CN206972270U - A kind of first branch bow member connecting plate protection device in tunnel - Google Patents

A kind of first branch bow member connecting plate protection device in tunnel Download PDF

Info

Publication number
CN206972270U
CN206972270U CN201720718152.4U CN201720718152U CN206972270U CN 206972270 U CN206972270 U CN 206972270U CN 201720718152 U CN201720718152 U CN 201720718152U CN 206972270 U CN206972270 U CN 206972270U
Authority
CN
China
Prior art keywords
connecting plate
bow member
tunnel
box body
protection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720718152.4U
Other languages
Chinese (zh)
Inventor
杨艳召
郝洪兴
秦梨棚
孙城彬
朱海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201720718152.4U priority Critical patent/CN206972270U/en
Application granted granted Critical
Publication of CN206972270U publication Critical patent/CN206972270U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of first branch bow member connecting plate protection device in tunnel, the connecting plate(2)Upper lid is equipped with the box body of one side opening(4), the box body(4)Size and connecting plate(2)Size be engaged;Described box body(4)It is made using thick bamboo slab rubber.Tunnel is preferably resolved to get out of a predicament or an embarrassing situation the connecting plate of bow member and inverted arch bow member junction(2)The problem of being sprayed by first branch concrete, not only saving of labor but also time saving, served to bow member and the connecting plate of inverted arch bow member junction of getting out of a predicament or an embarrassing situation again(2)Protective effect.

Description

A kind of first branch bow member connecting plate protection device in tunnel
Technical field
A kind of protection device is the utility model is related to, more specifically to a kind of tunnel just branch bow member connecting plate protection dress Put, belong to Construction technology for primary support of tunnel field.
Background technology
In Weak Surrounding Rock Construction, inverted arch is to be arranged on the anti-of tunnel bottom to improve top supporting construction stress condition To domes, it is one of chief component of tunnel structure.On the one hand inverted arch leads to the strata pressure on tunnel top Cross tunnel side wall structure or the load on road surface is effectively delivered to underground, with the other hand also effectively resisting tunnel bottom The counter-force that layer transmits;Inverted arch forms tunnel entirety with secondary lining, increases structural stability.
Due to constructing tunnel or design reasons, bow member is got out of a predicament or an embarrassing situation when carrying out just branch whitewashing in tunnel, and Gunning material is easily even Fishplate bar(With inverted arch junction)Cover in, therefore inverted arch construction is affected greatly, it is necessary to take measures connecting plate to dig out Come, not only taken a lot of work but also time-consuming.At present, for connecting plate it is covered live the problem of, traditional mode is to dig out connecting plate using pneumatic pick, Or dug in first branch face and be welded to connect plate;It is again low using efficiency during these measure expense expensess of labour, and welding occurs again not In place, the not full phenomenon of weld seam, and certain destruction can be caused to first branch structure.
The content of the invention
The purpose of this utility model be for existing connecting plate it is covered live the problem of expense existing for the measure taken Efficiency is again low and the problems such as can cause certain destruction to first branch structure during expenses of labour, there is provided a kind of first branch bow member connecting plate in tunnel Protection device.
To achieve the above object, technical solution of the present utility model is:A kind of just branch bow member connecting plate protection of tunnel Device, lid is equipped with the box body of one side opening on the connecting plate, and the size of the box body is engaged with the size of connecting plate.
The a length of 60cm of described box body, a width of 41cm, thickness 5cm.
Described box body is made using thick bamboo slab rubber.
Compared with prior art, the beneficial effects of the utility model are:
1st, the utility model is novel, simple in construction, economic and practical, and easy to operate, construction is easily.
2nd, the utility model preferably resolves that bow member is got out of a predicament or an embarrassing situation in tunnel and the connecting plate of inverted arch bow member junction is just propped up The problem of concrete sprays, not only saving of labor but also time saving, served to bow member and the connecting plate of inverted arch bow member junction of getting out of a predicament or an embarrassing situation again Protective effect.
3rd, the utility model is easily drawn materials, easily manufactured;And reusable edible, cost are relatively low.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
Fig. 2 is box body structure schematic diagram in the utility model.
Fig. 3 is got out of a predicament or an embarrassing situation in the utility model bow member and inverted arch bow member junction schematic diagram.
In figure, bow member 1 of getting out of a predicament or an embarrassing situation, connecting plate 2, inverted arch bow member 3, box body 4.
Embodiment
The utility model is described in further detail below in conjunction with brief description of the drawings and embodiment.
Referring to Fig. 1 to Fig. 3, the first branch bow member connecting plate protection device in a kind of tunnel, especially suitable for being faced upward using weak surrounding rock Encircle the Tunnel of connecting plate connection;On the connecting plate 2 lid be equipped with one side opening box body 4, the size of the box body 4 with The size of connecting plate 2 is engaged.
Referring to Fig. 1, specifically, described 4 a length of 60cm of box body, a width of 41cm, thickness 5cm.
Referring to Fig. 1, described box body 4 is made using thick bamboo slab rubber.
Referring to Fig. 1 to Fig. 3, during using this protection device, box body 4 need to be fixed at connecting plate 2 before whitewashing will connection Plate 2 is covered as its protection device, and the bow member 1 that carries out getting out of a predicament or an embarrassing situation afterwards again is whitewashed;After whitewashing terminates, this protection dress is removed rapidly Put, generally take out box body 4;So as to effectively prevent the problem of connecting plate 2 is sprayed by Gunning material, serve to getting out of a predicament or an embarrassing situation The protective effect of bow member 1 and the connecting plate 2 of the junction of inverted arch bow member 3.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to Assert that specific implementation of the present utility model is confined to these explanations.For the ordinary skill of the utility model art For personnel, without departing from the concept of the premise utility, some simple deduction or replace, said structure can also be made The scope of protection of the utility model should be all considered as belonging to.

Claims (3)

  1. A kind of 1. first branch bow member connecting plate protection device in tunnel, it is characterised in that:The connecting plate(2)Upper lid is equipped with one side opening Box body(4), the box body(4)Size and connecting plate(2)Size be engaged.
  2. A kind of 2. first branch bow member connecting plate protection device in tunnel according to claim 1, it is characterised in that:Described box body (4)A length of 60cm, a width of 41cm, thickness 5cm.
  3. A kind of 3. first branch bow member connecting plate protection device in tunnel according to claim 1, it is characterised in that:Described box body (4)It is made using thick bamboo slab rubber.
CN201720718152.4U 2017-06-20 2017-06-20 A kind of first branch bow member connecting plate protection device in tunnel Active CN206972270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720718152.4U CN206972270U (en) 2017-06-20 2017-06-20 A kind of first branch bow member connecting plate protection device in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720718152.4U CN206972270U (en) 2017-06-20 2017-06-20 A kind of first branch bow member connecting plate protection device in tunnel

Publications (1)

Publication Number Publication Date
CN206972270U true CN206972270U (en) 2018-02-06

Family

ID=61409465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720718152.4U Active CN206972270U (en) 2017-06-20 2017-06-20 A kind of first branch bow member connecting plate protection device in tunnel

Country Status (1)

Country Link
CN (1) CN206972270U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577341A (en) * 2020-04-02 2020-08-25 杨宪超 Concrete is spouted just and is prevented plugging device with bow member

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577341A (en) * 2020-04-02 2020-08-25 杨宪超 Concrete is spouted just and is prevented plugging device with bow member
CN111577341B (en) * 2020-04-02 2022-01-25 阳春市豪基实业有限公司 Concrete is spouted just and is prevented plugging device with bow member

Similar Documents

Publication Publication Date Title
CN206233102U (en) A kind of packaged type faces side operation work platform
CN206972270U (en) A kind of first branch bow member connecting plate protection device in tunnel
CN202851009U (en) Tunnel buffering multilayer waterproof-drainage structure
CN102852530A (en) Tunnel buffering multilayered water-discharging-preventing structure and construction method
CN106759485A (en) A kind of prefabricated piping lane of two-piece unit formula and installation method
CN206477469U (en) A kind of moisture-proof construction of wall
CN208309595U (en) A kind of prefabricated sheet pile building enclosure for applying to cheat in hole
CN204919483U (en) Power station seam stagnant water structure
CN102444408A (en) Secondary lining split mounting type blocking head device for metro underground excavation tunnel
CN207176411U (en) One kind is applied to the reusable combined type base board of soft soil foundation
CN201158822Y (en) Single-wall steel hanging box
CN203960860U (en) A kind of detachable anchoring piece
CN208899354U (en) Anti-leakage structure for box culvert deformation joint
WO2019218531A1 (en) Pipe gallery anti-floating device
CN209443356U (en) A kind of composite structure box beam
CN205617423U (en) Piping lane installation foundation structure and utility tunnel
CN203403445U (en) Steel sleeve used for plugging basement tube well
CN208347285U (en) A kind of construction and decoration high-altitude construction supporting structure
CN207686336U (en) A kind of coupled column protection system
CN206034470U (en) Novel photovoltaic support basis mounting structure
CN204282350U (en) A kind of uplift pile pile extension connected node
CN206752238U (en) A kind of temporary construction road structure of band sound absorption pervious function
CN104060845A (en) Temporary fixing structure for steel column and construction method thereof
CN204059204U (en) Aqueduct side wall top board Channel Maker via hole protective device
CN208563594U (en) One kind being applied to unwrapping wire hole in high level and buries unwrapping wire point device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant