubble valve 3-8 be connected.
Embodiment 2
The described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, which can be taken into account, carries out saturated soil experiment And unsaturated soil testing, primary operational are:
When carrying out saturated soil staight scissors simple shear test, closing the first high-pressure ball valve 2-45 and the second high-pressure ball valve 2-46 is Can;
When carrying out unsaturated soil staight scissors simple shear test, closing the second high-pressure ball valve 2-46 and the 3rd high-pressure ball valve 2-44 is Can.
Embodiment 3
During experiment, the described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling can be effectively Temperature is controlled, primary operational is:
Temperature control, described insulation are carried out to sample 2-25 using the circulating liquid in water-bath circulation copper pipe 4-3 Material 4-4 passes as balancing gate pit 2-3 and extraneous heat-insulating heat-preserving material, the first described temperature sensor 4-1 and second temperature Sensor 4-2 is monitored and fed back to the temperature in balancing gate pit 2-3 and sample 2-25 respectively, by feed back obtained temperature value with Temperature value is contrasted needed for experiment, the temperature change during Control experiment.
Embodiment 4
During simple shear test, the described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling can have Effect ground carries out the transmitting and reception of shearing wave, and main operational steps are:
During simple shear test, computer 5 or switch board 1 will pass through the shifting of the shear rate to experiment and down cut box Dynamic displacement voluntarily judges to launch flexure element 2-55 position, when transmitting flexure element 2-55 and first receive flexure element 2-56 same When on bar axis, instrument would automatically turn on the reception that the first reception flexure element 2-56 carries out shearing wave, as transmitting flexure element 2-55 Flexure element 2-57 is received when on same axis with second, and instrument would automatically turn on the second reception flexure element 2-57 and be sheared The reception of ripple, the like, the number for receiving flexure element can be set according to the needs of experiment.
Embodiment 5
The described multi-functional staight scissors simple shear test system of temperature-suction-stress coupling can carry out tests below:
A, conventional saturation soil body simple shear, direct shear test;
B, conventional unsaturation soil body simple shear, direct shear test;
B, under Temperature-Stress (suction s=0) coupling condition, the simple shear of saturated soil, direct shear test;
C, under the conditions of temperature-suction-stress coupling, the simple shear of unsaturated soil, direct shear test;
D, in the presence of shearing wave, saturated soil Temperature-Stress (suction s=0) coupling simple shear, direct shear test;
E, in the presence of shearing wave, unsaturated soil temperature-suction-stress coupling simple shear, direct shear test;
F, under the conditions of temperature-suction-stress coupling, unsaturation consolidation moisture absorption dehumidification experiment, soil―structure interaction is measured;
G, under Temperature-Stress (suction s=0) coupling condition, saturated soil consolidation test:Hierarchical loading, strain rate are constant The constant CRL consolidation tests of CRS consolidation tests, loading speed.
Embodiment of the present utility model is these are only, its description is more specific and detailed, but can not therefore understand For the limitation to the utility model patent scope.It should be pointed out that for the person of ordinary skill of the art, do not taking off On the premise of conceiving from the utility model, various modifications and improvements can be made, these belong to protection of the present utility model Scope.

Claims (8)

1. a kind of multi-functional staight scissors simple shear test system of temperature-suction-stress coupling, it is characterised in that it includes switch board (1), staight scissors simple shear apparatus (2), diffusion bubble flushing device (3), temperature control device (4) and computer (5), described switch board (1) It is connected with staight scissors simple shear apparatus (2), temperature control device (4) and computer (5), staight scissors simple shear apparatus (2) and diffusion bubble flushing device (3) It is connected with temperature control device (4);
Described staight scissors simple shear apparatus (2) include axial loading system (2-1), are horizontal to cutting system (2-2), balancing gate pit (2-3) With support (2-4);
Described level is installed on support (2-4) to cutting system (2-2) and balancing gate pit (2-3), and described level is to cutting Cutting system (2-2) passes through the first transmission lever (2-6), the second transmission lever (2-17) and the 3rd transmission lever (2-22) and balancing gate pit (2- 3) it is connected;
Described axial loading system (2-1) is fixed on balancing gate pit (2-3) top, by axial loading system (2-1) to pressure Sample (2-25) in power room (2-3) applies axial compressive force, sample (2-25) is in stress state, and described is horizontal to shearing System (2-2) carries out horizontal direction shearing property to balancing gate pit (2-3) internal sample (2-25).
2. the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling according to claim 1, it is characterised in that Described axial loading system (2-1) includes center-pole (2-9), vertical load sensor (2-10), cylinder piston (2-11), gas Cylinder (2-12), high-precision digital-display table (2-13), digital display meter fixture (2-14) and cylinder frame (2-15);
Described cylinder (2-12) is fixed on cylinder frame (2-15) top, and cylinder piston (2- is provided with inside cylinder (2-12) 11), described cylinder piston (2-11), vertical load sensor (2-10) and center-pole (2-9) are sequentially connected and connect;
Described high-precision digital-display table (2-13) is fixed on digital display meter fixture (2-14), described digital display meter fixture (2-14) peace Mounted in balancing gate pit (2-3) top.
3. the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling according to claim 1, it is characterised in that Described level includes turbine worm reducer (2-5), the first transmission lever (2-6), the second transmission lever to cutting system (2-2) (2-17), first level load sensor (2-18), base (2-19), the first adjusting screw rod (2-20), the 3rd transmission lever (2- 22), the second horizontal loading sensor (2-23) and the second adjusting screw rod (2-24);
Described turbine worm reducer (2-5) is connected by the first transmission lever (2-6) with the side wall of down cut box (2-30);
Described base (2-19) is arranged on support (2-4), and the upper and lower part of base (2-19) is respectively arranged with the first tune Screw rod (2-20) and the second adjusting screw rod (2-24) are saved, described first level load sensor (2-18) is arranged on the first regulation Between screw rod (2-20) and the second transmission lever (2-17), the second described horizontal loading sensor (2-23) is arranged on the second regulation Between screw rod (2-24) and the 3rd transmission lever (2-22);
Described the 3rd transmission lever (2-22), the second horizontal loading sensor (2-23) and the second adjusting screw rod (2-24) and first Transmission lever (2-6) is on same axis;
Described the second transmission lever (2-17) and the 3rd transmission lever (2-22) passes through L-type connector (2-47) and upper shear box respectively (2-33) is connected.
4. the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling according to claim 1, it is characterised in that Described balancing gate pit (2-3) includes pressure chamber upper cover (2-26), sealing side neck (2-27) and pressure chamber base (2-28), described Sealing side neck (2-27) is located between pressure chamber upper cover (2-26) and pressure chamber base (2-28);
Track (2-29) is provided with described pressure chamber base (2-28);
Described pressure chamber upper cover (2-26) center is provided with the first seal receptacle (2-8), described sealing side neck (2-27) On be separately installed with the second seal receptacle (2-7), the 3rd seal receptacle (2-16) and the 4th seal receptacle (2-21);
In described center-pole (2-9), the first transmission lever (2-6), the second transmission lever (2-17) and the 3rd transmission lever (2-22) Portion is equipped with raised (2-51), and described center-pole (2-9), the first transmission lever (2-6), the second transmission lever (2-17) and the 3rd pass Pass bar (2-22) and be each passed through the first seal receptacle (2-8), the second seal receptacle (2-7), the 3rd seal receptacle (2-16) and the 4th sealing Seat (2-21);Described center-pole (2-9), the first transmission lever (2-6), the second transmission lever (2-17) and the 3rd transmission lever (2-22) The projection (2-51) at middle part respectively with the first seal receptacle (2-8), the second seal receptacle (2-7), the 3rd seal receptacle (2-16) and the 4th Sealing cavity (2-52) is formed between seal receptacle (2-21), described sealing cavity (2-52) passes through tracheae (2-53) and balancing gate pit The inside of (2-3) is connected;
Bossing below center-pole (2-9) is in contact with the sunk part of pressure cap (2-35).
5. the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling according to claim 1, it is characterised in that Shear box includes upper shear box (2-33), down cut box (2-30) and simple shear and folds ring group (2-32), described down cut box (2- 30) track (2-29) top is placed on, simple shear folds ring group (2-32) and is located at down cut box (2-30) and upper shear box (2-33) Between;
In horizontal shear direction, down cut box (2-30), upper shear box (2-33) and simple shear fold ring group (2-32) three's phase mutual connection Tactile position is provided with slideway (2-54), and some steel balls (2-31) are placed in slideway (2-54);
In horizontal shear direction, the top of down cut box (2-30) is fixed with orientation ball (2-61), the sphere of orientation ball (2-61) The side for folding ring group (2-32) and upper shear box (2-33) with simple shear respectively is in contact;
Transmitting flexure element (2-55), rectangle pottery clay plates are sequentially installed with inside described down cut box (2-30) from center to border (2-38) and rectangle permeable stone with holes (2-37), described rectangle permeable stone with holes (2-37) are fixedly arranged above tabletting (2- 62), the spiral shape that has been respectively arranged below of described rectangle pottery clay plates (2-38) and rectangle permeable stone with holes (2-37) is crossed water and led to Road (2-39) and appearance water cavity (2-40);Described spiral shape water passage (2-39) and first passage (2-42) and second channel (2-43) is connected, and described appearance water cavity (2-40) is connected with third channel (2-41), described first passage (2-42), The end of second channel (2-43) and third channel (2-41) is respectively arranged with the first high-pressure ball valve (2-45), the second high-pressure ball valve (2-46) and the 3rd high-pressure ball valve (2-44).
6. the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling according to claim 5, it is characterised in that Along down cut box (2-30) direction of motion, permeable stone (2-34) bottom, which is provided with, receives flexure element (2-56).
7. the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling according to claim 1, it is characterised in that Described temperature control device (4) includes water bath, the first temperature sensor (4-1), second temperature sensor (4-2), water-bath circulation Copper pipe (4-3) and heat preserving and insulating material (4-4).
8. the multi-functional staight scissors simple shear test system of temperature-suction-stress coupling according to any one of claim 1 to 7, its It is characterised by, described staight scissors simple shear apparatus (2) can be replaced tetrad staight scissors simple shear apparatus (6), described tetrad staight scissors simple shear apparatus (6) Including the first staight scissors simple shear apparatus (6-1), the second staight scissors simple shear apparatus (6-2), the 3rd staight scissors simple shear apparatus (6-3) and the 4th staight scissors simple shear Instrument (6-4), the first described staight scissors simple shear apparatus (6-1), the second staight scissors simple shear apparatus (6-2), the 3rd staight scissors simple shear apparatus (6-3) and Four staight scissors simple shear apparatus (6-4) are connected by the first worm screw (6-5), shaft coupling (6-6) and the second worm screw (6-7) between each other.
CN201720392470.6U 2017-04-14 2017-04-14 The multi-functional staight scissors simple shear test system of temperature suction stress coupling Active CN207007632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720392470.6U CN207007632U (en) 2017-04-14 2017-04-14 The multi-functional staight scissors simple shear test system of temperature suction stress coupling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720392470.6U CN207007632U (en) 2017-04-14 2017-04-14 The multi-functional staight scissors simple shear test system of temperature suction stress coupling

Publications (1)

Publication Number Publication Date
CN207007632U true CN207007632U (en) 2018-02-13

Family

ID=61442571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720392470.6U Active CN207007632U (en) 2017-04-14 2017-04-14 The multi-functional staight scissors simple shear test system of temperature suction stress coupling

Country Status (1)

Country Link
CN (1) CN207007632U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107063893A (en) * 2017-04-14 2017-08-18 南京泰克奥科技有限公司 The multi-functional staight scissors simple shear test system of temperature suction stress coupling and its operating method
CN108918819A (en) * 2018-05-22 2018-11-30 青岛理工大学 A kind of multi-parameter micro-test device and its application method for simulating drying and watering cycle
CN108956331A (en) * 2018-05-26 2018-12-07 云南农业大学 Unsaturated soil capillary sucks direct shear apparatus and application method
CN111122280A (en) * 2019-12-16 2020-05-08 重庆大学 Large direct shear test sample preparation device for reinforcing coarse-grained soil by microorganisms and using method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107063893A (en) * 2017-04-14 2017-08-18 南京泰克奥科技有限公司 The multi-functional staight scissors simple shear test system of temperature suction stress coupling and its operating method
CN107063893B (en) * 2017-04-14 2023-08-11 南京泰克奥科技有限公司 Temperature-suction-stress coupling multifunctional direct shear single shear test system and operation method thereof
CN108918819A (en) * 2018-05-22 2018-11-30 青岛理工大学 A kind of multi-parameter micro-test device and its application method for simulating drying and watering cycle
CN108918819B (en) * 2018-05-22 2020-09-22 青岛理工大学 Multi-parameter micro test device for simulating dry-wet cycle and use method thereof
CN108956331A (en) * 2018-05-26 2018-12-07 云南农业大学 Unsaturated soil capillary sucks direct shear apparatus and application method
CN111122280A (en) * 2019-12-16 2020-05-08 重庆大学 Large direct shear test sample preparation device for reinforcing coarse-grained soil by microorganisms and using method

Similar Documents

Publication Publication Date Title
CN107063893A (en) The multi-functional staight scissors simple shear test system of temperature suction stress coupling and its operating method
CN207007632U (en) The multi-functional staight scissors simple shear test system of temperature suction stress coupling
CN205826656U (en) A kind of frozen soil freeze thawing laboratory testing rig
CN106680129B (en) Rock sample recycles the simulation of dry and wet freezing-thawing and damage deterioration test device
CN104267172B (en) A kind of multifunctional all formula soil body freezing-thawing test system
CN207194039U (en) Piled-box foundaton horizontal cyclic load testing machine
WO2018161866A1 (en) Device and method for testing mechanical behavior characteristic of pile-soil interface for energy pile
CN107449678A (en) Large-scale triaxial shear test devices and methods therefor in situ
CN105938070A (en) Multifunctional true triaxial rock drilling test system and test method for characterizing the characteristics of rocks
CN203643442U (en) Multifunctional rainfall landslide indoor testing device
CN104749205A (en) Water thermal force comprehensive testing system and method of soil body freezing process
CN103969282A (en) Test device for making research on soil freezing and thawing temperature field, water migration and deformation law
CN108732057A (en) Ring shear test equipment and its test method under a kind of soil body Frozen-thawed cycled and weathering environment
CN104502562A (en) Vertical well drainage consolidation soft foundation processing model test device and test method
CN105223080B (en) Evaluation method for jointed rock performance and bolting and grouting effects under compression-shear condition
Yunchuan et al. Simulation analysis of mass concrete temperature field
CN108693019A (en) Liquid-heat-stress coupling acts on roadbed bridge response to forced vibration device and method
CN106353359A (en) Device for testing thermophysical parameters of soil mass sample
CN106442035B (en) Device and method for manufacturing direct shear test sample of concrete-frozen soil contact surface
CN104897553A (en) Layered saturated soil seepage consolidation simulating device
CN102175583B (en) Temperature-controllable three-axis soil permeability test device
CN204536237U (en) A kind of Freezing Soils hydro-thermal power comprehensive test system
CN103485371A (en) Device and method for foundation failure mode simulation and bearing capacity testing
CN207650031U (en) Concrete sample Hydraulic fracturing test sealing device under axial force
CN207300760U (en) A kind of large-scale triaxial shear test device in situ

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant