CN206986861U - Penstock on downstream dam sur formula parent population type fish pass - Google Patents

Penstock on downstream dam sur formula parent population type fish pass Download PDF

Info

Publication number
CN206986861U
CN206986861U CN201720940484.7U CN201720940484U CN206986861U CN 206986861 U CN206986861 U CN 206986861U CN 201720940484 U CN201720940484 U CN 201720940484U CN 206986861 U CN206986861 U CN 206986861U
Authority
CN
China
Prior art keywords
fish
pipeline
penstock
gate
fish pass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720940484.7U
Other languages
Chinese (zh)
Inventor
王越
杨佳慧
刘仲秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720940484.7U priority Critical patent/CN206986861U/en
Application granted granted Critical
Publication of CN206986861U publication Critical patent/CN206986861U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/60Ecological corridors or buffer zones

Landscapes

  • Processing Of Meat And Fish (AREA)

Abstract

It the utility model is related to key water control project fish pass structure technical field, specially penstock on downstream dam sur formula parent population type fish pass, compared with traditional fish pass, the utility model is designed using penstock on downstream dam sur formula, cross fish process closing influenceed by extraneous factor it is small, and fish are not required to expend a large amount of muscle power during fish is crossed, therefore it is applied to a variety of different fish.Fish pass main part is not passed through dam body, it is smaller to dam body agent structure stabilizing influence, the fish pass adds middle part gate design using double-deck flushing pipeline, only voluntarily it can be washed by water using river water levels of upstream and downstream difference into fish pass, and realize flushing pipeline and mutually separate with crossing fish pipeline, significantly reduce the current under middle high water head running situation and hydraulic pressure to being influenceed caused by healthy fish.The water storage of upper gate and middle part gatehouse, saves flushing period, improves fish efficiency, and the half water in fish pass only need to be downstream discharged after the completion of a cycle, has saved upstream inpoundment resource.

Description

Penstock on downstream dam sur formula parent population type fish pass
Technical field
It the utility model is related to key water control project fish pass structure technical field, specially penstock on downstream dam sur formula parent population type fish pass.
Background technology
The research and construction of fish pass are accompanied by the development of hydraulic engineering and risen, with the continuous progress of science and technology, generation The fish pass construction of various countries of boundary is all constantly improving.Existing fish fish pass of crossing is often the ramp type built in the both sides of dam Artifical flume, often need fish to overcome the factors such as flow rate of water flow, own wt and wind-force to trace back by itself strength and swim to upstream, this Higher requirement just is proposed to travelling ability and muscle power of fish etc..And existing fish pass is often only applicable to compared with low water head Dam, and be difficult to be applicable in the case of middle high water head, large water-head row makes fish especially straddling fish stocks very into high flow rate Difficulty is sailed against the current, and higher head also can produce injury to fish.In addition, existing fish pass continuously must be arranged downstream Water, operation could be maintained, and it is less efficient, this also results in the waste of upstream water resource in a way.
The content of the invention
In order to solve the above-mentioned technical problem, the utility model is penstock on downstream dam sur formula parent population type fish pass, and its technical scheme is:Bag Include dam body(7), gate and penstock pipeline, be provided with flushing pipeline in the penstock pipeline and cross fish pipeline(1), penstock agent structure It is arranged on dam body(7)Back, the inlet and outlet of the penstock pipeline are respectively equipped with gate, and flushing pipeline is arranged on dam body(7) With fish pipeline excessively(1)Between.
Further, the flushing pipeline and excessively fish pipeline(1)It is arranged in parallel in penstock pipeline, crosses fish pipeline(1)Wear Cross dam body(7)Top.
Further, in addition to middle part gate(3), the middle part gate(3)It was arranged on fish pipeline(1)Middle part, incited somebody to action Fish pipeline(1)It is divided into two parts up and down.
Further, the flushing pipeline includes the first flushing pipeline(5)With the second flushing pipeline(6), first punching Waterpipe(5)With the second flushing pipeline(6)Import be respectively equipped with upper gate(2)With middle part gate(3), outlet respectively with mistake Fish pipeline(1)It is connected.
Further, it is described to cross fish pipeline(1)Upper, middle and lower be respectively equipped with upper gate(2), middle part gate (3)And aft-gate(4).
The beneficial effects of the utility model are:Compared with traditional fish pass, the utility model is designed using penstock on downstream dam sur formula, mistake The closing of fish process is influenceed small by extraneous factor, and fish are not required to expend a large amount of muscle power during fish is crossed, thus suitable for it is a variety of not Same fish.Fish pass main part is not passed through dam body, smaller to dam body agent structure stabilizing influence, and the fish pass uses double-deck jet water spout Road adds middle part gate design, only voluntarily can be washed by water using river water levels of upstream and downstream difference into fish pass, and realize flushing pipeline Mutually separate with crossing fish pipeline, significantly reduce current under middle high water head running situation and hydraulic pressure to shadow caused by healthy fish Ring.The water storage of upper gate and middle part gatehouse, saves flushing period, improves fish efficiency, and complete in a cycle The half water in fish pass only need to be downstream discharged afterwards, saved upstream inpoundment resource.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
As shown in figure 1,1 mistake fish pipeline, 2 upper gates, 3 middle part gates, 4 aft-gates, 5 first flushing pipelines, 6 second Flushing pipeline, 7 dam bodys.
Embodiment
As illustrated, the utility model is penstock on downstream dam sur formula parent population type fish pass, including dam body, gate and penstock pipeline, institute To state and flushing pipeline is provided with penstock pipeline and crosses fish pipeline 1, flushing pipeline is arranged in parallel in penstock pipeline with fish pipeline 1 is crossed, Penstock agent structure is arranged on the dam body dam facing of downstream, and fish pass main part is not passed through dam body, and only horizontal segment partially passes through dam Body top;It is smaller to dam body agent structure stabilizing influence.The inlet and outlet of the penstock pipeline is respectively equipped with gate;The dam Flushing pipeline is provided between body and excessively fish pipeline 1, the flushing pipeline is the first flushing pipeline 5 and the second flushing pipeline 6;
First flushing pipeline 5 and the import of the second flushing pipeline 6 are respectively equipped with upper gate 2 and middle part gate 3, outlet difference It is connected with crossing fish pipeline 1.Upper gate 2 can be opened to the top of the first flushing pipeline 5, cross the exit of fish pipeline 1 open completely and Three kinds of states are closed, the first flushing pipeline 5 is can control and crosses fish pipeline 1;Middle part gate 3 can be opened on the second flushing pipeline 6 Portion, three kinds of states are opened and closed in fish pipeline 1 completely crossing, can control the second flushing pipeline 6 and cross fish pipeline 1;Cross fish pipe The upper, middle and lower in road 1 is respectively equipped with upper gate 2, middle part gate 3 and aft-gate 4, aft-gate 4 to open and Close two states.Pore plate energy dissipation device is equipped with inside two layers of flushing pipeline(Dashed forward i.e. in pipeline provided with orifice plate by current The energy dissipating to current is realized in contracting and sudden expansion), upper and lower ends inlet and outlet be equipped with fish screen.In order that class fish are past to cross fish pipeline 1 Top trip go, can aft-gate 4 set vibrator, the vibrator setting in motion when closing aft-gate 4, make fish no longer to Trip is gone at aft-gate 4, while the inlet and outlet in pipeline and middle part, is provided with infrared monitoring device to monitor movement pattern of fish condition;Should Fish pass adds middle part gate design using double-deck flushing pipeline, only voluntarily can be washed by water using river water levels of upstream and downstream difference into fish pass, And realize flushing pipeline and mutually separate with crossing fish pipeline, significantly reduce the current and hydraulic pressure pair under middle high water head running situation Influenceed caused by healthy fish.The water storage of upper gate and middle part gatehouse, saves flushing period, improved fish efficiency, And the half water in fish pass only need to be downstream discharged after the completion of a cycle, save upstream inpoundment resource.
Operation principle of the present utility model is:
When initial, upper gate 2, middle part gate 3 are closed and two gatehouse pipe full water;Aft-gate 4 is opened, now Water level flushes with the level of tail water in aft-gate 4.After fish enter aft-gate 4, aft-gate 4 is closed;Open middle part lock Door 3 to the second flushing pipeline 6 top, the current that the middle part top of gate 3 stops are made to enter fish pipeline by the second flushing pipeline 6 1 bottom, fish can rise crossing in fish pipeline 1 with the rise of water level, and realize flushing pipeline with crossing fish pipeline point Separate, reduce current of being washed by water in pipeline as far as possible to influence caused by fish.Now water level is still less than upper water in pipeline Position, middle part gate is opened completely and opens upper gate 2 to the top of the first flushing pipeline 5, now upper water stream passes through first Flushing pipeline 5 flows into, and makes water level in fish pipeline 1 continue to rise, while still reduces bath current to caused by fish Influence.Water level in fish pipeline 1 has been served as to gradually rise to after flushing with upper pond level, completely open upper gate 2, at this moment pipeline with Upstream connects.Fish can be voluntarily swum into upstream.Finally, first close middle part gate 3 and turn off upper gate 2, open aft-gate 4.Now, full water is rushed between upper gate 2 and middle part gate 3, and water level is equal with downstream again in aft-gate 4, fish by Under swim over to a cycle of upstream process and terminate.Then reciprocating operation said process, this fish pass are applicable to the mistake of middle high dam type Fish requires.
Compared with traditional fish pass, the utility model is designed the utility model using penstock on downstream dam sur formula, cross the closing of fish process by Extraneous factor influence is small, and fish are not required to expend a large amount of muscle power during fish is crossed, suitable for a variety of different fish.Fish pass main body Part is not passed through dam body, smaller to dam body agent structure stabilizing influence, and the fish pass adds middle part gate to set using double-deck flushing pipeline It meter, only can voluntarily be washed by water using river water levels of upstream and downstream difference into fish pass, and realize flushing pipeline with crossing fish pipeline phase point Every significantly reducing current under middle high water head running situation and hydraulic pressure to influence caused by healthy fish.Upper gate is with The water storage of portion's gatehouse, saves flushing period, improves fish efficiency, and only need to downstream be discharged after the completion of a cycle Half water in fish pass, has saved upstream inpoundment resource.
It is to be also not limited to the example above, this skill to limitation of the present utility model, the utility model that described above, which is not, The variations, modifications, additions or substitutions that the technical staff in art field is made in essential scope of the present utility model, it should also belong to The scope of protection of the utility model.

Claims (5)

1. penstock on downstream dam sur formula parent population type fish pass, including dam body(7), gate and penstock pipeline, it is characterised in that the penstock pipeline It is interior to be provided with flushing pipeline and cross fish pipeline(1), penstock agent structure is arranged on dam body(7)Back, the import of the penstock pipeline Gate is respectively equipped with outlet, flushing pipeline is arranged on dam body(7)With fish pipeline excessively(1)Between.
2. penstock on downstream dam sur formula parent population type fish pass as claimed in claim 1, it is characterised in that the flushing pipeline and excessively fish pipeline (1)It is arranged in parallel in penstock pipeline, crosses fish pipeline(1)Through dam body(7)Top.
3. penstock on downstream dam sur formula parent population type fish pass as claimed in claim 2, it is characterised in that also including middle part gate(3), it is described Middle part gate(3)It was arranged on fish pipeline(1)Middle part, by fish pipeline(1)It is divided into two parts up and down.
4. penstock on downstream dam sur formula parent population type fish pass as claimed in claim 3, it is characterised in that the flushing pipeline includes the first punching Waterpipe(5)With the second flushing pipeline(6), first flushing pipeline(5)With the second flushing pipeline(6)Import be respectively equipped with Upper gate(2)With middle part gate(3), outlet is respectively with crossing fish pipeline(1)It is connected.
5. penstock on downstream dam sur formula parent population type fish pass as described in claim 4, it is characterised in that described to cross fish pipeline(1)It is upper Portion, middle part and bottom are respectively equipped with upper gate(2), middle part gate(3)And aft-gate(4).
CN201720940484.7U 2017-07-31 2017-07-31 Penstock on downstream dam sur formula parent population type fish pass Expired - Fee Related CN206986861U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720940484.7U CN206986861U (en) 2017-07-31 2017-07-31 Penstock on downstream dam sur formula parent population type fish pass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720940484.7U CN206986861U (en) 2017-07-31 2017-07-31 Penstock on downstream dam sur formula parent population type fish pass

Publications (1)

Publication Number Publication Date
CN206986861U true CN206986861U (en) 2018-02-09

Family

ID=61417402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720940484.7U Expired - Fee Related CN206986861U (en) 2017-07-31 2017-07-31 Penstock on downstream dam sur formula parent population type fish pass

Country Status (1)

Country Link
CN (1) CN206986861U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677893A (en) * 2018-06-29 2018-10-19 华电郑州机械设计研究院有限公司 A kind of pipeline formula fish pass structure suitable for complicated landform
CN109235386A (en) * 2018-09-14 2019-01-18 昆明理工大学 Formula crosses fish device and its application method behind a kind of dam
CN109853492A (en) * 2019-03-28 2019-06-07 中水珠江规划勘测设计有限公司 Gate valve duct type crosses fish method
CN112921907A (en) * 2021-04-06 2021-06-08 范鹏飞 Concrete gravity dam convenient to fish migratory
CN115387296A (en) * 2021-05-16 2022-11-25 李飞 Dam migration channel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677893A (en) * 2018-06-29 2018-10-19 华电郑州机械设计研究院有限公司 A kind of pipeline formula fish pass structure suitable for complicated landform
CN109235386A (en) * 2018-09-14 2019-01-18 昆明理工大学 Formula crosses fish device and its application method behind a kind of dam
CN109853492A (en) * 2019-03-28 2019-06-07 中水珠江规划勘测设计有限公司 Gate valve duct type crosses fish method
CN112921907A (en) * 2021-04-06 2021-06-08 范鹏飞 Concrete gravity dam convenient to fish migratory
CN115387296A (en) * 2021-05-16 2022-11-25 李飞 Dam migration channel
CN115387296B (en) * 2021-05-16 2024-05-31 李飞 Dam migration channel

Similar Documents

Publication Publication Date Title
CN206986861U (en) Penstock on downstream dam sur formula parent population type fish pass
CN104480914B (en) The fish pass structure that fish pass combines with ship lock and method
CN112281770B (en) Flood discharge structure adopting bottom hole and surface hole combined flood discharge and energy dissipation
CN108005040A (en) Minisize ecological natural flow station
CN107034861A (en) A kind of mixed type fish pass that can adapt to upstream high water-level amplitude
KR100541631B1 (en) A method of constructing an fish that is configured to facilitate the movement of fish by the resistance action of the flow rate guide plate and the fish cover
CN204825802U (en) Compound line type overflow weir
CN201943053U (en) Flow-guiding and flood-discharging hole structure
CN206928256U (en) Overfall dam flip trajectory bucket facility
CN202440787U (en) Riverway diversion device
CN106592542B (en) Folded arc formula becomes hydraulic gradient fish pass and crosses fish method
CN108589634A (en) A kind of method and its device for realizing beheaded river one-way flow using tide
CN203021973U (en) Sand intercepting groove
CN106560560B (en) Volume seat shuts off hydropower station simulation method
CN109577292B (en) Energy dissipation runner structure for reducing flow velocity
CN106013009A (en) Multi-reverse-slope type stilling pool
CN204715194U (en) With the bridge of small-sized view gate
CN208501611U (en) A kind of device for realizing beheaded river one-way flow using tide
CN217298828U (en) Fish collecting system for collecting fish by using tail water of hydropower station
CN207159957U (en) A kind of downstream rectification pier structure built jointly applied to pump lock
CN106284566B (en) A kind of fluid turbine is pressurized water-saving device for boilet
CN210459143U (en) Utilize integrated configuration of river levee and lock to realize crossing fish function
CN204849678U (en) Novel butyl dam structure
CN204982820U (en) A lock chamber arrangement structure that is used for high arch dam water conservancy diversion bottom outlet
CN105019414B (en) Composite lock chamber structure for narrow water intake of mountain hydropower project

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180209

Termination date: 20210731

CF01 Termination of patent right due to non-payment of annual fee