CN207003765U - Assembling type steel structure builds self-bearing type steel truss form bracing system - Google Patents

Assembling type steel structure builds self-bearing type steel truss form bracing system Download PDF

Info

Publication number
CN207003765U
CN207003765U CN201720906297.7U CN201720906297U CN207003765U CN 207003765 U CN207003765 U CN 207003765U CN 201720906297 U CN201720906297 U CN 201720906297U CN 207003765 U CN207003765 U CN 207003765U
Authority
CN
China
Prior art keywords
truss
steel
type steel
steel truss
fix bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720906297.7U
Other languages
Chinese (zh)
Inventor
开前正
李奎
王勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China City Investment Group Sixth Engineering Bureau Co Ltd
Original Assignee
China City Investment Group Sixth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China City Investment Group Sixth Engineering Bureau Co Ltd filed Critical China City Investment Group Sixth Engineering Bureau Co Ltd
Priority to CN201720906297.7U priority Critical patent/CN207003765U/en
Application granted granted Critical
Publication of CN207003765U publication Critical patent/CN207003765U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model gives a kind of assembling type steel structure building self-bearing type steel truss form bracing system;Including steel truss and fixation kit, steel truss both ends are respectively protruding between the side Liang Ge edges of a wing of the girder steel of two assembling type steel structure buildings, steel truss both ends are respectively by fixation kit load in steel beam flange, fixation kit includes fixed plate and fix bar, fix bar lower end and fixed plate weld, fixed plate is placed in steel beam flange, and fix bar is fixed with steel truss end.This assembling type steel structure builds self-bearing type steel truss form bracing system without vertical rod, only by fixation kit supporting steel truss itself and concrete floor slab placement model hard loading, and is delivered to structural steel beam, structure is safe and reliable, and installation and dismounting are convenient, and speed of application is fast, material reusable edible, construction cost are low.

Description

Assembling type steel structure builds self-bearing type steel truss form bracing system
Technical field
The support system in a kind of construction is the utility model is related to, more particularly to a kind of assembling type steel structure building is applied Self-bearing type steel truss form bracing system in work.
Background technology
Assembling type steel structure building is widely used in infrastructure project, and the floor construction in assembling type steel structure building is usual Need to pour and form, need that formwork for placing is installed before pouring, current formwork for placing mostly uses scaffold support, but pin hand Frame installation procedure is complicated, also needs to remove again after construction, wastes time and energy.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of assembling type steel structure simple in construction, convenient disassembly Build self-bearing type steel truss form bracing system.
In order to solve the above technical problems, the utility model provides a kind of assembling type steel structure building self-bearing type steel truss building Plate support system;
Including steel truss and fixation kit, steel truss both ends are respectively protruding into the one of the girder steel of two assembling type steel structure buildings Between the Liang Ge edges of a wing of side, steel truss both ends respectively by fixation kit load in steel beam flange, fixation kit include fixed plate and Fix bar, fix bar lower end are placed in steel beam flange with fixed plate weld, fixed plate, and fix bar is fixed with steel truss end.
After such structure, fixation kit fixes steel truss both sides, and the fixed plate of fixation kit is placed on girder steel The edge of a wing on, to steel truss provide support, by steel truss can be formed place concrete floor slab placement template support system.
This assembling type steel structure builds self-bearing type steel truss form bracing system without vertical rod, only by fixation kit supporting steel Truss itself and concrete floor slab placement model hard loading, and structural steel beam is delivered to, structure is safe and reliable, and installation and dismounting are convenient, construction Speed is fast, material reusable edible, and construction cost is low.
As the optimization of this assembling type steel structure building self-bearing type steel truss form bracing system, steel truss includes two ends Portion's truss and at least one standard truss, all standard truss bolt connection successively, the both sides of all standard truss respectively with end Upper and lower two wings in side of the girder steel of assembling type steel structure building are stretched into portion's truss bolt connection, the end of two end truss Between edge;After such structure, steel truss is changed into combination, adjustable, each to adapt to by changing the quantity of standard truss The concrete floor slab placement construction of kind span.
As the optimization of this assembling type steel structure building self-bearing type steel truss form bracing system, fixation kit also includes two Individual fixing nut, fix bar outer wall are provided with screw thread, after fix bar runs through steel truss end, two fixing nuts respectively with fix bar Screw thread coordinates, and two fixing nuts bear against the upper and lower sides in steel truss end;After such structure, two are utilized Fixing nut coordinates with fix bar, realizes the fine setting of steel truss height on fix bar direction, can basis in Specific construction The height of steel truss is adjusted flexibly construction environment at that time.
As the optimization of this assembling type steel structure building self-bearing type steel truss form bracing system, steel truss both ends are prolonged respectively Stretching has connecting plate, and the fix bar of fixation kit runs through connecting plate, and two fixing nuts are born against above and below connecting plate Side;After such structure, connecting plate is facilitated to coordinate with fixing nut.
Brief description of the drawings
Fig. 1 is the structural representation of this assembling type steel structure building self-bearing type steel truss form bracing system implementation example.
Fig. 2 is that the structure of this assembling type steel structure building self-bearing type steel truss form bracing system implementation example end truss is shown It is intended to.
Fig. 3 is that the structure of this assembling type steel structure building self-bearing type steel truss form bracing system implementation example standard truss is shown It is intended to.
Fig. 4 is enlarged drawings of the Fig. 1 along A-A to sectional view.
Fig. 5 is the vertical view for the use state for originally building assembling type steel structure building self-bearing type steel truss form bracing system Figure.
Embodiment
As shown in Figures 1 to 4
This assembling type steel structure building self-bearing type steel truss form bracing system includes steel truss and two groups of fixation kits.
Steel truss includes two end truss 11 and a standard truss 12, and end truss 11 and standard truss 12 are all steel Frame structure processed, the shape generally right-angled trapezium shape of end truss 11, end truss 11 is close to the region of right-angled trapezium acute angle Be outward extended with connecting plate 13, connecting plate 13 is steel angle structure, be provided with the plate body of 13 horizontal side of connecting plate through hole (through hole Aperture is more than the diameter of fix bar 21, and less than the external diameter of fixing nut 23), generally rectangular in shape, the mark of standard truss 12 The quasi- both ends of truss 12 are fixed with two end truss 11 by some bolt connection pieces, and the connecting plate 13 of two end truss 11 is stretched Between upper and lower two edges of a wing 41 in side for entering the girder steel 4 of steel building.
Steel truss both ends are placed on the edge of a wing 41 of girder steel 4 by fixation kit respectively, and fixation kit includes fixed plate 22, consolidated Fixed pole 21 and two fixing nuts 23, fixed plate 22 are one section of long strip steel plate, and fix bar 21 is welded in fixed plate 22 vertically End face, in T shape between fix bar 21 and fixed plate 22, the outer wall of fix bar 21 is provided with screw thread, and fixed plate 22 is placed on the wing of girder steel 4 On edge 41, fix bar 21 run through connecting plate 13 through hole, two fixing nuts 23 respectively with the screw thread of fix bar 21 coordinate and two Nut is born against in the upper and lower end face of 13 horizontal plate body of connecting plate.
As shown in Figure 5
It is specifically described with reference to above-mentioned assembling type steel structure building self-bearing type steel truss form bracing system and builds assembled steel The construction method of structural construction self-bearing type steel truss form bracing system, comprises the following steps:
Multiple steel truss are lifted between assembling type steel structure builds relative two girder steels 4 successively, the two of steel truss Individual connecting plate 13 is respectively protruding between the side Liang Ge edges of a wing 41 of relative girder steel 4, and two fixed plates 22 are directly placed at the wing of girder steel 4 On edge 41, multiple steel truss are placed in parallel and arranged for interval.
Fixed by three connecting rods 3 between adjacent steel truss, be bolted between connecting rod 3 and two steel truss It is fixed.
Form bracing system is collectively formed by steel truss, fixation kit, connecting rod and girder steel.
Can be according to the distance between two relative girder steels of steel building, selection standard truss number can be two Or two or more, all standard truss pass sequentially through bolt and are connected, linearly arrangement, the standard truss both ends after being connected pass through Bolt is connected with end truss.
In addition, this assembling type steel structure building self-bearing type steel truss form bracing system can include a steel truss and two Group fixation kit, multiple steel truss and multigroup fixation kit (the corresponding two groups of fixation kits of a steel truss) can also be included, if It is that assembling type steel structure building self-bearing type steel truss form bracing system includes multiple steel truss and multigroup fixation kit, then each Steel truss forms a support meanss, i.e. this assembling type steel structure building self-bearing type steel truss building with corresponding two groups of fixation kits Plate support system includes multiple support meanss, is fixed between multiple support meanss by connecting rod, multiple support meanss constitute The support system of assembling type steel structure building floor formwork for placing.
Above-described is only a kind of embodiment of the present utility model, it is noted that for the ordinary skill of this area For personnel, on the premise of the utility model principle is not departed from, some variations and modifications can also be made, these also should be regarded as Belong to the scope of protection of the utility model.

Claims (4)

1. a kind of assembling type steel structure builds self-bearing type steel truss form bracing system, it is characterized in that:
Including steel truss and two groups of fixation kits, steel truss both ends are respectively protruding into the one of the girder steel of two assembling type steel structure buildings Between the Liang Ge edges of a wing of side, steel truss both ends are placed in steel beam flange by fixation kit respectively, and fixation kit includes fix bar And fixed plate, fix bar lower end are placed in steel beam flange with fixed plate weld, fixed plate, fix bar is consolidated with steel truss end It is fixed.
2. assembling type steel structure according to claim 1 builds self-bearing type steel truss form bracing system, it is characterized in that:
Described steel truss includes two end truss and at least one standard truss, all standard truss bolt connection successively, The both sides of all standard truss are connected with end truss bolt respectively, the ends of two end truss stretched on the side of girder steel, Between lower two edges of a wing.
3. assembling type steel structure according to claim 1 builds self-bearing type steel truss form bracing system, it is characterized in that:
The fixation kit also includes two fixing nuts, and fix bar outer wall is provided with screw thread, after fix bar runs through steel truss end, Two fixing nuts coordinate respectively with fix bar screw thread and two fixing nuts bear against upper and lower sides in steel truss end.
4. assembling type steel structure according to claim 3 builds self-bearing type steel truss form bracing system, it is characterized in that:
Steel truss both ends have each extended over connecting plate, and the fix bar of fixation kit runs through connecting plate, and two fixing nuts point The upper and lower sides of connecting plate are not resisted against.
CN201720906297.7U 2017-07-25 2017-07-25 Assembling type steel structure builds self-bearing type steel truss form bracing system Active CN207003765U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720906297.7U CN207003765U (en) 2017-07-25 2017-07-25 Assembling type steel structure builds self-bearing type steel truss form bracing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720906297.7U CN207003765U (en) 2017-07-25 2017-07-25 Assembling type steel structure builds self-bearing type steel truss form bracing system

Publications (1)

Publication Number Publication Date
CN207003765U true CN207003765U (en) 2018-02-13

Family

ID=61456058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720906297.7U Active CN207003765U (en) 2017-07-25 2017-07-25 Assembling type steel structure builds self-bearing type steel truss form bracing system

Country Status (1)

Country Link
CN (1) CN207003765U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355037A (en) * 2017-07-25 2017-11-17 中城投集团第六工程局有限公司 Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355037A (en) * 2017-07-25 2017-11-17 中城投集团第六工程局有限公司 Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method

Similar Documents

Publication Publication Date Title
CN107355037A (en) Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method
CN108678417B (en) Steel construction floor reforms transform node
CN103362069B (en) Steel and concrete combined box girder concrete wing plate formwork and construction method
CN207003765U (en) Assembling type steel structure builds self-bearing type steel truss form bracing system
CN203475310U (en) Formwork for concrete slabs of composite steel-concrete box girders
CN208534069U (en) The assembled support device of steel bar truss floor support plate composite floor system
CN103225396A (en) Beam frame type construction template system
CN205531410U (en) A simply can dismantle construction canopy for steel construction job site
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN215858982U (en) Follow-on corner support of encorbelmenting
CN214834809U (en) Template drilling-free clamp
CN203531380U (en) Size-adjustable formwork system with local supports arranged bellow beam and no support arranged below plate
CN203188612U (en) Beam frame type building template system
CN203846402U (en) Steel-concrete superposed beam top plate support-free construction device
CN103790388B (en) Greatly install improve one's methods across the waft high-altitude of eaves of cantilever roofing steel
CN210289158U (en) Temporary support device for connecting laminated plate with beam or wall
CN202913716U (en) Temporary support structure for truss integral lifting
CN208267379U (en) A kind of trapezoidal steel structure support being used to support 24-32m cast-in-situ box girder and adjustable span
CN103410312A (en) Template system beam partially supported, plate free of supporting and size adjustable
CN206529707U (en) A kind of Hanging Basket for building
CN205894662U (en) Modular triangle steel truss template
CN221256137U (en) Temporary supporting device for floor support plate
CN204919363U (en) High mound pin -connected panel strength nature skeleton of anti high wind
CN219864053U (en) Cantilever hanging pull type detachable concrete formwork platform
CN219386034U (en) Steel-concrete combined truss girder positioning and adjusting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20200717

Granted publication date: 20180213

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20230717

Granted publication date: 20180213

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20230717

Granted publication date: 20180213